CN104808102B - A kind of relay protection DC control circuit in-service monitoring and method for early warning - Google Patents

A kind of relay protection DC control circuit in-service monitoring and method for early warning Download PDF

Info

Publication number
CN104808102B
CN104808102B CN201510214048.7A CN201510214048A CN104808102B CN 104808102 B CN104808102 B CN 104808102B CN 201510214048 A CN201510214048 A CN 201510214048A CN 104808102 B CN104808102 B CN 104808102B
Authority
CN
China
Prior art keywords
msub
circuit
trip
mrow
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510214048.7A
Other languages
Chinese (zh)
Other versions
CN104808102A (en
Inventor
李仲青
周泽昕
李永丽
张卫正
李伟
杜丁香
王兴国
郭小茜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Hubei Electric Power Co Ltd
Original Assignee
Tianjin University
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Hubei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University, State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, State Grid Hubei Electric Power Co Ltd filed Critical Tianjin University
Priority to CN201510214048.7A priority Critical patent/CN104808102B/en
Publication of CN104808102A publication Critical patent/CN104808102A/en
Application granted granted Critical
Publication of CN104808102B publication Critical patent/CN104808102B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Keying Circuit Devices (AREA)
  • Emergency Protection Circuit Devices (AREA)

Abstract

The present invention provides a kind of relay protection DC control circuit in-service monitoring and method for early warning, and DC control circuit includes closing circuit and trip(ping) circuit;This comprises the following steps:Closing circuit monitoring branch road and trip(ping) circuit monitoring branch road are built respectively;Closing circuit monitors element selection and parameter tuning in branch road and trip(ping) circuit monitoring branch road;The current value that conjunction/trip(ping) circuit monitors branch road is flowed through in detection, and with conjunction/trip(ping) circuit break alarm current value ratio compared with judging conjunction/trip(ping) circuit with the presence or absence of breaking.The present invention monitors branch road by building conjunction/trip(ping) circuit, and on-line monitoring flows through the current value that conjunction/trip(ping) circuit monitors branch road, and judges that loop whether there is disconnection problem according to monitoring current size, so as to realize tripping operation and the integrity monitoring of closing circuit;This method can not only realize DC control circuit integrality full working scope monitoring, and will not it is normal to system operation impact.

Description

A kind of relay protection DC control circuit in-service monitoring and method for early warning
Technical field
The present invention relates to a kind of method for early warning, and in particular to a kind of relay protection DC control circuit in-service monitoring and early warning Method.
Background technology
Relay protection hardware deficiency is the one of the main reasons for causing hidden failure to occur, and is drawn by DC control circuit defect The protection incorrect operation risen accounts at a relatively high ratio, thus it is prevention that effective monitoring and early warning are carried out to DC control circuit Hidden failure, the important means for reducing protection incorrect operation.DC control circuit loose contact, circuit breaking are to cause protection The major reason of incorrect operation.Conventional traffic lights loop is directly monitored by or position relay normally-closed contact concatenation signal circuit The method of indirect monitor, belongs to non-full working scope monitoring, and breaker closes conjunction (jump) lock loop after (jump) lock and loses monitoring.
The demand of intelligent grid is built in face of China, will realize it to power system device and the on-line monitoring in loop One of important measure of target.Meanwhile, the continuous improvement of electronic component reliability index is also on-line monitoring method and measure Application provide may.Document《Breaker operator loop design with trip circuit monitoring is with realizing》Indicate a kind of concatenation Closing circuit still falls within non-full working scope monitoring in trip(ping) circuit the broken string monitoring scheme, but the program of high internal resistance relay.Meanwhile, The concept of intelligent operation box is also suggested, but uses intelligent operation box in conventional substation, not only increases the complexity of system Property nor it is economical.At present, also realize that DC control circuit is comprehensively and effectively monitored without ripe means.
The content of the invention
In order to overcome the above-mentioned deficiencies of the prior art, the present invention provides a kind of relay protection DC control circuit in-service monitoring With method for early warning, branch road is monitored by building conjunction/trip(ping) circuit, on-line monitoring flows through the electric current that conjunction/trip(ping) circuit monitors branch road Value, and judge that loop whether there is disconnection problem according to monitoring current size, so as to realize tripping operation and the integrality of closing circuit Monitoring;This method can not only realize the integrality full working scope monitoring of DC control circuit, and will not be to the normal operation of system Impact.
In order to realize foregoing invention purpose, the present invention is adopted the following technical scheme that:
The present invention provides a kind of relay protection DC control circuit in-service monitoring and method for early warning, the DC control circuit Including closing circuit and trip(ping) circuit;It the described method comprises the following steps:
Closing circuit monitoring branch road and trip(ping) circuit monitoring branch road are built respectively;
Closing circuit monitors element selection and parameter tuning in branch road and trip(ping) circuit monitoring branch road;
The current value that conjunction/trip(ping) circuit monitors branch road is flowed through in detection, and with conjunction/trip(ping) circuit break alarm current value ratio Compared with, judge conjunction/trip(ping) circuit with the presence or absence of broken string.
The closing circuit includes combined floodgate guard relay normally opened contact, the first automatic closing contact, first manual combined floodgate Contact, combined floodgate guard relay, anti-trip relay contact, the first breaker normally closed auxiliary contact, closing coil and trip position Relay.
After the combined floodgate guard relay normally opened contact, the first automatic closing contact, first manual closing contact are in parallel, with The combined floodgate guard relay, anti-trip relay contact, the first breaker normally closed auxiliary contact and closing coil are sequentially connected in series, institute Tripping position relay one end connection direct current operative power source is stated, the other end connects closing line through the first breaker normally closed auxiliary contact Circle.
First additional monitoring resistor, the first Hall current sensor, the normally opened auxiliary contact of the first breaker and closing circuit In closing coil be followed in series to form closing circuit monitoring branch road.
The trip(ping) circuit includes tripping operation guard relay normally opened contact, the second automatic trip contact, the second hand trip(ping) Contact, tripping operation guard relay, the normally opened auxiliary contact of the second breaker, breaking coil and closing operation position relay.
After the tripping operation guard relay normally opened contact, the second automatic trip contact, the second manual trip contact are in parallel, with The tripping operation guard relay, the normally opened auxiliary contact of the second breaker, breaking coil are sequentially connected in series, the closing operation position relay One end connects direct current operative power source, and the other end connects breaking coil through the normally opened auxiliary contact of the second breaker.
Second additional monitoring resistor, the second Hall current sensor, the second breaker normally closed auxiliary contact and trip(ping) circuit In breaking coil be followed in series to form trip(ping) circuit monitoring branch road.
First Hall current sensor and the second Hall current sensor are using magnetic balance type Hall current sensing Device.
The selection of element and the tuning process of parameter are as follows in closing circuit monitoring branch road:
(1) when breaker is in closing position, the first breaker normally closed auxiliary contact disconnects and the first breaker is normally opened auxiliary Help the closing of contact, now the first additional monitoring resistor through the first Hall current sensor, the normally opened auxiliary contact of the first breaker with Closing coil constitutes path L1, ignores the internal resistance of the first Hall current sensor, uses UnDC control circuit rated voltage is represented, RcRepresent closing coil resistance, it is known that the resistance R of the first additional monitoring resistor1Meet:
Then R can be obtained1≥21Rc, according to the resistance R of the first additional monitoring resistor1Scope, selection first it is additional monitoring electricity Hinder, and require that the rated power of the first additional monitoring resistor is more than and actually bear more than twice of power, to ensure its permanent worker The reliability of work;
(2) understand that closing circuit monitors the long-term work electric current I of branch road according to the first additional monitoring resistor of selectioncFor:
According to IcSize select the first Hall current sensor;
(3) the contact resistance R of closing circuithRepresent, ignore the internal resistance of combined floodgate guard relay, in order to ensure breaker It is reliable to close a floodgate, RhNeed to meet:
Then R can be obtainedh≤0.25Rc
Closing circuit break alarm current value IhRepresent, then have:
The selection of element and the tuning process of parameter are as follows in trip(ping) circuit monitoring branch road:
(1) when breaker is in trip position, the normally opened auxiliary contact of the second breaker disconnect and the second breaker is normally closed auxiliary Help the closing of contact, now the second additional monitoring resistor through the second Hall current sensor, the second breaker normally closed auxiliary contact with Breaking coil constitutes path L2, ignores the internal resistance of the second Hall current sensor, uses UnDC control circuit rated voltage is represented, RdRepresent breaking coil resistance, it is known that the resistance R of the second additional monitoring resistor2Meet:
Then R can be obtained2≥21Rd, according to the resistance R of the second additional monitoring resistor2Scope, selection second it is additional monitoring electricity Hinder, and require that the rated power of the second additional monitoring resistor is more than and actually bear more than twice of power, to ensure its permanent worker The reliability of work;
(2) understand that trip(ping) circuit monitors the long-term work electric current I of branch road according to the second additional monitoring resistor of selectiondFor:
According to IdSize select the second Hall current sensor;
(3) the contact resistance R of trip(ping) circuittRepresent, ignore the internal resistance of tripping operation guard relay, in order to ensure breaker Reliable trip, RtNeed to meet:
Then R can be obtainedt≤0.25Rd
Trip(ping) circuit break alarm current value ItRepresent, then have:
When breaker is in "on" position, the current value that closing circuit monitors branch road is flowed through in monitoring, and by the conjunction of monitoring The current value and closing circuit break alarm current value I of lock loop monitoring branch roadhCompare, if closing circuit monitors the electric current of branch road Value is less than closing circuit break alarm current value Ih, then judge that loose contact or circuit breaking failure occurs in closing circuit, send Alarm signal.
When breaker is in tripped condition, the current value that trip(ping) circuit monitors branch road is flowed through in monitoring, and by the jump of monitoring The current value and trip(ping) circuit break alarm current value I of lock loop monitoring branch roadtCompare, if trip(ping) circuit monitors the electric current of branch road Value is less than trip(ping) circuit break alarm current value It, then judge that circuit breaking failure occurs in trip(ping) circuit, send alarm signal.
Compared with prior art, the beneficial effects of the present invention are:
The present invention realizes the integrality full working scope monitoring of DC control circuit, can overcome closing circuit mistake in the prior art Monitoring and trip(ping) circuit is gone to lose the deficiency of monitoring;
The monitoring sensitivity of the present invention is high, can effectively find DC control circuit loose contact, circuit breaking problem;
The present invention uses Hall current sensor, realizes that conjunction/trip(ping) circuit is monitored between branch road and conjunction/trip(ping) circuit completely It is electrically isolated, the main system of breaker will not be normally run and impacted, and precision is high, response is fast, small volume.
Brief description of the drawings
Fig. 1 is closing circuit and closing circuit monitoring branch structure figure in the embodiment of the present invention;
Fig. 2 is trip(ping) circuit and trip(ping) circuit monitoring branch structure figure in the embodiment of the present invention.
Embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings.
The present invention provides a kind of relay protection DC control circuit in-service monitoring and method for early warning, the DC control circuit Including closing circuit and trip(ping) circuit;It the described method comprises the following steps:
Closing circuit monitoring branch road and trip(ping) circuit monitoring branch road are built respectively;
Closing circuit monitors element selection and parameter tuning in branch road and trip(ping) circuit monitoring branch road;
The current value that conjunction/trip(ping) circuit monitors branch road is flowed through in detection, and with conjunction/trip(ping) circuit break alarm current value ratio Compared with, judge conjunction/trip(ping) circuit with the presence or absence of broken string.
Such as Fig. 1, the closing circuit include combined floodgate guard relay normally opened contact HBJ, the first automatic closing contact ZHJ, The normally closed auxiliary of first manual closing contact SHJ, combined floodgate guard relay HBJ, anti-trip relay contact TBJV, the first breaker is touched Point QF1, closing coil HQ and tripping position relay TWJ.
The combined floodgate guard relay normally opened contact HBJ, the first automatic closing contact ZHJ, first manual closing contact ZHJ After parallel connection, with the combined floodgate guard relay HBJ, anti-trip relay contact TBJV, the first breaker normally closed auxiliary contact QF1 and Closing coil HQ is sequentially connected in series, and described tripping position relay TWJ one end connects direct current operative power source+KW, and the other end is through first Breaker normally closed auxiliary contact QF1 connection closing coils HQ.
First additional monitoring resistor R1, the first Hall current sensor HL1, the normally opened auxiliary contact QF2 of the first breaker with Closing coil HQ in closing circuit is followed in series to form the closing circuit monitoring branch road.
Such as Fig. 2, the trip(ping) circuit includes tripping operation guard relay normally opened contact TBJ, the second automatic trip contact TJ, the Two manual trip contact STJ, tripping operation guard relay TBJ, the normally opened auxiliary contact QF3 of the second breaker, breaking coil TQ and conjunction Gate position relay HWJ.
The tripping operation guard relay normally opened contact, the second automatic trips of TBJ contact TJ, the second manual trip contact STJ After parallel connection, it is sequentially connected in series with the tripping operation guard relay TBJ, the normally opened auxiliary contact QF3 of the second breaker, breaking coil TQ, Described closing operation position relay HWJ one end connects direct current operative power source+KW, and the other end is through the normally opened auxiliary contact of the second breaker QF3 connection breaking coils TQ.
Second additional monitoring resistor R2, the second Hall current sensor HL2, the second breaker normally closed auxiliary contact QF4 with Breaking coil TQ in trip(ping) circuit is followed in series to form the trip(ping) circuit monitoring branch road.
The first Hall current sensor HL1 and the second Hall current sensor HL2 are using magnetic balance type Hall electricity Flow sensor.
The selection of element and the tuning process of parameter are as follows in closing circuit monitoring branch road:
(1) when breaker is in closing position, the first breaker normally closed auxiliary contact disconnects QF1 and the first breaker is normally opened Auxiliary contact QF2 is closed, and now the first additional monitoring resistor R1 is normally opened through the first Hall current sensor HL1, the first breaker Auxiliary contact QF2 constitutes path L1 with closing coil, ignores the first Hall current sensor HL1 internal resistance, uses UnRepresent direct current Operation circuit rated voltage, RcRepresent closing coil resistance, it is known that the resistance R of the first additional monitoring resistor1Meet:
Then R can be obtained1≥21Rc, according to the resistance R of the first additional monitoring resistor1Scope, selection first it is additional monitoring electricity R1 is hindered, and requires that the first additional monitoring resistor R1 rated power is more than and is actually born more than twice of power, to ensure that it is grown The reliability of phase work;
(2) understand that closing circuit monitors the long-term work electric current I of branch road according to the first additional monitoring resistor R1 of selectionc For:
According to IcSize select the first Hall current sensor HL1;
(3) the contact resistance R of closing circuithRepresent, ignore the internal resistance of combined floodgate guard relay, in order to ensure breaker It is reliable to close a floodgate, RhNeed to meet:
Then R can be obtainedh≤0.25Rc
Closing circuit break alarm current value IhRepresent, then have:
The selection of element and the tuning process of parameter are as follows in trip(ping) circuit monitoring branch road:
(1) when breaker is in trip position, the normally opened auxiliary contact QF3 of the second breaker disconnects and the second breaker is normally closed Auxiliary contact QF4 is closed, and now the second additional monitoring resistor R2 is normally closed through the second Hall current sensor HL2, the second breaker Auxiliary contact QF4 constitutes path L2 with breaking coil, ignores the internal resistance of the second Hall current sensor, uses UnRepresent DC operation Loop rated voltage, RdRepresent breaking coil resistance, it is known that the resistance R of the second additional monitoring resistor2Meet:
Then R can be obtained2≥21Rd, according to the resistance R of the second additional monitoring resistor2Scope, selection second it is additional monitoring electricity R2 is hindered, and requires that the second additional monitoring resistor R2 rated power is more than and is actually born more than twice of power, to ensure that it is grown The reliability of phase work;
(2) understand that trip(ping) circuit monitors the long-term work electric current I of branch road according to the second additional monitoring resistor R2 of selectiond For:
According to IdSize select the second Hall current sensor HL2;
(3) the contact resistance R of trip(ping) circuittRepresent, ignore the internal resistance of tripping operation guard relay, in order to ensure breaker Reliable trip, RtNeed to meet:
Then R can be obtainedt≤0.25Rd
Trip(ping) circuit break alarm current value ItRepresent, then have:
When breaker is in "on" position, the current value that closing circuit monitors branch road is flowed through in monitoring, and by the conjunction of monitoring The current value and closing circuit break alarm current value I of lock loop monitoring branch roadhCompare, if closing circuit monitors the electric current of branch road Value is less than closing circuit break alarm current value Ih, then judge that loose contact or circuit breaking failure occurs in closing circuit, send Alarm signal.
When breaker is in tripped condition, the current value that trip(ping) circuit monitors branch road is flowed through in monitoring, and by the jump of monitoring The current value and trip(ping) circuit break alarm current value I of lock loop monitoring branch roadtCompare, if trip(ping) circuit monitors the electric current of branch road Value is less than trip(ping) circuit break alarm current value It, then judge that circuit breaking failure occurs in trip(ping) circuit, send alarm signal.
Finally it should be noted that:The above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, institute The those of ordinary skill in category field with reference to above-described embodiment still can to the present invention embodiment modify or Equivalent substitution, these any modifications or equivalent substitution without departing from spirit and scope of the invention are applying for this pending hair Within bright claims.

Claims (9)

1. a kind of relay protection DC control circuit in-service monitoring and method for early warning, it is characterised in that:The DC control circuit Including closing circuit and trip(ping) circuit;It the described method comprises the following steps:
Closing circuit monitoring branch road and trip(ping) circuit monitoring branch road are built respectively;
Closing circuit monitors element selection and parameter tuning in branch road and trip(ping) circuit monitoring branch road;
The current value that conjunction/trip(ping) circuit monitors branch road is flowed through in detection, and with conjunction/trip(ping) circuit break alarm current value ratio compared with sentencing Disconnected conjunction/trip(ping) circuit is with the presence or absence of broken string;
The closing circuit include combined floodgate guard relay normally opened contact, the first automatic closing contact, first manual closing contact, Combined floodgate guard relay, anti-trip relay contact, the first breaker normally closed auxiliary contact, closing coil and trip position relay Device;
It is and described after the combined floodgate guard relay normally opened contact, the first automatic closing contact, first manual closing contact are in parallel Combined floodgate guard relay, anti-trip relay contact, the first breaker normally closed auxiliary contact and closing coil are sequentially connected in series, described to jump Gate position relay one end connects direct current operative power source, and the other end connects closing coil through the first breaker normally closed auxiliary contact;
The selection of element and the tuning process of parameter are as follows in closing circuit monitoring branch road:
(1) when breaker is in closing position, the first breaker normally closed auxiliary contact is disconnected and the normally opened auxiliary of the first breaker is touched Point closure, now the first additional monitoring resistor is through the first Hall current sensor, the normally opened auxiliary contact of the first breaker and combined floodgate Coil constitutes path L1, ignores the internal resistance of the first Hall current sensor, uses UnRepresent DC control circuit rated voltage, RcTable Show closing coil resistance, it is known that the resistance R of the first additional monitoring resistor1Meet:
<mrow> <mfrac> <mrow> <mn>110</mn> <mi>%</mi> <mo>&amp;times;</mo> <msub> <mi>U</mi> <mi>n</mi> </msub> </mrow> <mrow> <msub> <mi>R</mi> <mi>c</mi> </msub> <mo>+</mo> <msub> <mi>R</mi> <mn>1</mn> </msub> </mrow> </mfrac> <mo>&amp;le;</mo> <mn>5</mn> <mi>%</mi> <mo>&amp;times;</mo> <mfrac> <msub> <mi>U</mi> <mi>n</mi> </msub> <msub> <mi>R</mi> <mi>c</mi> </msub> </mfrac> </mrow>
Then R can be obtained1≥21Rc, according to the resistance R of the first additional monitoring resistor1Scope, select the first additional monitoring resistor, And require the first additional monitoring resistor rated power be more than actually bear more than twice of power, to ensure its long-term work Reliability;
(2) understand that closing circuit monitors the long-term work electric current I of branch road according to the first additional monitoring resistor of selectioncFor:
<mrow> <msub> <mi>I</mi> <mi>c</mi> </msub> <mo>=</mo> <mfrac> <msub> <mi>U</mi> <mi>n</mi> </msub> <mrow> <msub> <mi>R</mi> <mn>1</mn> </msub> <mo>+</mo> <msub> <mi>R</mi> <mi>c</mi> </msub> </mrow> </mfrac> </mrow>
According to IcSize select the first Hall current sensor;
(3) the contact resistance R of closing circuithRepresent, ignore the internal resistance of combined floodgate guard relay, in order to ensure that breaker is reliable Close a floodgate, RhNeed to meet:
