CN104795832B - Photovoltaic electric energy management method and system and electric energy distribution control device - Google Patents

Photovoltaic electric energy management method and system and electric energy distribution control device Download PDF

Info

Publication number
CN104795832B
CN104795832B CN201510202210.3A CN201510202210A CN104795832B CN 104795832 B CN104795832 B CN 104795832B CN 201510202210 A CN201510202210 A CN 201510202210A CN 104795832 B CN104795832 B CN 104795832B
Authority
CN
China
Prior art keywords
electric energy
photovoltaic
battery
control device
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510202210.3A
Other languages
Chinese (zh)
Other versions
CN104795832A (en
Inventor
范小波
任远航
肖学礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Sinexcel Electric Co Ltd
Original Assignee
Shenzhen Sinexcel Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Sinexcel Electric Co Ltd filed Critical Shenzhen Sinexcel Electric Co Ltd
Priority to CN201510202210.3A priority Critical patent/CN104795832B/en
Publication of CN104795832A publication Critical patent/CN104795832A/en
Application granted granted Critical
Publication of CN104795832B publication Critical patent/CN104795832B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The invention discloses a kind of photovoltaic electric energy management method and system and electric energy distribution control device.The photovoltaic electric energy management system includes the electric energy distribution control device of photovoltaic generating system, power transmission network and load, battery and one end connection photovoltaic generating system, other end connection power transmission network and load and battery.When the electric energy distribution control device is used to get the photovoltaic electric energy of photovoltaic generating system input, powering mode is presently in based on it and determines matching electric energy allocative decision, according to electricity or load supplying demand on power transmission network, perform corresponding electric energy between battery, power transmission network or load using the electric energy allocative decision and share out the work.Photovoltaic electric energy management system of the present invention can be according to electricity or load supplying demand on power transmission network, and its photovoltaic electric energy is carried out reasonable distribution by residing powering mode between battery, load or power transmission network, both customer power supply demand had been met, the waste of photovoltaic electric energy more than needed is turn avoid, the utilization rate of photovoltaic electric energy is improved.

Description

Photovoltaic electric energy management method and system and electric energy distribution control device
Technical field
The present invention relates to technical field of photovoltaic power generation, more specifically to a kind of photovoltaic electric energy management method and system, And electric energy distribution control device.
Background technology
In recent years, new energy photovoltaic generation is widely applied, and energy-storage system is by the unnecessary power storage of photovoltaic generation In the energy-storage units such as battery, it is that load or power network are powered that the electric energy in energy-storage units is discharged in dim light, realizes that the energy is stabilized, More smoothly to use the positive energy in day.
At present, photovoltaic generation has AC to couple to couple two kinds of sides with DC side with the scheme that energy storing and electricity generating is used in conjunction with Formula, wherein, AC coupled modes exchanger energy loss is larger, and DC side coupling energy loss is smaller.But, DC side coupling The mode of conjunction is typically that photovoltaic generating system and battery are merged together by DC-DC converter, reconnects inverter, This system architecture has energy pathway farther out and the problem of energy loss is larger.
The content of the invention
There is provided a kind of photovoltaic electric energy management for the drawbacks described above that the technical problem to be solved in the present invention is for prior art Method and system and electric energy distribution control device.
The technical solution adopted for the present invention to solve the technical problems is:A kind of photovoltaic electric energy management method is constructed, including Following steps:
S1, judge electric energy distribution control device be presently in powering mode;
S2, get photovoltaic generating system input photovoltaic electric energy when, it is determined that with electric energy distribution control device currently supply The electric energy allocative decision that power mode matches, according to electricity or load supplying demand on power transmission network, exists using the electric energy allocative decision Corresponding electric energy is performed between battery, power transmission network or load to share out the work.
In above-mentioned photovoltaic electric energy management method of the invention, methods described also includes following step before the step S1 Suddenly:
S0, by DC-to-dc reversible transducer or two-way inverter photovoltaic generating system input current is carried out it is real-time Sampling, the current peak power output of photovoltaic generating system is calculated according to sampled result, current maximum defeated according to photovoltaic generating system Go out power and dynamic regulation is carried out to DC bus-bar voltage.
In above-mentioned photovoltaic electric energy management method of the invention, the distribution of electric energy described in step S1 control device work as described In off-network powering mode, then the step S2 is accordingly including following sub-step:
S21, two-way inverter determine the first electric energy point matched with off-network powering mode residing for electric energy distribution control device With scheme, it will be converted to based on the Part I photovoltaic electric energy that the first electric energy allocative decision is assigned to after alternating current for load;
The Part II photovoltaic electric energy that S22, DC-to-dc reversible transducer will be assigned to based on the first electric energy allocative decision Carry out being stored in battery after decompression processing, or battery discharges the part electric energy of storage according to the first electric energy allocative decision, Boosting processing is carried out through DC-to-dc reversible transducer, and for load after being converted to alternating current through two-way inverter;
Wherein, the first electric energy allocative decision is realized based on the first electric energy power distribution formula, the first electric energy work( Rate distribution formula is expressed as follows:Poutput(max)=Pbattery+Pload
Poutput(max)Represent that photovoltaic generating system provides the peak power output of photovoltaic electric energy;
PloadExpression electric energy distribution control device distributes and is supplied in first of load when working in off-network powering mode Light splitting lies prostrate the power output of electric energy;
PbatteryRepresent that electric energy distribution control device distributes and be stored in the of battery when working in off-network powering mode Two part photovoltaic electric energy or battery discharge the power output of electric energy.
In above-mentioned photovoltaic electric energy management method of the invention, the step S22 also includes:
S221, such as Pload> Poutput(max), then judge that load supplying is not enough, is switched to discharge mode by battery, will store Battery carries out voltage increase through direct current according to the first electric energy allocative decision release electric energy through DC-to-dc reversible transducer, with And for load after through inverter being converted to alternating current;
Wherein, the power output of battery can be calculated by the first battery discharging formula and obtained, and first battery is put Electric formula is expressed as follows:Pbatteryoutput=Pload-Poutput(max)
PbatteryoutputRepresent that battery discharges the power output of electric energy under discharge mode;
S222, such as Pload< Poutput(max), then judge that photovoltaic generating system output photovoltaic electric energy is present more than needed, by battery Charge mode is switched to, storage is stored in after the photovoltaic electric energy progress decompression processing more than needed to this of DC-to-dc reversible transducer Battery;
The power output of the photovoltaic electric energy of the flap portion can be calculated by the first battery charge formula and obtained, and this first Battery charge formula is expressed as follows:Psuplus=Poutput(max)-Pload
PsuplusRepresent the power output of the photovoltaic electric energy more than needed;
Poutput(max)Represent that photovoltaic generating system provides the peak power output of photovoltaic electric energy;
PloadExpression electric energy distribution control device distributes and is supplied in first of load when working in off-network powering mode Light splitting lies prostrate the power output of electric energy.
In above-mentioned photovoltaic electric energy management method of the invention, the distribution of electric energy described in step S1 control device work as described In grid-connected powering mode, then the step S2 is accordingly including following sub-step:
S21 ', DC-to-dc reversible transducer determine what is matched with grid-connected powering mode residing for electric energy distribution control device Second electric energy allocative decision, the Part III photovoltaic electric energy being assigned to based on the second electric energy allocative decision is carried out after decompression processing It is stored in battery;
S22 ', two-way inverter will be converted to friendship based on the Part IV photovoltaic electric energy that the second electric energy allocative decision is assigned to It is after stream electricity that its is grid-connected;
Wherein, the second electric energy allocative decision is realized based on the second electric energy power distribution formula, the second electric energy power Distribution formula is expressed as follows:Poutput(max)=Pbattery+Pgrid
Poutput(max)Represent that photovoltaic generating system provides the peak power output of photovoltaic electric energy;
PgridRepresent when electric energy distribution control device works in grid-connected powering mode and online electricity Part III photovoltaic electric The power output of energy;
PbatteryRepresent that electric energy distributes the Part IV that battery is stored in when control device works in grid-connected powering mode Photovoltaic electric energy or battery discharge the power output of electric energy.
In above-mentioned photovoltaic electric energy management method of the invention, the step S22 ' also includes:
S221 ', such as Pgrid> Poutput(max), then photovoltaic generating system supply photovoltaic electric energy Shortcomings are judged, by electric power storage Pond is switched to discharge mode, and the electric energy that battery is discharged according to the second electric energy allocative decision is double through DC-to-dc through direct current Voltage increase is carried out to converter, and after being converted to alternating current through inverter and online electricity;
Wherein, the power output of battery can be calculated by the second battery discharging formula and obtained, and second battery is put Electric formula is expressed as follows:Pbatteryoutput=Pgrid-Poutput(max)
PbatteryoutputRepresent that battery discharges the power output of electric energy in discharge mode;
Poutput(max)Represent that photovoltaic generating system provides the peak power output of photovoltaic electric energy;
PgridRepresent when electric energy distribution control device works in grid-connected powering mode and online electricity Part III photovoltaic electric The power output of energy;
S222 ', such as Pgrid< Poutput(max), then judge that photovoltaic generating system output photovoltaic electric energy is present more than needed, by electric power storage Pond is switched to charge mode, is stored up after the photovoltaic electric energy progress decompression processing more than needed to this of DC-to-dc reversible transducer It is stored in battery;
The power output of the photovoltaic electric energy more than needed can be calculated by the second battery charge formula and obtained, second electric power storage Pond charge formula is expressed as follows:Psuplus=Poutput(max)-Pgrid
PsuplusRepresent the power output of the photovoltaic electric energy more than needed.
In above-mentioned photovoltaic electric energy management method of the invention, the step S0 also includes following sub-step:
S01, such as judge that photovoltaic generating system works in Night according to photovoltaic generating system input current sampled result, DC bus-bar voltage is accordingly then turned down by DC-to-dc reversible transducer or two-way inverter, while starting anti-reversing clutch;
S02, such as judge photovoltaic power generation system output power beyond negative according to photovoltaic generating system input current sampled result The rated power sum of load and battery, then accordingly raise direct current female by DC-to-dc reversible transducer or two-way inverter Line voltage.
The present invention also constructs a kind of photovoltaic electric energy management system, including photovoltaic generating system, power transmission network and load, electric power storage The electric energy distribution control of pond, in addition to one end connection photovoltaic generating system, other end connection power transmission network and load and battery Device:
It is current based on its when the electric energy distribution control device is used to get the photovoltaic electric energy of photovoltaic generating system input Residing powering mode determines matching electric energy allocative decision, according to electricity or load supplying demand on power transmission network, using the electricity Energy allocative decision performs corresponding electric energy between battery, power transmission network or load and shared out the work.
The present invention also constructs a kind of electric energy applied to photovoltaic electric energy management system and distributes control device, the electric energy distribution Control device includes:
The anti-reversing clutch of dc bus is connected to, for preventing photovoltaic generating system input current from producing adverse current;
Two-way inverter, will be based on the first electricity during for judging that electric energy distribution control device works in off-network powering mode The Part I photovoltaic electric energy that energy allocative decision is assigned to is converted to for load after alternating current, and for judging that electric energy is distributed When control device is in grid-connected powering mode, the Part IV photovoltaic electric energy being assigned to based on the second electric energy allocative decision is changed To be grid-connected after alternating current;
DC-to-dc reversible transducer, for judging that electric energy distribution control device works in off-network powering mode and electric power storage When pond is in charge mode, the Part II photovoltaic electric energy being assigned to based on the first electric energy allocative decision is carried out after decompression processing It is stored in battery;
And during for judging that electric energy distribution control device works in off-network powering mode and battery is in discharge mode, The battery electric energy discharged based on the second electric energy allocative decision is subjected to boosting processing, and alternating current is converted to through two-way inverter Afterwards for load.
In above-mentioned electric energy distribution control device of the invention, the first MPPT built in the DC-to-dc reversible transducer is controlled Device processed, the second MPPT controller built in the two-way inverter, first MPPT controller and second MPPT controller It is used to carry out real-time sampling to photovoltaic power generation system output power, calculates the current peak power output of photovoltaic generating system, root Dynamic regulation is carried out to DC bus-bar voltage according to photovoltaic generating system current peak power output.
Implement photovoltaic electric energy management method of the present invention and system and electric energy distribution control device, can reach following beneficial Effect:
1st, photovoltaic electric energy management system of the present invention can be distributed and control according to electricity or load supplying demand on power transmission network with reference to electric energy Powering mode residing for device processed is closed the photovoltaic electric energy that photovoltaic generating system is inputted between battery, load or power transmission network Reason distribution, had both met customer power supply demand, and turn avoid the waste of photovoltaic electric energy more than needed, saved fuel source, improved The utilization rate of photovoltaic electric energy.
2nd, electric energy distribution control device can be by DC-to-dc reversible transducer or two-way inverter to photovoltaic generating system Input current carries out real-time sampling, calculates the current peak power output of photovoltaic generating system, current most according to photovoltaic generating system Big power output carries out dynamic regulation to DC bus-bar voltage, realize and busbar voltage voltage stabilizing is controlled, it is to avoid overvoltage causes electricity The damage of control device internal component can be distributed.
3rd, electric energy distribution control device of the present invention is provided with automatic protection mechanism.As electric energy distribution control device is sent out according to photovoltaic Electric system input current sampled result judges that photovoltaic generating system works in Night, then passes through DC-to-dc two-way changing Device or two-way inverter accordingly turn down DC bus-bar voltage, while starting anti-reversing clutch, prevent bus high pressure from pouring into photovoltaic cell Plate;As electric energy distribution control device judges photovoltaic power generation system output power according to photovoltaic generating system input current sampled result Beyond load and the rated power sum of battery, then accordingly raised by DC-to-dc reversible transducer or two-way inverter DC bus-bar voltage is prevented to accumulator super-charge or DC-to-dc reversible transducer overload with deviateing the operation of MPPT points.
Brief description of the drawings
The flow chart of one specific embodiment of the photovoltaic electric energy management method that Fig. 1 provides for the present invention;
Fig. 2 is the method flow diagram for the first electric energy allocative decision being related in the photovoltaic electric energy management method shown in Fig. 1;
Fig. 3 is the method flow diagram for the second electric energy allocative decision being related in the photovoltaic electric energy management method shown in Fig. 1;
The structured flowchart of one specific embodiment of the photovoltaic electric energy management system that Fig. 4 provides for the present invention;
Fig. 5 is that the electric energy of the photovoltaic electric energy management system shown in Fig. 4 distributes the structured flowchart of control device.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described.Based on the embodiment in the present invention, The every other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made, belongs to this hair The scope of bright protection.
The present invention proposes a kind of photovoltaic electric energy management method, and this method can be according to simultaneously online electricity or the power supply need of load 300 Photovoltaic electric energy exported to photovoltaic generating system 100 and carry out reasonable distribution, improved the utilization rate of photovoltaic electric energy, saved fuel Resource, serves for energy-saving and emission-reduction and certain advocates effect.
Fig. 1 shows the flow chart of the photovoltaic electric energy management method of first embodiment of the invention.As shown in figure 1, the light Volt electric energy management method comprises the following steps:
In step S101 first, electric energy distribution control device 200 is adopted in real time to the input current of photovoltaic generating system 100 Sample, calculates the current peak power output of photovoltaic generating system 100, according to the current peak power output pair of photovoltaic generating system 100 DC bus-bar voltage carries out dynamic regulation, realizes and busbar voltage voltage stabilizing is controlled.
As electric energy distribution control device 200 judges photovoltaic generation according to the input current sampled result of photovoltaic generating system 100 System 100 works in Night, then accordingly turns down direct current by DC-to-dc reversible transducer 203 or two-way inverter 202 Busbar voltage, while starting anti-reversing clutch 201, prevents bus high pressure from pouring into photovoltaic battery panel.
As electric energy distribution control device 200 judges photovoltaic generation according to the input current sampled result of photovoltaic generating system 100 The power output of system 100 then passes through DC-to-dc reversible transducer beyond load 300 and the rated power sum of battery 500 203 or two-way inverters 202 accordingly rise DC bus-bar voltage to deviate the operation of MPPT points, prevent from overcharging battery 500 or DC-to-dc reversible transducer 203 overloads.
In later step S102, judge that electric energy distribution control device 200 is presently in powering mode.
In later step S1031, electric energy distribution control device 200 is held after working in off-network powering mode, step S1031 Row step S1041.
Or in step S1032, electric energy distribution control device 200 is held after working in grid-connected powering mode, step S1032 Row step S1042.
In later step S1041, DC-to-dc reversible transducer 203 determine with electric energy distribution control device 200 it is residing from First electric energy allocative decision of net powering mode matching, according to 300 needs for electricity are loaded, is storing according to the first electric energy allocative decision Corresponding electric energy is performed between battery 500 and load 300 to share out the work.
Or in step S1042, two-way inverter 202 is determined and grid-connected power supply mould residing for electric energy distribution control device 200 Second electric energy allocative decision of formula matching, according to electric demand on power transmission network 400, according to the second electric energy allocative decision in battery Corresponding electric energy is performed between 500 and power transmission network 400 to share out the work.
Fig. 2 shows one of the first electric energy allocative decision under the off-network powering mode in Fig. 1 disclosed in step S104 The method flow diagram of specific embodiment, as shown in Fig. 2 step S104 further comprises following sub-step:
In step S10411 first, two-way inverter 202 determines to power mould with off-network residing for electric energy distribution control device 200 First electric energy allocative decision of formula matching, will be converted to based on the Part I photovoltaic electric energy that the first electric energy allocative decision is assigned to Supply load 300 after alternating current.
In the present invention, above-mentioned first electric energy allocative decision is realized based on the first electric energy power distribution formula, first electricity Energy power distribution formula is expressed as follows:Poutput(max)=Pbattery+Pload
Poutput(max)Represent that photovoltaic generating system 100 provides the peak power output of photovoltaic electric energy;
PloadRepresent to be supplied in first that loads 300 when electric energy distribution control device 200 works in off-network powering mode Light splitting lies prostrate the power output of electric energy;
PbatteryRepresent that electric energy distribution control device 200 is stored in the of battery 500 when working in off-network powering mode Two part photovoltaic electric energy or battery 500 discharge the power output of electric energy.
In later step S10412, DC-to-dc reversible transducer 203 combines light according to the first electric energy allocative decision Working mould residing for the current peak power output of photovoltaic generating system 100 and power transmission network 400 and online electric demand switching battery 500 Formula.
When electric energy of the present invention distribution control device 200 is in off-network powering mode, the mode of operation of battery 500 switched Journey is as follows:
Such as Pload> Poutput(max), then judge 300 electricity shortages of load, battery 500 be switched to discharge mode, will be stored Battery 500 discharges electric energy according to the first electric energy allocative decision and carried through direct current through the progress voltage of DC-to-dc reversible transducer 203 Rise, and for load 300 after being converted to alternating current through inverter;
Wherein, the power output of the release of battery 500 electric energy can be calculated by the first battery discharging formula and obtained, the storage The electric discharge formula of battery 500 is expressed as follows:Pbatteryoutput=Pload-Poutput(max)
PbatteryoutputRepresent that battery 500 discharges the power output of electric energy under discharge mode.
Such as Pload< Poutput(max), then judge that the output photovoltaic electric energy of photovoltaic generating system 100 is present more than needed, by battery 500 are switched to charge mode, and being carried out by 203 pairs of photovoltaic electric energy more than needed of DC-to-dc reversible transducer will after decompression processing It is stored in battery 500;
The power output of the photovoltaic electric energy of the flap portion can be calculated by the first battery charge formula and obtained, and this first Battery charge formula is expressed as follows:Psuplus=Poutput(max)-Pload
PsuplusRepresent the power output of the photovoltaic electric energy more than needed;
Poutput(max)Represent that photovoltaic generating system 100 provides the peak power output of photovoltaic electric energy;
PloadRepresent to distribute and be supplied in load 300 when electric energy distribution control device 200 works in off-network powering mode The power output of Part I photovoltaic electric energy.
In later step S10413, DC-to-dc reversible transducer 203 is current maximum defeated according to photovoltaic generating system 100 Go out power and battery 500 is switched to charge mode by 300 power demands of load.
In later step S10414, DC-to-dc reversible transducer 203 will be distributed based on the first electric energy allocative decision Two part photovoltaic electric energy are stored in battery 500 after carrying out decompression processing.
Or in step S10415, battery 500 is switched to discharge mode, electric power storage by DC-to-dc reversible transducer 203 Pond 500 discharges part electric energy according to the first electric energy allocative decision, and 203 pairs of the DC-to-dc reversible transducer part electric energy is carried out Boosting is handled, for load 300 after being converted to alternating current through two-way inverter 202.
Fig. 3 shows a specific embodiment of the second electric energy allocative decision disclosed in step S1042 in Fig. 1 of the present invention Method flow diagram.As shown in figure 3, step S1042 specifically includes following sub-step:
In step S10421 first, DC-to-dc reversible transducer 203 determines to distribute residing for control device 200 with electric energy Second electric energy allocative decision of grid-connected powering mode matching, two-way inverter 202 will be assigned to based on the second electric energy allocative decision Part II photovoltaic electric energy be converted to after alternating current for load 300.
In the present invention, the second electric energy allocative decision is realized based on the second electric energy power distribution formula, second electric energy Power distribution formula is expressed as follows:Poutput(max)=Pbattery+Pgrid;Wherein:
Poutput(max)Represent that photovoltaic generating system 100 provides the peak power output of photovoltaic electric energy;
PgridRepresent when electric energy distribution control device 200 works in grid-connected powering mode and online electricity Part III photovoltaic The power output of electric energy;
PbatteryRepresent to distribute and be stored in battery when electric energy distribution control device 200 works in grid-connected powering mode 500 Part IV photovoltaic electric energy or battery 500 discharges the power output of electric energy.
In later step S10422, DC-to-dc reversible transducer 203 combines light according to the second electric energy allocative decision Working mould residing for the current peak power output of photovoltaic generating system 100 and power transmission network 400 and online electric demand switching battery 500 Formula.
When electric energy of the present invention distribution control device 200 is in grid-connected powering mode, the mode of operation of battery 500 switched Journey is as follows:
Such as Pgrid> Poutput(max), then DC-to-dc reversible transducer 203 judge photovoltaic generating system 100 supply photovoltaic Electric energy Shortcomings, discharge mode is switched to by battery 500, and battery 500 is discharged according to the second electric energy allocative decision Electric energy carries out voltage increase through direct current through DC-to-dc reversible transducer 203, after being converted to alternating current through inverter and online Electricity;
Wherein, the power output of battery 500 can be calculated by the second battery 500 electric discharge formula and obtained, second storage The electric discharge formula of battery 500 is expressed as follows:Pbatteryoutput=Pgrid-Poutput(max)
PbatteryoutputRepresent that battery 500 discharges the power output of electric energy in discharge mode;
Poutput(max)Represent that photovoltaic generating system 100 provides the peak power output of photovoltaic electric energy;
PgridRepresent when electric energy distribution control device 200 works in grid-connected powering mode and online electricity Part III photovoltaic The power output of electric energy.
Such as Pgrid< Poutput(max), then DC-to-dc reversible transducer 203 judge photovoltaic generating system 100 output photovoltaic Electric energy, which exists, is had more than needed, and battery 500 is switched into charge mode, is stored up after carrying out decompression processing to the photovoltaic electric energy more than needed It is stored in battery 500;
The power output of the photovoltaic electric energy more than needed can be calculated by the charge formula of the second battery 500 and obtained, and this second The charge formula of battery 500 is expressed as follows:Psuplus=Poutput(max)-Pgrid
