CN104831912B - A kind of building wall construction robot walking guide and method - Google Patents

A kind of building wall construction robot walking guide and method Download PDF

Info

Publication number
CN104831912B
CN104831912B CN201510283273.6A CN201510283273A CN104831912B CN 104831912 B CN104831912 B CN 104831912B CN 201510283273 A CN201510283273 A CN 201510283273A CN 104831912 B CN104831912 B CN 104831912B
Authority
CN
China
Prior art keywords
building wall
wall construction
photoswitch
construction robot
controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510283273.6A
Other languages
Chinese (zh)
Other versions
CN104831912A (en
Inventor
周广旭
王平来
李小伟
王知学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Automation Shandong Academy of Sciences
Original Assignee
Institute of Automation Shandong Academy of Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Automation Shandong Academy of Sciences filed Critical Institute of Automation Shandong Academy of Sciences
Priority to CN201510283273.6A priority Critical patent/CN104831912B/en
Publication of CN104831912A publication Critical patent/CN104831912A/en
Application granted granted Critical
Publication of CN104831912B publication Critical patent/CN104831912B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manipulator (AREA)

Abstract

The invention discloses a kind of building wall construction robot walking guide and method, building wall construction robot both sides are equipped with crawler unit, crawler unit connects motor, the chassis that crawler unit is supported is provided with photoswitch combination, photoswitch combination is connected with controller, controller is connected with driver, and driver drives motor operates;The front or behind of building wall construction robot walking is provided with horizontal and vertical generating laser.Place generating laser in construction area, generate horizontal and vertical lasing area, and in robot both sides, photoswitch combination, position signalling in detection walking are installed, controller is by the movable motor of driver control robot both sides it is ensured that it is walked according to guided laser face and is accurately positioned;Structure is simple, and walking and position fixing process fully achieve straight line guiding, and the speed of travel and location efficiency are higher.

