CN104792968B - A kind of simulation boring blocking section dredging pilot system and test method thereof - Google Patents

A kind of simulation boring blocking section dredging pilot system and test method thereof Download PDF

Info

Publication number
CN104792968B
CN104792968B CN201510174700.7A CN201510174700A CN104792968B CN 104792968 B CN104792968 B CN 104792968B CN 201510174700 A CN201510174700 A CN 201510174700A CN 104792968 B CN104792968 B CN 104792968B
Authority
CN
China
Prior art keywords
boring
blocking section
pressure
drilling rod
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510174700.7A
Other languages
Chinese (zh)
Other versions
CN104792968A (en
Inventor
王永龙
孙玉宁
宋维宾
王振锋
王明中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201510174700.7A priority Critical patent/CN104792968B/en
Publication of CN104792968A publication Critical patent/CN104792968A/en
Application granted granted Critical
Publication of CN104792968B publication Critical patent/CN104792968B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of simulation boring blocking section dredging pilot system and test method thereof, including air supply device, boring test platform, buncher, confined pressure charger, high-speed camera instrument, boring blocking section, described air supply device is connected with the transparent material bore entrance on boring test platform by air intake sebific duct, buncher is fixed on boring test platform, drilling rod one end is arranged on buncher, holed inner chamber by transparent material, the drilling rod other end is arranged on boring test platform bracing frame, and high-speed camera instrument is arranged on the side of boring test platform.Its test method: in the boring confined pressure loaded ring be arranged on the boring blocking section made on boring test platform, apply pressure to boring blocking section by confined pressure charger, connect air supply device, starts boring blocking section dredging test.The present invention is novel in design, can test different confined pressure, different blocking segment length, dissimilar drilling rod, different coal inclination angle, different drilling rod rotary speed, the variation characteristic of boring blocking section dredging pressure.

Description

A kind of simulation boring blocking section dredging pilot system and test method thereof
Technical field
The invention belongs to mine gas prevention and control technical field, be specifically related to a kind of simulation boring blocking section dredging pilot system and Its test method.
Background technology
Drilling construction is the premise of underground gas extraction, by factor effects such as crustal stress, gas pressure, drilling rod perturbed forces, Boring deflection is big, hole drilling deslagging space contraction, and drilling cuttings migration resistance increases, and drilling cuttings is easily piled up, blocked and cause boring Construction is forced to terminate, when dealing with improperly, fall to bore, in the breaking of rod and hole the accident such as gas combustion with occurring.For air drilling Technique, when forming blocking section in boring, in hole, gas pressure raises, and in hole, gas pressure is more than rubbing that boring blocking section is formed When wiping resistance, boring blocking section can be dredged, when in hole, gas pressure reaches the upper limit of air feed system, and boring blocking section is still When cannot dredge, drilling construction will be forced to terminate.Creep in engineering actual, boring blocking section periphery confined pressure, drilling rod cross section shape The factors such as shape, drilling rod rotary speed all can affect the change of boring blocking section dredging pressure, therefore, it is necessary to a kind of coal seam of exploitation Creep into visualization hole drilling deslagging pilot system and test method thereof, it is possible to the different confined pressure of test, different blocking segment length, inhomogeneity The variation characteristic of boring blocking section dredging pressure under type drilling rod, different coal inclination angle, different drilling rod rotational speed condition, for reality Engineering determining, air feed system blast parameter coupling, prevention boring blocking, drilling tool structure innovation provide Technical Reference.
Summary of the invention
The invention provides a kind of simulation boring blocking section dredging pilot system and test method thereof, it is possible to test difference is enclosed Boring blocking section under pressure, different blocking segment length, dissimilar drilling rod, different coal inclination angle, different drilling rod rotational speed condition The variation characteristic of dredging pressure.
For solving above-mentioned technical problem, the present invention adopts the following technical scheme that system is tested in one simulation boring blocking section dredging System, including air supply device, boring test platform, buncher, confined pressure charger, high-speed camera instrument, boring blocking section, its It is characterised by: described air supply device is connected with the transparent material bore entrance on boring test platform by air intake sebific duct, buncher Being fixed on boring test platform, drilling rod one end is arranged on buncher, and by transparent material boring inner chamber, the drilling rod other end is pacified Being contained on boring test platform bracing frame, high-speed camera instrument is arranged on the side of boring test platform;Air supply device by air compressor, Control switch, air intake sebific duct, Pressure gauge composition;Boring test platform is by bracing frame, slag input case, slag inlet switch, casing, thoroughly Bright material boring, drilling rod, slag tapping box, testing stand support, lifting regulator composition;Confined pressure charger is by for press pump, high pressure Sebific duct, confession press pump tap changer, blocking section Pressure gauge, boring confined pressure loaded ring composition.
A kind of test method simulating boring blocking section dredging pilot system, test method comprises the following steps:
1. in the boring confined pressure loaded ring boring blocking section made being arranged on boring test platform;
Apply pressure 2. to boring blocking section, start for press pump, observed pressure table, adjust pressure to test setting value;
3. high-speed camera instrument is set up at boring blocking section end, the motion feature when observational record boring blocking section dredging;
4. connect air supply device, start air compressor, be gradually increased pressure, force value during record boring blocking section dredging.
Owing to have employed such scheme, the invention have the characteristics that:
1. can conveniently adjust boring blocking section confined pressure by confined pressure charger, boring blocking section dredging under the conditions of different confined pressure can be carried out Test.
2. adjust confined pressure charger length, different boring stemming length boring blocking section dredging test can be carried out.
3. the drilling rod type being arranged on buncher by replacing, and make the boring blocking matched with drilling rod cross section Section, can carry out the boring blocking section dredging test of dissimilar drilling rod.
4. by arranging lifting regulator at testing stand support, the boring blocking section dredging examination of different dip angle of hole can be carried out Test.
5. drive rotation device for drill rod to use multistep speed regulation motor, the boring blocking section dredging of drilling rod different rotation rates can be carried out Test.
6. by the internal diameter of boring on regulation boring test platform, the boring blocking section dredging examination of different bore diameter can be carried out Test.
7. open slag inlet switch, be continuously added drilling cuttings by slag input case in the front end applying confined pressure boring blocking section, thus The variation characteristic dredging pressure in the boring blocking dynamic propagation process of section can be simulated.
Accompanying drawing explanation
Fig. 1 be the present invention hole blocking section dredging test system architecture schematic diagram.
Detailed description of the invention
As it is shown in figure 1, a kind of simulation boring blocking section dredging pilot system and test method thereof, including air supply device (1), boring test platform (2), buncher (3), confined pressure charger (4), high-speed camera instrument (5), boring blocking section (6), it is characterised in that: described air supply device (1) is by air intake sebific duct (13) and the transparent material on boring test platform (2) Matter boring (24) entrance connects, and buncher (3) is fixed on boring test platform (2), and drilling rod (26) one end is arranged on On buncher (3), by transparent material boring (25) inner chamber, drilling rod (26) other end is arranged on boring test platform (2), on bracing frame (21), high-speed camera instrument (5) is arranged on the side of boring test platform (2).Air supply device (1) by Air compressor (11), control switch (12), air intake sebific duct (13), Pressure gauge (14) composition.Boring test platform (2) By bracing frame (21), slag input case (22), slag inlet switch (23), casing (24), transparent material boring (25), drilling rod (26), slag tapping box (27), testing stand support (28), lifting regulator (29) composition, bracing frame (21) is arranged on examination Testing platform support (28) left end, casing (24) is arranged between boring blocking section (6) and bracing frame (21), and is arranged on On testing stand support (28), connect in slag input case (22) is arranged on casing (24) and with transparent material boring (25), enter Cinder notch switch (23) is arranged on the lower end of slag input case (22), and slag tapping box (27) is arranged on confined pressure loaded ring (45) and speed governing Between motor (3) and be fixed on testing stand support (28), transparent material boring (25) is by casing (24) and slags tap Case (27) is arranged on the top of testing stand support (28), and drilling rod (26) is through slag tapping box (27), transparent material boring (25) and casing (24), drilling rod (26) left end is arranged on bracing frame (21), drilling rod (26) right-hand member and buncher (3) connecting, lifting regulator (29) is arranged on testing stand support (28) bottom;Confined pressure charger (4) is by for press pump (41), high-pressure rubber pipe (42), confession press pump tap changer (43), blocking section Pressure gauge (44), boring confined pressure loaded ring (45) composition, is connected to hole on confined pressure loaded ring (45) by high-pressure rubber pipe (42) for press pump (41), and confined pressure loads Ring (45) is arranged between casing (24) and slag tapping box (27) and is arranged on testing stand support (28), for press pump (41) install successively for press pump tap changer (43), blocking section Pressure gauge (44) on the high-pressure rubber pipe (42) drawn.
A kind of simulation boring blocking section dredging pilot system and test method thereof, test method comprises the following steps:
1. the boring made blocking section (6) is arranged on boring confined pressure loaded ring (45) on boring test platform (2) Nei;
Apply pressure 2. to boring blocking section (6), start for press pump (41), observed pressure table, adjust pressure and set to test Value;
3. high-speed camera instrument (5) is set up at boring blocking section (6) end, when observational record boring blocking section (6) dredging Motion feature;
4. connect air supply device, start air compressor, be gradually increased pressure, pressure during record boring blocking section (6) dredging Value.

Claims (2)

1. a simulation boring blocking section dredging pilot system, loads including air supply device, boring test platform, buncher, confined pressure Device, high-speed camera instrument, boring blocking section, it is characterised in that: described air supply device is by air intake sebific duct and boring test platform Transparent material bore entrance connect, buncher is fixed on boring test platform, and drilling rod one end is arranged on buncher, logical Crossing transparent material boring inner chamber, the drilling rod other end is arranged on boring test platform bracing frame, and high-speed camera instrument is arranged on boring test The side of platform;Air supply device is made up of air compressor, control switch, air intake sebific duct, Pressure gauge;Boring test platform is by supporting Frame, slag input case, slag inlet switch, casing, transparent material boring, drilling rod, slag tapping box, testing stand support, lifting regulator Composition, bracing frame is arranged on testing stand support left end, and casing is arranged between boring blocking section and bracing frame, and is arranged on test On platform support, connecting in slag input case is arranged on casing and with transparent material boring, slag inlet switch is arranged on the lower end of slag input case, Slag tapping box is arranged between confined pressure loaded ring and buncher and is fixed on testing stand support, transparent material boring by casing and Slag tapping box is arranged on the top of testing stand support, and drilling rod is through slag tapping box, transparent material boring and casing, and drilling rod left end is arranged on Bracing frame, drilling rod right-hand member is connected with buncher, and lifting regulator is arranged on testing stand support bottom;Confined pressure charger is by supplying Press pump, high-pressure rubber pipe, confession press pump tap changer, blocking section Pressure gauge, boring confined pressure loaded ring composition, pass through high pressure for press pump Sebific duct is connected to hole on confined pressure loaded ring, and confined pressure loaded ring is arranged between casing and slag tapping box and is arranged on testing stand support On, for installing successively on the high-pressure rubber pipe that press pump is drawn for press pump tap changer, blocking section Pressure gauge.
2. simulate a test method for boring blocking section dredging pilot system, use a kind of simulation boring as claimed in claim 1 Blocking section dredging pilot system, it is characterised in that: comprise the following steps:
1. in the boring confined pressure loaded ring boring blocking section made being arranged on boring test platform;
Apply pressure 2. to boring blocking section, start for press pump, observed pressure table, adjust pressure to test setting value;
3. high-speed camera instrument is set up at boring blocking section end, the motion feature when observational record boring blocking section dredging;
4. connect air supply device, start air compressor, be gradually increased pressure, force value during record boring blocking section dredging.
CN201510174700.7A 2015-04-14 2015-04-14 A kind of simulation boring blocking section dredging pilot system and test method thereof Expired - Fee Related CN104792968B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510174700.7A CN104792968B (en) 2015-04-14 2015-04-14 A kind of simulation boring blocking section dredging pilot system and test method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510174700.7A CN104792968B (en) 2015-04-14 2015-04-14 A kind of simulation boring blocking section dredging pilot system and test method thereof

Publications (2)

Publication Number Publication Date
CN104792968A CN104792968A (en) 2015-07-22
CN104792968B true CN104792968B (en) 2016-08-24

Family

ID=53557946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510174700.7A Expired - Fee Related CN104792968B (en) 2015-04-14 2015-04-14 A kind of simulation boring blocking section dredging pilot system and test method thereof

Country Status (1)

Country Link
CN (1) CN104792968B (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4739855B2 (en) * 2005-08-10 2011-08-03 関西電力株式会社 Carbon dioxide gas penetration monitoring method
CN102297831B (en) * 2011-05-23 2013-04-03 山东科技大学 Test device and method for rapid gas logging of permeability of coal seam
CN102680187B (en) * 2012-05-25 2014-11-05 中国矿业大学 Method and equipment for checking sealing quality of gas extraction drilled holes
CN103065538B (en) * 2012-12-21 2014-12-03 中国石油大学(北京) Indoor drilling accident and well control technology simulation test device
CN103742129B (en) * 2013-12-30 2016-06-22 中国矿业大学 The method of weak seam measuring gas pressure of coal bed by drilling hole
CN203772574U (en) * 2014-03-03 2014-08-13 河南理工大学 Borehole negative pressure deslagging coal seam fixed-point sampling experiment system
CN103983754B (en) * 2014-05-23 2015-09-02 天津大学 The test unit of rock drilling simulation and determine the method for check bar pressure and moment of torsion
CN104330835A (en) * 2014-10-30 2015-02-04 河南理工大学 Testing system for coal containing methane hybrid dynamic disaster working surface in predicting laboratory

Also Published As

Publication number Publication date
CN104792968A (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN104614497B (en) True triaxial stream pressure fracturing, slot, seepage flow, gas drive integrated experimental system
CN202216946U (en) Crack grouting visualization test device under complicated conditions
CN105134186A (en) Shale gas hydraulic fracturing physical simulation test system
CN105974084B (en) A kind of coal bed gas extraction experimental simulation device
CN104564125B (en) Cherry coal reservoir gas enhanced gas extraction contrast experiment's device and experimental technique
CN103454164A (en) Multi-field coupled coal rock impact loading experimental device and method
CN102419303A (en) Crack grouting visualization tester under complex conditions
CN105041284A (en) Experimental device and method for integrity evaluation of oil and gas well fracturing working condition pitshaft
CN104198311A (en) Torsional impact rock-breaking experiment device and experiment method
CN203420700U (en) Measuring device for rock fracture steering simulation experiment
CN112727444B (en) Visual hole sealing material crack plugging performance testing device and method
CN104237484A (en) Mechanical rock-breaking experiment device and method
CN104950088B (en) The device of the perf shutoff of artificial ground
CN114705834B (en) Simulated gas lift reverse circulation slurry suspension deslagging indoor test system and test method thereof
CN104296956A (en) Sublevel caving/mining longwall face goaf flow filed simulation test device and method
CN109441441A (en) Seat earth multi-angle oblique bored grouting Analog Experiment for Discharges device and method under a kind of pressure-bearing influence of dynamic water
CN107991165B (en) Cement sheath air tightness failure judgment method
CN111287731A (en) Device and method for evaluating integrity of well cementation cement sheath
CN104792968B (en) A kind of simulation boring blocking section dredging pilot system and test method thereof
CN110196315A (en) A kind of gas solid extraction and Study on Protection of Spontaneous Combustion coupling test system
CN104792489B (en) One kind simulation drilling in coal visualization hole drilling deslagging pilot system and its test method
CN205175721U (en) Require experimental suspension point load analogue means in beam -pumping unit factory
CN113884373A (en) System and method for testing well completion and erosion test under on-site true triaxial loading condition
CN105275461B (en) Coal bed gas straight well drilling process coal dust output test device
CN218644246U (en) Directional well rock debris migration simulation device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824