PsuplusRepresent the power output of the photovoltaic electric energy more than needed.
Based on the photovoltaic electric energy management method disclosed in Fig. 1 to Fig. 3, the present invention also proposes a kind of intelligentized photovoltaic electric energy Management system.
As shown in figure 4, the photovoltaic electric energy management system includes photovoltaic generating system 100,300/ power transmission network 400 of load, stored Battery 500 and one end connection photovoltaic generating system 100, other end connection 300/ power transmission network 400 of load and battery 500 Electric energy distributes control device 200.Electric energy distribution control device 200 is used for the photovoltaic electric for obtaining the offer of photovoltaic generating system 100 Can, powering mode is presently in based on it and determines rational electric energy allocative decision, is supplied according to electricity on power transmission network 400 or load 300 Electric demand, performs corresponding electric energy between battery 500, power transmission network 400 or load 300 using the electric energy allocative decision and distributes Work.
Fig. 5 shows the structured flowchart of a specific embodiment of electric energy distribution control device 200 in Fig. 4.Such as Fig. 5 institutes Show, electric energy distribution control device 200 includes:
The anti-reversing clutch 201 of dc bus is connected to, for preventing the input current of photovoltaic generating system 100 from producing adverse current;
Two-way inverter 202, during for judging that electric energy distribution control device 200 works in off-network powering mode, will be based on The Part I photovoltaic electric energy that first electric energy allocative decision is assigned to is converted to for load 300 after alternating current, and for sentencing When power-off can distribute control device 200 in grid-connected powering mode, by the 4th be assigned to based on the second electric energy allocative decision Light splitting volt electric energy is converted to grid-connected after alternating current;
DC-to-dc reversible transducer 203, for judging that electric energy distribution control device 200 works in off-network powering mode And battery 500 is when being in charge mode, the Part II photovoltaic electric energy being assigned to based on the first electric energy allocative decision is carried out Battery 500 is stored in after decompression processing;
And for judging that electric energy distribution control device 200 works in off-network powering mode and battery 500 is in electric discharge During pattern, the electric energy of battery 500 discharged based on the second electric energy allocative decision is subjected to boosting processing, and through two-way inverter 202 are converted to after alternating current for load 300.
First MPPT controller built in the DC-to-dc reversible transducer 203, second built in the two-way inverter 202 MPPT controller, first MPPT controller and second MPPT controller are used to the input current of photovoltaic generating system 100 Real-time sampling is carried out, the current peak power output of photovoltaic generating system 100 is calculated, it is current maximum according to photovoltaic generating system 100 Power output carries out dynamic regulation to DC bus-bar voltage, it is to avoid overvoltage causes electric energy to distribute the internal component of control device 200 Damage.
In the present invention, anti-reversing clutch 201 can be the one way conducting devices such as diode, or mechanically or electrically sub switch Device.
Photovoltaic electric energy management method of the present invention and system and the advantage of electric energy distribution control device 200 embody as follows:
1st, photovoltaic electric energy management system of the present invention can be according to 300 power demands of electricity on power transmission network 400 or load, with reference to electric energy Distribution control device 200 residing for powering mode by photovoltaic generating system 100 input photovoltaic electric energy battery 500, load 300 or Reasonable distribution is carried out between power transmission network 400, customer power supply demand has both been met, the waste of photovoltaic electric energy more than needed is turn avoid, saved About fuel source, improve can photovoltaic electric energy utilization rate.
2nd, electric energy distribution control device 200 can pass through 202 pairs of light of DC-to-dc reversible transducer 203 or two-way inverter The input current of photovoltaic generating system 100 carries out real-time sampling, the current peak power output of photovoltaic generating system 100 is calculated, according to light The current peak power output of photovoltaic generating system 100 carries out dynamic regulation to DC bus-bar voltage, realizes to busbar voltage voltage stabilizing control System, it is to avoid overvoltage causes electric energy to distribute the damage of control device 200 internal component.
3rd, electric energy distribution control device 200 of the present invention is provided with automatic protection mechanism.As electric energy distributes the basis of control device 200 The input current sampled result of photovoltaic generating system 100 judges that photovoltaic generating system 100 works in Night, then by direct current- Direct current reversible transducer 203 or two-way inverter 202 accordingly turn down DC bus-bar voltage, while starting anti-reversing clutch 201, prevent Bus high pressure pours into photovoltaic battery panel;Sampled and tied according to the input current of photovoltaic generating system 100 such as electric energy distribution control device 200 Fruit judge the power output of photovoltaic generating system 100 beyond load 300 and battery 500 rated power sum, then by direct current- Accordingly rise DC bus-bar voltage, to deviate the operation of MPPT points, is prevented to storing for direct current reversible transducer 203 or two-way inverter 202 Battery 500 is overcharged or DC-to-dc reversible transducer 203 overloads.
One of ordinary skill in the art will appreciate that realize all or part of flow in above-described embodiment method, being can be with The hardware of correlation is instructed to complete by computer program, described program can be stored in a computer readable storage media In, the program is upon execution, it may include such as the flow of the embodiment of above-mentioned each method.Wherein, described storage medium can be magnetic Dish, CD, read-only storing memory body (Read Only Memory, ROM) or random storing memory body (Random ABBess Memory, RAM) etc..
Embodiments of the invention are described above in conjunction with accompanying drawing, but the invention is not limited in above-mentioned specific Embodiment, above-mentioned embodiment is only schematical, rather than restricted, one of ordinary skill in the art Under the enlightenment of the present invention, in the case of present inventive concept and scope of the claimed protection is not departed from, it can also make a lot Form, these are belonged within the protection of the present invention.

