CN104832176A - 一种低透气性煤层群卸压瓦斯抽采高抽巷的一巷多用布置方法 - Google Patents

一种低透气性煤层群卸压瓦斯抽采高抽巷的一巷多用布置方法 Download PDF

Info

Publication number
CN104832176A
CN104832176A CN201510119460.0A CN201510119460A CN104832176A CN 104832176 A CN104832176 A CN 104832176A CN 201510119460 A CN201510119460 A CN 201510119460A CN 104832176 A CN104832176 A CN 104832176A
Authority
CN
China
Prior art keywords
coal seam
gas
work plane
pressure relief
extraction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510119460.0A
Other languages
English (en)
Other versions
CN104832176B (zh
Inventor
王红胜
双海清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Science and Technology
Original Assignee
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Science and Technology filed Critical Xian University of Science and Technology
Priority to CN201510119460.0A priority Critical patent/CN104832176B/zh
Publication of CN104832176A publication Critical patent/CN104832176A/zh
Application granted granted Critical
Publication of CN104832176B publication Critical patent/CN104832176B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Abstract

本发明涉及一种低透气性煤层群卸压瓦斯抽采高抽巷的一巷多用布置方法。首先,上下煤层巷道合理布置。其次,布置穿层钻孔预抽上下煤层瓦斯。再次,抽采上下煤层卸压瓦斯;外错高抽巷钻孔抽采卸压瓦斯。最后,内错高抽巷抽采卸压瓦斯。本发明既可起到降低上、下煤层的煤与瓦斯突出危险性,又可实现上、下煤层的卸压瓦斯抽采。实现了高抽巷一巷多用,能大幅度提高了高抽巷利用效率,对工作面瓦斯治理起到了积极作用,保障了工作面安全高效回采。

