CN104805843A - 一种基坑支护的方法 - Google Patents
一种基坑支护的方法 Download PDFInfo
- Publication number
- CN104805843A CN104805843A CN201510249066.9A CN201510249066A CN104805843A CN 104805843 A CN104805843 A CN 104805843A CN 201510249066 A CN201510249066 A CN 201510249066A CN 104805843 A CN104805843 A CN 104805843A
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- strength prestressed
- prestressed hollow
- hollow shell
- supporting method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 20
- 238000010276 construction Methods 0.000 claims abstract description 17
- 239000004567 concrete Substances 0.000 claims abstract description 12
- 239000006187 pill Substances 0.000 claims description 23
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 238000009412 basement excavation Methods 0.000 abstract description 3
- 239000004035 construction material Substances 0.000 abstract description 2
- 239000011150 reinforced concrete Substances 0.000 abstract description 2
- 238000003466 welding Methods 0.000 abstract 1
- 239000002689 soil Substances 0.000 description 6
- 230000007547 defect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明公开了一种基坑支护方法,包括如下步骤:1)沿需要支护的基坑四周向地面以下打入高强预应力空心管桩,打桩顺序施工分两个阶段,第一阶段打1,3,2根桩,第二阶段,按前进两根桩位后打1根,再回退打1根的方式打桩;2)在高强预应力空心管桩的顶部与锚筋的一端焊接,在高强预应力空心管桩(21)的顶部的孔处活动设置有面积大于孔的板;3)在高强预应力空心管桩(21)的上部浇注混凝土构成钢筋混凝土冠梁(24)。本发明,成本低、支护结构占有施工场地面积小、施工速度快、施工无污染,节省施工材料,用于基坑开挖深度不大于5m的基坑。
Description
技术领域
本发明属于建筑工程施工领域,涉及一种基坑支护方法。
背景技术
在城市建设中,有许多建筑物设计为地下一层,其基础埋深一般不会超过5m。如果工程地处高地下水位的软弱土质地区,且施工现场周边环境复杂时,进行地下室施工时,需沿基坑四周设置挡土、止水结构,保证施工时,基坑内施工人员的安全与正常作业。现有技术中挡土结构形式有多种,对于基坑深度小于5m时,多采用格构式水泥土挡土墙、连排混凝土灌注桩或者钢板桩等。但在这些工艺中都存在许多缺陷,如格构式水泥土挡土墙需在占有一定的施工场地,当施工场地狭小时无法采用,而且该工艺施工速度较慢,需要水泥土达到一定强度后才能进行基坑开挖。连排混凝土灌注桩也存在施工速度慢,需要一定的养护期。钢板桩作为挡土结构,存在基坑四周变形较大的,对周边环境影响较大。中国专利申请号:201210024780.4公开了“一种深基坑支护方法”,提供了一种空心管桩密排在基坑四周作为挡土结构,并在其空心内设置钢筋混凝土以提高管桩的抗弯强度。该方法也存在以下缺陷:当基坑深度不超过5m时,在空心管桩内满设钢筋混凝土芯,成本高,没有充分利用空心管桩自身的抗弯强度。
发明内容
本发明的目的是克服现有技术的不足,提供一种成本低、支护结构占有施工场地面积小、施工速度快的适用于基坑深度不超过5m的一种基坑支护方法。
本发明的技术方案概述如下:
一种基坑支护方法,包括如下步骤:
1)沿需要支护的基坑四周向地面以下打入高强预应力空心管桩21,按相邻两根高强预应力空心管桩21之间的距离b为100-150mm设计,打桩顺序施工分两个阶段,第一阶段打1,3,2根桩,第二阶段,按前进两根桩位后打1根,再回退打1根的方式打桩;
2)在高强预应力空心管桩21的顶部与锚筋22的一端焊接,锚筋22与高强预应力空心管桩21的顶部间的夹角为θ,45度≤θ≤90度;在高强预应力空心管桩21的顶部的孔处活动设置有面积大于孔的板23;
3)在高强预应力空心管桩21的上部浇注混凝土构成钢筋混凝土冠梁24。
板优选为钢板、铁板、塑料板或木板。
本发明的优点:
本发明与现有技术相比,成本低、支护结构占有施工场地面积小、施工速度快、施工无污染,节省施工材料,用于基坑开挖深度不大于5m的基坑,用本发明的方法顺序打桩,可以使两两管桩间的土挤压成密度大并且均匀的土墙,与本发明的方法完成后的装置共同起到基坑支护的作用。
附图说明
图1为本发明一种基坑支护方法打桩顺序示意图。
图2本发明的方法完成后的结构纵剖面图。
图3为高强预应力空心管桩示意图。
具体实施
本发明的高强预应力空心管桩(1)为市售商品,是由顶部为环形钢板(25),下部为高强预应力钢筋混凝土管组成,见图3。
一种基坑支护方法,包括如下步骤:
1)沿需要支护的基坑四周向地面以下打入高强预应力空心管桩21,按相邻两根高强预应力空心管桩21之间的距离b为100mm设计,也可以按130mm或150mm设计,打桩顺序施工分两个阶段,第一阶段打1,3,2根桩,第二阶段,按前进两根桩位后打1根,再回退打1根的方式打桩,见图1,直至将基坑四周围住;
2)在高强预应力空心管桩21的顶部与锚筋22的一端焊接,锚筋22与高强预应力空心管桩21的顶部间的夹角为θ,45度≤θ≤90度;在高强预应力空心管桩21的顶部的孔处活动设置有面积大于孔的板23;板优选为钢板、铁板、塑料板或木板;
3)在高强预应力空心管桩21的上部浇注混凝土构成钢筋混凝土冠梁24,见图2。
Claims (2)
1.一种基坑支护方法,其特征是包括如下步骤:
1)沿需要支护的基坑四周向地面以下打入高强预应力空心管桩(21),按相邻两根高强预应力空心管桩(21)之间的距离b为100-150mm设计,打桩顺序施工分两个阶段,第一阶段打1,3,2根桩,第二阶段,按前进两根桩位后打1根,再回退打1根的方式打桩;
2)在高强预应力空心管桩(21)的顶部与锚筋(22)的一端焊接,锚筋(22)与所述高强预应力空心管桩(21)的顶部间的夹角为θ,45度≤θ≤90度;在高强预应力空心管桩(21)的顶部的孔处活动设置有面积大于孔的板(23);
3)在高强预应力空心管桩(21)的上部浇注混凝土构成钢筋混凝土冠梁(24)。
2.根据权利要求1所述的一种基坑支护方法,其特征是所述板为钢板、铁板、塑料板或木板。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510249066.9A CN104805843A (zh) | 2015-05-15 | 2015-05-15 | 一种基坑支护的方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510249066.9A CN104805843A (zh) | 2015-05-15 | 2015-05-15 | 一种基坑支护的方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN104805843A true CN104805843A (zh) | 2015-07-29 |
Family
ID=53691012
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510249066.9A Pending CN104805843A (zh) | 2015-05-15 | 2015-05-15 | 一种基坑支护的方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104805843A (zh) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107190752A (zh) * | 2017-05-31 | 2017-09-22 | 郑州安源工程技术有限公司 | 一种柔性复合防渗装配式可回收矩形截面排桩支护结构的设计施工方法 |
| CN108360534A (zh) * | 2018-05-04 | 2018-08-03 | 广西建工集团基础建设有限公司 | 一种抗变形的基坑支护结构及其施工方法 |
| CN108360535A (zh) * | 2018-05-04 | 2018-08-03 | 广西建工集团基础建设有限公司 | 基于排桩与内支撑的基坑支护结构及其施工方法 |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3730256A1 (de) * | 1987-09-09 | 1989-03-23 | Alfred Thiemann Gmbh & Co Kg | Vorrichtung zur positionierung eines an das in eine montagegrube hineinragende ende eines gesetzten schraegpfahles anzusetzenden widerlagers |
| CN203270561U (zh) * | 2013-03-29 | 2013-11-06 | 中国电力科学研究院 | 抗拔预应力管桩 |
| CN203716188U (zh) * | 2014-01-07 | 2014-07-16 | 南京市测绘勘察研究院有限公司 | 一种预应力混凝土支护管桩与冠梁连接结构 |
-
2015
- 2015-05-15 CN CN201510249066.9A patent/CN104805843A/zh active Pending
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3730256A1 (de) * | 1987-09-09 | 1989-03-23 | Alfred Thiemann Gmbh & Co Kg | Vorrichtung zur positionierung eines an das in eine montagegrube hineinragende ende eines gesetzten schraegpfahles anzusetzenden widerlagers |
| CN203270561U (zh) * | 2013-03-29 | 2013-11-06 | 中国电力科学研究院 | 抗拔预应力管桩 |
| CN203716188U (zh) * | 2014-01-07 | 2014-07-16 | 南京市测绘勘察研究院有限公司 | 一种预应力混凝土支护管桩与冠梁连接结构 |
Non-Patent Citations (1)
| Title |
|---|
| 潘骏等: "PCMW工法深基坑支护若干问题分析", 《建筑结构》 * |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107190752A (zh) * | 2017-05-31 | 2017-09-22 | 郑州安源工程技术有限公司 | 一种柔性复合防渗装配式可回收矩形截面排桩支护结构的设计施工方法 |
| CN107190752B (zh) * | 2017-05-31 | 2019-11-29 | 郑州安源工程技术有限公司 | 一种柔性复合防渗装配式可回收矩形截面排桩支护结构的设计施工方法 |
| CN108360534A (zh) * | 2018-05-04 | 2018-08-03 | 广西建工集团基础建设有限公司 | 一种抗变形的基坑支护结构及其施工方法 |
| CN108360535A (zh) * | 2018-05-04 | 2018-08-03 | 广西建工集团基础建设有限公司 | 基于排桩与内支撑的基坑支护结构及其施工方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103758134B (zh) | 一种组合双排桩支护体系的施工方法 | |
| CN203222809U (zh) | 一种输电线路杆塔预应力混凝土管桩基础 | |
| CN105714831A (zh) | 一种支护基坑侧壁的异型双排桩及其施工方法 | |
| CN203729308U (zh) | 钢筋混凝土桩组合型钢水泥土搅拌桩墙的双排桩支护体系 | |
| CN103410156A (zh) | 一种可回收直立式钢管前撑围护结构及其应用方法 | |
| CN206616565U (zh) | 门字形双排桩及双排高压旋喷止水帷幕联合支护结构 | |
| CN104805843A (zh) | 一种基坑支护的方法 | |
| WO2017133373A1 (zh) | 一种用于桩基的小直径桩簇及其施工方法 | |
| CN211113674U (zh) | 基坑双排柱支护结构 | |
| CN102220764B (zh) | 深基坑支护体系的施工方法 | |
| CN202482889U (zh) | 一种连锁预制桩地下连续墙 | |
| CN205348152U (zh) | 用于连续支护墙体预应力混凝土支护桩 | |
| CN204849788U (zh) | 一种水电工程小型渣场护坡结构 | |
| CN103485348A (zh) | 大范围基坑开挖中的抗侧墩体组合式围护结构 | |
| CN102561315B (zh) | 一种连锁预制桩地下连续墙 | |
| CN203729309U (zh) | 组合双排桩联合竖向预应力锚杆支护体系 | |
| CN104594358A (zh) | 异型平面深基坑顺逆结合施工方法 | |
| CN205062820U (zh) | 一种止水桩内插预制桩组合灌注桩的双排桩支护结构 | |
| CN204898710U (zh) | 一种新型钢结构挡土墙 | |
| CN204849791U (zh) | 一种土石围堰防渗体系的结构 | |
| CN203403434U (zh) | 地下室 | |
| CN102677679A (zh) | 建筑基坑用现浇异型钢筋混凝土桩芯水泥土地下连续墙 | |
| CN104250976A (zh) | 地下室 | |
| CN104005413B (zh) | 一种深基坑中加强型钢板桩与核心筒对撑的支护结构 | |
| CN212896374U (zh) | 一种位于既有建构筑物地下空间的基坑围护结构 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| EXSB | Decision made by sipo to initiate substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150729 |