CN104807622A - 一种检验盖梁抱箍承载力的试验方法 - Google Patents
一种检验盖梁抱箍承载力的试验方法 Download PDFInfo
- Publication number
- CN104807622A CN104807622A CN201510194397.7A CN201510194397A CN104807622A CN 104807622 A CN104807622 A CN 104807622A CN 201510194397 A CN201510194397 A CN 201510194397A CN 104807622 A CN104807622 A CN 104807622A
- Authority
- CN
- China
- Prior art keywords
- anchor ear
- oil pump
- hoop
- load
- tensimeter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
本发明公开了一种检验盖梁抱箍承载力的试验方法,包括以下施工步骤:步骤一:将抱箍紧固扣住立柱,在抱箍下端两侧各放置一台千斤顶,抱箍和千斤顶之间放置有钢板,将千斤顶和油泵连接;步骤二:初步启动油泵,使千斤顶与钢板、抱箍两端紧密接触在一起,此时,油泵开始进行初始应力施加,使得压力表表盘压力值为理论值的20%,待荷载稳定1-2min后,如果抱箍未发生变化,再开始均匀缓慢施加荷载。本发明的优点是:结构合理,使用方便,而且稳定可靠,提高了盖梁抱箍法施工安全和进度。
Description
技术领域
本发明涉及一种建筑施工检测方法,更具体的说,是涉及一种检验盖梁抱箍承载力的试验方法。
背景技术
目前盖梁施工方法一般有满堂支架法、抱箍法等。满堂支架法施工是在墩柱处搭设支架,在支架上浇筑盖梁混凝土,待混凝土达到强度后拆除模板及支架。支架法施工最大的优点是不需要大型吊装设备,其缺点是施工用的支架模板消耗量大、工期长,对山区桥梁及高墩有很大的局限性,并对地基承载力要求较高。抱箍法施工是在立柱上安装抱箍,利用抱箍和立柱之间的摩擦力,承受盖梁施工全部荷载。抱箍法施工能节省支架,操作简单,需要劳力少,相对满堂支架法具有明显优势。但要求“抱箍”必须具有一定的强度和刚度,能够承受一定的重量而不变形。使用前需根据工程实际情况对抱箍进行受力验算,并严格按照计算模式指导现场施工,确保施工安全。上述两种方法在施工过程中具体实施时,还需要对其承载力的校验通常是采用荷载预压的形式进行校验,会耗用大量的时间、人力、物力、财力等,大大增加了施工成本。
发明内容
本发明针对现有技术的不足,而提供一种结构合理,使用方便,稳定可靠,提高施工效率,降低施工成本的一种检验盖梁抱箍承载力的试验方法。
本发明的一种检验盖梁抱箍承载力的试验方法,包括以下施工步骤:
步骤一 将抱箍紧固扣住立柱,在抱箍下端两侧各放置一台千斤顶,抱箍和千斤顶之间放置钢板,将千斤顶和油泵连接;
步骤二 初步启动油泵,使千斤顶与钢板、抱箍两端紧密接触在一起,此时,油泵开始进行初始应力施加,使得压力表表盘压力值为理论值的20%,待荷载稳定1-2min后,如果抱箍未发生变化,再开始均匀缓慢施加荷载;待压力表表盘压力值达到理论值75%时,荷载稳定1-2min后,抱箍仍未发生变化,再开始均匀缓慢施加荷载,待压力表表盘压力值达到理论值100%时,荷载稳定1-2min后,发现抱箍仍未发生变化,此后压力表压力值每增加0.5MPa,荷载便稳定1-2min,直至抱箍开始发生变形,记录下压力表显示压力值,然后测算出理论值与实测值之间的系数来确定抱箍是否满足施工要求。
所述步骤二中油泵加压过程中,抱箍发生位移,需对抱箍进行加固,再进行测试。
本发明的有益效果是:(1)结构合理,使用方便,稳定可靠,提高了盖梁抱箍法施工安全和进度。
附图说明
图1为本发明的结构示意图;
图中:抱箍1、钢板2、千斤顶3、立柱4、油泵5、压力表6。
具体实施方式
下面结合附图对本发明作进一步的描述。
在图中,本发明的一种检验盖梁抱箍承载力的试验方法,包括以下施工步骤:
步骤一 将抱箍1紧固扣住立柱4,在抱箍1下端两侧各放置一台千斤顶3,抱箍1和千斤顶3之间放置钢板2,将千斤顶3和油泵5连接;
步骤二 初步启动油泵5,使千斤顶3与钢板2、抱箍1两端紧密接触在一起,此时,油泵5开始进行初始应力施加,使得压力表6表盘压力值为理论值的20%,待荷载稳定1-2min后,如果抱箍1未发生变化,再开始均匀缓慢施加荷载;待压力表6表盘压力值达到理论值75%时,荷载稳定1-2min后,抱箍1仍未发生变化,再开始均匀缓慢施加荷载,待压力表6表盘压力值达到理论值100%时,荷载稳定1-2min后,发现抱箍1仍未发生变化,此后压力表压力值每增加0.5MPa,荷载便稳定1-2min,直至抱箍1开始发生变形,记录下压力表6显示压力值,然后测算出理论值与实测值之间的系数来确定抱箍1是否满足施工要求。所述步骤二中油泵5加压过程中,抱箍1发生位移,需对抱箍1进行加固,再进行测试。
本发明的一种检验盖梁抱箍承载力的试验方法,利用现场检验盖梁抱箍承载力试验方法,证明盖梁时采取抱箍法施工是墩柱式盖梁施工方案中切实可行的施工方法,此方法克服了为支撑盖梁底模对地基承载力的要求,尤其在软土地基及水上等地基承载力较差的情况下优先采用,为施工过程中节省了大量的人力、物力、财力。
Claims (2)
1.一种检验盖梁抱箍承载力的试验方法,其特征在于,包括以下施工步骤:
步骤一 将抱箍(1)紧固扣住立柱(4),在抱箍(1)下端两侧各放置一台千斤顶(3),抱箍(1)和千斤顶(3)之间放置钢板(2),将千斤顶(3)和油泵(5)连接;
步骤二 初步启动油泵(5),使千斤顶(3)与钢板(2)、抱箍(1)两端紧密接触在一起,此时,油泵(5)开始进行初始应力施加,使得压力表(6)表盘压力值为理论值的20%,待荷载稳定1-2min后,如果抱箍(1)未发生变化,再开始均匀缓慢施加荷载;待压力表(6)表盘压力值达到理论值75%时,荷载稳定1-2min后,抱箍(1)仍未发生变化,再开始均匀缓慢施加荷载,待压力表(6)表盘压力值达到理论值100%时,荷载稳定1-2min后,发现抱箍(1)仍未发生变化,此后压力表压力值每增加0.5MPa,荷载便稳定1-2min,直至抱箍(1)开始发生变形,记录下压力表(6)显示压力值,然后测算出理论值与实测值之间的系数来确定抱箍(1)是否满足施工要求。
2.根据权利要求1所述的一种检验盖梁抱箍承载力的试验方法,其特征在于,所述步骤二中油泵(5)加压过程中,抱箍(1)发生位移,需对抱箍(1)进行加固,再进行测试。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510194397.7A CN104807622A (zh) | 2015-04-22 | 2015-04-22 | 一种检验盖梁抱箍承载力的试验方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510194397.7A CN104807622A (zh) | 2015-04-22 | 2015-04-22 | 一种检验盖梁抱箍承载力的试验方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104807622A true CN104807622A (zh) | 2015-07-29 |
Family
ID=53692645
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510194397.7A Pending CN104807622A (zh) | 2015-04-22 | 2015-04-22 | 一种检验盖梁抱箍承载力的试验方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104807622A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080116A (zh) * | 2019-05-30 | 2019-08-02 | 甘肃路桥建设集团有限公司 | 一种大跨度预应力盖梁临时支撑装置及其施工方法 |
CN112255098A (zh) * | 2020-10-09 | 2021-01-22 | 中国建筑第七工程局有限公司 | 一种盖梁施工用抱箍承载力检测方法 |
CN112881186A (zh) * | 2021-01-15 | 2021-06-01 | 中建一局集团第三建筑有限公司 | 盖梁承载力检测结构及用该结构进行承载力检测的方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1274407A (en) * | 1970-01-30 | 1972-05-17 | Commissariat Energie Atomique | Prestressing device for an enclosure or vessel resistant to high pressures |
CN201258494Y (zh) * | 2008-08-27 | 2009-06-17 | 湖南省第六工程有限公司 | 单桩竖向抗拔静载试验加载装置 |
CN101831925A (zh) * | 2010-06-01 | 2010-09-15 | 张百全 | 一种桩基静载的检测方法 |
-
2015
- 2015-04-22 CN CN201510194397.7A patent/CN104807622A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1274407A (en) * | 1970-01-30 | 1972-05-17 | Commissariat Energie Atomique | Prestressing device for an enclosure or vessel resistant to high pressures |
CN201258494Y (zh) * | 2008-08-27 | 2009-06-17 | 湖南省第六工程有限公司 | 单桩竖向抗拔静载试验加载装置 |
CN101831925A (zh) * | 2010-06-01 | 2010-09-15 | 张百全 | 一种桩基静载的检测方法 |
Non-Patent Citations (3)
Title |
---|
周邵宜等: "墩柱式盖梁抱箍法施工实践与探讨", 《建筑工程》 * |
张洪军等: "现浇盖梁抱箍法模板支撑设计与施工", 《中外公路》 * |
杨自刚: "盖梁抱箍法施工技术总结", 《西部探矿工程》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080116A (zh) * | 2019-05-30 | 2019-08-02 | 甘肃路桥建设集团有限公司 | 一种大跨度预应力盖梁临时支撑装置及其施工方法 |
CN112255098A (zh) * | 2020-10-09 | 2021-01-22 | 中国建筑第七工程局有限公司 | 一种盖梁施工用抱箍承载力检测方法 |
CN112881186A (zh) * | 2021-01-15 | 2021-06-01 | 中建一局集团第三建筑有限公司 | 盖梁承载力检测结构及用该结构进行承载力检测的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203654299U (zh) | 一种钢支撑活络端 | |
CN102505636B (zh) | 一种双薄壁墩连续刚构桥0号块施工方法 | |
CN206832583U (zh) | 一种用于节理岩体中锚杆拉伸及剪切的试验装置 | |
CN104807622A (zh) | 一种检验盖梁抱箍承载力的试验方法 | |
CN103015330A (zh) | 顶升桥梁钢抱箍支架系统 | |
CN205223871U (zh) | 一种悬索桥桥塔横梁支架预压装置 | |
CN104328810A (zh) | 预制管桩单桩地基承载力检测改进方法 | |
CN103114734A (zh) | 一种适用于具有充气膜压杆桁架的快速施工方法 | |
CN202466651U (zh) | 一种预应力管桩轴向力试验加载装置 | |
CN202543984U (zh) | 锚筋-钢梁组合的反力装置 | |
CN203160142U (zh) | 顶升桥梁钢抱箍支架系统 | |
CN112095435A (zh) | 一种大跨度钢拱架预压的施工方法 | |
CN204850482U (zh) | 一种千斤顶反张拉预压工具 | |
CN212670670U (zh) | 一种基桩抗压静载试验用加载装置及试验设备 | |
CN210151589U (zh) | 不平衡连续梁边跨配重辅助装置 | |
CN204282415U (zh) | 一种单桩抗压静载试验钢制桩帽 | |
CN103759928B (zh) | 检测吊装大型设备用平衡梁的承载载荷的方法 | |
CN102535532A (zh) | 锚筋-钢梁组合的反力装置 | |
CN101586329B (zh) | 大跨径预应力混凝土桥梁悬臂浇筑施工用的抱箍牛腿支架 | |
CN108894111B (zh) | 一种重型钢锚梁与钢牛腿整体吊装装置及吊装方法 | |
CN102051890A (zh) | 基桩单桩静荷载的试验检测车 | |
CN202500164U (zh) | 一种两根螺纹钢筋锚杆检测夹持装置及检测系统 | |
CN201588230U (zh) | 用于桩基承载力试验的组合式预埋荷载箱 | |
CN202804054U (zh) | 基于对c型板安装时提供支撑的内置桁架 | |
CN111894049A (zh) | 一种基桩抗压静载试验用加载装置及试验设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150729 |
|
WD01 | Invention patent application deemed withdrawn after publication |