CN104818857A - Installation method of multiple uniform-distributed thin praline pull rods on large-span roof - Google Patents

Installation method of multiple uniform-distributed thin praline pull rods on large-span roof Download PDF

Info

Publication number
CN104818857A
CN104818857A CN201510187285.9A CN201510187285A CN104818857A CN 104818857 A CN104818857 A CN 104818857A CN 201510187285 A CN201510187285 A CN 201510187285A CN 104818857 A CN104818857 A CN 104818857A
Authority
CN
China
Prior art keywords
pull bar
roofing
roof
conveying arrangement
purlin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510187285.9A
Other languages
Chinese (zh)
Other versions
CN104818857B (en
Inventor
朱道付
程玉洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201510187285.9A priority Critical patent/CN104818857B/en
Publication of CN104818857A publication Critical patent/CN104818857A/en
Application granted granted Critical
Publication of CN104818857B publication Critical patent/CN104818857B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an installation method of multiple uniform-distributed thin praline pull rods on a large-span roof. The installation method comprises the construction steps of: (1) roof praline checking; (2) arrangement of a pull rod roof transportation device; (3) arrangement of a safety belt; and (4) transportation and installation of the pull rods. The installation method has the advantages of realizing quick installation of the pull rods, improving the construction efficiency, enhancing the working efficiency of transporting and installing the pull rods and reducing the construction cost.

Description

The thin pull bar mounting method of the uniform purlin of long-span roofing many
Technical field
The present invention relates to a kind of construction techniques, in particular, relate to the thin pull bar mounting method of the uniform purlin of a kind of long-span roofing many.
Background technology
At present, in steel house surface construction, often running into the support strength for increasing roof purline, between every two purlins, vertically two to four pull bars being all equidistantly set, after pull head passes the reserved connecting hole of two purlins usually, two ends nut is fixed, and will form entirety by purlin between two.Pull bar normal length is about 1 to 2m, the pull bar quantity of whole Roof system configuration is many, because purlin wall is thin and many with roof girder tie point, pull bar diameter comparatively thin (general diameter is at about 12mm) in addition, carries out the mounting method of burst lifting after being difficult to realize ground assembling.And conventional project way adopts the method for installing by root to carry out in place, install because of pull bar and belong to work high above the ground, pull bar hoisted in position and be arranged on each tie point want multiple multiple once, and safety rope is often shifted and once all needs to untie to reset, cause efficiency of construction lower, construction period will extend, and construction cost increases.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, and under a kind of prerequisite more at roofing pull bar is provided, improve transport and the installation work efficiency of pull bar, reduce the thin pull bar mounting method of the uniform purlin of long-span roofing many of construction cost.
The thin pull bar mounting method of the uniform purlin of long-span roofing of the present invention many, comprises following construction sequence:
The inspection of step one roof purline:
According to designing requirement, check installation procedure and the quality of roof girder and roof purline;
Step 2 arranges pull bar roofing conveying arrangement:
Roof purline longitudinal pitch is set to 1 ~ 2m, according to the weight of roof purline spacing dimension and pull bar, adopt cable testing bridge horizontal on the longitudinal direction of roofing four roof purlines, and it is vertical with roof purline longitudinal centre line, by the groove of cable testing bridge upwards and both ends open Plate Welding seal, composition a upper opening roofing conveying arrangement;
Step 3 arranges safety belt:
In the side of the everywhere contact position of roofing conveying arrangement and four roof purlines, all arrange one and be fixed on safety belt on roofing conveying arrangement, making pull bar when transporting or install, in the track that four constructors vertically move, all can wear safely the safety belt without the need to untiing;
The transport of step 4 pull bar and installation:
Described roofing conveying arrangement once can transport covering four root roof purlines, between two roof girders, lay four equidistant roof purlines 6 pull bars are set altogether, during pull bar transport, everyone is pass a bridge across in the middle of roof girder with roof purline one by one to arrange four constructors, and wear the safety belt be arranged on roofing conveying arrangement, often arranging 6 pull bar handlings across roof girder place lifting gear in roofing conveying arrangement groove, then four people press the position that pull bar is arranged in roof purline longitudinal center, after common promotion roofing conveying arrangement to the installation site of pull bar, pull bar is penetrated in roof purline by technical size requirement, every constructor is responsible for the installation of pull-rod nut in this running orbit and fastening, circulated successively these four roof purlines pull bar install, and then by above method, whole roofing pull bar is all installed.
Roofing conveying arrangement bottom portion of groove in described step 2 respectively installs a position-limited wheel.Described position-limited wheel and roof purline side clearance are 2 ~ 3mm, play the restriction that the longitudinal running orbit of roofing conveying arrangement is anti-deviation.Described cable testing bridge specification is 300 × 100.Described pull bar quality is 1 ~ 2kg.Described roofing conveying arrangement length is 6m, and quality is 180kg.
The invention has the beneficial effects as follows: (1) achieves the Fast Installation of pull bar, improve efficiency of construction, save the engineering time; (2) improve transport and the installation work efficiency of pull bar, reduce construction cost.
Accompanying drawing explanation
Fig. 1 is Roof system end view of the present invention.
Fig. 2 is Roof system schematic top plan view of the present invention.
Fig. 3 is roofing conveying arrangement schematic top plan view of the present invention.
Fig. 4 is roofing conveying arrangement end view of the present invention.
Fig. 5 is pull bar of the present invention transport and installs schematic top plan view.
Fig. 6 is pull bar of the present invention transport and installs end view.
In figure: roof girder 1, roof purline 2, conveying arrangement 3, position-limited wheel 4, safety belt 5, pull bar 6.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
In the drawings, the thin pull bar mounting method of the uniform purlin of long-span roofing of the present invention many, comprises following construction sequence:
Step one as shown in Figure 1, 2, roof purline inspection; According to designing requirement, check installation procedure and the quality of roof girder 1 and roof purline 2;
Step 2 as shown in Figure 3,4, arranges pull bar roofing conveying arrangement; Roof purline 2 longitudinal pitch is 1 ~ 2m, the single heavy about 1 ~ 2kg of pull bar 6, according to the weight of roof purline 2 spacing dimension and pull bar 6, select the cable testing bridge of 300 × 100 horizontal on the longitudinal direction of roofing four roof purlines 2, and it is vertical with roof purline 2 longitudinal centre line, by the groove of cable testing bridge upwards and both ends open Plate Welding seal, composition a upper opening roofing conveying arrangement 3;
Step 3 as shown in Figure 4,5, arranges safety belt; In the side of the everywhere contact position of roofing conveying arrangement 3 and four roof purlines 2, all arrange one and be fixed on safety belt 5 on roofing conveying arrangement 3, making pull bar 6 when transporting or install, in the track that four constructors vertically move, all can wear safely the safety belt 5 without the need to untiing;
As shown in Figure 5,6, pull bar transports and installs step 4, described roofing conveying arrangement 3 once can transport covering four root roof purlines 2, described roofing conveying arrangement 3 length is about 6m, between two roof girders 1, lay four equidistant roof purlines 26 pull bars 6 are set altogether, 6 pull bar 6 heavily about 12kg, roofing conveying arrangement 3 heavily about 180kg, roofing conveying arrangement 3 gross weight that pull bar 6 is housed is about 200kg, when pull bar 6 transports, everyone is pass a bridge across in the middle of roof girder 1 with roof purline 2 one by one to arrange four constructors, and wear the safety belt 5 be arranged on roofing conveying arrangement 3, often arranging the handling of 6 pull bars 6 across roof girder 1 place lifting gear in roofing conveying arrangement 3 groove, then four people press the position that pull bar 6 is arranged in roof purline 2 longitudinal center, behind the installation site of common promotion roofing conveying arrangement 3 to pull bar 6, pull bar 6 is penetrated in roof purline 2 by technical size requirement, every constructor is responsible for the installation of pull bar 6 nut in this running orbit and fastening, the pull bar 6 of these four roof purlines 2 of having circulated successively is installed, and then by above method, whole roofing pull bar 6 is all installed.
Roofing conveying arrangement 3 bottom portion of groove in described step 2 respectively installs a position-limited wheel 4.Described position-limited wheel 4 is 2 ~ 3mm with roof purline 2 side clearance, plays the restriction that the longitudinal running orbit of roofing conveying arrangement 3 is anti-deviation.
Lianyun Harbour engineering factory building be individual layer five across portal-rigid frames steel work, often across 30m, post is apart from 7.5m, and eaves height is 15.00m, and roof structure is purlin system light roof, and roof pitch is 1/10.Factory building head factory 400m, wide 150m, building area is about 60000 ㎡.Roof girder is welded H section steel roof girder, and roof girder spacing is 7500mm, and roofing Z-shaped purline connects in place at roof girder, spacing 1500mm.Tie rod between purlin, specification ф 12 × 1621, number of packages 9752, substance 1.3kg, spacing 2500mm.Adopt the method to achieve the Fast Installation of pull bar, result of use is good.

Claims (6)

1. the thin pull bar mounting method of the uniform purlin of long-span roofing many, is characterized in that, comprise following construction sequence:
The inspection of step one roof purline:
According to designing requirement, check installation procedure and the quality of roof girder (1) and roof purline (2);
Step 2 arranges pull bar roofing conveying arrangement:
Roof purline (2) longitudinal pitch is set to 1 ~ 2m, according to the weight of roof purline (2) spacing dimension and pull bar (6), adopt cable testing bridge horizontal on the longitudinal direction of roofing four roof purlines (2), and it is vertical with roof purline (2) longitudinal centre line, by the groove of cable testing bridge upwards and both ends open Plate Welding seal, composition a upper opening roofing conveying arrangement (3);
Step 3 arranges safety belt:
In the side of roofing conveying arrangement (3) with the everywhere contact position of four roof purlines (2), a safety belt (5) be fixed on roofing conveying arrangement (3) is all set, making pull bar (6) when transporting or install, in the track that four constructors vertically move, all can wear safely the safety belt (5) without the need to untiing;
The transport of step 4 pull bar and installation:
Described roofing conveying arrangement (3) once can transport covering four root roof purlines (2), between two roof girders (1), lay four equidistant roof purlines (2) 6 pull bars (6) are set altogether, during pull bar (6) transport, everyone is pass a bridge across in the middle of roof girder (1) with a roof purline (2) to arrange four constructors, and wear the safety belt (5) be arranged on roofing conveying arrangement (3), often arranging the handling of 6 pull bars (6) across roof girder (1) place lifting gear in roofing conveying arrangement (3) groove, then four people press the position that pull bar (6) is arranged in roof purline (2) longitudinal center, after common promotion roofing conveying arrangement (3) to the installation site of pull bar (6), pull bar (6) is penetrated in roof purline (2) by technical size requirement, every constructor is responsible for the installation of pull bar in this running orbit (6) nut and fastening, circulated successively these four roof purlines (2) pull bar (6) install, and then by above method, whole roofing pull bar (6) is all installed.
2. the thin pull bar mounting method of the uniform purlin of long-span roofing according to claim 1 many, is characterized in that, roofing conveying arrangement (3) bottom portion of groove in described step 2 respectively installs a position-limited wheel (4).
3. the thin pull bar mounting method of the uniform purlin of long-span roofing according to claim 2 many, it is characterized in that, described position-limited wheel (4) and roof purline (2) side clearance are 2 ~ 3mm, play the restriction that roofing conveying arrangement (3) longitudinal running orbit is anti-deviation.
4. the thin pull bar mounting method of the uniform purlin of long-span roofing according to claim 2 many, is characterized in that, described cable testing bridge specification is 300 × 100.
5. the thin pull bar mounting method of the uniform purlin of long-span roofing according to claim 1 many, is characterized in that, described pull bar (6) quality is 1 ~ 2kg.
6. the thin pull bar mounting method of the uniform purlin of long-span roofing according to claim 1 many, is characterized in that, described roofing conveying arrangement (3) length is 6m, and quality is 180kg.
CN201510187285.9A 2015-04-21 2015-04-21 Many uniform purlin thin pull bar installation methods of long-span roofing Active CN104818857B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510187285.9A CN104818857B (en) 2015-04-21 2015-04-21 Many uniform purlin thin pull bar installation methods of long-span roofing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510187285.9A CN104818857B (en) 2015-04-21 2015-04-21 Many uniform purlin thin pull bar installation methods of long-span roofing

Publications (2)

Publication Number Publication Date
CN104818857A true CN104818857A (en) 2015-08-05
CN104818857B CN104818857B (en) 2016-10-05

Family

ID=53729317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510187285.9A Active CN104818857B (en) 2015-04-21 2015-04-21 Many uniform purlin thin pull bar installation methods of long-span roofing

Country Status (1)

Country Link
CN (1) CN104818857B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888262A (en) * 2016-04-14 2016-08-24 中国十七冶集团有限公司 Construction method for large-span pipe corridor pipeline
CN106930539A (en) * 2017-03-15 2017-07-07 广东大粤新能源科技股份有限公司 Purlin localization method
CN109898649A (en) * 2017-12-11 2019-06-18 美建建筑系统(中国)有限公司 A kind of high strength steel constructional device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张友恩: "贺龙体育场大型悬挑钢屋盖安装技术", 《施工技术》 *
王新武等: "门式刚架的安装技术及安装质量要点", 《洛阳工业高等专科学校学报》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888262A (en) * 2016-04-14 2016-08-24 中国十七冶集团有限公司 Construction method for large-span pipe corridor pipeline
CN106930539A (en) * 2017-03-15 2017-07-07 广东大粤新能源科技股份有限公司 Purlin localization method
CN106930539B (en) * 2017-03-15 2019-01-29 广东大粤新能源科技股份有限公司 Purlin localization method
CN109898649A (en) * 2017-12-11 2019-06-18 美建建筑系统(中国)有限公司 A kind of high strength steel constructional device

Also Published As

Publication number Publication date
CN104818857B (en) 2016-10-05

Similar Documents

Publication Publication Date Title
US10443380B2 (en) Asymmetric support structure of entry driven along gob-side under unstable roof in deep mines and construction method thereof
CN105569358A (en) Construction method of special-shaped curved surface roof with large span and multiple curvatures
CN105780925B (en) A kind of truss-hanging combined system construction method of installation
CN109440985B (en) Hydraulic synchronous lifting system for super large curtain wall unit of super high-rise building and construction method thereof
CN104912099A (en) Fabricated precast concrete box culvert
CN206559275U (en) A kind of three-dimensional rope net photovoltaic bracket of novel double-layer
CN106245919B (en) A kind of assembled architecture Automated assembly platform
CN202578055U (en) Shed used for coke oven building construction and adjustable in height and width
CN104818857B (en) Many uniform purlin thin pull bar installation methods of long-span roofing
CN104372961A (en) Anti-seismic integrated lightweight steel construction house
CN110593125A (en) Suspension bridge catwalk system
CN113585075A (en) Cast-in-place bridge deck formwork for steel-concrete composite beam
CN211142832U (en) Suspension bridge catwalk system
CN106533334A (en) Novel single-layer parallel suspension cable photovoltaic support system
CN115341701B (en) Hanging formwork construction method for high-altitude overhanging steel bar truss floor support plate
CN214940962U (en) Large-span steel construction vestibule
CN210563326U (en) Overhead unit type overhead sliding splicing operation platform
CN114215335A (en) Movable construction platform for rock anchor beam of underground factory building
CN104912339A (en) Long-distance multi-span welding H-section steel roof beam installation method
CN113137102A (en) Assembled type warehouse roof structure and installation method thereof
CN104818856A (en) Mounting method of roof thin-wall Z-shaped purline
CN207228604U (en) A kind of unilateral suspension type aerial movement steel platform
CN111636571A (en) Quick installation method of combined container house
CN204753629U (en) Assembled precast concrete box culvert
CN214784662U (en) Steel construction is encorbelmented archaize corridor arrangement structure outward

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Installation method of multiple uniform purlin thin tie rods on long span roof

Effective date of registration: 20210519

Granted publication date: 20161005

Pledgee: Industrial and Commercial Bank of China Limited MAANSHAN Tuanjie square sub branch

Pledgor: CHINA MCC17 GROUP Co.,Ltd.

Registration number: Y2021980003566

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230810

Granted publication date: 20161005

Pledgee: Industrial and Commercial Bank of China Limited MAANSHAN Tuanjie square sub branch

Pledgor: CHINA MCC17 GROUP Co.,Ltd.

Registration number: Y2021980003566