CN104791843B - Cold-state prefiring gas replacement operation method of full gas fired boiler - Google Patents

Cold-state prefiring gas replacement operation method of full gas fired boiler Download PDF

Info

Publication number
CN104791843B
CN104791843B CN201510164717.4A CN201510164717A CN104791843B CN 104791843 B CN104791843 B CN 104791843B CN 201510164717 A CN201510164717 A CN 201510164717A CN 104791843 B CN104791843 B CN 104791843B
Authority
CN
China
Prior art keywords
valve
gas
nitrogen
pipeline
blast furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510164717.4A
Other languages
Chinese (zh)
Other versions
CN104791843A (en
Inventor
王琴
吴荣荣
张永福
赵华
陶东路
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Magang Group Holding Co Ltd
Maanshan Iron and Steel Co Ltd
Original Assignee
Magang Group Holding Co Ltd
Maanshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Magang Group Holding Co Ltd, Maanshan Iron and Steel Co Ltd filed Critical Magang Group Holding Co Ltd
Priority to CN201510164717.4A priority Critical patent/CN104791843B/en
Publication of CN104791843A publication Critical patent/CN104791843A/en
Application granted granted Critical
Publication of CN104791843B publication Critical patent/CN104791843B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Regulation And Control Of Combustion (AREA)

Abstract

The invention discloses a cold-state prefiring gas replacement operation method of a full gas fired boiler, and belongs to the field of gas boilers. The method comprises the following main steps that 1, a front-and-back lower layer coke oven gas burning torch carries out firing; 2, it is checked and confirmed that hydraulic valves and a blast-furnace gas valve are in the closed state; 3, a manual blow off valve and one hydraulic valve are opened, the flow of adjusting valves is adjusted to 50 percent, and preparations are made for nitrogen cleaning replacement; 4, a nitrogen valve is opened; 5, a sampling valve is opened, and samples are taken for laboratory testing till the content of nitrogen is qualified; 6, the nitrogen is replaced with blast-furnace gas; 7, the manual blow off valve is closed; 8, the hydraulic valves are opened, the adjusting valves are adjusted, and blast-furnace gas firing succeeds. The problems that in the prior art, a replacement method is large in danger and long in starting time are solved, the gas testing step is omitted, the time spent on blowing replacement is shortened, the blast-furnace gas blowing replacement operation step is simplified, and replacement efficiency is improved.