Claims (6)

1. a kind of photovoltaic electric energy management method, it is characterised in that it is used in photovoltaic electric energy management system, photovoltaic electric energy management system System includes photovoltaic generating system, load and power transmission network, battery and one end connection photovoltaic generating system, and other end connection is negative Carry and the electric energy of power transmission network and battery distributes control device;The electric energy distribution control device is used to get photovoltaic generation During the photovoltaic electric energy of system input, powering mode is presently in based on it and determines matching electric energy allocative decision, according to defeated Electricity or load supplying demand on power network, are performed corresponding using the electric energy allocative decision between battery, power transmission network or load Electric energy shares out the work;
The electric energy distribution control device includes the anti-reversing clutch for being connected to dc bus, for preventing photovoltaic generating system from inputting Electric current produces adverse current;Two-way inverter, will be based on the during for judging that electric energy distribution control device works in off-network powering mode The Part I photovoltaic electric energy that one electric energy allocative decision is assigned to is converted to for load after alternating current, and for judging electric energy When distributing control device in grid-connected powering mode, the Part IV photovoltaic electric energy that will be assigned to based on the second electric energy allocative decision Be converted to grid-connected after alternating current;DC-to-dc reversible transducer, powers for judging that electric energy distribution control device works in off-network When pattern and battery are in charge mode, the Part II photovoltaic electric energy being assigned to based on the first electric energy allocative decision is carried out Battery is stored in after decompression processing, and for judging that electric energy distribution control device works in off-network powering mode and battery During in discharge mode, the battery electric energy discharged based on the second electric energy allocative decision is subjected to boosting processing, and through two-way inverse Become device to be converted to after alternating current for load;
Comprise the following steps:
S0, real-time sampling carried out to photovoltaic generating system input current by DC-to-dc reversible transducer or two-way inverter, The current peak power output of photovoltaic generating system is calculated according to sampled result, according to the current peak power output of photovoltaic generating system Dynamic regulation is carried out to DC bus-bar voltage, and the power output of system is all determined by two-way inverter, that is, it is defeated when being incorporated into the power networks Go out the power output that power sets by two-way inverter and determine that power output is determined by the load of two-way inverter during off-grid operation It is fixed;
DC-to-dc reversible transducer, for judging that electric energy distribution control device is worked at off-network powering mode and battery When charge mode, the Part II photovoltaic electric energy being assigned to based on the first electric energy allocative decision is carried out to store after decompression processing In battery;
S1, judge electric energy distribution control device be presently in powering mode;
S2, when getting the photovoltaic electric energy of photovoltaic generating system input, it is determined that currently being powered mould with electric energy distribution control device The electric energy allocative decision that formula matches, according to electricity or load supplying demand on power transmission network, using the electric energy allocative decision in electric power storage Corresponding electric energy is performed between pond, power transmission network or load to share out the work;The step S0 also includes following sub-step:
S01, such as judge that photovoltaic generating system works in Night according to photovoltaic generating system input current sampled result, then lead to Cross DC-to-dc reversible transducer or two-way inverter accordingly turns down DC bus-bar voltage, and stability contorting dc bus electricity Pressure, while starting anti-reversing clutch;
S02, such as according to photovoltaic generating system input current sampled result judge photovoltaic power generation system output power beyond load and The rated power sum of battery, then accordingly raise dc bus electricity by DC-to-dc reversible transducer or two-way inverter Pressure, is prevented to accumulator super-charge or DC-to-dc reversible transducer overload.
2. photovoltaic electric energy management method according to claim 1, it is characterised in that electric energy described in step S1 divides as described Off-network powering mode is worked in control device, then the step S2 accordingly includes following sub-step:
S21, two-way inverter determine the first electric energy distribution side matched with off-network powering mode residing for electric energy distribution control device Case, will be converted to after alternating current for load based on the Part I photovoltaic electric energy that the first electric energy allocative decision is assigned to;
S22, DC-to-dc reversible transducer carry out the Part II photovoltaic electric energy being assigned to based on the first electric energy allocative decision Battery is stored in after decompression processing, or battery discharges the part electric energy of storage according to the first electric energy allocative decision, through straight Stream-direct current reversible transducer carries out boosting processing, and for load after being converted to alternating current through two-way inverter;
Wherein, the first electric energy allocative decision is realized based on the first electric energy power distribution formula, the first electric energy power point It is expressed as follows with formula:Poutput(max)=Pbattery+Pload
Poutput(max)Represent that photovoltaic generating system provides the peak power output of photovoltaic electric energy;
PloadRepresent that electric energy distributes the Part I photovoltaic for distributing and being supplied in load when control device works in off-network powering mode The power output of electric energy;
PbatteryRepresent that electric energy distributes the Part II for distributing and being stored in battery when control device works in off-network powering mode Photovoltaic electric energy or battery discharge the power output of electric energy.
3. photovoltaic electric energy management method according to claim 2, it is characterised in that the step S22 also includes:
S221, such as Pload> Poutput(max), then judge that load supplying is not enough, is switched to discharge mode, by battery by battery Electric energy is discharged according to the first electric energy allocative decision through DC-to-dc reversible transducer progress voltage increase, and through inverter to turn It is changed to after alternating current for load;
Wherein, the power output of battery can be calculated by the first battery discharging formula and obtained, and first battery discharging is public Formula is expressed as follows:Pbatteryoutput=Pload-Poutput(max)
PbatteryoutputRepresent that battery discharges the power output of electric energy under discharge mode;
S222, such as Pload< Poutput(max), then judge that photovoltaic generating system output photovoltaic electric energy is present more than needed, battery switched To charge mode, battery is stored in after the photovoltaic electric energy progress decompression processing more than needed to this of DC-to-dc reversible transducer;
The power output of the photovoltaic electric energy of the flap portion can be calculated by the first battery charge formula and obtained, first electric power storage Pond charge formula is expressed as follows:Psuplus=Poutput(max)-Pload
PsuplusRepresent the power output of the photovoltaic electric energy more than needed;
Poutput(max)Represent that photovoltaic generating system provides the peak power output of photovoltaic electric energy;
PloadRepresent that electric energy distributes the Part I photovoltaic for distributing and being supplied in load when control device works in off-network powering mode The power output of electric energy.
4. photovoltaic electric energy management method according to claim 1, it is characterised in that electric energy described in step S1 divides as described Grid-connected powering mode is worked in control device, then the step S2 accordingly includes following sub-step:
S21 ', DC-to-dc reversible transducer determine second matched with grid-connected powering mode residing for electric energy distribution control device Electric energy allocative decision, the Part III photovoltaic electric energy being assigned to based on the second electric energy allocative decision is carried out to store after decompression processing In battery;
S22 ', two-way inverter will be converted to alternating current based on the Part IV photovoltaic electric energy that the second electric energy allocative decision is assigned to It is afterwards that its is grid-connected;
Wherein, the second electric energy allocative decision is realized based on the second electric energy power distribution formula, the second electric energy power distribution Formula is expressed as follows:Poutput(max)=Pbattery+Pgrid
Poutput(max)Represent that photovoltaic generating system provides the peak power output of photovoltaic electric energy;
PgridRepresent when electric energy distribution control device works in grid-connected powering mode and the Part III photovoltaic electric energy of online electricity it is defeated Go out power;
PbatteryRepresent that electric energy distributes the Part IV photovoltaic electric that battery is stored in when control device works in grid-connected powering mode Energy or battery discharge the power output of electric energy.
5. photovoltaic electric energy management method according to claim 4, it is characterised in that the step S22 ' also includes:
S221 ', such as Pgrid> Poutput(max), then judge photovoltaic generating system supply photovoltaic electric energy Shortcomings, battery cut Discharge mode is changed to, the electric energy that battery discharges according to the second electric energy allocative decision is carried out through DC-to-dc reversible transducer Voltage increase, and after being converted to alternating current through inverter and online electricity;Wherein, the power output of battery can store by second Battery discharge formula is calculated and obtained, and the second battery discharging formula is expressed as follows:Pbatteryoutput=Pgrid-Poutput(max)
PbatteryoutputRepresent that battery discharges the power output of electric energy in discharge mode;
Poutput(max)Represent that photovoltaic generating system provides the peak power output of photovoltaic electric energy;
PgridRepresent when electric energy distribution control device works in grid-connected powering mode and the Part III photovoltaic electric energy of online electricity it is defeated Go out power;
S222 ', such as Pgrid< Poutput(max), then judge that photovoltaic generating system output photovoltaic electric energy is present more than needed, battery cut Charge mode is changed to, is stored at after the photovoltaic electric energy progress decompression processing more than needed to this of DC-to-dc reversible transducer Battery;
The power output of the photovoltaic electric energy more than needed can be calculated by the second battery charge formula and obtained, and second battery fills Electric formula is expressed as follows:Psuplus=Poutput(max)-Pgrid
PsuplusRepresent the power output of the photovoltaic electric energy more than needed.
6. a kind of electric energy applied to photovoltaic electric energy management method as claimed in claim 5 distributes control device, its feature exists In electric energy distribution control device includes:
First MPPT controller built in DC-to-dc reversible transducer, the second MPPT controller built in two-way inverter, described One MPPT controller and second MPPT controller are used to carry out real-time sampling to photovoltaic power generation system output power, calculate The current peak power output of photovoltaic generating system, enters according to the current peak power output of photovoltaic generating system to DC bus-bar voltage Mobile state is adjusted.
CN201510202210.3A 2015-04-24 2015-04-24 Photovoltaic electric energy management method and system and electric energy distribution control device Active CN104795832B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510202210.3A CN104795832B (en) 2015-04-24 2015-04-24 Photovoltaic electric energy management method and system and electric energy distribution control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510202210.3A CN104795832B (en) 2015-04-24 2015-04-24 Photovoltaic electric energy management method and system and electric energy distribution control device

Publications (2)

Publication Number Publication Date
CN104795832A CN104795832A (en) 2015-07-22
CN104795832B true CN104795832B (en) 2017-10-31

Family

ID=53560446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510202210.3A Active CN104795832B (en) 2015-04-24 2015-04-24 Photovoltaic electric energy management method and system and electric energy distribution control device

Country Status (1)

Country Link
CN (1) CN104795832B (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105119553B (en) * 2015-09-09 2018-09-28 湖北中南鹏力海洋探测系统工程有限公司 Modular power supply system based on solar panels Yu accumulation energy type accumulator
CN105244918A (en) * 2015-11-12 2016-01-13 甘肃上航电力运维有限公司 Photovoltaic energy storage power station
CN107332270B (en) * 2016-04-29 2023-06-09 伊顿飞瑞慕品股份有限公司 Energy management device for photovoltaic grid-connected power generation system
CN106329568B (en) * 2016-08-31 2018-10-02 湖北大学 Family quotient's type photovoltaic generation economic dispatch control system
CN106225254A (en) * 2016-09-30 2016-12-14 王义东 A kind of round-the-clock multipurpose photovoltaic stores hot systems and method
CN108418240B (en) * 2017-02-10 2023-04-18 丰郅(上海)新能源科技有限公司 Energy routing system and energy distribution method
WO2018213273A1 (en) 2017-05-15 2018-11-22 Dynapower Company Llc Method and system for extracting excess power
EP3698448B1 (en) * 2017-10-20 2022-07-20 Cummins Power Generation Ltd. (UK) Controller for a power generation system and operating method thereof
CN107979115B (en) * 2017-12-18 2019-08-23 科华恒盛股份有限公司 The maximum power point tracking method, apparatus and equipment of photovoltaic generating system
CN109995087B (en) * 2017-12-29 2021-03-09 北京天诚同创电气有限公司 Frequency modulation control method and device for power station and frequency modulation system
CN108964100B (en) * 2018-06-26 2022-03-25 江门云天电力设计咨询有限公司 Photovoltaic circuit control method and device based on circuit current
CN109347094B (en) * 2018-10-24 2020-10-09 珠海格力电器股份有限公司 Converter, method and device for distributing electric energy by converter and electric energy distribution system
CN111244952A (en) * 2020-03-12 2020-06-05 珠海格力电器股份有限公司 Composite power supply system and power supply regulation and control method thereof
CN112701755A (en) * 2020-12-31 2021-04-23 北京意科瑞思能源技术有限公司 Off-grid photovoltaic system and residual generating power utilization method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102195525A (en) * 2011-05-19 2011-09-21 南京航空航天大学 Power supply system for photovoltaic (PV) building
CN102427266B (en) * 2012-01-04 2014-03-19 广东易事特电源股份有限公司 Multifunctional photovoltaic UPS (uninterruptible power supply) system and control method thereof
JP5947736B2 (en) * 2013-03-05 2016-07-06 東京瓦斯株式会社 Power supply system, power supply control program, and power supply control method
CN204230948U (en) * 2014-09-30 2015-03-25 深圳市盛弘电气有限公司 A kind of new forms of energy feed-type charge-discharge machine
CN104283237A (en) * 2014-10-29 2015-01-14 阳光电源股份有限公司 Photovoltaic power generation system, wind power generation system and control methods of photovoltaic power generation system and wind power generation system

Also Published As

Publication number Publication date
CN104795832A (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN104795832B (en) Photovoltaic electric energy management method and system and electric energy distribution control device
CN105656169B (en) The control method of power supply system and power supply system
CN104092278B (en) Energy management method applied to photovoltaic energy storage system
CN104410105B (en) Based on dc bus cancellated Intelligent wind power field control method
CN103545905B (en) A kind of photovoltaic direct-current micro-grid energy coordination control method
Gao et al. An actively controlled fuel cell/battery hybrid to meet pulsed power demands
CN103840487A (en) Black-start method, energy management system and off-grid light storage micro-grid with shared alternating-current bus
CN106026168B (en) The energy management strategies of honourable energy storage wisdom energy tower
CN108258720A (en) A kind of double-bus energy grid connection topology structure and its grid-connected control method
CN103236747B (en) Photovoltaic power supply hybrid energy storage system
CN108039732A (en) A kind of and the one-piece type photovoltaic energy-storage system power supply of off-network and its control method
CN110299722A (en) A kind of hydrogen fuel cell stabilizes the control method of photovoltaic output-power fluctuation
CN208142855U (en) A kind of battery management system and battery pack
CN106602608A (en) Photovoltaic energy storage system in DC power distribution network and operation control method thereof
CN105226675B (en) Prevent the inverter Reactive-power control control method of grid-connected voltage out-of-limit
KR20170118285A (en) System and method ofoperating variable voltage for DC micro-grid
CN108512254A (en) A kind of energy internet photovoltaic generation micro-grid system
CN103441555B (en) A kind of based on the MPPT accumulator charging control method controlled
CN103545847A (en) Photovoltaic power generation energy management system
CN108667113A (en) A kind of intelligent power management system
CN203760568U (en) Circuit structure for inhibiting impact current of vanadium battery energy storage system
WO2024148806A1 (en) Direct-current power supply system having fixed output voltage
CN103683334A (en) Energy management method of intelligent microgrid
CN115276100B (en) Anti-countercurrent control system and method applied to photovoltaic energy storage integrated machine
CN207166135U (en) A kind of remote distributed DC power-supply system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: Nanshan District Xili street of Shenzhen city in Guangdong province 518025 White Pine Road No. 1002, Piovan letter High-tech Industrial Park District 2 Building 6

Applicant after: SHENZHEN SINEXCEL ELECTRIC CO., LTD.

Address before: 518054 Guangdong city of Shenzhen province Nanshan District Baiwang letter Industrial Park Second District 6.

Applicant before: Shenzhen City Shenghong Electric Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 518054 SHENZHEN, GUANGDONG PROVINCE TO: 518025 SHENZHEN, GUANGDONG PROVINCE

Free format text: CORRECT: APPLICANT; FROM: SHENZHEN CITY SHENGHONG ELECTRIC CO., LTD. TO: SHENZHEN SINEXCEL ELECTRIC CO., LTD.

GR01 Patent grant
GR01 Patent grant