Description

一种低透气性煤层群卸压瓦斯抽采高抽巷的一巷多用布置方法
技术领域
本发明涉及煤矿低透气性煤层群开采卸压瓦斯抽采领域,具体涉及一种低透气性煤层群卸压瓦斯抽采高抽巷的一巷多用布置方法。
背景技术
瓦斯抽采是煤矿瓦斯灾害防治的主要技术措施之一,由于我国煤层赋存地质条件复杂,煤层透气性差,煤层预抽瓦斯效果不理想。即使对低透气性煤层进行了钻孔预先抽采,但工作面回采时,瓦斯仍易超限,时刻威胁工作面安全高效回采。工作面回采时,受采动影响,覆岩将发生大范围运移,导致煤岩层卸压,煤岩层透气性增强,大量瓦斯从煤层及顶底板岩层中涌出,通过穿层裂隙进入裂隙带内,导致裂隙带内积聚了大量游离态瓦斯。随着人们对瓦斯运移规律的掌握以及卸压抽采技术的快速发展,卸压瓦斯抽采技术得到了广泛应用。先后开发出高抽巷抽采卸压瓦斯,或在煤层顶底板内布置钻场,再布置长钻孔抽采卸压瓦斯。这两种抽采方式优点突出,高抽巷具有抽采时间较长、抽采半径较大、抽采效果较好特点;钻场配合长钻孔抽采具有布置灵活、快速高效解决小区域瓦斯问题,同时也可降低或消除区域煤与瓦斯突出问题。但高抽巷抽采存在掘进费用高、仅服务于一个工作面、受采动影响大等不足,钻场配合长钻孔抽采也存在钻场施工影响工作面回采、钻场和钻孔工程量大、采动影响时钻孔易错位变形等问题。目前,煤矿瓦斯工业性抽采中鲜有将高抽巷抽采和钻孔抽采相结合使用,不能充分将两者的优点最大化的综合利用。
发明内容
为解决上述问题,本发明提供了一种低透气性煤层群卸压瓦斯抽采高抽巷的一巷多用布置方法。煤层群开采时,将高抽巷布置在下煤层顶板合理层位,在高抽巷内布置钻孔抽采上、下煤层瓦斯,从而实现一巷多用。高抽巷布置初期可以降低或消除上、下煤层的煤与瓦斯突出危险性,后期能够高效抽采上、下煤层工作面的卸压瓦斯,有效降低工作面瓦斯浓度,避免工作面瓦斯超限。
为实现上述目的,本发明采取的技术方案为:
一种低透气性煤层群卸压瓦斯抽采高抽巷的一巷多用布置方法,包括如下步骤:
S1、上下煤层巷道合理布置:煤层(1、2)为低透气性煤层,先开采上煤层(1),上煤层(1)上区段工作面(3)中设有进风顺槽(4)和回风顺槽(5),下区段工作面(6)设有进风顺槽(7)和回风顺槽(8),留设煤柱(9);后开采下煤层(2),下煤层(2)上区段工作面(10)中设有进风顺槽(11)和回风顺槽(12),下区段工作面(13)设有回风顺槽(14)和进风顺槽(15),留设煤柱(16);在布置煤层(1、2)各工作面回采巷道之前,先将高抽巷(18)布置在下煤层下区段工作面回风顺槽(14)侧覆岩裂隙带中、下部或冒落带顶部的“O”型圈(17)内,区段煤柱(9、16)为窄煤柱;
S2、布置穿层钻孔预抽上下煤层瓦斯:布置高抽巷(18)后,在高抽巷(18)内向上煤层(1)或向下煤层(2)布置穿层钻孔(19、20)预抽煤层(1、2)瓦斯,以降低煤层(1、2)瓦斯含量和瓦斯压力;待煤层(1、2)瓦斯压力降低到安全值以后,可在上煤层(1)内先后布置回采工作面(3、6)进行回采作业;
S3、抽采上下煤层卸压瓦斯:上煤层(1)先后回采上区段工作 面(3)和下区段工作面(6),工作面(3、6)回采时,受采动影响,煤层(1、2)透气性增强,大量瓦斯从煤层中涌出,通过穿层钻孔(19、20)继续抽采煤层(1、2)的卸压瓦斯;同时,可在高抽巷(18)内布置上行穿层钻孔(22)抽采上煤层(1)采动覆岩裂隙带内卸压瓦斯;为保证工作面正常接续,在回采上煤层(1)工作面(6)时,开始准备下煤层(2)工作面(10);
S4、外错高抽巷钻孔抽采卸压瓦斯:当下煤层(2)上区段工作面(10)回采时,在高抽巷(18)向上区段工作面(10)覆岩裂隙带“O”型圈(23)内布置抽采钻孔(24),以抽采工作面覆岩裂隙带内的卸压瓦斯;
S5、内错高抽巷抽采卸压瓦斯:当下煤层下区段工作面(10)回采结束及围岩稳定后,开始准备工作面(13);工作面(13)回采时,对高抽巷(18)进行密闭(25),通过瓦斯抽采管道(26)负压抽采工作面(13)覆岩裂隙带卸压瓦斯。
本发明具有以下有益效果:
为提高低透气性煤层群开采中高抽巷的利用率,基于煤层群开采卸压瓦斯抽采技术,本发明提出了一种低透气性煤层群卸压瓦斯抽采高抽巷的一巷多用布置方法。这种高抽巷布置方法,既可起到降低或消除上、下煤层的煤与瓦斯突出危险性,又可实现上、下煤层开采时的卸压瓦斯抽采。实现了高抽巷一巷多用,大幅度提高了高抽巷利用率,对工作面瓦斯治理起到了积极作用,保障了工作面安全高效回采,取得了巨大的经济效益和社会效益,具有重要的理论意义和实用价值。
附图说明
图1为本发明下煤层平面示意图。
图2为本发明剖面示意图。
图3为本发明高抽巷密闭埋管负压抽采示意图。
图中1—上煤层,2—下煤层,3—上煤层上区段工作面,4—上煤层上区段工作面进风顺槽,5—上煤层上区段工作面回风顺槽,6—上煤层下区段工作面,7—上煤层下区段工作面进风顺槽,8—上煤层下区段工作面回风顺槽,9—上煤层区段煤柱,10—下煤层上区段工作面,11—下煤层上区段工作面进风顺槽,12—下煤层上区段工作面回风顺槽,13—下煤层下区段工作面,14—下煤层下区段工作面回风顺槽,15—下煤层下区段工作面进风顺槽,16—下煤层区段煤柱,17—下煤层下区段工作面“O”型圈,18—高抽巷,19—预抽采上煤层瓦斯穿层钻孔,20—预抽采下煤层瓦斯穿层钻孔,21—上煤层上区段工作面“O”型圈,22—抽采上煤层上区段工作面穿层钻孔,23—下煤层上区段工作面“O”型圈,24—抽采下煤层上区段工作面裂隙带顶部瓦斯钻孔,25—密闭,26—瓦斯抽采管道,27—工作面停采线。
具体实施方式:
为了使本发明的目的及优点更加清楚明白,以下结合该发明一巷多用高抽巷下煤层剖面图(五个阶段)、一巷多用高抽巷下煤层平面图和高抽巷密闭埋管抽采示意图对本发明进行进一步详细说明。
阶段一:煤层1、2为低透气性煤层,先开采上煤层1,上煤层1上区段工作面3中设有进风顺槽4和回风顺槽5,下区段工作面6设有进风顺槽7和回风顺槽8,留设煤柱9;后开采下煤层2,下煤层2上区段工作面10中设有进风顺槽11和回风顺槽12,下区段工作面13设有回风顺槽14和进风顺槽15,留设煤柱16;在布置煤层1、2各工作面回采巷道之前,基于下煤层2下区段工作面13的地质条件,采用理论计算、数值模拟、工程类比以及工业试验等研究方法,确定 工作面13覆岩“三带”发育特征,先将高抽巷18布置在下煤层下区段工作面回风顺槽14侧覆岩裂隙带中、下部或冒落带顶部的“O”型圈17内,将高抽巷18布置在裂隙带中下层位。采用锚杆支护技术控制高抽巷18围岩变形,确保高抽巷18断面满足服务期内瓦斯抽采需要。区段煤柱9、16为窄煤柱;
阶段二:高抽巷18布置后,可在高抽巷18内向上煤层1和下煤层2内布置穿层钻孔19、20,通过钻孔19、20预抽上煤层1和下煤层2的瓦斯,以降低上下煤层1、2的瓦斯含量和瓦斯压力,待上下煤层1、2的瓦斯压力降低到安全值以后,可在上煤层1内先后布置回采工作面3、6进行回采作业。
阶段三:在上煤层1内先后布置回采工作面3、6进行回采作业。工作面3、6回采时,受采动影响,煤层1、2透气性增强,大量瓦斯从煤层中涌出,通过穿层钻孔19、20继续抽采煤层1、2的卸压瓦斯;同时,可在高抽巷18内布置上行穿层钻孔22抽采上煤层1工作面3采动覆岩裂隙带内卸压瓦斯。为保证工作面正常接续,在回采上煤层1工作面6时,开始准备下煤层2工作面10。
阶段四:下煤层2上区段工作面10回采时,在高抽巷18内向工作面10采动覆岩裂隙带中上部“O”形圈23内布置抽采钻孔24抽采卸压瓦斯。
阶段五:下煤层2下区段工作面13回采时,采用高抽巷18抽采工作面13采动覆岩裂隙带卸压瓦斯。在停采线27内对高抽巷18进行密闭25,在密闭25埋设瓦斯抽采管道26,负压抽采工作面13采动覆岩裂隙带卸压瓦斯。
以上所述仅是本发明的一般的实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以作 出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。

Claims (1)

1.一种低透气性煤层群卸压瓦斯抽采高抽巷的一巷多用布置方法,其特征在于,包括如下步骤:
S1、上下煤层巷道合理布置:煤层(1、2)为低透气性煤层,先开采上煤层(1),上煤层(1)上区段工作面(3)中设有进风顺槽(4)和回风顺槽(5),下区段工作面(6)设有进风顺槽(7)和回风顺槽(8),留设煤柱(9);后开采下煤层(2),下煤层(2)上区段工作面(10)中设有进风顺槽(11)和回风顺槽(12),下区段工作面(13)设有回风顺槽(14)和进风顺槽(15),留设煤柱(16);在布置煤层(1、2)各工作面回采巷道之前,先将高抽巷(18)布置在下煤层下区段工作面回风顺槽(14)侧覆岩裂隙带中、下部或冒落带顶部的“O”型圈(17)内,区段煤柱(9、16)为窄煤柱;
S2、布置穿层钻孔预抽上下煤层瓦斯:布置高抽巷(18)后,在高抽巷(18)内向上煤层(1)或向下煤层(2)布置穿层钻孔(19、20)预抽煤层(1、2)瓦斯,以降低煤层(1、2)瓦斯含量和瓦斯压力;待煤层(1、2)瓦斯压力降低到安全值以后,可在上煤层(1)内先后布置回采工作面(3、6)进行回采作业;
S3、抽采上下煤层卸压瓦斯:上煤层(1)先后回采上区段工作面(3)和下区段工作面(6),工作面(3、6)回采时,受采动影响,煤层(1、2)透气性增强,大量瓦斯从煤层中涌出,通过穿层钻孔(19、20)继续抽采煤层(1、2)的卸压瓦斯;同时,可在高抽巷(18)内布置上行穿层钻孔(22)抽采上煤层(1)采动覆岩裂隙带内卸压瓦斯;为保证工作面正常接续,在回采上煤层(1)工作面(6)时,开始准备下煤层(2)工作面(10);
S4、外错高抽巷钻孔抽采卸压瓦斯:当下煤层(2)上区段工作面(10)回采时,在高抽巷(18)向上区段工作面(10)覆岩裂隙带“O”型圈(23)内布置抽采钻孔(24),以抽采工作面覆岩裂隙带内的卸压瓦斯;
S5、内错高抽巷抽采卸压瓦斯:当下煤层下区段工作面(10)回采结束及围岩稳定后,开始准备工作面(13);工作面(13)回采时,对高抽巷(18)进行密闭(25),通过瓦斯抽采管道(26)负压抽采工作面(13)覆岩裂隙带卸压瓦斯。
CN201510119460.0A 2015-03-18 2015-03-18 一种低透气性煤层群卸压瓦斯抽采高抽巷的一巷多用布置方法 Expired - Fee Related CN104832176B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510119460.0A CN104832176B (zh) 2015-03-18 2015-03-18 一种低透气性煤层群卸压瓦斯抽采高抽巷的一巷多用布置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510119460.0A CN104832176B (zh) 2015-03-18 2015-03-18 一种低透气性煤层群卸压瓦斯抽采高抽巷的一巷多用布置方法

Publications (2)

Publication Number Publication Date
CN104832176A true CN104832176A (zh) 2015-08-12
CN104832176B CN104832176B (zh) 2016-10-12

Family

ID=53810318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510119460.0A Expired - Fee Related CN104832176B (zh) 2015-03-18 2015-03-18 一种低透气性煤层群卸压瓦斯抽采高抽巷的一巷多用布置方法

Country Status (1)

Country Link
CN (1) CN104832176B (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105134214A (zh) * 2015-09-24 2015-12-09 中国矿业大学 一种煤矿开采后期辅助通风巷道布置及围岩稳定控制方法
CN106321143A (zh) * 2016-11-04 2017-01-11 中国矿业大学 立井井筒揭穿特厚松软突出煤层的快速卸压排放瓦斯方法
CN108343400A (zh) * 2018-01-27 2018-07-31 中国矿业大学(北京) 一种利用定向钻孔顺层抽采煤层群瓦斯的方法
CN109827484A (zh) * 2019-03-28 2019-05-31 中国矿业大学(北京) 一种高瓦斯矿井巨厚坚硬顶板定向预裂松动方法
CN110130895A (zh) * 2019-05-27 2019-08-16 太原理工大学 一种弱化遗留煤柱潜在破坏面的煤柱破坏方法
RU2732931C1 (ru) * 2020-06-01 2020-09-24 Федеральное Государственное Бюджетное Учреждение Науки Институт Проблем Комплексного Освоения Недр Им. Академика Н.В. Мельникова Российской Академии Наук (Ипкон Ран) Способ дегазации выемочного участка
CN112459782A (zh) * 2020-11-10 2021-03-09 陈卫军 留小煤柱基于f型综采工作面的煤矿冲击地压治理方法
CN113294199A (zh) * 2021-04-07 2021-08-24 淮南矿业(集团)有限责任公司 开采下保护层瓦斯治理巷道布置方法
CN113513359A (zh) * 2021-08-09 2021-10-19 太原理工大学 一种综放开采煤层高位巷一巷两用瓦斯抽采方法
CN114352344A (zh) * 2021-12-17 2022-04-15 中煤科工集团沈阳研究院有限公司 一种煤层间巷道过地质构造影响区域瓦斯治理方法
RU2807283C1 (ru) * 2022-09-26 2023-11-13 Федеральное Государственное Бюджетное Учреждение Науки Институт Проблем Комплексного Освоения Недр Им. Академика Н.В. Мельникова Российской Академии Наук (Ипкон Ран) Способ дегазации выемочного угольного поля

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4140343A (en) * 1977-02-14 1979-02-20 Occidental Oil Shale, Inc. Gas withdrawal from an in situ oil shale retort
CN1534164A (zh) * 2003-03-28 2004-10-06 淮南矿业(集团)有限责任公司 低透气性高瓦斯软厚煤层远程卸压瓦斯抽放方法
CN101251028A (zh) * 2008-04-03 2008-08-27 淮南矿业(集团)有限责任公司 高瓦斯煤层群开采沿空留巷y型通风卸压瓦斯抽采方法
CN103089295A (zh) * 2013-01-23 2013-05-08 重庆大学 多煤层联合开采过程中煤层气抽采试验方法
CN103758560A (zh) * 2014-01-14 2014-04-30 中国矿业大学 一种多重递进保护层分组区域瓦斯治理方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4140343A (en) * 1977-02-14 1979-02-20 Occidental Oil Shale, Inc. Gas withdrawal from an in situ oil shale retort
CN1534164A (zh) * 2003-03-28 2004-10-06 淮南矿业(集团)有限责任公司 低透气性高瓦斯软厚煤层远程卸压瓦斯抽放方法
CN101251028A (zh) * 2008-04-03 2008-08-27 淮南矿业(集团)有限责任公司 高瓦斯煤层群开采沿空留巷y型通风卸压瓦斯抽采方法
CN103089295A (zh) * 2013-01-23 2013-05-08 重庆大学 多煤层联合开采过程中煤层气抽采试验方法
CN103758560A (zh) * 2014-01-14 2014-04-30 中国矿业大学 一种多重递进保护层分组区域瓦斯治理方法

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105134214A (zh) * 2015-09-24 2015-12-09 中国矿业大学 一种煤矿开采后期辅助通风巷道布置及围岩稳定控制方法
CN105134214B (zh) * 2015-09-24 2017-12-19 中国矿业大学 一种煤矿开采后期辅助通风巷道布置及围岩稳定控制方法
CN106321143A (zh) * 2016-11-04 2017-01-11 中国矿业大学 立井井筒揭穿特厚松软突出煤层的快速卸压排放瓦斯方法
CN106321143B (zh) * 2016-11-04 2018-07-06 中国矿业大学 立井井筒揭穿特厚松软突出煤层的快速卸压排放瓦斯方法
CN108343400A (zh) * 2018-01-27 2018-07-31 中国矿业大学(北京) 一种利用定向钻孔顺层抽采煤层群瓦斯的方法
CN109827484A (zh) * 2019-03-28 2019-05-31 中国矿业大学(北京) 一种高瓦斯矿井巨厚坚硬顶板定向预裂松动方法
CN110130895A (zh) * 2019-05-27 2019-08-16 太原理工大学 一种弱化遗留煤柱潜在破坏面的煤柱破坏方法
CN110130895B (zh) * 2019-05-27 2020-08-07 太原理工大学 一种弱化遗留煤柱潜在破坏面的煤柱破坏方法
RU2732931C1 (ru) * 2020-06-01 2020-09-24 Федеральное Государственное Бюджетное Учреждение Науки Институт Проблем Комплексного Освоения Недр Им. Академика Н.В. Мельникова Российской Академии Наук (Ипкон Ран) Способ дегазации выемочного участка
CN112459782A (zh) * 2020-11-10 2021-03-09 陈卫军 留小煤柱基于f型综采工作面的煤矿冲击地压治理方法
CN113294199A (zh) * 2021-04-07 2021-08-24 淮南矿业(集团)有限责任公司 开采下保护层瓦斯治理巷道布置方法
CN113294199B (zh) * 2021-04-07 2022-08-02 淮南矿业(集团)有限责任公司 开采下保护层瓦斯治理巷道布置方法
CN113513359A (zh) * 2021-08-09 2021-10-19 太原理工大学 一种综放开采煤层高位巷一巷两用瓦斯抽采方法
CN114352344A (zh) * 2021-12-17 2022-04-15 中煤科工集团沈阳研究院有限公司 一种煤层间巷道过地质构造影响区域瓦斯治理方法
CN114352344B (zh) * 2021-12-17 2023-09-26 中煤科工集团沈阳研究院有限公司 一种煤层间巷道过地质构造影响区域瓦斯治理方法
RU2807283C1 (ru) * 2022-09-26 2023-11-13 Федеральное Государственное Бюджетное Учреждение Науки Институт Проблем Комплексного Освоения Недр Им. Академика Н.В. Мельникова Российской Академии Наук (Ипкон Ран) Способ дегазации выемочного угольного поля
RU2814374C1 (ru) * 2023-07-14 2024-02-28 Федеральное Государственное Бюджетное Учреждение Науки Институт Проблем Комплексного Освоения Недр Им. Академика Н.В. Мельникова Российской Академии Наук (Ипкон Ран) Способ дегазации угольного пласта