Description

Coal gas replacement method of operating before a kind of full burning gas boiler cold state spark
Technical field
The present invention relates to gas boiler field, more particularly, it relates to coal gas before a kind of full burning gas boiler cold state spark Replacement operator method.
Background technology
The high efficiente callback of blast furnace in metallurgical industry coal gas is utilized, and is just progressively becoming new benefit growth point, and full burning gas boiler is sent out Group of motors is widely used with the advantage of its energy-saving and environmental protection.In view of blast furnace gas is inflammable, explosive, easy poisoning physical characteristic And effect on environment it is big the characteristics of, country promulgates to be had special " GB6222-2005 industrial enterprise gas safety norm standard ", real Border is formulated all very with caution, respectively using Zhong Ge enterprises enterprises standard, such as " gas safety operational procedure ", to coal gas Safety work give specification and guidance.
At present country's gas boiler combustor arrangement form has two kinds of forms:Front-back wall arranges and corner arrangement, no matter what Arrangement is planted, at least one layer burner centre has burning torch as flame on duty.In industry, according to " GB6222-2005 " specification Require, full burning gas boiler startup stage, before lighting up procedure is carried out, blast furnace gas system must twice be purged and changed Test, ignition operation can be carried out after result of laboratory test is qualified.Twice purging is respectively with chemical examination:(1) nitrogen displacement pipe-line system is used Interior air, until nitrogen content chemical examination is qualified;(2) nitrogen in blast furnace gas displacement pipe-line system, until blast furnace gas contains Quantization tests qualified, and boiler can start igniting.For step (2), for blast furnace gas hour consumption is in 10 ten thousand steres More than boiler, at diffusion mouth at least two, its bore be typically larger than DN80mm, and replace, diffuse the time 0.5 hour with On.Based on above-mentioned factor, in the operating process of step (2) production scene often occur gas concentration reach alarming value with On, unavoidably becoming dangerous matter sources (point), more serious situation can occur gas poisoning, cause personal injury;Additionally, should Operating process also extends the boiler ignition start time, causes the wasting of resources.
Chinese invention patent, Authorization Notice No.:The B of CN 101792831, authorized announcement date:2011.08.31, one is disclosed The automatic blowing method of nitrogen replaced with gas in blast furnace gas energy recovery system pipe network is planted, the method adopts Programmable Logic Controller What PLC or Distributed Control System DCS were configured to the automatic blowing of nitrogen replaced with gas in blast furnace gas energy recovery system pipe network Each unit is controlled, suitable according to the automatic blowing flow process of the present invention by programmable controller PLC or Distributed Control System DCS Sequence, is monitored to relevant device and controls one by one, is finally completed to replaced with gas in blast furnace gas energy recovery system pipe network The automatic blowing function of nitrogen.The invention is used in blast furnace gas energy recovery system pipe network, remote with coal gas replacement nitrogen Journey automatic blowing function, and with reducing user's operation cost and the characteristics of Personal Risk.Its weak point is that the program is setting Timing need to increase control system so that cost increases, and need to increase a number of electric control valve and in production run process In have very high requirement to the tightness of valve, in case nitrogen or gas leak.
Chinese invention patent, application number 201410007331.8, applying date 2014.01.06 discloses a kind of continuous annealing The Ignition method of stove, comprises the following steps:1) to NOF stoves, RTF stoves, SF stoves, RJC stove leak tests, pipeline leak test;2) confirm The each valve closing of pipeline and stokehold, zero valve are closed;3) the valve blind plate of nitrogen zero is extracted first, each valve of pipeline is opened successively;4) it is right Oxygen content is measured in stove;5) valve of nitrogen zero and each valve of gaspipe line pipeline are opened successively;6) nitrogen purging coal gas is closed The valve of pipeline, blocks up nitrogen purging coal gas blind plate;7) detonation test is done after coal gas replacement;8) stokehold igniting will be opened burner one by one Open, one by one burner igniting.The beneficial effect of the invention is:It is effectively prevented and is not caused because valve leaks or blind plate are tight etc. Gas leak, the gas leak caused during annealing furnace furnace lifting is thoroughly avoided from mistake proofing angle in stove, in addition blast Etc. hidden danger, it is ensured that be protective atmosphere in the safety and stove of furnace lifting.Its weak point is that the invention is for continuous annealing furnace Ignition method description, for coal gas replacement operation, in step 5) and step 6) in, independent of nitrogen purge and coal Stress control in gas purge, according to《GB6222-2005 industrial enterprise gas safety norm standard》, to pipeline internal pressure Power is distinctly claimed, and keeps suitable pipeline pressure to produce beneficial to industry security, control of the invention with regard to each valve opening degree System is without detailed description.
The content of the invention
1. the invention technical problem to be solved
Dangerous big, the starting time length existed for method of replacing in prior art and the problem of waste of resource, this It is bright there is provided coal gas replacement method of operating before a kind of full burning gas boiler cold state spark, it is therefore an objective to optimize blast furnace gas displacement nitrogen Operation, reduce the consumption of blast furnace gas and nitrogen, reduce coal gas diffusion effect on environment, shorten the boiler startup time, drop Low cost, improves the performance of enterprises.
2. technical scheme
To reach above-mentioned purpose, the technical scheme that the present invention is provided is:
Coal gas replacement method of operating before a kind of full burning gas boiler cold state spark, its step is:
(A) igniting of coke-stove gas burning torch, is opened;
(B) the first hydraulic valve, the second hydraulic valve, the 3rd hydraulic valve, the 4th hydraulic valve, blast furnace gas valve, are reviewed and validate It is closed;
(C), manual diffusion valve and the 5th hydraulic valve are opened, and the first regulating valve I, the first regulating valve II, first is adjusted Valve III and the first regulating valve IV are opened and flow is adjusted to 50%, is that nitrogen purge displacement is prepared;
(D), open nitrogen valve, nitrogen is passed through in blast furnace gas pipeline purged, displaced air, control pressure exists More than 0.7kPa;
(E) sampling valve, sample examination, are opened, until nitrogen content is up to more than 98%;
(F), blast furnace gas valve is slowly opened, carries out blast furnace gas displacement nitrogen, slowly closing nitrogen valve, the first regulating valve I, the first regulating valve II, the first regulating valve III and the first regulating valve IV;
(G), in pipeline mixture pressure and suitable gas pressure, manual diffusion valve is closed, purges end-of-job;
(H), the second hydraulic valve and the 4th hydraulic valve are opened, adjust the flow of the first regulating valve II and the first regulating valve IV to 5%, blast furnace gas promotes nitrogen to flow along pipeline, and blast furnace gas gradually catches fire normally, lights a fire successfully.
Preferably, the sample of more than three diverse locations is taken during nitrogen sample examination in described step (E), and It is qualified when each position sample nitrogen content is all higher than 98%, chemically examines the equipment for adopting for portable oxygen scale, assay method It is to analyze from direct sample at three different sampling valves.
Preferably, the pipeline mixture pressure and gas pressure suitable duration is 4-6 in described step (G) Minute.
Preferably, described manual diffusion valve is arranged on the end of pipeline, and blind segment length is not more than 0.5 meter.
Preferably, in described step (F), the nitrogen pressure in pipeline is remained after blast furnace gas replaces nitrogen More than 0.7kPa.
Preferably, in described step (F), after blast furnace gas introduces pipeline, pipeline internal gas pressure, pipeline are observed Pressure is closed nitrogen valve, the first regulating valve I, the first regulating valve II, the first regulating valve III and first in 2kPa, progressively and is adjusted Valve IV, till completely closing.
Preferably, the coke-stove gas burning torch in the step (A) is all lighted, and its purpose is to guarantee that coal gas is conveyed During safety.
3. beneficial effect
The technical scheme provided using the present invention, compared with prior art, with following remarkable result:
(1) in step (G) of the invention, when the gas pressure of pipeline mixture pressure and gas generator is suitable, Duration is 4-6 minutes, closes manual diffusion valve, purges end-of-job, eliminates coal gas assay step, shortens purging and puts The required time is changed, shortens the boiler ignition start time, simplify blast furnace gas purging replacement operator step, improve coal gas The efficiency of displacement;
(2) in step (A) of the invention, the igniting of coke-stove gas burning torch is opened, after coke-stove gas burning torch is all lighted Turn on the gas-fire again valve, prevents the fuel gas during supplying gas from exploding into burner hearth, improves the security of operating process, Reduce the probability of risk generation;
(3) present invention is provided with diffusion valve, increased nitrogen assay step, and nitrogen content is up to more than 98%, then carries out coal Gas replaces the operation of nitrogen, reduces the impact that coal gas diffusion is produced to environment;
(4) present invention optimization blast furnace gas replaces the operation of nitrogen, reduces the consumption of blast furnace gas and nitrogen, reduces coal Gas diffuses effect on environment, shortens the boiler startup time, and reduces cost improves the performance of enterprises.
Description of the drawings
Accompanying drawing 1 is boiler pipe schematic diagram of the invention.
Label declaration in schematic diagram:
1st, the first hydraulic valve;2nd, the second hydraulic valve;3rd, the 3rd hydraulic valve;4th, the 4th hydraulic valve;5th, blast furnace gas valve;6th, Five hydraulic valves;7th, the first regulating valve I;8th, the first regulating valve II;9th, the first regulating valve III;10th, the first regulating valve IV;11st, sample Valve;12nd, manual diffusion valve;13rd, coke-oven coal air valve;14th, nitrogen valve;15th, coke-stove gas burning torch.
Specific embodiment
To further appreciate that present disclosure, with reference to accompanying drawing, the present invention is described in detail.
Embodiment 1
By taking the full burning gas boilers of the 400t/h of certain steel as an example, blast furnace gas is a kind of toxic gas, once reveal aggregation meeting Cause poisoning, or even explosion accident, therefore the induction system and combustion apparatus of blast furnace gas etc. requires strict sealing.Blast furnace gas Concentration of catching fire under normal temperature and pressure is 35%-71%, there is the possibility of blast within this range, so in general provision conveyance conduit Oxygen concentration be less than 5%.
Boiler capacity:400t/h, hot blast temperature:380 DEG C, superheated steam pressure:13.7MPa, air temperature:20 DEG C, superheat steam temperature:540 DEG C, exhaust gas temperature:143 DEG C, feed temperature:238 DEG C, the boiler design thermal efficiency:88.14%, pot The fuel of stove:Blast furnace gas.In pipeline each part annexation as shown in figure 1, before cold state spark is carried out to boiler coal gas Before the operation of displacement, it is to be ensured that other positions are in a safe condition, coal gas replacement behaviour before a kind of full burning gas boiler cold state spark Make method, its step is:
(A), open coke-stove gas burning torch 15 to light a fire;Coke-stove gas burning torch 15 is all lighted, and be its purpose is to really The safety protected in coal gas course of conveying.
(B) the first hydraulic valve 1, the second hydraulic valve 2, the 3rd hydraulic valve 3, the 4th hydraulic valve 4, blast furnace coal, are reviewed and validate Air valve 5 is closed;
(C), open the manual hydraulic valve 6 of diffusion valve 12 and the 5th, and by the first regulating valve I7, the first regulating valve II8, first Regulating valve III9 and the first regulating valve IV10 are opened and flow is adjusted to 50%, is that nitrogen purge displacement is prepared;Described is manual Diffusion valve 12 is arranged on the end of pipeline, and blind segment length is not more than 0.5 meter.According to《GB6222-2005 industrial enterprises gas safety Code》7.3.1.1, before gas fittings and pipeline partition apparatus, a sluice valve is by gas main before and after grid partition apparatus In 0.5m, exhaust stack can not be set, but during more than 0.5m, deflation head should be set.
(D), open nitrogen valve 14, nitrogen is passed through in blast furnace gas pipeline purged, displaced air, control pressure exists More than 0.7kPa;By pressure gauge observed pressure, using method be come regulation pipe by adjustment rectification campaign plate or valve opening degree Road pressure.
(E), sampling valve 11, sample examination, until nitrogen content during nitrogen sample examination, takes three up to more than 98% are opened The sample of individual above diverse location, and be qualified when each position sample nitrogen content is all higher than 98%, what chemical examination was adopted sets Standby is portable oxygen scale, and assay method is to analyze from direct sample at three different sampling valves 11, and sampling should be representative;
(F) it is, slow to open blast furnace gas valve 5, blast furnace gas displacement nitrogen is carried out, slowly closing nitrogen valve 14, first is adjusted Section valve I7, the first regulating valve II8, the first regulating valve III9 and the first regulating valve IV10;To begin after blast furnace gas displacement nitrogen The nitrogen pressure in pipeline is kept to be more than 0.7kPa eventually.After blast furnace gas introduces pipeline, pipeline internal gas pressure, pipe are observed Road pressure closes nitrogen valve 14, the first regulating valve I7, the first regulating valve II8, the first regulating valve III9 and the in 2kPa, progressively One regulating valve IV10, till completely closing.
(G), when the gas pressure of pipeline mixture pressure and gas generator is suitable, the duration is 4-6 minutes, Manual diffusion valve 12 is closed, end-of-job is purged, the coal of pipeline mixture pressure and gas generator is judged by pressure gauge Atmospheric pressure is suitable;
(H), the second hydraulic valve 2 of unlatching and the 4th hydraulic valve 4, the first regulating valve II8 of regulation and the first regulating valve IV10 To 5%, blast furnace gas promotes nitrogen to flow along pipeline to flow, and blast furnace gas gradually catches fire normally, lights a fire successfully.
Embodiment 2
By taking certain steel HTHP global natural disasters as an example, rated capacity:220t/h, superheater outlet temperature: 540 DEG C, superheater outlet pressure:9.81Mpa, feed temperature:220 DEG C, continuous blowdown system of boiler rate:< 3%, cold wind temperature:20 DEG C, gas inlet temperature:20℃.The fuel of boiler:Coke-stove gas and blast furnace gas.
Non-combustible composition in due to blast furnace gas is more, and its theoretical temperature combustion is relatively low, only l250 DEG C~1300 DEG C, Be coal theoretical temperature combustion 60% or so, its flame kernel temperature is low, and chemical reaction velocity is slow, therefore when boiler is designed Being considered as blast furnace gas needs enough tail-off times, also to solve that combustion flame is unstable, be also easy to produce pulsation, easily de- fire etc. Problem, the ignition temperature of blast furnace gas is higher, is (530~660) DEG C, therefore the boiler of the blast furnace gas that burns generally should be adopted The higher igniter fuel of other calorific values (natural gas or coke-stove gas), blast furnace gas combustion is gas gas single-phase combustion, once tool For catching fire and surely firing condition, burning is just very fast, and torch is very short, the CO and H in blast furnace gas2For inflammable and explosive gas Body, CO is toxic gas, and the aerial explosible limit concentration of blast furnace gas is 35%~71%, therefore the safety of blast furnace gas Stable burning is also very important.
Blast furnace gas burner is bispin flow pattern, and burner is that front-back wall is arranged, 3 layers of front wall collocation, and rear wall paper puts 2 layers, 4 burners of per layer of arrangement, 20 altogether, this method for arranging is relatively flexible, and the front-back wall burner number of plies need not be identical, and The burner of other gases can be increased according to the actual conditions of steel mill.Wherein, 2 in the middle of front wall upper strata are coke-stove gas combustion Burner, remaining 18 are blast furnace gas burner, and 2 in the middle of front wall upper strata coke oven gas burner is equipped with coke-stove gas Burning torch 15.In order to ensure combustion completion, it is furnished with flame detecting device on every burner.Further, since coal gas is a kind of bad Matter gaseous fuel, in order to the stability for ensureing to burn, hearth combustor area and furnace bottom are covered with wall with refractory lining, refracto, to ensure boiler at low load When stable burning.
In pipeline each part annexation as shown in figure 1, before cold state spark is carried out to boiler coal gas replacement operation Before, first have to guarantee that other positions are in a safe condition, then pass to air and the fuel gas in boiler is purged clean, one kind Coal gas replacement method of operating before full burning gas boiler cold state spark, its step is:
(A), open coke-stove gas burning torch 15 to light a fire;Coke-stove gas burning torch 15 is all lighted, and be its purpose is to really The safety protected in coal gas course of conveying;
(B) the first hydraulic valve 1, the second hydraulic valve 2, the 3rd hydraulic valve 3, the 4th hydraulic valve 4, blast furnace coal, are reviewed and validate Air valve 5 is closed;
(C), open the manual hydraulic valve 6 of diffusion valve 12 and the 5th, and by the first regulating valve I7, the first regulating valve II8, first Regulating valve III9 and the first regulating valve IV10 are opened and flow is adjusted to 50%, is that nitrogen purge displacement is prepared;Described is manual Diffusion valve 12 is arranged on the end of pipeline, and blind segment length is not more than 0.5 meter.According to《GB6222-2005 industrial enterprises gas safety Code》7.3.1.1, before gas fittings and pipeline partition apparatus, a sluice valve is by gas main before and after grid partition apparatus In 0.5m, exhaust stack can not be set, but during more than 0.5m, deflation head should be set;
(D), open nitrogen valve 14, nitrogen is passed through in blast furnace gas pipeline purged, displaced air, control pressure exists More than 0.7kPa;By pressure gauge observed pressure, using method be rectification campaign plate or valve opening degree adjusting pipeline pressure.
(E) sampling valve 11, sample examination, are opened, until nitrogen content is up to more than 98%;During nitrogen sample examination, three are taken The sample of individual above diverse location, and be qualified when each position sample nitrogen content is all higher than 98%, what chemical examination was adopted sets Standby is portable oxygen scale, and assay method is to analyze from direct sample at three different sampling valves 11, and sampling should be representative;
(F) it is, slow to open coke-oven coal air valve 13, coke-stove gas displacement nitrogen is carried out, slowly closing nitrogen valve 14, first is adjusted Section valve I7, the first regulating valve II8, the first regulating valve III9 and the first regulating valve IV10;To begin after coke-stove gas displacement nitrogen The nitrogen pressure in pipeline is kept to be more than 0.7kPa eventually.After coke-stove gas introduces pipeline, pipeline internal gas pressure, pipe are observed Road pressure closes nitrogen valve 14, the first regulating valve I7, the first regulating valve II8, the first regulating valve III9 and the in 2kPa, progressively One regulating valve IV10, till completely closing;
(G), in pipeline mixture pressure and suitable coke-stove gas pressure, the duration is 4-6 minutes, is closed manual Diffusion valve (12), purges end-of-job;Judge that mixture pressure and coke-stove gas pressure are suitable by pressure gauge;
(H), the second hydraulic valve 2 of unlatching and the 4th hydraulic valve 4, the first regulating valve II8 of regulation and the first regulating valve IV10 To 5%, coke-stove gas promotes nitrogen to flow along pipeline to flow, and coke-stove gas gradually catches fire normally;
(I), coke-stove gas flameholding, when burner hearth middle portion temperature reaches more than 600 DEG C, puts into blast furnace gas, while Start flame protection system, it is slow to open blast furnace gas valve 5, carry out blast furnace gas displacement coke-stove gas, blast furnace gas is gradually It is fiery normal, light a fire successfully.

Claims (7)

1. coal gas replacement method of operating before a kind of full burning gas boiler cold state spark, its step is:
(A) coke-stove gas burning torch (15) igniting, is opened;
(B) the first hydraulic valve (1), the second hydraulic valve (2), the 3rd hydraulic valve (3), the 4th hydraulic valve (4), height, are reviewed and validate Producer gas valve (5) is closed;
(C), manual diffusion valve (12) and the 5th hydraulic valve (6) are opened, and by the first regulating valve I (7), the first regulating valve II (8), First regulating valve III (9) and the first regulating valve IV (10) are opened and flow is adjusted to 50%, is that nitrogen purge displacement is prepared;
(D), open nitrogen valve (14), nitrogen is passed through in blast furnace gas pipeline purged, displaced air, control pressure exists More than 0.7kPa;
(E) sampling valve (11), sample examination, are opened, until nitrogen content is up to more than 98%;
(F), blast furnace gas valve (5) is slowly opened, carries out blast furnace gas displacement nitrogen, slowly closing nitrogen valve (14), first are adjusted Section valve I (7), the first regulating valve II (8), the first regulating valve III (9) and the first regulating valve IV (10);
(G), in pipeline mixture pressure and suitable gas pressure, manual diffusion valve (12) is closed, purges end-of-job;
(H), the second hydraulic valve (2) and the 4th hydraulic valve (4) are opened, adjusts the first regulating valve II (8) and the first regulating valve IV (10) to 5%, blast furnace gas promotes nitrogen to flow along pipeline to flow, and blast furnace gas gradually catches fire normally, lights a fire successfully.
2. coal gas replacement method of operating before a kind of full burning gas boiler cold state spark according to claim 1, its feature exists In:In described step (E) during nitrogen sample examination, the sample of more than three diverse locations is taken, and when each position sample It is qualified that product nitrogen content is all higher than 98%, chemically examines the equipment for adopting for portable oxygen scale, and assay method is from three differences Sampling valve (11) place direct sample analysis.
3. coal gas replacement method of operating before a kind of full burning gas boiler cold state spark according to claim 1 and 2, its feature It is:The pipeline mixture pressure and gas pressure suitable duration is 4-6 minutes in described step (G).
4. coal gas replacement method of operating before a kind of full burning gas boiler cold state spark according to claim 1, its feature exists In:Described manual diffusion valve (12) is arranged on the end of pipeline, and blind segment length is not more than 0.5 meter.
5. coal gas replacement method of operating before a kind of full burning gas boiler cold state spark according to claim 1 or 4, its feature It is:In described step (F), to remain that the nitrogen pressure in pipeline is more than after blast furnace gas displacement nitrogen 0.7kPa。
6. coal gas replacement method of operating before a kind of full burning gas boiler cold state spark according to claim 1, its feature exists In:In described step (F), after blast furnace gas introduces pipeline, pipeline internal gas pressure is observed, pipeline pressure is in 2kPa When, progressively close nitrogen valve (14), the first regulating valve I (7), the first regulating valve II (8), the first regulating valve III (9) and first and adjust Section valve IV (10), till completely closing.
7. coal gas replacement method of operating before a kind of full burning gas boiler cold state spark according to claim 1 or 4, its feature It is:Coke-stove gas burning torch (15) in the step (A) is all lighted.
CN201510164717.4A 2015-04-08 2015-04-08 Cold-state prefiring gas replacement operation method of full gas fired boiler Active CN104791843B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510164717.4A CN104791843B (en) 2015-04-08 2015-04-08 Cold-state prefiring gas replacement operation method of full gas fired boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510164717.4A CN104791843B (en) 2015-04-08 2015-04-08 Cold-state prefiring gas replacement operation method of full gas fired boiler

Publications (2)

Publication Number Publication Date
CN104791843A CN104791843A (en) 2015-07-22
CN104791843B true CN104791843B (en) 2017-04-26

Family

ID=53556870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510164717.4A Active CN104791843B (en) 2015-04-08 2015-04-08 Cold-state prefiring gas replacement operation method of full gas fired boiler

Country Status (1)

Country Link
CN (1) CN104791843B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106439894B (en) * 2016-11-15 2024-07-09 广东惠州天然气发电有限公司 Combustion engine and starting energy-saving control method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6514879B2 (en) * 1999-12-17 2003-02-04 Intel Corporation Method and apparatus for dry/catalytic-wet steam oxidation of silicon
CN101792831B (en) * 2010-03-26 2011-08-31 西安陕鼓动力股份有限公司 Automatic sweeping method for nitrogen replaced with gas in blast furnace gas energy recovery system pipe network
CN102297590A (en) * 2010-06-25 2011-12-28 鞍钢股份有限公司 Heating furnace ignition method
CN202382259U (en) * 2011-12-27 2012-08-15 北京佰能电气技术有限公司 Raw coke oven gas ignition diffusing control device
CN103710524A (en) * 2014-01-06 2014-04-09 鞍钢股份有限公司 Ignition furnace-starting method of continuous annealing furnace

Also Published As

Publication number Publication date
CN104791843A (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN102563857B (en) Process and device for heating gas by using a heat accumulation type heating furnace
CN101576313B (en) Method for controlling automatic ignition of tube furnace
CN102952913B (en) Dual-preheating method and device for preheating blast furnace gas by using heat-storage-type preheating furnace
CN110736107B (en) Heating furnace burner safety ignition control system and control method
CN112342332B (en) Ignition heat preservation and inverse air supply integrated system for hot blast stove and operation method
CN104566366B (en) Heating furnace and burner pipe-line system thereof
CN204058506U (en) A kind of blast furnace ironmaking hotblast stove device
CN107120680B (en) Ignition device and ignition method under high-pressure inert atmosphere
CN104791843B (en) Cold-state prefiring gas replacement operation method of full gas fired boiler
US20040175663A1 (en) Method for combusting fuel in a fired heater
CN104401943B (en) A kind of hydrogen chloride synthetic furnace controls system
CN102563646B (en) Combustion device for gaseous fuel with low heating values
WO2014170086A1 (en) Blast furnace plant and operation method
CN111336543A (en) Automatic ignition method for sintering flue gas denitration heating furnace
CN204438115U (en) Heating furnace and burner pipe-line system thereof
CN102295085B (en) Hot film methane hot wind utilization control system and operation control method thereof
CN204853491U (en) Three air supply safety combustors
CN111829347A (en) System and process for heating acidic circulating gas by using regenerative heating furnace
CN108278854A (en) A kind of diesel oil furnace drying method
CN202470057U (en) Low-heat-value gas fuel combustion device
Booman et al. Failures in cabin type hydrocarbon heaters due to inadequate fuel control
CN103343964B (en) Combustion method for greatly improving thermal efficiency of industrial furnace by alcohol-based clean fuel
CN207035215U (en) A kind of igniter under high inert atmosphere with pressure
CN113758294A (en) Control method for safe combustion of industrial furnace
CN206846793U (en) It is a kind of to synthesize ignition of the boiler device of the ammonia relief gas as thermal source

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant