CN104818708A - Building pile structure - Google Patents

Building pile structure Download PDF

Info

Publication number
CN104818708A
CN104818708A CN201510164819.6A CN201510164819A CN104818708A CN 104818708 A CN104818708 A CN 104818708A CN 201510164819 A CN201510164819 A CN 201510164819A CN 104818708 A CN104818708 A CN 104818708A
Authority
CN
China
Prior art keywords
pile body
pile
connecting piece
fixed connecting
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510164819.6A
Other languages
Chinese (zh)
Inventor
梁枫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu LVDI Technology Co Ltd
Original Assignee
Chengdu LVDI Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu LVDI Technology Co Ltd filed Critical Chengdu LVDI Technology Co Ltd
Priority to CN201510164819.6A priority Critical patent/CN104818708A/en
Publication of CN104818708A publication Critical patent/CN104818708A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a building pile structure. The building pile structure comprises a pile body, wherein the top of the pile body is connected with a pile fixed connecting piece; the pile fixed connecting piece and the pile body are integrally connected; a pile fixed connecting hole is formed in the pile fixed connecting piece; connecting anchor pipes are arranged on the pile body near the top; two connecting anchor pipes are provided, adopt arc structures, and are vertically arranged; a reinforcing column is arranged between the two connecting anchor pipes; the top and the bottom of the reinforcing column are connected with the connecting anchor pipes through connecting bolts; a protective strip is arranged at the bottom of the pile body, and is connected with the pile body through a fastening nail; and a spiral filling pile is mounted on the lower surface of the protective strip. The building pile structure is high in structure strength; the friction force, the horizontal force resistance and the cutting force of the pile are enhanced to a certain extent; the stability and the bearing intensity of the pile are effectively improved; the building pile structure is convenient to be disassembled for recycling; the construction cost is reduced to a certain extent; and the construction efficiency is greatly improved.

Description

Building pilework
Technical field
The present invention relates to a kind of pilework, particularly one building pilework.
Background technology
After building builds up, due to reasons such as settings of ground, often have the situation of the flooring depression of building to occur, and due to the indoor floor height of buildings in general limited, main equipment cannot be adopted at indoor pile, therefore, the flooring depression of building is difficult to obtain consolidation process later, and danger is very high, and the time has been grown, easily cause entire building will be forced to stop using, economic loss is also very large.For this reason, current building operations there is a lot of small building pile body, normally assemble being transported to job site after pre-erection structure again, but in practice of construction process, the self structure performance of pile foundation is not enough, and the primary structure of pile foundation remains and takes site operation technology, but pouring concrete in-situ piling strtucture consumes time is long, cause long construction period, be unfavorable for the saving of construction cost.
Summary of the invention
The technical problem to be solved in the present invention is: overcome the problems referred to above, provides a kind of self structure intensity high, increases the frictional force of stake and horizontal force resistant and cutting force to a certain extent, effectively improve stake stability and bear the building pilework of dynamics.
To achieve these goals, the technical solution used in the present invention is such: building pilework of the present invention, comprise pile body, pile body top is connected with a fixed connecting piece, stake fixed connecting piece is connected with one between pile body, stake fixed connecting piece has stake and is fixedly connected with hole, pile body is provided with connection anchor tube near top place, connecting anchor tube is two, connect anchor tube and adopt arcuate structure, two connection anchor tubes are upper and lower spread configuration, reinforcing prop is provided with between two connection anchor tubes, reinforcing prop top and bottom all by connecting bolt be connected anchor tube and connect, guard strip is provided with bottom pile body, guard strip is adopted and is connected by clench nail with between pile body, guard strip soffit is provided with screw pouring piles, helix tube stanchion top removably connects through guard strip and pile body.
Further, as a kind of concrete form of structure, be also connected with flaps between stake fixed connecting piece of the present invention and pile body, flaps is connected with stake fixed connecting piece and pile body one respectively.
Further, as a kind of concrete form of structure, stake of the present invention is fixedly connected with hole and is at least two, and built-in steady pin.
Further, as a kind of concrete form of structure, pile body of the present invention adopts the one in cylindrical structure, triangular form structure and rectangular configuration.
Further, as a kind of concrete form of structure, pile body of the present invention is connected with being mated by helicitic texture between reinforcing prop.
Further, as a kind of concrete form of structure, in vibration damping pipe of the present invention, be filled with spongy layer.
Further, as a kind of concrete form of structure, the tapered structure of screw pouring piles pile top of the present invention, which is provided with lug tooth.
Compared with prior art, the invention has the advantages that: this building pilework self structure intensity is high, increase the frictional force of stake and horizontal force resistant and cutting force to a certain extent, effectively improve the stability of stake and dynamics of bearing, conveniently dismantle simultaneously, can repeat to use, reduce construction cost to a certain extent, efficiency of construction have also been obtained very large raising.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described.
Fig. 1 is structural representation of the present invention;
In figure: 1. pile body; 2. a fixed connecting piece; 3. be fixedly connected with hole; 4. connect anchor tube; 5. reinforcing prop; 6. vibration damping pipe; 7. guard strip; 8. screw pouring piles.
Detailed description of the invention
In conjunction with the accompanying drawings, the present invention is further detailed explanation.These accompanying drawings are the schematic diagram of simplification, only basic structure of the present invention are described in a schematic way, and therefore it only shows the formation relevant with the present invention.
The present invention as shown in Figure 1 builds the preferred embodiment of pilework, comprise pile body 1, pile body 1 top is connected with a fixed connecting piece 2, stake fixed connecting piece 2 is connected with one between pile body 1, stake fixed connecting piece 2 has stake and is fixedly connected with hole 3, pile body 1 is provided with near top place and connects anchor tube 4, connecting anchor tube 4 is two, connect anchor tube 4 and adopt arcuate structure, two connect anchor tube 4 in upper and lower spread configuration, reinforcing prop 5 is provided with between two connection anchor tubes 4, reinforcing prop 5 top and bottom all by connecting bolt be connected anchor tube 4 and connect, guard strip 7 is provided with bottom pile body 1, guard strip 7 is adopted and is connected by clench nail between pile body 1, guard strip 7 soffit is provided with screw pouring piles 8, helix tube stanchion 8 top removably connects through guard strip 7 and pile body 1, also flaps is connected with between described stake fixed connecting piece 2 and pile body 1, flaps is connected with stake fixed connecting piece 2 and pile body 1 one respectively, described stake is fixedly connected with hole 3 and is at least two, and built-in steady pin, described pile body 1 adopts cylindrical structure, one in triangular form structure and rectangular configuration, described pile body 1 is connected with being mated by helicitic texture between reinforcing prop 5, spongy layer is filled with in described vibration damping pipe 6, the tapered structure of described screw pouring piles 8 pile top, which is provided with lug tooth.
Building pilework self structure intensity of the present invention is high, increase the frictional force of stake and horizontal force resistant and cutting force to a certain extent, effectively improve the stability of stake and dynamics of bearing, conveniently dismantle simultaneously, can repeat to use, reduce construction cost to a certain extent, efficiency of construction have also been obtained very large raising.Also be connected with flaps between described stake fixed connecting piece 2 and pile body 1, flaps is connected with stake fixed connecting piece 2 and pile body 1 one respectively, can stop certain external force, improve the stationarity of stake itself; Described stake is fixedly connected with hole 3 and is at least two, and built-in steady pin, can at connecting hole built-in fixed device, fixed performance is very good; Described pile body 1 adopts the one in cylindrical structure, triangular form structure and rectangular configuration, meets design concept; Described pile body 1 is connected with being mated by helicitic texture between reinforcing prop 5, conveniently dismantles; Be filled with spongy layer in described vibration damping pipe 6, further increase damping effect; The tapered structure of described screw pouring piles 8 pile top, which is provided with lug tooth, can good being connected with ground.
With above-mentioned according to desirable embodiment of the present invention for enlightenment, by above-mentioned description, relevant staff in the scope not departing from this invention technological thought, can carry out various change and amendment completely.The technical scope of this invention is not limited to the content on manual, must determine its technical scope according to right.

Claims (1)

1. a building pilework, comprise pile body, it is characterized in that: pile body top is connected with a fixed connecting piece, stake fixed connecting piece is connected with one between pile body, stake fixed connecting piece has stake and is fixedly connected with hole, pile body is provided with connection anchor tube near top place, connecting anchor tube is two, connect anchor tube and adopt arcuate structure, two connection anchor tubes are upper and lower spread configuration, reinforcing prop is provided with between two connection anchor tubes, reinforcing prop top and bottom all by connecting bolt be connected anchor tube and connect, guard strip is provided with bottom pile body, guard strip is adopted and is connected by clench nail with between pile body, guard strip soffit is provided with screw pouring piles, helix tube stanchion top removably connects through guard strip and pile body, also flaps is connected with between described stake fixed connecting piece and pile body, flaps is connected with stake fixed connecting piece and pile body one respectively, described stake is fixedly connected with hole and is at least two, and built-in steady pin, described pile body adopts cylindrical structure, one in triangular form structure and rectangular configuration, described pile body is connected with being mated by helicitic texture between reinforcing prop, spongy layer is filled with in described vibration damping pipe, the tapered structure of described screw pouring piles pile top, which is provided with lug tooth.
CN201510164819.6A 2015-04-09 2015-04-09 Building pile structure Pending CN104818708A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510164819.6A CN104818708A (en) 2015-04-09 2015-04-09 Building pile structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510164819.6A CN104818708A (en) 2015-04-09 2015-04-09 Building pile structure

Publications (1)

Publication Number Publication Date
CN104818708A true CN104818708A (en) 2015-08-05

Family

ID=53729173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510164819.6A Pending CN104818708A (en) 2015-04-09 2015-04-09 Building pile structure

Country Status (1)

Country Link
CN (1) CN104818708A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4137541A1 (en) * 1991-11-14 1993-05-27 Schorr Claus Peter Method of on site production of concrete piles - by implement which forms hole in the ground and directs concrete into hole
CN102966100A (en) * 2012-10-25 2013-03-13 国鼎(南通)管桩有限公司 Tensioned spun concrete (TSC) and prestressed high-strength concrete (PHC) combined pile
CN103669335A (en) * 2013-12-16 2014-03-26 钟智谦 Pile connecting structure and pile
CN103758118A (en) * 2014-01-14 2014-04-30 钟智谦 Pile connecting structure and pile
CN204185847U (en) * 2014-09-29 2015-03-04 孟玲 The stake of a kind of novel building piecewise combination
CN204199277U (en) * 2014-11-12 2015-03-11 魏瑞琼 The spiral building stake of filling concrete

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4137541A1 (en) * 1991-11-14 1993-05-27 Schorr Claus Peter Method of on site production of concrete piles - by implement which forms hole in the ground and directs concrete into hole
CN102966100A (en) * 2012-10-25 2013-03-13 国鼎(南通)管桩有限公司 Tensioned spun concrete (TSC) and prestressed high-strength concrete (PHC) combined pile
CN103669335A (en) * 2013-12-16 2014-03-26 钟智谦 Pile connecting structure and pile
CN103758118A (en) * 2014-01-14 2014-04-30 钟智谦 Pile connecting structure and pile
CN204185847U (en) * 2014-09-29 2015-03-04 孟玲 The stake of a kind of novel building piecewise combination
CN204199277U (en) * 2014-11-12 2015-03-11 魏瑞琼 The spiral building stake of filling concrete

Similar Documents

Publication Publication Date Title
CN204326255U (en) A kind of Reinforced Concrete Composite Beams and steel pipe column connected node
CN102704491B (en) Sectional steel and reinforced concrete beam combination foundation pit supporting protection surrounding purlin and construction method of purlin
CN205421616U (en) Assemble integral shear force wall with steel pipe concrete edge member
CN205712137U (en) Foundation pit supporting construction
CN107313424A (en) A kind of building aseismicity pile foundation and construction method
CN202000651U (en) Adjustable wall-mounted supporting device for reinforcing upright columns
KR20120120565A (en) Joined structure of steel pipe strut
CN204551463U (en) The anchor pole of a kind of rotatable break-in and recovery
CN204715345U (en) Building pilework
CN104818708A (en) Building pile structure
CN105421867A (en) Loop ground anchor device and installation method
CN205530324U (en) Miniature stake of thin -walled cold -formed steel
CN204456813U (en) A kind of single support operation platform for elevator hoistways
CN204080807U (en) A kind of major diameter drilling follow pile tube Pile feeder
CN104452748B (en) Filling type reinforcing self tapping stake and preparation method thereof
CN102155015A (en) Barbed implanted steel pipe anchor rod
CN204059947U (en) A kind of self-stabilization type outer wall formwork of basement support system
CN103938731B (en) Combination joint of prefabricated concrete beam and round concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars
CN201943071U (en) Implantable steel tube anchor rod with stabs
CN206158010U (en) High -strength steel superstrong combination column structure of high -strength grouting material
CN208604615U (en) A kind of pressurization sinking device for open caisson construction
CN206503139U (en) A kind of screw pile
CN206203725U (en) Small-sized sustaining wall
CN204418208U (en) Anchor rod foundation
CN203834475U (en) Pipe pile with pre-locating function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150805