<mrow> <mfrac> <msub> <mi>U</mi> <mi>n</mi> </msub> <mrow> <msub> <mi>R</mi> <mi>h</mi> </msub> <mo>+</mo> <msub> <mi>R</mi> <mi>c</mi> </msub> </mrow> </mfrac> <mo>&amp;times;</mo> <msub> <mi>R</mi> <mi>c</mi> </msub> <mo>&amp;GreaterEqual;</mo> <mn>80</mn> <mi>%</mi> <mo>&amp;times;</mo> <msub> <mi>U</mi> <mi>n</mi> </msub> </mrow>
Then R can be obtainedh≤0.25Rc
Closing circuit break alarm current value IhRepresent, then have:
<mrow> <msub> <mi>I</mi> <mi>h</mi> </msub> <mo>=</mo> <mfrac> <msub> <mi>U</mi> <mi>n</mi> </msub> <mrow> <msub> <mi>R</mi> <mn>1</mn> </msub> <mo>+</mo> <msub> <mi>R</mi> <mi>c</mi> </msub> <mo>+</mo> <msub> <mi>R</mi> <mi>h</mi> </msub> </mrow> </mfrac> <mo>.</mo> </mrow>
2. relay protection DC control circuit in-service monitoring according to claim 1 and method for early warning, it is characterised in that:The Closing line in one additional monitoring resistor, the first Hall current sensor, the normally opened auxiliary contact of the first breaker and closing circuit Circle is followed in series to form the closing circuit monitoring branch road.
3. relay protection DC control circuit in-service monitoring according to claim 2 and method for early warning, it is characterised in that:Institute Stating trip(ping) circuit includes tripping operation guard relay normally opened contact, the second automatic trip contact, the second manual trip contact, tripping operation guarantor Hold relay, the normally opened auxiliary contact of the second breaker, breaking coil and closing operation position relay.
4. relay protection DC control circuit in-service monitoring according to claim 3 and method for early warning, it is characterised in that:Institute State after tripping operation guard relay normally opened contact, the second automatic trip contact, the second manual trip contact parallel connection, protected with the tripping operation Hold relay, the normally opened auxiliary contact of the second breaker, breaking coil to be sequentially connected in series, closing operation position relay one end connection is straight Operation power is flowed, the other end connects breaking coil through the normally opened auxiliary contact of the second breaker.
5. relay protection DC control circuit in-service monitoring according to claim 3 and method for early warning, it is characterised in that:The Tripping operation line in two additional monitoring resistors, the second Hall current sensor, the second breaker normally closed auxiliary contact and trip(ping) circuit Circle is followed in series to form the trip(ping) circuit monitoring branch road.
6. relay protection DC control circuit in-service monitoring according to claim 5 and method for early warning, it is characterised in that:Institute State the first Hall current sensor and the second Hall current sensor and use magnetic balance type Hall current sensor.
7. relay protection DC control circuit in-service monitoring according to claim 1 and method for early warning, it is characterised in that:Jump The selection of element and the tuning process of parameter are as follows in lock loop monitoring branch road:
(1) when breaker is in trip position, the normally opened auxiliary contact of the second breaker are disconnected and the normally closed auxiliary of the second breaker is touched Point closure, now the second additional monitoring resistor is through the second Hall current sensor, the second breaker normally closed auxiliary contact and tripping operation Coil constitutes path L2, ignores the internal resistance of the second Hall current sensor, uses UnRepresent DC control circuit rated voltage, RdTable Show breaking coil resistance, it is known that the resistance R of the second additional monitoring resistor2Meet:
<mrow> <mfrac> <mrow> <mn>110</mn> <mi>%</mi> <mo>&amp;times;</mo> <msub> <mi>U</mi> <mi>n</mi> </msub> </mrow> <mrow> <msub> <mi>R</mi> <mi>d</mi> </msub> <mo>+</mo> <msub> <mi>R</mi> <mn>2</mn> </msub> </mrow> </mfrac> <mo>&amp;le;</mo> <mn>5</mn> <mi>%</mi> <mo>&amp;times;</mo> <mfrac> <msub> <mi>U</mi> <mi>n</mi> </msub> <msub> <mi>R</mi> <mi>d</mi> </msub> </mfrac> </mrow>
Then R can be obtained2≥21Rd, according to the resistance R of the second additional monitoring resistor2Scope, select the second additional monitoring resistor, And require the second additional monitoring resistor rated power be more than actually bear more than twice of power, to ensure its long-term work Reliability;
(2) understand that trip(ping) circuit monitors the long-term work electric current I of branch road according to the second additional monitoring resistor of selectiondFor:
<mrow> <msub> <mi>I</mi> <mi>d</mi> </msub> <mo>=</mo> <mfrac> <msub> <mi>U</mi> <mi>n</mi> </msub> <mrow> <msub> <mi>R</mi> <mn>2</mn> </msub> <mo>+</mo> <msub> <mi>R</mi> <mi>d</mi> </msub> </mrow> </mfrac> </mrow>
According to IdSize select the second Hall current sensor;
(3) the contact resistance R of trip(ping) circuittRepresent, ignore the internal resistance of tripping operation guard relay, in order to ensure that breaker is reliable Tripping operation, RtNeed to meet:
<mrow> <mfrac> <msub> <mi>U</mi> <mi>n</mi> </msub> <mrow> <msub> <mi>R</mi> <mi>t</mi> </msub> <mo>+</mo> <msub> <mi>R</mi> <mi>d</mi> </msub> </mrow> </mfrac> <mo>&amp;times;</mo> <msub> <mi>R</mi> <mi>d</mi> </msub> <mo>&amp;GreaterEqual;</mo> <mn>80</mn> <mi>%</mi> <mo>&amp;times;</mo> <msub> <mi>U</mi> <mi>n</mi> </msub> </mrow>
Then R can be obtainedt≤0.25Rd
Trip(ping) circuit break alarm current value ItRepresent, then have:
<mrow> <msub> <mi>I</mi> <mi>t</mi> </msub> <mo>=</mo> <mfrac> <msub> <mi>U</mi> <mi>n</mi> </msub> <mrow> <msub> <mi>R</mi> <mn>2</mn> </msub> <mo>+</mo> <msub> <mi>R</mi> <mi>d</mi> </msub> <mo>+</mo> <msub> <mi>R</mi> <mi>t</mi> </msub> </mrow> </mfrac> <mo>.</mo> </mrow>
8. relay protection DC control circuit in-service monitoring according to claim 1 and method for early warning, it is characterised in that:When When breaker is in "on" position, the current value that closing circuit monitors branch road is flowed through in monitoring, and the closing circuit of monitoring is monitored The current value of branch road and closing circuit break alarm current value IhCompare, closed a floodgate if the current value of closing circuit monitoring branch road is less than Circuit breaking alarm current value Ih, then judge that loose contact or circuit breaking failure occurs in closing circuit, send alarm signal.
9. relay protection DC control circuit in-service monitoring according to claim 7 and method for early warning, it is characterised in that:When When breaker is in tripped condition, the current value that trip(ping) circuit monitors branch road is flowed through in monitoring, and the trip(ping) circuit of monitoring is monitored The current value of branch road and trip(ping) circuit break alarm current value ItCompare, if the current value of trip(ping) circuit monitoring branch road is less than tripping operation Circuit breaking alarm current value It, then judge that circuit breaking failure occurs in trip(ping) circuit, send alarm signal.
CN201510214048.7A 2015-04-29 2015-04-29 A kind of relay protection DC control circuit in-service monitoring and method for early warning Active CN104808102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510214048.7A CN104808102B (en) 2015-04-29 2015-04-29 A kind of relay protection DC control circuit in-service monitoring and method for early warning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510214048.7A CN104808102B (en) 2015-04-29 2015-04-29 A kind of relay protection DC control circuit in-service monitoring and method for early warning