Description

A kind of building wall construction robot walking guide and method
Technical field
The present invention relates to needing sprocket bit is equipped with the mobile device of exact requirements, more particularly, to a kind of building wall is applied Work robot ambulation guide and method.
Background technology
Building wall construction robot when carrying out building wall plastering construction, constantly move in construction area and Keep there is certain accurate distance with constructed metope, need a kind of effective method and apparatus to ensure positioning precision.Existing A lot of methods measure the distance of walking by measuring the rotation of track drive motor in chassis, due to double in actual application Skidding in the difference and walking process of side crawler belt can bring larger measurement error.
Content of the invention
The purpose of the present invention is for overcoming above-mentioned the deficiencies in the prior art, providing a kind of building wall construction robot walking Guide and method, to realize building wall construction robot using exterior laser source, photoswitch and sampling processing device Walking is accurately positioned with fixed position.
For achieving the above object, the present invention adopts following technical proposals:
A kind of building wall construction robot walking guide, building wall construction robot both sides are equipped with crawler belt row Walking apparatus, crawler unit connects motor, and the chassis that described crawler unit is supported is provided with photoswitch combination, institute State photoswitch combination to be connected with controller, controller is connected with driver, and driver drives motor operates;Described building wall The front or behind of construction robot walking is provided with horizontal and vertical generating laser, and described horizontal and vertical generating laser is sent out The light going out forms vertical reference face and level reference needed for wall construction.
Described photoswitch combination is positioned only at the one of the chassis of building wall construction robot crawler unit support Side.
Preferably, the chassis both sides that the crawler unit of described building wall construction robot both sides is supported are equipped with Photoswitch combines.
Described photoswitch combination includes multiple photoswitches, is established by cable with one of light in construction robot walking process Central point on the basis of pass, remaining photoswitch is laid up and down along this central point both sides or uniformly.
Described controller is PLC or MCU.
A kind of building wall construction robot walking bootstrap technique, comprises the following steps:
(1) horizontal and vertical generating laser, this horizontal and vertical generating laser are placed in building wall construction area The light sending forms vertical reference face and level reference;
(2) after vertical reference face is irradiated to the photoswitch combination on building wall construction robot crawler unit, Form the on-off model of building wall construction robot position, this on-off model is transferred to control by photoswitch combination Device;
(3) controller is according to the on-off model receiving, and the on-off model with the photoswitch position of central point Compare, if deviateing in building wall construction robot walking process, controller controls driver to adjust motor fortune Scanning frequency degree, thus driving crawler unit to carry out the adjustment of position in walking process, realize building wall construction robot with Construction being accurately positioned of metope.
In described step (3), building wall construction robot is concretely comprised the following steps with construction the pinpoint of metope:? Before building wall construction robot is not walked, horizontal and vertical generating laser is adjusted according to construction requirement so that send hangs down Straight datum level is the plane of reference in building wall construction robot walking process, remain in walking process vertical reference face with When the photoswitch of the central point setting overlaps, reference laser face is irradiated on benchmark photoswitch all the time, this photoswitch Detection signal exports controller, and controller is failure to actuate;
If deviateed in building wall construction robot walking process, vertical reference face is irradiated the laser sending and is irradiated During to left side or right side photoswitch, to controller, controller is according to upper for left side or right side photoswitch output detection signal Stating signal controls driver to adjust the motor speed of service, thus driving crawler unit to carry out position in walking process Adjust it is ensured that set vertical reference face is overlapped with the photoswitch position of central point all the time before construction, thus realizing building Wall construction robot is accurately positioned with construction metope.
Beneficial effects of the present invention are:
The present invention using exterior laser source, photoswitch and sampling processing device to realize walk and fixed position accurate Positioning;Place generating laser in construction area, generate horizontal and vertical lasing area, and in robot both sides, photoswitch is installed Combination, position signalling in detection walking, controller is by the movable motor of driver control robot both sides it is ensured that it is according to drawing Lead lasing area to walk and be accurately positioned;Present configuration is simple, and walking and position fixing process fully achieve straight line guiding, the speed of travel Higher with location efficiency.
Brief description
Fig. 1 is the schematic diagram of building wall construction robot walking guide of the present invention;
In figure, 1 is horizontal and vertical generating laser, and 2 is vertical reference face, and 3 is level reference, and 4 is photoswitch Combination, 5 is controller, and 6 is left side drive, and 7 is left motor, and 8 is right driver, and 9 is right motor, and 10 is building wall Surface construction robot, 11 is crawler unit.
Specific embodiment
The present invention is further described with reference to the accompanying drawings and examples.
As shown in figure 1, building wall construction robot walking guide, required according to wall construction in construction area Place horizontal and vertical laser reflector 1, this emitter forms vertical reference face 2 and level reference 3 according to specific needs.Build Walling surface construction robot 10 both sides are equipped with crawler unit 11, and left track running gear connects left motor 7, right side Crawler unit connects right motor 9, is installed on building wall construction robot one or both sides crawler unit 11 Photoswitch combination 4 formed building wall construction robot walking processes in position signallings, in actual applications light establish by cable Close combination and can adjust quantity as needed, can be such as 3,4,5 etc. more form permutation and combination, photoswitch Combination includes multiple photoswitches, defines point centered on certain photoswitch in the middle of in photoswitch combination, such as selection B or Point centered on C.Photoswitch combination 4 is connected with controller 5, and controller 5 is connected with left side drive 6 and right driver 8, left Side driver 6 and right driver 8 drive left motor 7 and right motor 9 to operate respectively;Controller 5 can be programmable patrolling Collect device (PLC) or microprocessor (MCU).
Building wall construction robot walking bootstrap technique, comprises the following steps:
(1) horizontal and vertical generating laser 1, this horizontal and vertical generating laser are placed in building wall construction area The light that 1 sends forms vertical reference face 2 and level reference 3;
(2) vertical reference face 2 is irradiated to the photoswitch group on building wall construction robot 10 crawler unit 11 After closing 4, form the on-off model of building wall construction robot 11 position, this on-off model is passed by photoswitch combination 4 It is defeated by controller 5;
(3) before building wall construction robot is not walked, workmen adjusts generating laser according to construction requirement, makes The vertical reference face that must send is the plane of reference during wall construction robot ambulation, remains vertical base in walking process Quasi- face all the time with set photoswitch combine in reference photoswitch center superposition when, reference laser face is irradiated all the time To on benchmark photoswitch, the detection signal of this photoswitch exports follow-up controller, controller regard as walking in Reference position overlaps.
If deviateed in walking process, reference laser face is irradiated the laser sending and is deviateed reference position and be irradiated to a left side When side or right side photoswitch, the left side irradiated by laser pulse or right side photoswitch will export detection signal, left side Or right side offset signal is input to controller, walking mechanism controller controls driver to adjust motor fortune according to above-mentioned signal Scanning frequency degree, thus drive crawler unit to carry out the adjustment of position in walking process it is ensured that vertical base set before construction Quasi- face combine with photoswitch all the time in reference photoswitch center superposition, thus realizing building wall construction robot With being accurately positioned of construction metope.
Although the above-mentioned accompanying drawing that combines is described to the specific embodiment of the present invention, not model is protected to the present invention The restriction enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme, and those skilled in the art are not Need to pay the various modifications that creative work can make or deformation still within protection scope of the present invention.

Claims (6)

1. a kind of building wall construction robot is walked bootstrap technique, it is characterized in that, the method based on device include in building Wall construction robot both sides are equipped with crawler unit, and crawler unit connects motor, described crawler unit institute The chassis supporting is provided with photoswitch combination, and described photoswitch combination is connected with controller, and controller is connected with driver, Driver drives motor operates;The front or behind of described building wall construction robot walking is provided with horizontal and vertical laser and sends out Emitter, the light that described horizontal and vertical generating laser sends forms vertical reference face and horizontal reference needed for wall construction Face;
The method comprises the following steps:
(1)Place horizontal and vertical generating laser in building wall construction area, this horizontal and vertical generating laser sends Light form vertical reference face and level reference;
(2)After vertical reference face is irradiated to the photoswitch combination on building wall construction robot crawler unit, formed The on-off model of building wall construction robot position, this on-off model is transferred to controller by photoswitch combination;
(3)Controller according to the on-off model receiving, and compared with the on-off model of the photoswitch position of central point Relatively, if deviateing in building wall construction robot walking process, controller controls driver to adjust motor operation speed Degree, thus driving crawler unit to carry out the adjustment of position in walking process, realizes building wall construction robot and construction Being accurately positioned of metope.
2. building wall construction robot walking bootstrap technique as claimed in claim 1, is characterized in that, described photoswitch group Close the side on the chassis being positioned only at the support of building wall construction robot crawler unit.
3. building wall construction robot walking bootstrap technique as claimed in claim 1, is characterized in that, described building wall is applied The chassis both sides that the crawler unit of work robot both sides is supported are equipped with photoswitch combination.
4. building wall construction robot walking bootstrap technique as claimed in claim 1, is characterized in that, described photoswitch group Close include multiple photoswitches, in building wall construction robot walking process on the basis of one of photoswitch center Point, remaining photoswitch is laid up and down along this central point both sides or uniformly.
5. building wall construction robot walking bootstrap technique as claimed in claim 1, is characterized in that, described controller is PLC or MCU.
6. building wall construction robot walking bootstrap technique as claimed in claim 1, is characterized in that, described step(3)In Building wall construction robot is concretely comprised the following steps with construction the pinpoint of metope:
Before building wall construction robot is not walked, horizontal and vertical generating laser is adjusted according to construction requirement so that sending out The vertical reference face going out is the plane of reference in building wall construction robot walking process, remains vertical base in walking process When quasi- face is overlapped with the photoswitch of the central point setting, reference laser face is irradiated on benchmark photoswitch all the time, this photoelectricity The detection signal of switch exports controller, and controller is failure to actuate;
If deviateed in building wall construction robot walking process, vertical reference face is irradiated the laser sending and is irradiated to a left side When side or right side photoswitch, to controller, controller is according to above-mentioned letter for left side or right side photoswitch output detection signal Number control driver adjust the motor speed of service, thus driving crawler unit to carry out the tune of position in walking process Whole it is ensured that construction before set vertical reference face overlap with the photoswitch position of central point all the time, thus realizing building wall Surface construction robot is accurately positioned with construction metope.
CN201510283273.6A 2015-05-28 2015-05-28 A kind of building wall construction robot walking guide and method Active CN104831912B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510283273.6A CN104831912B (en) 2015-05-28 2015-05-28 A kind of building wall construction robot walking guide and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510283273.6A CN104831912B (en) 2015-05-28 2015-05-28 A kind of building wall construction robot walking guide and method

Publications (2)

Publication Number Publication Date
CN104831912A CN104831912A (en) 2015-08-12
CN104831912B true CN104831912B (en) 2017-03-08

Family

ID=53810070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510283273.6A Active CN104831912B (en) 2015-05-28 2015-05-28 A kind of building wall construction robot walking guide and method

Country Status (1)

Country Link
CN (1) CN104831912B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110640735A (en) * 2019-10-17 2020-01-03 广东博智林机器人有限公司 Deviation rectifying method, deviation rectifying device and robot

