CN201390959Y - Novel pile foundation structure - Google Patents

Novel pile foundation structure Download PDF

Info

Publication number
CN201390959Y
CN201390959Y CN 200920067074 CN200920067074U CN201390959Y CN 201390959 Y CN201390959 Y CN 201390959Y CN 200920067074 CN200920067074 CN 200920067074 CN 200920067074 U CN200920067074 U CN 200920067074U CN 201390959 Y CN201390959 Y CN 201390959Y
Authority
CN
China
Prior art keywords
pile
steel pipe
pipe pile
phc
pile tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200920067074
Other languages
Chinese (zh)
Inventor
黄建玲
蒋乐群
吴海根
陈浩群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Dong Hua Construction Management Co Ltd
CCCC Third Harbor Consultants
Original Assignee
Shanghai Dong Hua Construction Management Co Ltd
CCCC Third Harbor Consultants
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Dong Hua Construction Management Co Ltd, CCCC Third Harbor Consultants filed Critical Shanghai Dong Hua Construction Management Co Ltd
Priority to CN 200920067074 priority Critical patent/CN201390959Y/en
Application granted granted Critical
Publication of CN201390959Y publication Critical patent/CN201390959Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a novel pile foundation structure comprising a PHC pipe pile (1); the end of the PHC pipe pile (1) is fixedly connected with a steel pipe pile (2); and the PHC pipe pile (1) and the steel pipe pile (2) have the same axis. The novel pile foundation structure reduces the self-weight of the pile body and facilitates the hoisting and construction of the pile foundation.

Description

Novel piling strtucture
Technical field
The utility model relates to a kind of piling strtucture, particularly a kind of novel piling strtucture of high-pile beam formula harbour.
Background technology
The PHC stake is the pile foundation that high-pile beam formula harbour often adopts, especially in the harbour of high-grade berth, often adopt major diameter PHC pile tube, but it is bigger at the harbour load, calculate under the long long situation of stake, as adopt single PHC pile tube, pile body deadweight is heavier, and handling, the injection of foundation pile all existed certain difficulty and risk.
The utility model content
The technical problems to be solved in the utility model provide a kind of from heavy and light, make things convenient for the novel piling strtucture of handling and injection.
For solving the problems of the technologies described above, the utility model comprises a PHC pile tube, and the end of described PHC pile tube is connected and fixed a steel pipe pile, and described PHC pile tube is coaxial with described steel pipe pile.
Preferably, described PHC pile tube and described steel pipe pile junction are provided with a plurality of stiffeners.
Preferably, described PHC pile tube is identical or big slightly with the internal diameter of described steel pipe pile.
Preferably, the fixedly employing welding manner of described PHC pile tube and described steel pipe pile.
After adopting said structure, reduce the deadweight of pile body, made things convenient for the handling and the injection of foundation pile.
Description of drawings
Fig. 1 is a front view of the present utility model.
Fig. 2 is that the A-A of Fig. 1 is to sectional view.
Reference numeral is as follows:
1, PHC pile tube 3, stiffener
2, steel pipe pile
The specific embodiment
Hereinafter with reference to the accompanying drawings the utility model is described in detail.
Long at PHC pile tube 1 length, from great, suspension centre is difficult to be provided with, the difficult point that the injection difficulty is big, and the piling strtucture pattern that adopts PHC pile tube 1 to splice certain-length steel pipe pile 2 to reduce the pile body deadweight, need not to consider steel pipe pile 2 parts when suspension centre is provided with, make things convenient for handling.Adopt internal diameter to be welded on PHC pile tube 1 end plate with the steel pipe pile 2 of PHC pile tube 1 identical (or big slightly), stiffener 3 and PHC pile end plate and steel pipe pile 2 welding are adopted in the outside, determine to adopt the quantity of stiffener 3 and the length of stiffener 3 according to the size in stake footpath.As depicted in figs. 1 and 2.
Above-mentioned design example only is used for the utility model is described, and does not constitute the restriction to the claim scope, and other substantial equivalence means that it may occur to persons skilled in the art that are all in the utility model claim scope.

Claims (4)

1. novel piling strtucture, it is characterized in that: comprise a PHC pile tube (1), the end of described PHC pile tube (1) is connected and fixed a steel pipe pile (2), and described PHC pile tube (1) is coaxial with described steel pipe pile (2).
2. novel piling strtucture according to claim 1 is characterized in that: described PHC pile tube (1) is provided with a plurality of stiffeners (3) with described steel pipe pile (2) junction.
3. novel piling strtucture according to claim 1 is characterized in that: described steel pipe pile (2) is identical or big slightly with the internal diameter of described PHC pile tube (1).
4. novel piling strtucture according to claim 1 is characterized in that: the fixedly employing welding manner of described PHC pile tube (1) and described steel pipe pile (2).
CN 200920067074 2009-01-16 2009-01-16 Novel pile foundation structure Expired - Fee Related CN201390959Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200920067074 CN201390959Y (en) 2009-01-16 2009-01-16 Novel pile foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200920067074 CN201390959Y (en) 2009-01-16 2009-01-16 Novel pile foundation structure

Publications (1)

Publication Number Publication Date
CN201390959Y true CN201390959Y (en) 2010-01-27

Family

ID=41597782

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200920067074 Expired - Fee Related CN201390959Y (en) 2009-01-16 2009-01-16 Novel pile foundation structure

Country Status (1)

Country Link
CN (1) CN201390959Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102839660A (en) * 2012-09-18 2012-12-26 天津港建设公司 Composite pile of long piled wharf PHC (prestressed high-strength concrete) pile and steel pipe pile
CN102966100A (en) * 2012-10-25 2013-03-13 国鼎(南通)管桩有限公司 Tensioned spun concrete (TSC) and prestressed high-strength concrete (PHC) combined pile
CN104929116A (en) * 2015-06-11 2015-09-23 中交四航局港湾工程设计院有限公司 Precision pile sinking foundation structure of underwater engineering and underwater chute pile foundation structure construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102839660A (en) * 2012-09-18 2012-12-26 天津港建设公司 Composite pile of long piled wharf PHC (prestressed high-strength concrete) pile and steel pipe pile
CN102966100A (en) * 2012-10-25 2013-03-13 国鼎(南通)管桩有限公司 Tensioned spun concrete (TSC) and prestressed high-strength concrete (PHC) combined pile
CN104929116A (en) * 2015-06-11 2015-09-23 中交四航局港湾工程设计院有限公司 Precision pile sinking foundation structure of underwater engineering and underwater chute pile foundation structure construction method

Similar Documents

Publication Publication Date Title
CN201390959Y (en) Novel pile foundation structure
CN204002796U (en) Shield launching steel is born ring structure
CN203701123U (en) Shallow sea varying diameter single pile foundation
CN201794087U (en) Cylindrical foundation component
CN202090660U (en) Alternative-current supper high voltage steel tube tower butt-welded connection variable-slope node
CN203007935U (en) Concrete pile joint with variable cross-sections
CN208777191U (en) A kind of armored concrete tube coupling and water supply and sewage culvert pipe
CN201325362Y (en) S-shaped suspension arm mechanism for road wrecker
CN204715349U (en) Tenon joint type resistance to plucking connector
CN204437497U (en) Built-in type under ground piping lifting device
CN201826322U (en) Barrel type base member
CN203582333U (en) Triangular-truss-type continuous variable cross-section chord crane boom
CN103334405B (en) Locking-type pile gripper of pile foundation
CN206645698U (en) A kind of Portable multi-functional lifting device
CN205840347U (en) Stiffened column, beam concrete placings device
CN201864003U (en) Plough-shaped fluke with flanks
CN204003293U (en) The flange arrangement that a kind of anti-piling is impacted
CN106697177A (en) Small flat bottom and large circle bilge ship cargo with flexible connection device
CN205224049U (en) Large -scale steel cofferdam hoisting device in aquatic
CN204491583U (en) For the reinforcement structure of fluid concrete stake
CN210917339U (en) Square pile for bearing high-rise building
CN202674063U (en) Reinforced reel coupling
CN208395795U (en) A kind of rotation ring beam Wedge-type hydraulic lift
CN103303814A (en) Tower footing assembly
CN203007972U (en) Tower crane ground foundation structure using engineering piles

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100127

Termination date: 20130116

CF01 Termination of patent right due to non-payment of annual fee