Also Published As

Publication number Publication date
CN104832176B (zh) 2016-10-12

Similar Documents

Publication Publication Date Title
CN104832176A (zh) 一种低透气性煤层群卸压瓦斯抽采高抽巷的一巷多用布置方法
CN107083988B (zh) 基于千米定向钻孔的采动裂隙带瓦斯抽采技术方法
CN104131831B (zh) 一种煤层气井上下立体联合抽采方法
CN103670496B (zh) 单一低透气性突出煤层沿空留巷与预抽区段煤层瓦斯方法
CN104481578B (zh) 一种高瓦斯煤层大采高工作面瓦斯治理方法
CN102080526B (zh) 地面煤层顶板顺层水平压裂井抽采瓦斯方法
CN103758559B (zh) 沿空留巷y型通风高位回风巷钻孔抽采瓦斯方法
CN105221179B (zh) 一种高瓦斯矿井y型通风方法
CN103742148B (zh) 一种急倾斜煤层柔掩支护下行矸石充填的采煤法
CN103967493B (zh) 一种缓倾斜薄矿体矿柱采矿法
CN102352769A (zh) 高突矿井煤与瓦斯共采一体化开采方法
CN104806285A (zh) 基于地面水平井的煤矿采空区瓦斯治理方法
CN112593936B (zh) 一种深部矿井多灾害区域超前综合防治方法
CN103485786B (zh) 一种急倾斜煤层走向长壁机械化开采方法
CN104100292A (zh) 单一低透气性突出厚煤层区域性瓦斯强化抽采方法
CN105804788A (zh) 一种煤层瓦斯巷道治理方法
CN104047629B (zh) 薄煤层综采沿空留巷定向钻进抽采临近下煤层瓦斯的方法
CN102644476A (zh) 保护层机巷高位钻场穿层钻孔抽采被保护层瓦斯的方法
CN103899348A (zh) 一种采煤工作面瓦斯快速抽采方法
CN103362539A (zh) 留巷钻场钻孔抽采卸压瓦斯的方法
CN104847401A (zh) 一种区域性防治煤与瓦斯突出煤层采煤工作面突出的方法
CN105239964A (zh) 保护层卸压井上下立体化煤与煤层气协调开发方法
CN104564127A (zh) 一种上覆巨厚火成岩下煤层瓦斯的抽采方法
CN106468177A (zh) 一种煤与瓦斯协调开采方法
CN107503790B (zh) 快速回采综采面瓦斯综合抽放布置治理方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161012

Termination date: 20170318