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105587107B (en) * 2016-01-28 2018-02-23 长沙万工机器人科技有限公司 A kind of full automatic wall material construction robot
CN107327126B (en) * 2017-08-11 2023-09-08 深圳班翟机器人有限公司 Plastering robot
CN108518047A (en) * 2018-05-21 2018-09-11 黄艳秋 A kind of plastering machine for painting wall
CN109577616B (en) * 2019-01-17 2020-12-29 深圳市森博机器人有限公司 Control method of plastering robot with automatic translation and walking function
CN111576803A (en) * 2020-04-26 2020-08-25 哈尔滨工业大学(深圳)(哈尔滨工业大学深圳科技创新研究院) Wall surface construction robot and wall surface robot control method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09210687A (en) * 1996-01-31 1997-08-12 Topcon Corp Laser level
CN202280240U (en) * 2011-11-14 2012-06-20 蒋京德 Construction robot for wall surface of building
CN202324558U (en) * 2011-11-14 2012-07-11 蒋京德 Walking and turning device of building wall surface construction robot
CN103726645A (en) * 2013-12-10 2014-04-16 沈阳市昂扬科技有限公司 Special device for automatic spraying and whitewashing
CN104563459A (en) * 2014-12-25 2015-04-29 三一汽车制造有限公司 Wall plastering machine and leveling method thereof
CN104631804A (en) * 2014-12-25 2015-05-20 三一汽车制造有限公司 Wall plastering machine and leveling method thereof
CN204738511U (en) * 2015-05-28 2015-11-04 山东省科学院自动化研究所 Building wall construction walking guiding device of robot

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09210687A (en) * 1996-01-31 1997-08-12 Topcon Corp Laser level
CN202280240U (en) * 2011-11-14 2012-06-20 蒋京德 Construction robot for wall surface of building
CN202324558U (en) * 2011-11-14 2012-07-11 蒋京德 Walking and turning device of building wall surface construction robot
CN103726645A (en) * 2013-12-10 2014-04-16 沈阳市昂扬科技有限公司 Special device for automatic spraying and whitewashing
CN104563459A (en) * 2014-12-25 2015-04-29 三一汽车制造有限公司 Wall plastering machine and leveling method thereof
CN104631804A (en) * 2014-12-25 2015-05-20 三一汽车制造有限公司 Wall plastering machine and leveling method thereof
CN204738511U (en) * 2015-05-28 2015-11-04 山东省科学院自动化研究所 Building wall construction walking guiding device of robot

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110640735A (en) * 2019-10-17 2020-01-03 广东博智林机器人有限公司 Deviation rectifying method, deviation rectifying device and robot
CN110640735B (en) * 2019-10-17 2021-05-11 广东博智林机器人有限公司 Deviation rectifying method, deviation rectifying device and robot

Also Published As

Publication number Publication date
CN104831912A (en) 2015-08-12

Similar Documents

Publication Publication Date Title
CN104831912B (en) A kind of building wall construction robot walking guide and method
CN103790367B (en) A kind of full-automatic erection equipment of external wall stone material
CN110805301B (en) Hole plugging device and hole plugging robot
CN104942519A (en) Straight pipe correcting platform and straight pipe correcting method
CN203566083U (en) Double-rail laser marking machine
CN103831192A (en) Conformal coating spraying PCB conveying spraying positioning system
CN104772266B (en) A kind of ultraviolet light polymerization equipment
CN103742160A (en) Mounting device for upper structure in tunnel
CN103862582A (en) Transmission device for glass drilling machine and glass drilling machine thereof
KR102099271B1 (en) Method and System for Preventing Cutting of Cable For Supplying Power to Tripper Car
CN204738511U (en) Building wall construction walking guiding device of robot
CN104440453A (en) Automatic edge grinding device
CN108661384A (en) A kind of automatic parking system of parking
CN110162056A (en) A kind of light guidance follow-up mechanism and method
CN204759202U (en) Location detection device in walking of wall construction robot
CN105862526A (en) High speed rail base plate side wall vehicle-mounted sawing device
CN104850126B (en) Locating and detecting device and method in a kind of wall construction robot ambulation
CN115633614A (en) Control system for planting machine and control method thereof
CN203529417U (en) Production line for transferring workpiece by transfer trolley
CN104556655A (en) Novel glass cutting equipment and control method thereof
CN109481856A (en) Make the auxiliary equipment of spiral-fault radiation therapeutic systematic treating bed holding level
CN208441556U (en) A kind of automatic parking system of parking
KR20200019208A (en) Tire production system and method
CN106952666A (en) Plasterboard diagonal Bias Correction device
JP2020078852A (en) Learning system and robot position adjustment system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20150812

Assignee: SHANDONG JUNDE ROBOT TECHNOLOGY CO., LTD.

Assignor: Automation Inst., Shandong Prov.

Contract record no.: X2019370000011

Denomination of invention: Travelling guide device and method for building wall construction robot

Granted publication date: 20170308

License type: Common License

Record date: 20191105