Prior art keywords
explosion
datonation
inhibition
blast
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510175092.1A
Other languages
Chinese (zh)
Other versions
CN104806282A (en
Inventor
张超
巨万里
闻强
杨德志
李武
田敬秋
芶启泷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Tianwei Electronic Co Ltd
Original Assignee
Sichuan Tianwei Electronic Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Tianwei Electronic Co Ltd filed Critical Sichuan Tianwei Electronic Co Ltd
Priority to CN201510175092.1A priority Critical patent/CN104806282B/en
Publication of CN104806282A publication Critical patent/CN104806282A/en
Application granted granted Critical
Publication of CN104806282B publication Critical patent/CN104806282B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F5/00Means or methods for preventing, binding, depositing, or removing dust; Preventing explosions or fires
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
  • Traffic Control Systems (AREA)

Abstract

The invention discloses a multi-layer gas explosion protection system and method for a coal mine tunnel. The system comprises an active early warning protecting layer, an automatic explosion inhibiting protecting layer, an automatic explosion isolating protecting layer and an intelligent management system; the active early warning protecting layer, the automatic explosion inhibiting protecting layer and the automatic explosion isolating protecting layer are respectively connected with the intelligent management system. With the adoption of the system and method, explosion can be avoided at the beginning by early warning and removing the explosion factors in the coal mine tunnel at the beginning; the active detecting can be carried out at the middle period of explosion and explosion inhibiting substances can be sprayed to control the explosion at the small energy stage of the explosion; an explosion isolating water barrier is started at the later period of explosion, and an explosion isolating door is closed, so as to completely cut of the explosion.

Description

Coal mine roadway gas explosion multilayer proofing system and method
Technical field
The present invention relates to the datonation-inhibition field of coal mine down-hole tunnel gas explosion, and in particular to coal mine roadway gas explosion multilayer is prevented Protecting system and method.
Background technology
Coal is the pillar industry of China's energy, and for national whole energy strategy important guarantee is provided." 12 " with Come, coal and coal seam exploitation are the emphasis for carrying out energy construction, have very important ground in national economy and social development Position.China is the country of coal mine gas " protrusion " accident most serious in the world, and more than 10,000 prominent accident is had occurred and that so far.With The continuous enhancing of mining rate, China's coal-mine mining depth will increase every year on average 10 to 20 meters, and highly gassy mine will be more next It is more.At present, most domestic coal mining enterprise in coal mine gas safety more adopts passive type explosion suppression system and active explosion suppression Device:Passive type explosion suppression system such as explosion-proof rock dust barrier, explosion-proof water barrier etc., i.e., the measure of putting out a fire to save life and property just taken after blast occurs, it There is the deficiencies such as starting time is long, efficiency is uncertain;Active gas explosion suppression device is to the initial stage of exploding by detector Situation carries out active probe, and when explosion time is detected, explosion suppression device sprays datonation-inhibition material, absorbs blast in the starting stage of blast The energy of generation prevents the expansion of blast and cuts off the continuation propagation of blast.Although passive type explosion suppression system or active explosion suppression are filled Putting can play certain datonation-inhibition effect in coal mine roadway explosion suppression, but passive type explosion suppression system or active explosion suppression device All only just generation actions after blast occurs, can not shift to an earlier date according to detonation factors prediction blast it may happen that, it is and then broken Bad detonation factors prevent blast from occurring, and these systems only have one layer of protection, it is impossible to meet coal mine roadway rugged environment.
The content of the invention
Instant invention overcomes the deficiencies in the prior art, there is provided the coal mine roadway watt of the generation of preventing and treating coal mine roadway gas explosion This blast multilayer proofing system and method.
Early stage of the present invention, the detecting early-warning of detonation factors and destruction detonation factors part;Mid-term, blast forms the initial stage actively The datonation-inhibition material of detection injection suppresses detonation propagation and development;Later stage, reduce blast loss formed water curtain barrier close flame proof door from And thoroughly cut off the propagation of blast.
To solve above-mentioned technical problem, the present invention is employed the following technical solutions:
A kind of coal mine roadway gas explosion multilayer proofing system, it includes:
Active forewarning overcoat, for detecting mine lane gas from explosion factor parameter, when the detonation factors parameter When reaching the early warning upper limit, starting device reduces mine lane gas from explosion factor;
Automatically datonation-inhibition overcoat, for detecting to the blast initial stage, when explosion time is detected, prevents the expansion of blast simultaneously The continuation of cut-out blast is propagated;
Automatic flame proof overcoat, for being linked with the datonation-inhibition overcoat automatically, when the datonation-inhibition overcoat automatically Explosion time is detected, flame proof system shutdown detonation propagation is started according to setting time;
Intelligent management system, the active forewarning overcoat, automatically datonation-inhibition overcoat, automatic flame proof overcoat respectively with institute Intelligent management system connection is stated, for carrying out to the active forewarning overcoat, automatic datonation-inhibition overcoat, automatic flame proof overcoat Real-time monitoring positioning, data storage and fault diagnosis.
Further technical scheme is that active forewarning overcoat includes:Gas density Monitor And Control Subsystem, for goaf, Upper even angle, face gas concentration monitor;
Infrared thermal imaging Monitor And Control Subsystem, for equipment spark, corona and belt fever monitoring;
Fiber optic temperature Monitor And Control Subsystem, for tunnel rib, the temperature monitoring in goaf;
Goaf index gas wireless monitor subsystem, for index gas concentration monitor;The index gas include sulphur Change hydrogen, carbon monoxide;
Also include nitrogen/carbon-dioxide fire engine subsystem and the datonation-inhibition subsystem of fine water mist dust removal.
Further technical scheme is that automatic datonation-inhibition overcoat includes the datonation-inhibition subsystem of automatic powder spraying and fine water mist dust removal Datonation-inhibition subsystem.
Further technical scheme is that automatic flame proof overcoat includes the datonation-inhibition subsystem of automatic water bag.
Further technical scheme is that intelligent management system includes wisdom line transmission positioning and data storage subsystem.
Further technical scheme be fiber optic temperature Monitor And Control Subsystem be passive gapless fiber optic temperature Monitor And Control Subsystem.
Further technical scheme is to provide a kind of coal mine roadway gas explosion multilayer proofing method, described method bag Include following steps:
Ground floor active forewarning is protected
Gas density is detected by gas density Monitor And Control Subsystem, when gas density is detected more than the early warning upper limit, plus Big ventilation;
Dust Concentration is detected by Dust Concentration detector, when Dust Concentration is detected more than the setting upper limit, is started thin The datonation-inhibition subsystem of water mist dust fall carries out depositing dust;
By infrared thermal imaging Monitor And Control Subsystem and fiber optic temperature Monitor And Control Subsystem detection operations device temperature, when detecting When temperature reaches the upper limit, working equipment power supply is automatically cut off;
The second layer datonation-inhibition protection automatically
Automatic flame detection is carried out to the initial stage that blast is produced by optical detector, when flame is detected, datonation-inhibition dress Put and spray the continuation propagation that datonation-inhibition medium prevents the expansion of blast and cuts off blast in the starting stage of blast, suppress coal mine gas Blast;
The automatic flame proof protection of third layer
When optical detector detects the initial stage signal of blast, the datonation-inhibition subsystem of automatic water bag is started according to setting time System, and the explosion proof door closed in tunnel, the continuation for cutting off blast is propagated.
Further technical scheme is the datonation-inhibition son of automatic powder spraying in the automatic datonation-inhibition protection of the second layer when flame is detected System and the datonation-inhibition subsystem of fine water mist dust removal spray datonation-inhibition material in the starting stage of blast, absorb energy that blast produces, every Anoxybiotic gas, the continuation for preventing the expansion of blast and cutting off blast is propagated, and suppresses coal mine gas from explosion.
Compared with prior art, the invention has the beneficial effects as follows:The present invention be directed to what coal mine roadway gas explosion suppressed Coal mine roadway gas explosion suppresses multilayer proofing system.System is by prime detonation factors detecting early-warning removal system, middle rank active Explosionsunter-druckungssystem, rear class thoroughly cut off flare system and this four part of intelligent management system to complete jointly to coal mine roadway watt The multilayer proofing of this blast, the multilayer for realizing coal mine roadway gas explosion suppresses, and the system can realize the initial stage of coal mine roadway Early warning excludes detonation factors and elimination by explosion stifles in the cradle;Mid-term blast initial stage active probe sprays datonation-inhibition material in blast Little energized state blast is controlled;Later stage starts explosion-proof water barrier, closes flame proof goalkeeper blast thoroughly cut-out.
Description of the drawings
Fig. 1 is the system architecture diagram of one embodiment of the invention.
Fig. 2 is the multilayer proofing pie graph of one embodiment of the invention.
Specific embodiment
All features disclosed in this specification, or disclosed all methods or during the step of, except mutually exclusive Feature and/or step beyond, can combine by any way.
Any feature disclosed in this specification (including any accessory claim, summary and accompanying drawing), except non-specifically is chatted State, can alternative features equivalent by other or with similar purpose replaced.I.e., unless specifically stated otherwise, each feature It is an example in a series of equivalent or similar characteristics.
Below in conjunction with the accompanying drawings and embodiment to the present invention specific embodiment be described in detail.
Embodiment 1
As shown in figure 1, the present embodiment discloses a kind of coal mine roadway gas explosion multilayer proofing system, its system is constituted can join As shown in Figure 1, it includes active forewarning overcoat, for detecting mine lane gas from explosion factor parameter, when the blast When factor parameter reaches the upper limit, mine lane gas from explosion factor is reduced;Further specific embodiment is, active forewarning Overcoat includes:Gas density Monitor And Control Subsystem, for goaf, even angle, face gas concentration monitor;Infrared thermal imaging is supervised Control subsystem, for equipment spark, corona and belt fever monitoring;Fiber optic temperature Monitor And Control Subsystem, for tunnel rib, mined out The temperature monitoring in area;Goaf index gas wireless monitor subsystem, monitors for methane, carbonomonoxide concentration;Also include nitrogen Gas/carbon-dioxide fire engine subsystem and the datonation-inhibition subsystem of fine water mist dust removal.The present embodiment has not occurred blast in coal mine roadway Between, the prime detonation factors early warning detection removal system of active forewarning overcoat mainly to gas density, concentration of toxic gases, The factors such as Dust Concentration, working equipment temperature are detected, when relevant parameter reach setting the upper limit when, respectively increase ventilation, Device for reducing dust, cut-out equipment working power etc. are opened, detonation factors are reduced.
Automatically datonation-inhibition overcoat, for detecting to the blast initial stage, when explosion time is detected, prevents the expansion of blast simultaneously The continuation of cut-out blast is propagated;Specifically, automatically datonation-inhibition overcoat includes that the datonation-inhibition subsystem of automatic powder spraying and fine water mist dust removal press down Quick-fried subsystem.There is the initial stage of explosion time in the present embodiment, automatically the middle rank of datonation-inhibition overcoat is actively quick-fried in coal mine roadway Fried suppression system mainly carries out active probe to the initial stage that blast is produced, and when explosion time is detected, explosion suppression device is made rapidly instead Should, in the datonation-inhibition material of starting stage ejection of blast, the expansion for absorb the blast energy for producing, reducing oxygen concentration prevention blast And cut off blast continuation propagate.
Automatic flame proof overcoat, for being linked with the datonation-inhibition overcoat automatically, when the datonation-inhibition overcoat automatically Explosion time is detected, cut-out detonation propagation system is started according to setting time;Specifically, automatic flame proof overcoat includes automatic water The datonation-inhibition subsystem of bag.Automatic flame proof overcoat is linked with intermediate active Explosionsunter-druckungssystem in the present embodiment, as middle rank master When the detector of dynamic Explosionsunter-druckungssystem detects the initial stage signal of blast, the flame proof water in tunnel is started according to setting time Canopy, and the flame proof door closed in tunnel immediately, the continuation for completely cutting through blast is propagated.
The present embodiment coal mine roadway gas explosion multilayer proofing system also includes intelligent management system, active forewarning protection Layer, automatically datonation-inhibition overcoat, automatic flame proof overcoat are connected respectively with intelligent management system, for protecting the active forewarning Layer, automatically datonation-inhibition overcoat, the working condition of automatic flame proof overcoat carry out real-time monitoring and record, and it are carried out in real time Fault diagnosis.
The present embodiment coal mine roadway gas explosion multilayer proofing system by prime detonation factors detecting early-warning removal system, in Level active Explosionsunter-druckungssystem, rear class thoroughly cut off flare system and this four part of central control system to complete jointly to colliery The multilayer proofing of tunnel gas explosion, the multilayer for realizing coal mine roadway gas explosion suppresses.
Embodiment 2
As shown in Fig. 2 the present invention further discloses a kind of coal mine roadway gas explosion multilayer proofing method, the multilayer is prevented Maintaining method is implemented on the basis of above-described embodiment coal mine roadway gas explosion multilayer proofing system.
Specifically, the present embodiment multilayer proofing method is comprised the following steps:
Ground floor active forewarning is protected
Gas density is detected by gas density Monitor And Control Subsystem, when gas density is detected more than the early warning upper limit, plus Big ventilation;
Dust Concentration is detected by Dust Concentration detector, when Dust Concentration is detected more than the setting upper limit, is started thin The datonation-inhibition subsystem of water mist dust fall carries out depositing dust;
By infrared thermal imaging Monitor And Control Subsystem and fiber optic temperature Monitor And Control Subsystem detection operations device temperature, when detecting When temperature reaches the upper limit, working equipment power supply is automatically cut off.
Specifically, the protection of ground floor active forewarning is mainly detected by gas density detector, poison gas concentration in the present embodiment Device, Dust Concentration detector and hygrosensor etc. are constituted, when each autoregressive parameter that these detectors are detected reaches the upper of setting Limit value, prime will send alarm signal, and start corresponding device increasing exhaust amount, start atomizer and carry out depositing dust or cut-out Equipment working power quits work.
The second layer datonation-inhibition protection automatically
Active flame detecting is carried out to the initial stage that blast is produced by optical detector, when flame is detected, spray automatically The datonation-inhibition subsystem of powder and the datonation-inhibition subsystem of fine water mist dust removal spray datonation-inhibition material in the starting stage of blast, absorb what blast was produced Energy, starvation, the continuation for preventing the expansion of blast and cutting off blast is propagated, and suppresses coal mine gas from explosion.
Specifically, the second layer initial stage that automatically datonation-inhibition protection is mainly produced by optical detector to blast in the present embodiment Active flame detecting is carried out, when explosive flame is detected, explosion suppression device is reacted sprayed in the starting stage of blast rapidly Datonation-inhibition material, the energy of absorption blast generation, starvation prevent the expansion of blast and cut off the continuation propagation of blast, suppress coal Ore deposit gas explosion.
The automatic flame proof protection of third layer
When optical detector detects the initial stage signal of blast, the datonation-inhibition subsystem of automatic water bag is started according to setting time System, and the explosion proof door closed in tunnel, the continuation for cutting off blast is propagated.
Automatically datonation-inhibition protection is linked the automatic flame proof protection of third layer with the second layer in the present embodiment, when intermediate actively quick-fried When the detector of fried suppression system detects the initial stage signal of blast, this one-level can start the flame proof in tunnel according to setting time Fluid barrier, and the flame proof door closed in tunnel immediately, the continuation for completely cutting through blast is propagated;Simultaneously central control system is intelligence pipe Reason system is monitored and records to one, two, three working condition in real time, and carries out real-time fault diagnosis to it.
The multilayer proofing method of the present embodiment can realize that the initial stage early warning of coal mine roadway excludes detonation factors and blast disappears Except stifling in the cradle;Mid-term blast initial stage active probe sprays the little energized state of datonation-inhibition material in blast by control of exploding Firmly;Later stage starts explosion-proof water barrier, closes flame proof goalkeeper blast thoroughly cut-out.
" one embodiment ", " another embodiment ", " embodiment " for being spoken of in this manual, etc., refer to knot Specific features, structure or the feature for closing the embodiment description is included at least one embodiment of the application generality description In.It is not necessarily to refer to same embodiment that in the description statement of the same race occur in multiple places.Furthermore, it is understood that with reference to appoint When one embodiment describes specific features, structure or a feature, what is advocated is realizing this with reference to other embodiment Plant feature, structure or feature also to fall within the scope of the present invention.
Although reference be made herein to invention has been described for the multiple explanatory embodiments invented, however, it is to be understood that this Art personnel can be designed that a lot of other modification and embodiment, and these modifications and embodiment will fall in the application Within disclosed spirit and spirit.More specifically, in the range of disclosure claim, can be to theme group Closing the building block and/or layout of layout carries out various modifications and improvement.Except the modification carried out to building block and/or layout Outer with improving, to those skilled in the art, other purposes also will be apparent.

Claims (6)

1. a kind of coal mine roadway gas explosion multilayer proofing system, it is characterised in that:It includes:
Active forewarning overcoat, for detecting mine lane gas from explosion factor parameter, when the detonation factors parameter reaches During the early warning upper limit, starting device reduces mine lane gas from explosion factor;
Automatically datonation-inhibition overcoat, for detecting to the blast initial stage, when explosion time is detected, prevents the expansion of blast and cuts off The continuation of blast is propagated;
Automatic flame proof overcoat, for being linked with the datonation-inhibition overcoat automatically, when the datonation-inhibition protection Layer Detection automatically To explosion time, flame proof system shutdown detonation propagation is started according to setting time;
Intelligent management system, the active forewarning overcoat, automatically datonation-inhibition overcoat, automatic flame proof overcoat respectively with the intelligence Energy management system connection, for carrying out in real time to the active forewarning overcoat, automatic datonation-inhibition overcoat, automatic flame proof overcoat Monitoring positioning, data storage and fault diagnosis;
Described active forewarning overcoat includes:Gas density Monitor And Control Subsystem, for goaf, upper even angle, face gas Concentration monitor;
Infrared thermal imaging Monitor And Control Subsystem, for equipment spark, corona and belt fever monitoring;
Fiber optic temperature Monitor And Control Subsystem, for tunnel rib, the temperature monitoring in goaf;
Goaf index gas wireless monitor subsystem, for index gas concentration monitor;The index gas include hydrogen sulfide, Carbon monoxide;
Also include nitrogen/carbon-dioxide fire engine subsystem and the datonation-inhibition subsystem of fine water mist dust removal;
Described fiber optic temperature Monitor And Control Subsystem is passive gapless fiber optic temperature Monitor And Control Subsystem.
2. coal mine roadway gas explosion multilayer proofing system according to claim 1, it is characterised in that described automatic suppression Quick-fried overcoat includes the datonation-inhibition subsystem of automatic powder spraying and the datonation-inhibition subsystem of fine water mist dust removal.
3. coal mine roadway gas explosion multilayer proofing system according to claim 1, it is characterised in that it is described it is automatic every Quick-fried overcoat includes the datonation-inhibition subsystem of automatic water bag.
4. coal mine roadway gas explosion multilayer proofing system according to claim 1, it is characterised in that described intelligence pipe Reason system includes wisdom line transmission positioning and data storage subsystem.
5. a kind of coal mine roadway gas explosion multilayer proofing method, it is characterised in that described method is comprised the following steps:
Ground floor active forewarning is protected
Gas density is detected by gas density Monitor And Control Subsystem, when gas density is detected more than the early warning upper limit, increases logical Air quantity;
Dust Concentration is detected by Dust Concentration detector, when Dust Concentration is detected more than the setting upper limit, starts water mists The datonation-inhibition subsystem of depositing dust carries out depositing dust;
By infrared thermal imaging Monitor And Control Subsystem and fiber optic temperature Monitor And Control Subsystem detection operations device temperature, when detecting temperature When reaching the upper limit, working equipment power supply is automatically cut off;
The second layer datonation-inhibition protection automatically
Automatic flame detection is carried out to the initial stage that blast is produced by optical detector, when flame is detected, explosion suppression device exists The starting stage of blast sprays datonation-inhibition medium and prevents the expansion of blast and cut off the continuation propagation of blast, suppresses coal mine gas quick-fried It is fried;
The automatic flame proof protection of third layer
When optical detector detects the initial stage signal of blast, the datonation-inhibition subsystem of automatic water bag is started according to setting time, and The explosion proof door closed in tunnel, the continuation for cutting off blast is propagated.
6. coal mine roadway gas explosion multilayer proofing method according to claim 5, it is characterised in that the described second layer Automatically in datonation-inhibition protection when flame is detected, the datonation-inhibition subsystem of automatic powder spraying and the datonation-inhibition subsystem of fine water mist dust removal are in blast Starting stage sprays datonation-inhibition material, absorbs energy, starvation that blast is produced, prevent blast expansion and cut off blast after Resume and broadcast, suppress coal mine gas from explosion.
CN201510175092.1A 2015-04-14 2015-04-14 Multi-layer gas explosion protection system and method for coal mine tunnel Active CN104806282B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510175092.1A CN104806282B (en) 2015-04-14 2015-04-14 Multi-layer gas explosion protection system and method for coal mine tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510175092.1A CN104806282B (en) 2015-04-14 2015-04-14 Multi-layer gas explosion protection system and method for coal mine tunnel

Publications (2)

Publication Number Publication Date
CN104806282A CN104806282A (en) 2015-07-29
CN104806282B true CN104806282B (en) 2017-04-19

Family

ID=53691434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510175092.1A Active CN104806282B (en) 2015-04-14 2015-04-14 Multi-layer gas explosion protection system and method for coal mine tunnel

Country Status (1)

Country Link
CN (1) CN104806282B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106178363A (en) * 2015-05-08 2016-12-07 抚顺市沃尔普机电设备有限公司 Gas tube automatic powder spraying explosion-suppressing device
CN107178386A (en) * 2017-07-24 2017-09-19 贵州大学 A kind of system for preventing goaf coal body spontaneous combustion
CN108896116A (en) * 2018-09-26 2018-11-27 中煤科工集团重庆研究院有限公司 Coal powder leakage and explosion online monitoring method for large coal gasification device
CN109184798B (en) * 2018-09-29 2020-01-14 贵州师范学院 Gas monitoring system under karst landform
CN110201566A (en) * 2018-11-15 2019-09-06 金方圆安全技术研究院(苏州)有限公司 Dry dust removal system dust explosion protection intelligent control explosion suppression device
CN113090956B (en) * 2021-04-01 2022-04-12 大连理工大学 Partitioned active explosion-proof and explosion-suppression device and control method thereof
CN118091053B (en) * 2024-04-25 2024-07-02 徐州江煤科技有限公司 Goaf monitoring system for coal mine

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1693671A (en) * 2005-06-06 2005-11-09 杨光良 Full automatic coal mine gas prewarning explosion-proof system
CN101713297A (en) * 2009-09-04 2010-05-26 中国矿业大学(北京) Method and equipment for suppressing gas from multiple continuous explosions
CN201851146U (en) * 2010-11-22 2011-06-01 西安科技大学 Explosion-proof and intrinsically safe controller with automatic dust-settling function
CN202250187U (en) * 2011-09-13 2012-05-30 杜志刚 Equipment for comprehensively preventing 'one-ventilation and three-prevention' accidents of working faces
CN202731976U (en) * 2012-08-10 2013-02-13 四川天微电子有限责任公司 Mine gas fire-extinguishing explosion suppression device
CN102979566A (en) * 2011-09-15 2013-03-20 杜志刚 Device for preventing one ventilation and three prevention accidents of driving face in comprehensive mode
CN103470295A (en) * 2013-09-13 2013-12-25 安阳市思菲特矿用设备有限公司 Mine extinguishment and explosion suppression system
CN103628921A (en) * 2013-12-12 2014-03-12 中煤科工集团重庆研究院有限公司 Low-concentration gas conveying safety monitoring system
CN103790622A (en) * 2014-01-21 2014-05-14 中国矿业大学 Method for active explosion proofing and explosion suppression through high-pressure inert gas
CN204552806U (en) * 2015-04-14 2015-08-12 四川天微电子有限责任公司 Coal mine gas multilayer proofing complex control system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1693671A (en) * 2005-06-06 2005-11-09 杨光良 Full automatic coal mine gas prewarning explosion-proof system
CN101713297A (en) * 2009-09-04 2010-05-26 中国矿业大学(北京) Method and equipment for suppressing gas from multiple continuous explosions
CN201851146U (en) * 2010-11-22 2011-06-01 西安科技大学 Explosion-proof and intrinsically safe controller with automatic dust-settling function
CN202250187U (en) * 2011-09-13 2012-05-30 杜志刚 Equipment for comprehensively preventing 'one-ventilation and three-prevention' accidents of working faces
CN102979566A (en) * 2011-09-15 2013-03-20 杜志刚 Device for preventing one ventilation and three prevention accidents of driving face in comprehensive mode
CN202731976U (en) * 2012-08-10 2013-02-13 四川天微电子有限责任公司 Mine gas fire-extinguishing explosion suppression device
CN103470295A (en) * 2013-09-13 2013-12-25 安阳市思菲特矿用设备有限公司 Mine extinguishment and explosion suppression system
CN103628921A (en) * 2013-12-12 2014-03-12 中煤科工集团重庆研究院有限公司 Low-concentration gas conveying safety monitoring system
CN103790622A (en) * 2014-01-21 2014-05-14 中国矿业大学 Method for active explosion proofing and explosion suppression through high-pressure inert gas
CN204552806U (en) * 2015-04-14 2015-08-12 四川天微电子有限责任公司 Coal mine gas multilayer proofing complex control system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
综合防尘调研报告;周永清;《中州煤炭》;19840301(第01期);全文 *

Also Published As

Publication number Publication date
CN104806282A (en) 2015-07-29

Similar Documents

Publication Publication Date Title
CN104806282B (en) Multi-layer gas explosion protection system and method for coal mine tunnel
CN110690513B (en) Battery thermal runaway state detection control device and method
CN110270032B (en) Fire prevention and control device of lithium ion battery energy storage system and implementation method
CN108049916B (en) A kind of mine coal spontaneous combustion grading forewarning system and actively it is classified preventing control method
CN1693675B (en) Full automatic coal mine gas prewarning explosion-proof system
CN109939390A (en) It is a kind of based on extinction using gas and force ventilation heat dissipation electrochemical energy storage station prefabricated cabin in fire extinguishing system and method
CN104110582B (en) Safe delivery system for coal bed gas
RU2400633C1 (en) System for confinement and suppression of methane-air mixtures and/or coal dust explosions in mines network
CN114949678A (en) Nitrogen protection and multi-region step-by-step detection prevention and control method and system for energy storage power station
CN110038240A (en) A kind of gas concentration automatic detection alarm and datonation-inhibition fire extinguishing linkage system
CN108721805A (en) A kind of pulverized coal bin carbon dioxide inerting method and inerting system
CN103061795A (en) Method for preventing and extinguishing fire of coal mine through pithead power plant flue gas
CN104790958A (en) Oxygen-free outburst-prevention green and efficient tunneling technology suitable for gas-outburst coal road
CN1958096A (en) Zonal asphyxiation fire extinguisher system for underground cavity
CN118273760B (en) Underground mining explosion-proof intelligent control system
CN112943349B (en) Comprehensive management construction method for gas in high-gas tunnel
CN205387929U (en) High -gas coal mine gas drainage system
CN206792842U (en) The emergency disposal system of electric automobile electric charging station electrokinetic cell thermal runaway
CN220175909U (en) Energy storage container fire extinguishing system and energy storage container
CN2797637Y (en) Full automatic gas prealarming and explosion-proof device used for coal mine
CN104667471A (en) Automatic gaseous fire suppression device with alarm
CN107158635A (en) A kind of intelligent fire fire extinguishing system
CN204552806U (en) Coal mine gas multilayer proofing complex control system
Zhang et al. Fire safety analysis of Nanjing Yangtze River tunnel based on fault tree and triangle fuzzy theory
CN216477444U (en) Intelligent emergency spraying device for coal mine belt lane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 233, Wulian 1st Road, Gongxing street, Shuangliu District, Chengdu, Sichuan 610000

Patentee after: Sichuan tianmicroelectronics Co., Ltd

Address before: 610000 No. 12, Cheng Cheng Road, Longtan Industrial Development Zone, Longtan, Chengdu, Sichuan, Chenghua District

Patentee before: SICHUAN TIANWEI ELECTRONIC Co.,Ltd.

CP03 Change of name, title or address