Publications (2)

Publication Number Publication Date
CN104808102A CN104808102A (en) 2015-07-29
CN104808102B true CN104808102B (en) 2017-11-03

Family

ID=53693098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510214048.7A Active CN104808102B (en) 2015-04-29 2015-04-29 A kind of relay protection DC control circuit in-service monitoring and method for early warning

Country Status (1)

Country Link
CN (1) CN104808102B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106814313B (en) * 2017-01-13 2019-05-17 天津大学 The intellectual faculties in breaker operator circuit
CN106950449A (en) * 2017-04-07 2017-07-14 国网山东省电力公司潍坊供电公司 Intelligent substation checks and accepts breaker controller in analogue system
CN109509658B (en) * 2018-12-29 2019-09-24 国网北京市电力公司 A kind of relay protection DC control circuit and its full working scope monitoring and fault early warning method
CN109991533A (en) * 2019-03-11 2019-07-09 国网新疆电力有限公司昌吉供电公司 Counter type control loop exports monitoring device
CN109884521B (en) * 2019-03-28 2024-03-12 山东钢铁股份有限公司 Circuit breaker divide-shut brake control circuit broken wire monitoring alarm circuit
CN110146773A (en) * 2019-06-20 2019-08-20 广东电网有限责任公司 A kind of monitoring of control loop and fault coverage judgement system
CN110514994A (en) * 2019-09-04 2019-11-29 甘书宇 A kind of high-voltage AC breaker is restriked the method for on-line monitoring
CN111308334B (en) * 2019-11-07 2021-01-26 广东电网有限责任公司 Current type relay protection tripping circuit contact resistance detection device
CN111308332B (en) * 2019-11-07 2021-01-26 广东电网有限责任公司 Voltage type relay protection tripping circuit contact resistance detection device
CN112485655B (en) * 2020-10-29 2022-05-31 国网湖北省电力有限公司电力科学研究院 Accurate monitoring device and method for tripping and closing loop of substation breaker
CN115291093B (en) * 2022-05-27 2023-12-22 国网江苏省电力有限公司南通供电分公司 Circuit breaker working state detection method and system based on voltage monitoring
CN116840740B (en) * 2023-08-25 2023-11-03 珠海菲森电力科技有限公司 Control loop detection circuit and method and electronic equipment

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203368011U (en) * 2013-05-07 2013-12-25 南京南自西电电气有限责任公司 Circuit breaker trip coil automation protection device
CN103515921A (en) * 2013-09-25 2014-01-15 国家电网公司 Online protection circuit of high-voltage breaker opening/closing coil and protection method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1429180A (en) * 1972-08-18 1976-03-24 Gent Co Ltd Alarm circuits
JPH0353483A (en) * 1989-07-20 1991-03-07 Fuoresuto:Kk Heater failure alarm
CN101710685B (en) * 2009-11-20 2012-05-30 深圳市科陆电子科技股份有限公司 Intelligent recloser
CN101728819B (en) * 2009-11-20 2012-05-30 深圳市科陆电子科技股份有限公司 Intelligent switch and control method thereof
CN102005720B (en) * 2010-10-21 2013-09-11 重庆大学 Neutral line breakage detection protection method and device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203368011U (en) * 2013-05-07 2013-12-25 南京南自西电电气有限责任公司 Circuit breaker trip coil automation protection device
CN103515921A (en) * 2013-09-25 2014-01-15 国家电网公司 Online protection circuit of high-voltage breaker opening/closing coil and protection method thereof

Also Published As

Publication number Publication date
CN104808102A (en) 2015-07-29

Similar Documents

Publication Publication Date Title
CN104808102B (en) A kind of relay protection DC control circuit in-service monitoring and method for early warning
CN103515921B (en) A kind of online protective circuit of high-voltage circuit breaker/closing coil and guard method thereof
CN105140897B (en) A kind of guard method suitable for small resistance grounding system singlephase earth fault
CN102089667B (en) Method and device for supervising secondary circuit of instrument transformer in power system
CN104092206B (en) Power distribution network grounding self-adaptive control system and method
CN101593964B (en) Method for longitudinal zero-sequence power direction protection of double circuit line on same pole
CN107907792A (en) Neutral by arc extinction coil grounding ring distribution system single-phase grounding selecting method
CN103954879B (en) A kind of band shunt reactor double circuit lines character method of discrimination
CN106549355B (en) A kind of high-speed reclosure method with breaker jump recognition capability
CN103606889B (en) A kind of secondary side overcurrent protection circuit of electric arc furnace transformer
CN101877479A (en) Method for comparing and judging phase of single-pole adaptive reclosure of electric transmission line
CN102005720B (en) Neutral line breakage detection protection method and device
US8861154B2 (en) Recloser device and method of operation
CN112039020A (en) Method for identifying magnetizing inrush current and faults based on transformer transformation ratio
CN101877480A (en) Method for judging voltage compensation of single-pole adaptive reclosure of electric transmission line
CN106684844B (en) A kind of power distribution network isolated island recognition methods
CN101626158A (en) Automatic tuning control method of post-set arc suppression coils
CN106468763A (en) A kind of online Insulation monitoring control method of motor stopping
CN103618296B (en) Breaker fail protection blocking method
CN104993455A (en) Traction transformer over current protection method
CN105529681A (en) Leakage protection circuit for low-voltage ungrounded system and realization method
CN209311616U (en) A kind of simple type current protection detection illustrative circuitry
CN107482599A (en) Suppress the breaker control method of DC bias current during a kind of line no-load switching
CN206096384U (en) Breaker state monitoring system based on divide closing coils electric current
CN202094598U (en) Rated current adjustable leakage protector

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant