CN104792818B - 将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法 - Google Patents

将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法 Download PDF

Info

Publication number
CN104792818B
CN104792818B CN201510161963.4A CN201510161963A CN104792818B CN 104792818 B CN104792818 B CN 104792818B CN 201510161963 A CN201510161963 A CN 201510161963A CN 104792818 B CN104792818 B CN 104792818B
Authority
CN
China
Prior art keywords
specific heat
temperature
soil
heat
phase change
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510161963.4A
Other languages
English (en)
Other versions
CN104792818A (zh
Inventor
李顺群
王彦洋
鲍鹏
马金栋
张培印
唐高杰
程学磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University
Original Assignee
Henan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University filed Critical Henan University
Priority to CN201510161963.4A priority Critical patent/CN104792818B/zh
Publication of CN104792818A publication Critical patent/CN104792818A/zh
Application granted granted Critical
Publication of CN104792818B publication Critical patent/CN104792818B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Or Analyzing Materials Using Thermal Means (AREA)

Abstract

本发明提供一种将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法,该方法包括将土体比热当作土体内土的固体成分比热与土中水比热按质量的加权平均再与土中水相变潜热的叠加;利用室内土工试验确定相变温度范围内土体中各成分含量,得出不考虑相变潜热的土体比热;将相变温度范围分为若干段,依每段上未冻水的含量将相变潜热在相变温度范围内进行分配,得到每一温度区间段温度变化时吸收和放出的热量,得到比热在相变温度范围内随温度的变化曲线;采用量热器测量对应温度点土样的比热。有益效果是采用本方法弥补了土中水相变过程中比热随温度变化关系的空白,建立了以温度为自变量的考虑相变潜热的黏土冻结相变过程中的比热‑温度函数。计算结果准确可靠,该方法简单易行。

Description

将土中水相变潜热进行能量替代的黏土冻结阶段比热计算 方法
技术领域
本发明属于土木工程学科岩土冻结研究领域,具体涉及一种将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法,主要应用于天然冻土和人工冻土的比热计算。
背景技术
随着社会经济的不断发展,人口的不断增长和空间的相对缩小,开发地下空间已经成为人类扩大生存空间的重要手段和发展趋势。“21世纪是人类开发利用地下空间的世纪”(《东京宣言》),地下工程已经成为岩土工程十分活跃的领域。在地下工程建设向更深更难条件发展的形势下,人工地层冻结技术将是施工深厚表土层、含水地层的有效方法。冻土的比热是人工地层冻结设计中必须考虑的重要因素,比热的确定直接影响冻结法施工的成本。
人工地层冻结过程是伴随相变的、有内冷源的、边界条件极其复杂且移动的瞬态导热问题。采用人工冻结法加固地层过程中,随着地层温度下降以及热交换过程的进行,当土中水温度达到冰点附近时,土中水会发生相变并释放潜热,伴随着潜热的释放,土体的比热将发生变化,由于土中水相变潜热的释放是缓慢的过程,因此比热的变化是渐变的。
目前,对于冻结前与冻结后比热的确定相对成熟。文献记载有王铁行等通过实验得出,在含水量相同条件下,黄土的比热容随密度的增大而增大;在密度相同条件下,黄土的比热随含水量的增大而增大,且相对于密度,含水量的变化对黄土比热的影响较为显著。并总结出以下公式,可以用于黄土比热的计算:
C=rd·(1.27+0.021w)·103
徐斅祖等通过实验总结出土的比热具有按各种物质成分的质量加权平均的性质(土中气相填充物的含量及比热均很小,可忽略不计),即:
在分析冻结温度场计算比热时,主要存在以下问题:(1)在冻结阶段的计算中假定比热是不变的;(2)不把温度作为变量,仅研究比热随含水量、密度的变化关系;(3)虽考虑温度变化,但是将黏土冻结前及冻结后的比热分别计算,不考虑相变对其造成的影响,忽略土中水相变过程中潜热的释放。
首先,土体比热在冻结阶段是变化的这一事实是毋庸置疑的,其次,温度是比热变化的一个重要因素,最后,在冻结阶段土中水相变过程中伴随着大量的热量释放,必然会引起比热值的变化,若忽略比热的变化必将引起计算冻结需冷量与实际需冷量之间的差距,造成资源浪费。
发明内容
为解决上述技术问题,本发明的目的是提供一种将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法,用于人工地层冻结中的冷冻系统设计,其冻结需冷量的计算更为客观、合理,可靠性更高,能减少资源的浪费。
为实现上述目的,本发明采用的技术方案是提供一种将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法,该方法步骤如下:
(1)取现场原状土,测得其密度、含水量,制备标准规格为的土样,进行冰点试验,控制恒温温度为-30℃,测得土样发生相变的温度范围,在取土位置处深度为8.8-9.0m的土样相变温度范围在-1℃~0℃之间;
(2)运用一点法确定预报冻土中未冻水含量的公式Wu=aθ-b中的常数项,得到未冻水含量与负温间的动态平衡关系,式中,Wu为未冻水含量,θ为负温绝对值,a、b为与土质有关的经验常数;
(3)将步骤(1)中测得的相变温度范围按温度分为若干段,利用现有计算冻土比热的公式计算各分段点的比热,式中,Cdf、Csf、Ci、Cw分别为冻土比热、冻土骨架比热、冰的比热以及水的比热,W为土体的总含水量;
(4)设相变起始温度及相变终止温度分别为Tu、Tf,分段点上不考虑相变潜热的比热计算值为Cj,相邻分段点的未冻水含量分别为Wu1、Wu2,则由公式计算能够得各段上的比热,当温度分段足够多、段长足够小时,各段上的比热值趋于稳定,能够用以上计算值代替分段上的比热值;
(5)采用混合量热法测定不同温度下土样的比热,不同温度的温度梯度结合步骤(1)布置为0℃、-0.1℃、-0.2℃、-0.3℃、-0.4℃、-0.5℃、-0.6℃、-0.7℃、-0.8℃、-0.9℃、-1℃;
(6)结合计算结果,总结比热在土体冻结过程中的变化规律公式为:
式中,Csu为未冻土骨架比热,L为单位质量水的相变潜热,其余符号含义如前所述。
本发明的效果是采用本方法弥补了土中水相变过程中,比热随温度变化关系的空白,建立了以温度为自变量的考虑相变潜热的黏土冻结相变过程中的比热-温度函数。在冻结工程设计中,利用本方法可以使冻结需冷量的计算思路清晰、理论依据充足,计算结果更加接近实际需冷量,解决了实际冻结中依靠盲目延长冻结时间来弥补计算供冷量不足的问题,对于节约资源具有重要意义。
附图说明
图1为本发明的对应土样1的冻结温度试验曲线;
图2为本发明的对应土样1的未冻水含量随温度的变化图;
图3为本发明的对应土样1的比热随温度变化对比曲线。
具体实施方式
结合附图对发明的将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法加以说明。
本发明的将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法原理是:将冻土的比热当作土体内土的固体成分比热与土中水比热及土中水潜热按质量的加权平均,首先对土样进行冻结温度试验得到对应土样的相变温度范围、相变起始温度及相变终止温度,并将相变温度范围进行分段。其次,确定冻土中未冻水含量与负温的对应关系,得到对应温度分段点的未冻水含量,根据现有的不考虑相变潜热的冻土比热公式计算对应温度分段点的比热值。最后,将相变潜热分配到每段上,重新计算每段上的比热,用混合量热法测定对应温度分段点的比热与计算结果进行比较。
本发明的将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法作用机理基于:一方面,冻土的比热满足各物质成分质量的加权平均;另一方面,土中水冻结成冰过程中会伴随着相变潜热的释放,并且满足叠加原理。利用极限的思想,将土样的相变温度范围分段,只要段数足够多、段长足够小,可以认为在每段上比热近似相等。通过室内热物性试验,得到在确定含水量、密度条件下,土中水相变温度范围,并通过已有公式计算得到对应温度分段点的比热值,考虑相变潜热利用公式得到计算比热随温度的变化曲线。采用混合量热法,利用量热器测量对应温度分段点的比热值与两种计算比热进行对比。结合现有的比热计算公式,总结出整个土体冻结及融化过程中随温度的变化公式。
本发明的将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法包括以下步骤:
(1)取现场原状土,测得其密度、含水量,制备标准规格为的土样,进行冰点试验,控制恒温温度为-30℃,测得土样发生相变的温度范围,在取土位置处深度为8.8-9.0m的土样相变温度范围在-1℃~0℃之间;
(2)运用一点法确定预报冻土中未冻水含量的公式Wu=aθ-b中的常数项,得到未冻水含量与负温间的动态平衡关系,式中,Wu为未冻水含量,θ为负温绝对值,a、b为与土质有关的经验常数;
(3)将步骤(1)中测得的相变温度范围按温度分为若干段,利用现有计算冻土比热的公式计算各分段点的比热,式中,Cdf、Csf、Ci、Cw分别为冻土比热、冻土骨架比热、冰的比热以及水的比热,W为土体的总含水量;
(4)设相变起始温度及相变终止温度分别为Tu、Tf,分段点上不考虑相变潜热的比热计算值为Cj,相邻分段点的未冻水含量分别为Wu1、Wu2,则由公式计算能够得各段上的比热,当温度分段足够多、段长足够小时,各段上的比热值趋于稳定,能够用以上计算值代替分段上的比热值;
(5)采用混合量热法测定不同温度下土样的比热,不同温度的温度梯度结合步骤(1)布置为0℃、-0.1℃、-0.2℃、-0.3℃、-0.4℃、-0.5℃、-0.6℃、-0.7℃、-0.8℃、-0.9℃、-1℃;
(6)结合计算结果,总结比热在土体冻结过程中的变化规律公式为:
式中,Csu为未冻土骨架比热,L为单位质量水的相变潜热,其余符号含义如前所述。
下面结合土样1的整个计算过程来详细说明本发明的将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法:
(1)取现场原状土样,测得其密度为1.9g/cm3、含水量为23.7%,制备规格为的土样,进行冻结为冰点的温度试验,冻结过程中土样1温度随时间的变化曲线如图1所示,其发生相变的温度范围在0℃~-1℃之间,相变起始温度Tu为-0.25℃,相变终止温度Tf为-1℃。
(2)结合仪器精度将相变范围按温度分段,利用公式Wu=aθ-b计算冻土中对应温度下的未冻水含量。(其中,公式中的常数a、b可根据(1)中所得数据由一点法求得,计算公式为式中,W0为土样1的初始含水量23.7%,θf为土样1的起始冻结温度-0.25℃,θ为负温绝对值,Wu为对应负温绝对值为θ的未冻水含量。根据未冻水含量测试方法专利中所述方法,计算得出当温度值为-1℃,即负温绝对值为θ=1时,未冻水含量Wu=11.0%,代入公式求得b的值为0.5536,a的值为11.0。因此,未冻水含量的公式为Wu=11θ-0.5536)对应温度分段点的未冻水含量如表1,未冻水含量与负温的关系呈现幂函数变化,变化曲线如图2所示。
表1对应温度分段点的未冻水含量表
(3)利用现有的计算未冻土及冻土比热的公式 计算各分段点的比热。未冻土骨架比热Csu取0.84kJ/kg·℃,冻土骨架Csf取0.77kJ/kg·℃,水的比热Cw取4.182kJ/kg·℃,冰的比热Ci取2.09kJ/kg·℃,求得不考虑相变潜热的比热计算值如表2,将不考虑相变潜热的比热随温度变化关系反映在图线中如图3所示。
表2对应温度分段点的不考虑相变潜热的比热值表
(4)按公式计算的土体冻结冻结阶段考虑相变潜热的比热计算值如表3所示,将考虑相变潜热的比热随温度变化关系反映在图线中如图3所示。
表3对应温度分段点的考虑相变潜热的比热值表
(5)采用混合量热法测定土样在不同温度(温度的梯度设定结合(1)将冻结温度附近加密测点,分别取0℃、-0.1℃、-0.2℃、-0.3℃、-0.4℃、-0.5℃、-0.6℃、-0.7℃、-0.8℃、-0.9℃、-1℃、-2℃)下的比热如表4所示,将比热的测量值随温度的变化关系反映在图线中如图3所示。
表4对应温度分段点的比热测量值表
(6)对比(3)、(4)、(5)中所得结果得出结论,考虑土中相变潜热的比热计算值与测量结果更接近,并且考虑相变潜热的比热计算值与不考虑相变潜热的计算值在潜热释放段差距较大。
(7)得出土体冻结或融化过程中,土样1土体比热随温度变化的关系如下:
式中,Cdu、Cdf分别为未冻土及冻土比热,Csu、Csf为分别未冻土与冻土骨架比热,W、Wu、Wu1、Wu2分别为土样含水量、冻土中未冻水含量及相邻两温度分段点上的未冻水含量,Cw、Ci分别为冰的比热、水的比热,L为单位质量的土中水结冰的相变潜热,Tu、Tf分别为相变起始温度与相变终止温度。

Claims (1)

1.一种将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法,该方法包括以下步骤:
(1)取现场原状土,测得其密度、含水量,制备标准规格为的土样,进行冰点试验,控制恒温温度为-30℃,测得土样发生相变的温度范围,在取土位置处深度为8.8-9.0m的土样相变温度范围在-1℃~0℃之间;
(2)运用一点法确定预报冻土中未冻水含量的公式Wu=aθ-b中的常数项,得到未冻水含量与负温间的动态平衡关系,式中,Wu为未冻水含量,θ为负温绝对值,a、b为与土质有关的经验常数;
(3)将步骤(1)中测得的相变温度范围按温度分为若干段,利用现有计算冻土比热的公式计算各分段点的比热,式中,Cdf、Csf、Ci、Cw分别为冻土比热、冻土骨架比热、冰的比热以及水的比热,W为土体的总含水量;
(4)设相变起始温度及相变终止温度分别为Tu、Tf,分段点上不考虑相变潜热的比热计算值为Cj,相邻分段点的未冻水含量分别为Wu1、Wu2,则由公式计算能够得各段上的比热,当温度分段足够多、段长足够小时,各段上的比热值趋于稳定,能够用以上计算值代替分段上的比热值;
(5)采用混合量热法测定不同温度下土样的比热,不同温度的温度梯度结合步骤(1)布置为0℃、-0.1℃、-0.2℃、-0.3℃、-0.4℃、-0.5℃、-0.6℃、-0.7℃、-0.8℃、-0.9℃、-1℃;
(6)结合计算结果,总结比热在土体冻结过程中的变化规律公式为:
C = C s u + WC w 1 + W T > T u C j + L ( W u 1 - W u 2 ) T u - T f T f &le; T &le; T u C s f + ( W - W u ) C i + W u C w 1 + W T < T f
式中,Csu为未冻土骨架比热,L为单位质量水的相变潜热,其余符号含义如前所述。
CN201510161963.4A 2015-04-07 2015-04-07 将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法 Expired - Fee Related CN104792818B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510161963.4A CN104792818B (zh) 2015-04-07 2015-04-07 将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510161963.4A CN104792818B (zh) 2015-04-07 2015-04-07 将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法

Publications (2)

Publication Number Publication Date
CN104792818A CN104792818A (zh) 2015-07-22
CN104792818B true CN104792818B (zh) 2017-07-18

Family

ID=53557800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510161963.4A Expired - Fee Related CN104792818B (zh) 2015-04-07 2015-04-07 将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法

Country Status (1)

Country Link
CN (1) CN104792818B (zh)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105241920B (zh) * 2015-11-06 2018-02-23 天津城建大学 利用比热计算确定土冻结过程中未冻水含量的方法
CN106295236B (zh) * 2016-09-23 2019-02-15 天津城建大学 一种砌体比热的计算方法
CN106770436B (zh) * 2016-11-11 2019-05-21 天津城建大学 基于混合量热法的冻土比热计算方法
CN106841290B (zh) * 2017-04-07 2019-11-26 天津城建大学 适用于饱和砂质冻土的导热系数计算方法
CN107704689B (zh) * 2017-10-11 2019-12-10 中国科学院寒区旱区环境与工程研究所 深度相关的冻土指数确定方法及电子设备
CN107966473B (zh) * 2017-12-08 2019-12-10 天津城建大学 基于相似理论的模型冻土热参数计算方法
CN108549617B (zh) * 2018-04-18 2021-06-29 天津城建大学 一种考虑未冻水含量非线性变化的冻土相变潜热计算方法
CN108931553B (zh) * 2018-05-28 2020-06-26 天津城建大学 一种将冻土相变潜热转换为等效比热的计算方法
CN109142444B (zh) * 2018-07-26 2020-10-23 中国科学院西北生态环境资源研究院 基于粘土胶体化学双电层理论的冻土中未冻水含量计算法
CN111380906B (zh) * 2020-03-30 2021-08-17 大连理工大学 一种将冻土相变潜热转换为等效比热的精细化方法
CN113419044B (zh) * 2021-06-02 2022-03-22 中国科学院西北生态环境资源研究院 基于黏土扩散层离子浓度梯度的冻土未冻水含量计算方法
CN114018975A (zh) * 2021-11-08 2022-02-08 中国铁道科学研究院集团有限公司铁道建筑研究所 一种非饱和土比热容快速估算方法及装置
CN115540788B (zh) * 2022-11-08 2023-08-29 中南大学 联合多轨道InSAR形变观测和未冻水含量的活动层厚度估算方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5599104A (en) * 1993-09-24 1997-02-04 Seiko Instruments Inc. Thermal analysis instrument
CN102135513A (zh) * 2011-01-04 2011-07-27 刘波 冻土未冻水含量的测试方法
CN102879425A (zh) * 2012-10-25 2013-01-16 东南大学 一种岩土体综合导热系数和比热容的测试系统及测试方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5599104A (en) * 1993-09-24 1997-02-04 Seiko Instruments Inc. Thermal analysis instrument
CN102135513A (zh) * 2011-01-04 2011-07-27 刘波 冻土未冻水含量的测试方法
CN102879425A (zh) * 2012-10-25 2013-01-16 东南大学 一种岩土体综合导热系数和比热容的测试系统及测试方法

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
上海人工冻结土层热物理参数;肖朝昀 等;《福建工程学院学报》;20091231;第7卷(第6期);第638-641页 *
季节性冻土区同沟原油成品油管道的周围土壤温度场;田娜 等;《节能技术》;20110331;第29卷(第2期);第113-117页 *
祁东矿人工冻土物理力学性能试验研究;戚家忠 等;《淮南工业学院学报》;19990930;第19卷(第3期);第54-58页 *
量热法与测温法在冻土未冻水测试中的应用;冷毅飞 等;《吉林大学学报(地球科学版)》;20110331;第41卷(第2期);第478--497页 *
青藏高原路基材料(沥青、混凝土)比热容的测定;雷向前;《科教文汇》;20100331;第67-68页 *

Also Published As

Publication number Publication date
CN104792818A (zh) 2015-07-22

Similar Documents

Publication Publication Date Title
CN104792818B (zh) 将土中水相变潜热进行能量替代的黏土冻结阶段比热计算方法
Hu et al. Review of algorithms and parameterizations to determine unfrozen water content in frozen soil
Romanovsky et al. Thawing of the active layer on the coastal plain of the Alaskan Arctic
CN105241920B (zh) 利用比热计算确定土冻结过程中未冻水含量的方法
Pei et al. A new method to model the thermal conductivity of soil–rock media in cold regions: An example from permafrost regions tunnel
CN106770436B (zh) 基于混合量热法的冻土比热计算方法
Kujala et al. Physical properties of peat and palsa formation
CN104833693B (zh) 砂土、粉土和粉质粘土的导热系数确定方法
Hou et al. Research on the distribution of soil water, heat, salt and their response mechanisms under freezing conditions
CN106872529A (zh) 通过测量电阻率确定冻土未冻水含量的方法
Chen et al. Combined impacts of freeze–thaw processes on paddy land and dry land in Northeast China
Zhang et al. Advances of coupled water-heat-salt theory and test techniques for soils in cold and arid regions: A review
Liu et al. Thermal regime of frozen soil foundation affected by concrete base of transmission line tower on the Tibetan Plateau
Hu et al. Modeling permafrost properties in the Qinghai-Xizang (Tibet) Plateau
Cheng et al. In situ measured and simulated seasonal freeze–thaw cycle: A 2-year comparative study between layered and homogeneous field soil profiles
Sun et al. Determining in-situ soil freeze–thaw cycle dynamics using an access tube-based dielectric sensor
Hu et al. Modeling hydrothermal transfer processes in permafrost regions of Qinghai-Tibet Plateau in China
Kurz et al. Thermal conductivities of frozen and unfrozen soils at three project sites in northern Manitoba
Endrizzi et al. Modelling the spatial pattern of ground thaw in a small basin in the arctic tundra
Xie et al. Changes in the thermal and hydraulic regime within the active layer in the Qinghai-Tibet Plateau
Du et al. Effect of snowmelt infiltration on groundwater recharge in a seasonal soil frost area: a case study in Northeast China
Zhang et al. Pore water pressure changes of supercooling and ice nucleation stages during freezing point testing
Nguyen et al. Water retention and thermal conductivity of a natural unsaturated loess
Li et al. Thermal-seepage coupled numerical simulation methodology for the artificial ground freezing process
CN109916949A (zh) 一种适用于饱和冻土的导热系数计算方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170718

Termination date: 20190407