CN102966100A - Tensioned spun concrete (TSC) and prestressed high-strength concrete (PHC) combined pile - Google Patents

Tensioned spun concrete (TSC) and prestressed high-strength concrete (PHC) combined pile Download PDF

Info

Publication number
CN102966100A
CN102966100A CN201210411004XA CN201210411004A CN102966100A CN 102966100 A CN102966100 A CN 102966100A CN 201210411004X A CN201210411004X A CN 201210411004XA CN 201210411004 A CN201210411004 A CN 201210411004A CN 102966100 A CN102966100 A CN 102966100A
Authority
CN
China
Prior art keywords
tsc
pile
phc
pile tube
tubular pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210411004XA
Other languages
Chinese (zh)
Inventor
姜平平
叶喆宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUODING (NANTONG) PIPE PILES CO Ltd
Original Assignee
GUODING (NANTONG) PIPE PILES CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUODING (NANTONG) PIPE PILES CO Ltd filed Critical GUODING (NANTONG) PIPE PILES CO Ltd
Priority to CN201210411004XA priority Critical patent/CN102966100A/en
Publication of CN102966100A publication Critical patent/CN102966100A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a tensioned spun concrete (TSC) and prestressed high-strength concrete (PHC) combined pile which comprises a PHC tubular pile and a TSC tubular pile; the innovation points are as follows: the combined pile comprises at least one PHC tubular pile and at least one TSC tubular pile, wherein the TSC tubular pile is arranged at an upper part, and the PHC tubular pipe is arranged at a lower part; the tubular piles are arranged concentrically; and all the tubular piles are fixedly connected by welding or by quick connectors. According to the TSC and PHC combined pile, the PHC tubular pile and the TSC tubular pile are integrated and are fixedly connected by welding or by the mechanical connection of quick connectors. The TSC and PHC combined pile not only has the advantages of a pure steel tubular pile but also has good driving resistance, a pile formation process is consistent with that of the pure steel tubular pile, and the cost is saved by about 40 percent when the length is the same; and after being combined, the TSC tubular pile is mainly used for structural horizontal force resistance, the specific length of the TSC tubular pile is determined according to the actual engineering horizontal force resistant requirement, can replace the traditional pure steel tubular pile, so that the price is reduced on the premise that engineering requirements are met, and the resources are effectively saved.

Description

A kind of TSC, PHC compound pile
Technical field
The present invention relates to a kind of pile tube, particularly a kind of cost is low and meet TSC, the PHC compound pile of engineering demand.
Background technology
Along with the development of concrete technology, the technology of concrete tubular pile also reaches its maturity, and except being applied to industry, civilian construction, also is widely used in each field such as bridge, harbour, railway or hydraulic engineering.Pile tube comprises prestressed concrete pipe pile (PC pile tube), thin tubular piles produced by prestressed concrete (PTC pile tube), prestressed high-strength concrete pile (PHC pile tube), centrifugal tubular pile with concrete of thin-wall steel pipe (TSC pile tube).
The PS steel pipe pile also is a kind of pile foundation material that develops rapidly in recent years, be mainly used on highrise building and large bridge and the large equipment base, along with building up of Construction of Hangzhou Bay Cross-sea Bridge, steel pipe pile is anti-corrosion measure and construction technology maturation in seawater, and increasing application will be arranged from now on.Steel pipe pile anti-bending strength and shear behavior are fine, easy construction, and the durable resistance energy is excellent pile foundation material, and the problem of unique existence is exactly that steel quantity consumption is large, and the financial cost index is high.
Summary of the invention
It is low and meet TSC, the PHC compound pile of engineering demand that the technical problem to be solved in the present invention provides a kind of cost.
For solving the problems of the technologies described above, technical scheme of the present invention is: a kind of TSC, PHC compound pile, and its innovative point is: comprise PHC pile tube and TSC pile tube, all at least one of described PHC pile tube and TSC pile tube, described PHC pile tube and TSC pile tube arrange with one heart; Be connected and fixed by welding or fast connecting joint between PHC pile tube and the TSC pile tube.
Further, described TSC pile tube is on top, and the PHC pile tube is in the bottom.
Further, described TSC pile tube can be combined by the TSC pile tube segmentation of different thickness of steel pipe.
Further, described PHC pile tube, TSC pile tube are connected and fixed by inside and outside groove built-up welding between the end plate.
Further, described fast connecting joint comprises a pair of mounting flange, this is welded on respectively the pile end board place that needs connection to mounting flange, and the outer end of mounting flange arranges annular lip, and the mounting flange external surface of annular lip inboard is distributed with some radial screw bore; Several circular arc anchor ear plates, the inner arc center of described anchor ear plate have the location embeded slot that arranges along the circular arc bearing of trend, and the arc convex outer arc surface that embeded slot both sides, location form has the through hole corresponding with two mounting flange radial screw bore; The location embeded slot of anchor ear plate just can hold the mounting flange annular lip of being close to docking in two outer faces and embed, and the anchor ear plate is connected and fixed with two mounting flanges respectively by bolt.
The invention has the advantages that: TSC, PHC compound pile adopt PHC pile tube and TSC pile tube to combine, and utilize the mode of welding or fast connecting joint mechanical connection to be connected and fixed.The advantage that had both had the clean steel pile tube, durable resistance is good, and pile-formation process is consistent with the clean steel pile tube, on equal length, cost savings about 40%; The TSC pile tube is mainly used in the structure horizontal force resistant after combination, its concrete length requires to determine to have simultaneously the stable advantage of PHC pile tube carrying according to the Practical Project horizontal force resistant, can replace traditional clean steel pile tube, reduce cost on the basis that meets engineering demand, effectively economize on resources.
Description of drawings
Fig. 1 is TSC of the present invention, PHC compound pile structural representation.
Fig. 2 is mounting flange and pile tube connection diagram among the present invention.
Fig. 3 is anchor ear plated construction schematic diagram among the present invention.
Fig. 4 is fast connecting joint connection diagram of the present invention.
The specific embodiment
As shown in Figure 1, TSC, PHC compound pile comprise all at least one of PHC pile tube 1 and 2, two kinds of pile tube quantity of TSC pile tube.
PHC pile tube 1 structure mainly comprises the concrete hollow pile body and is located at the interior reinforcing cage of concrete hollow pile body, the two ends welded end plate of reinforcing cage.TSC pile tube 2 mainly comprises concrete hollow shape body and is coated on the outer steel pipe of concrete that end plate is established at the steel pipe two ends.
TSC pile tube 2 can be combined by the TSC pile tube segmentation of different thickness of steel pipe.Usually, TSC pile tube 2 is as the top pile body of compound pile, and concrete length needs to require to determine that PHC pile tube 1 is in the bottom according to the Practical Project horizontal force resistant; PHC pile tube 1 and the 2 concentric settings of TSC pile tube are fixed by welding or fast connecting joint 3 mechanical connections between the two.
Welding manner: PHC pile tube 1, TSC pile tube 2 are connected and fixed by inside and outside groove built-up welding between the end plate.
Mechanical connection manner: as shown in Figure 2, fast connecting joint 3 comprises a pair of mounting flange 31, and this replaces the pile end board place that traditional shirt rim is welded on respectively needs connection to mounting flange 31, and it welded before pile tube is transported to the job site.The outer end of mounting flange 31 arranges annular lip 32, and mounting flange 31 external surfaces of annular lip 32 inboards are distributed with some radial screw bore 33, and radial screw bore 33 quantity of single mounting flange 31 are nine in the present embodiment.
As shown in Figure 3, also comprise three circular arc anchor ear plates 34, its circular arc number of degrees are 120 °, three's tandem array can consist of an annulus, the inner arc center of anchor ear plate 34 has the location embeded slot 35 that arranges along the circular arc bearing of trend, the protruding outer arc of the upper and lower layer surface that embeded slot both sides, anchor ear plate 34 location form has six through holes 36 corresponding with two mounting flange radial screw bore 33, and two-layer protruding outer arc is opened respectively three.
Location embeded slot 35 width of anchor ear plate 34 are the twice of adpting flange annular lip 32 thickness, make it just can hold the mounting flange annular lip of being close to docking in two outer faces and embed.
During connection, as shown in Figure 4, two pile tubes that need to connect dock, so that two mounting flanges, 31 outer faces at pile end board place are close to, install anchor ear plate 34 at external surface, locate in the embeded slot 35 so that the annular lip 32 of two mounting flanges 31 embeds, and the through hole of anchor ear plate 34 is corresponding with screwed hole 33, by bolt 37 anchor ear plate 34 and two mounting flanges 31 are connected and fixed, by three anchor ear plates 34 that form annular pile tube are connected and fixed.
Mechanical connection manner not only is confined to the structure described among the present invention, also can adopt other quick coupling structures well known in the art.

Claims (5)

1. a TSC, PHC compound pile is characterized in that: comprise PHC pile tube and TSC pile tube, and all at least one of described PHC pile tube and TSC pile tube, described PHC pile tube and TSC pile tube arrange with one heart; Be connected and fixed by welding or fast connecting joint between PHC pile tube and the TSC pile tube.
2. TSC according to claim 1, PHC compound pile, it is characterized in that: described TSC pile tube is on top, and the PHC pile tube is in the bottom.
3. TSC according to claim 1, PHC compound pile, it is characterized in that: described TSC pile tube can be combined by the TSC pile tube segmentation of different thickness of steel pipe.
4. TSC according to claim 1, PHC compound pile, it is characterized in that: described PHC pile tube, TSC pile tube are connected and fixed by inside and outside groove built-up welding between the end plate.
5. TSC according to claim 1, PHC compound pile, it is characterized in that: described fast connecting joint comprises:
A pair of mounting flange, this is welded on respectively the pile end board place that needs connection to mounting flange, and the outer end of mounting flange arranges annular lip, and the mounting flange external surface of annular lip inboard is distributed with some radial screw bore;
Several circular arc anchor ear plates, the inner arc center of described anchor ear plate have the location embeded slot that arranges along the circular arc bearing of trend, and the arc convex outer arc surface that embeded slot both sides, location form has the through hole corresponding with two mounting flange radial screw bore;
The location embeded slot of anchor ear plate just can hold the mounting flange annular lip of being close to docking in two outer faces and embed, and the anchor ear plate is connected and fixed with two mounting flanges respectively by bolt.
CN201210411004XA 2012-10-25 2012-10-25 Tensioned spun concrete (TSC) and prestressed high-strength concrete (PHC) combined pile Pending CN102966100A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210411004XA CN102966100A (en) 2012-10-25 2012-10-25 Tensioned spun concrete (TSC) and prestressed high-strength concrete (PHC) combined pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210411004XA CN102966100A (en) 2012-10-25 2012-10-25 Tensioned spun concrete (TSC) and prestressed high-strength concrete (PHC) combined pile

Publications (1)

Publication Number Publication Date
CN102966100A true CN102966100A (en) 2013-03-13

Family

ID=47796513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210411004XA Pending CN102966100A (en) 2012-10-25 2012-10-25 Tensioned spun concrete (TSC) and prestressed high-strength concrete (PHC) combined pile

Country Status (1)

Country Link
CN (1) CN102966100A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334427A (en) * 2013-07-22 2013-10-02 吴广怀 Irregularly-shaped prefabricated high-strength concrete thin-wall steel pipe pile (TSC)
CN103741683A (en) * 2013-12-23 2014-04-23 浙江天润建设有限公司 Bag bottom expanding rigid-flexible combined pile and construction method thereof
CN103953033A (en) * 2014-04-30 2014-07-30 百盛联合建设集团有限公司 Pile head locking-connecting structure
CN104060606A (en) * 2014-07-01 2014-09-24 国鼎(南通)管桩有限公司 Combined splicing tubular pile and pile splicing method
CN104818708A (en) * 2015-04-09 2015-08-05 成都绿迪科技有限公司 Building pile structure
CN104889642A (en) * 2015-05-22 2015-09-09 南通中远船务工程有限公司 Folding positioning device and method for pile leg
CN105569037A (en) * 2015-06-09 2016-05-11 周兆弟 Connecting plug for connecting piece
CN106013089A (en) * 2016-06-24 2016-10-12 张继红 High-fault-tolerance and recoverable steel pile cup joint method
CN109881665A (en) * 2019-02-20 2019-06-14 中交第二航务工程局有限公司 High-performance prefabricated UHPC~PHC combined built pile integral structure and preparation method thereof
CN110130327A (en) * 2018-02-08 2019-08-16 上海勘测设计研究院有限公司 Organizational pile foundation structure and its installation method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1746434A (en) * 2005-07-22 2006-03-15 上海二十冶金混凝土构件有限公司 Centrifugal tubular pile with concrete of thin-wall steel pipe and production thereof
CN201007003Y (en) * 2007-02-27 2008-01-16 王伟明 Reinforced concrete compounded pile
KR200441567Y1 (en) * 2007-04-12 2008-08-25 (주)한맥기술 Composite pile combined PHC pile and steel pile
CN201183949Y (en) * 2008-04-12 2009-01-21 中交第三航务工程局有限公司江苏分公司 Prestress large diameter assembled tube pile
CN201390959Y (en) * 2009-01-16 2010-01-27 中交第三航务工程勘察设计院有限公司 Novel pile foundation structure
CN201679002U (en) * 2010-06-12 2010-12-22 江苏建华管桩有限公司 Pulling-resistant mechanical connecting clamp for pile foundations
CN201924350U (en) * 2011-02-14 2011-08-10 江苏建华管桩有限公司 Bolt-type mechanical connecting clamp for pulling-resistant pipe pile
KR101116389B1 (en) * 2011-08-05 2012-02-22 오성남 Composit pile combined steel tubular pile and concrete pile reinforced with connecting structure
CN202945601U (en) * 2012-10-25 2013-05-22 国鼎(南通)管桩有限公司 Thin-wall steel tube centrifugal concrete (TSC) and prestress high concrete (PHC) combined pile

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1746434A (en) * 2005-07-22 2006-03-15 上海二十冶金混凝土构件有限公司 Centrifugal tubular pile with concrete of thin-wall steel pipe and production thereof
CN201007003Y (en) * 2007-02-27 2008-01-16 王伟明 Reinforced concrete compounded pile
KR200441567Y1 (en) * 2007-04-12 2008-08-25 (주)한맥기술 Composite pile combined PHC pile and steel pile
CN201183949Y (en) * 2008-04-12 2009-01-21 中交第三航务工程局有限公司江苏分公司 Prestress large diameter assembled tube pile
CN201390959Y (en) * 2009-01-16 2010-01-27 中交第三航务工程勘察设计院有限公司 Novel pile foundation structure
CN201679002U (en) * 2010-06-12 2010-12-22 江苏建华管桩有限公司 Pulling-resistant mechanical connecting clamp for pile foundations
CN201924350U (en) * 2011-02-14 2011-08-10 江苏建华管桩有限公司 Bolt-type mechanical connecting clamp for pulling-resistant pipe pile
KR101116389B1 (en) * 2011-08-05 2012-02-22 오성남 Composit pile combined steel tubular pile and concrete pile reinforced with connecting structure
CN202945601U (en) * 2012-10-25 2013-05-22 国鼎(南通)管桩有限公司 Thin-wall steel tube centrifugal concrete (TSC) and prestress high concrete (PHC) combined pile

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334427A (en) * 2013-07-22 2013-10-02 吴广怀 Irregularly-shaped prefabricated high-strength concrete thin-wall steel pipe pile (TSC)
CN103741683B (en) * 2013-12-23 2015-11-18 浙江天润建设有限公司 A kind of pouch expands end rigid-flexible mechanical arm and construction method
CN103741683A (en) * 2013-12-23 2014-04-23 浙江天润建设有限公司 Bag bottom expanding rigid-flexible combined pile and construction method thereof
CN103953033A (en) * 2014-04-30 2014-07-30 百盛联合建设集团有限公司 Pile head locking-connecting structure
CN104060606A (en) * 2014-07-01 2014-09-24 国鼎(南通)管桩有限公司 Combined splicing tubular pile and pile splicing method
CN104060606B (en) * 2014-07-01 2016-06-08 国鼎(南通)管桩有限公司 A kind of combined and spliced pile tube and pile extension method thereof
CN104818708A (en) * 2015-04-09 2015-08-05 成都绿迪科技有限公司 Building pile structure
CN104889642A (en) * 2015-05-22 2015-09-09 南通中远船务工程有限公司 Folding positioning device and method for pile leg
CN104889642B (en) * 2015-05-22 2017-01-18 南通中远船务工程有限公司 Folding positioning device and method for pile leg
CN105569037A (en) * 2015-06-09 2016-05-11 周兆弟 Connecting plug for connecting piece
CN105569037B (en) * 2015-06-09 2019-09-24 周兆弟 Connection-peg for connector
CN106013089A (en) * 2016-06-24 2016-10-12 张继红 High-fault-tolerance and recoverable steel pile cup joint method
CN110130327A (en) * 2018-02-08 2019-08-16 上海勘测设计研究院有限公司 Organizational pile foundation structure and its installation method
CN109881665A (en) * 2019-02-20 2019-06-14 中交第二航务工程局有限公司 High-performance prefabricated UHPC~PHC combined built pile integral structure and preparation method thereof
CN109881665B (en) * 2019-02-20 2023-11-24 中交第二航务工程局有限公司 High-performance prefabricated UHPC-PHC combined pile integrated structure and preparation method thereof

Similar Documents

Publication Publication Date Title
CN102966100A (en) Tensioned spun concrete (TSC) and prestressed high-strength concrete (PHC) combined pile
CN108505433B (en) Pier structure and construction method thereof
CN102926504B (en) Construction method of steel and concrete overlapped beam combined part
CN103132506A (en) Processing and manufacturing method for bored pile double-layer strengthened hoop steel bar cage
CN204059347U (en) Prestressed concrete reducing pile tube
CN106438212A (en) Bent and spliced type bucket-shaped tower barrel
CN202945601U (en) Thin-wall steel tube centrifugal concrete (TSC) and prestress high concrete (PHC) combined pile
CN102108760A (en) Fibre reinforced plastic-steel composite tube restrained reinforcement high-strength concrete column
CN101245595B (en) Method for manufacturing big diameter borehole filling pile cage of reinforcement
CN102226378B (en) Reinforced riser pipe combined structure and construction method thereof
CN109881665B (en) High-performance prefabricated UHPC-PHC combined pile integrated structure and preparation method thereof
CN110820546A (en) Concrete column high anti-seismic performance assembled connection structure
CN202000338U (en) Hollow square pile of foundation
CN203603366U (en) Extensive cantilever truss
CN202031090U (en) Hollow prestressed concrete square pile
CN102966098A (en) Fast joint for tubular piles
CN214460138U (en) Embedded large-diameter concrete cylindrical structure and cylindrical revetment structure
CN202945602U (en) Tubular pile fast-connecting joint
CN202936717U (en) Corrugated steel trussed arch bridge
CN214033342U (en) Be applied to marine building's novel anticorrosive steel pipe concrete pier that excels in
CN212835355U (en) Steel structure of concrete pipe pile body
CN210164055U (en) Quick butt joint fine adjustment device for upper layer and lower layer of steel concrete composite pipe
CN207700226U (en) A kind of prefabricated well bore and segmented precast inspection well
CN207919734U (en) A kind of concrete filled steel tube transition section structure
CN202492795U (en) Bridge pier structure with square steel tube provided with stiffening ribs with openings and light steel fiber reinforced concrete

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130313