CN104790679A CN201510137836.0A CN201510137836A CN104790679A CN 104790679 A CN104790679 A CN 104790679A CN 201510137836 A CN201510137836 A CN 201510137836A CN 104790679 A CN104790679 A CN 104790679A
Authority
CN
China
Prior art keywords
iron
fixed mount
wall
backstay
protection tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510137836.0A
Other languages
Chinese (zh)
Inventor
邓金云
张家元
孟小平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201510137836.0A priority Critical patent/CN104790679A/en
Publication of CN104790679A publication Critical patent/CN104790679A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides a method for operating an H-shaped steel fixing rack, and relates to the field of building equipment. The method includes the steps that S100, before a wall is poured, the positions, corresponding to H-shaped steel to be fixed, of pouring formworks on the two sides of the wall are marked; S200, a fixing rack body is mounted, positioning rods correspondingly penetrate through the pouring formworks on the two sides of the wall, and protective pipe sleeves are made to be arranged on the positioning rods in a sleeving mode and located within the to-be-poured range of the wall; S300, the H-shaped steel is mounted, and the H-shaped steel to be fixed is located between the two corresponding positioning rods; S400, nuts are mounted and adjusted onto the positioning rods, and the H-shaped steel to be fixed is clamped between a base and the nuts; S500, after the wall is poured and solidified, the nuts are removed, the fixing rack body is taken out, and protective pipes are left in the wall. The method is easy to operate, the H-shaped steel fixing rack can be mounted firmly and reliably, and mounting precision is high; meanwhile, the H-shaped steel fixing rack can be used repeatedly, materials are saved, and the cost is lowered.

Description

I iron fixed mount method of operating
Technical field
The present invention relates to building implements field, in particular to a kind of i iron fixed mount and method of operating.
Background technology
When building site being carried out the concreting of body of wall, need steel to be embedded in concrete, and then increase the intensity of body of wall, use safety and the long service life of body of wall.
Before concreting, first steel will be fixed on the position of setting, therefore need the fixed mount using steel, the fixed mount of existing installation steel mostly is and adopts inverted U-shaped anchor ring.During use, first inverted U-shaped anchor ring concrete is fixed on the position of setting, the opening direction of U-shaped is towards the bottom surface of body of wall.After anchor ring fixes, then steel being clamped between anchor ring, in order to make clamping better effects if, in the gap of anchor ring and steel, filling sheet material.
Inventor finds under study for action, and when existing concrete is built, the use of fixed mount at least exists following shortcoming:
The mounting process of one, existing fixed mount, fixed mount coordinates inaccuracy with template, easily produces error, and then affects the installation of steel; Two, existing fixed mount mounting process, fixed mount needs to fill sheet material to be fixed steel, and fixed effect is poor, and in casting process, the position change of steel, affects pouring quality; Three, existing fixed mount mounting process, fixed mount is embedded in body of wall, can not reuse, and the utilization rate of material is low.
Summary of the invention
The object of the present invention is to provide a kind of i iron fixed mount method of operating, it is low and can not reusable problem to be intended to improve existing fixed mount installation site accuracy.
Based on above-mentioned purpose; the invention provides a kind of i iron fixed mount; described i iron fixed mount comprises fixed mount main body and protection tube; two backstays that described fixed mount main body comprises the base of template, two nuts and is positioned on described base; described two backstay intervals are arranged; and described two backstays are perpendicular to the plate face of described base, the method comprises:
Step S100, build body of wall before, the position that the formwork for placing of body of wall both sides corresponds to i iron to be fixed marks;
Step S200, mounting and fixing support main body, make the corresponding described position of described backstay run through the described formwork for placing of both sides, and make described protection tube be set on described backstay and be positioned at the scope to be built of described body of wall;
Step S300, installation i iron, make described i iron to be fixed accordingly between described two backstays;
Step S400, installation tighten described nut on described backstay, make described i iron to be fixed be clamped between described base and described nut;
Step S500, body of wall have been built and after solidifying, have been removed described nut and take out described fixed mount main body, making described protection tube be retained in described body of wall.
Preferably, the line of ink marker is adopted to mark or whitewash mark, in actual mechanical process in described step S100, the line of ink marker or to whitewash marking operation simple, result of use is good, after mark, mark is obvious, is not easily spent by wiping or is erased, being convenient to the position that staff accurately installs i iron fixed mount.
Preferably, in described step S200, described base is made to be fitted in the mark of described formwork for placing, on building site, need to use formwork for placing when building, formwork for placing adopts dull and stereotyped, be fitted in by base on formwork for placing, the quality of fit of i iron fixed mount and formwork for placing is high, easy to use.
Preferably; in described step S200; the length of described protection tube is not less than the thickness of described body of wall; protection tube is in casting process; be mainly used for protection objective bar not adhered to by concrete, therefore, the length of protection tube is not less than the thickness of body of wall; after concreting, be convenient to backstay and take out from protection tube.
Preferably, described protection tube is pvc pipe, and the use of pvc pipe is extensive, low cost of manufacture; And there is good tension, compressive strength, and not easily break in casting process, safe and reliable; The resistance of fluid is little, and in casting process, concrete can be good at filling full whole body of wall, good with the tube wall filling effect of pvc pipe, and then the pouring quality of whole body of wall is high; Good corrosion resistance, concrete slurry has certain corrosivity, and in concreting process or after building, protection tube is stayed in body of wall, as a part for body of wall, long service life.
Preferably, in described step S300, between described base and described i iron, place cushion block, the edge of a wing of described i iron is clamped between corresponding two described backstays, the described cushion block and fit in the surface on one of them edge of a wing of described i iron.According to installing by force intensity of i iron, after ensureing that i iron is embedded in body of wall, play best load effect; Meanwhile, i iron easy for installation, simple to operate, after installation, position is fixing not easily moves, and when building, concrete can wrap up i iron fast.
Preferably, in described step S400, before described nut is installed, steel plate is placed between described nut and described i iron, make described backstay through described steel plate, install and after tightening described nut, make described steel plate be clamped between described nut and described i iron.I iron fixing more firm, after being tightened by nut, the coupling mechanism force of nut passes to i iron by steel plate, i iron stressed more even, and fixed effect is better.
Preferably, described backstay is reinforcing bar, and the scope of application of reinforcing bar is wide, toughness and compressive property good, impact force during concreting can be born, not easily bending or fracture, use safety; Meanwhile, reinforcing bar is convenient to further processing, can either increase with floor installation after fastness, be convenient to again i iron to be fixed between two backstays, safe and reliable, easy to use.
Preferably; in described step S400; the screw thread matched with described nut is positioned at and stretches out on the described backstay of described protection tube; be convenient to the processing of screw thread; when namely processing described screw thread, do not need to process on the whole bar of backstay, reduce difficulty of processing; save the time, and then reduce cost.
Preferably; in described step S500; take out described fixed mount main body to comprise: the end for the described nut that is spirally connected of knocking described backstay, the movement vertically of described backstay makes the connection of itself and described protection tube loosen, and pulls described base to depart from described protection tube completely to it.Simple and quick, be convenient to fixed mount main body to take out from body of wall.
Beneficial effect of the present invention:
In sum, i iron fixed mount method of operating provided by the invention, can be arranged on desired location accurately by described i iron fixed mount, and high with the quality of fit of formwork for placing, is convenient to the location of i iron, improves the precision of location; Meanwhile, between two backstays that i iron well can be fixed on i iron fixed mount, the positioning action of i iron is simple, position error is little, alignment quality is high, and then improves pouring quality; Method of operating provided by the invention, in conjunction with the structure of described i iron fixed mount, after finishing using, i iron fixed mount can take out from body of wall, achieves reusing of i iron fixed mount, saves material.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme of the embodiment of the present invention, be briefly described to the accompanying drawing used required in embodiment below, be to be understood that, the following drawings illustrate only some embodiment of the present invention, therefore the restriction to scope should be counted as, for those of ordinary skill in the art, under the prerequisite not paying creative work, other relevant accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structure chart of i iron fixed mount;
Fig. 2 is the flow chart of i iron fixed mount method of operating of the present invention.
Reference numeral gathers:
Fixed mount main body 101, protection tube 102, base 103, backstay 104.
Detailed description of the invention
When carrying out the building of body of wall on building sites, in body of wall, need pre-buried i iron, to increase the intensity of body of wall, ensure safety.The fixed mount of the fixing employing of existing i iron is inverted U-shaped anchor ring, during use, first inverted U-shaped anchor ring concrete is fixed on the position of setting, and the opening direction of U-shaped is towards the bottom surface of body of wall.After anchor ring fixes, then steel being clamped between anchor ring, in order to make clamping better effects if, in the gap of anchor ring and steel, filling sheet material.Existing i iron fixed form is coarse, does not have complete fixed equipment, and cause the permanent position of i iron accurate not, fixing weak effect, in casting process, i iron position is moved, and reduces pouring quality; Meanwhile, existing fixed mount is embedded in body of wall, and as a part for body of wall, can not take out from body of wall, the utilization rate of material is low.
Given this, designer of the present invention devises i iron fixed mount method of operating in, simple and quick; Meanwhile, the installation site being convenient to i iron fixed mount is accurate, and the fixation of i iron is reliable, i iron fixed mount can take out after finishing using from body of wall, neither affect the bulk strength of body of wall and the attractive in appearance of body of wall, achieve again reusing of i iron fixed mount, save material.
For making the object of the embodiment of the present invention, technical scheme and advantage clearly, below in conjunction with the accompanying drawing in the embodiment of the present invention, technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is the present invention's part embodiment, instead of whole embodiments.The assembly of the embodiment of the present invention describing and illustrate in usual accompanying drawing herein can be arranged with various different configuration and design.Therefore, below to the detailed description of the embodiments of the invention provided in the accompanying drawings and the claimed scope of the present invention of not intended to be limiting, but selected embodiment of the present invention is only represented.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
It should be noted that: represent similar terms in similar label and letter accompanying drawing below, therefore, once be defined in an a certain Xiang Yi accompanying drawing, then do not need to define further it and explain in accompanying drawing subsequently.
In describing the invention, it should be noted that, term " " center ", " on ", D score, " left side ", " right side ", " vertically ", " level ", " interior ", orientation or the position relationship of the instruction such as " outward " are based on orientation shown in the drawings or position relationship, or this invention product orientation of usually putting or position relationship when using, only the present invention for convenience of description and simplified characterization, instead of indicate or imply that the device of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore limitation of the present invention can not be interpreted as.In addition, term " first ", " second ", " the 3rd " etc. only for distinguishing description, and can not be interpreted as instruction or hint relative importance.
In describing the invention, also it should be noted that, unless otherwise clearly defined and limited, term " setting ", " installation ", " being connected ", " connection " should be interpreted broadly, and such as, can be fixedly connected with, also can be removably connect, or connect integratedly; Can be mechanical connection, also can be electrical connection; Can be directly be connected, also indirectly can be connected by intermediary, can be the connection of two element internals.For the ordinary skill in the art, concrete condition above-mentioned term concrete meaning in the present invention can be understood.
Refer to Fig. 1-2; present embodiments provide a kind of i iron fixed mount; described i iron fixed mount comprises fixed mount main body 101 and protection tube 102; base 103, two nuts that described fixed mount main body 101 comprises template and two backstays 104 be positioned on described base 103; described two backstay 104 intervals are arranged; and described two backstays 104 are perpendicular to the plate face of described base 103, the method comprises:
Step S100, build body of wall before, the position that the formwork for placing of body of wall both sides corresponds to i iron to be fixed marks;
Step S200, mounting and fixing support main body 101, make the corresponding described position of described backstay 104 run through the described formwork for placing of both sides, and make described protection tube 102 be set on described backstay 104 and be positioned at the scope to be built of described body of wall;
Step S300, installation i iron, make described i iron to be fixed accordingly between described two backstays 104;
Step S400, installation tighten described nut on described backstay 104, make described i iron to be fixed be clamped between described base 103 and described nut;
Step S500, body of wall have been built and after solidifying, have been removed described nut and take out described fixed mount main body 101, making described protection tube 102 be retained in described body of wall.
This i iron fixed mount method of operating, for operating described i iron fixed mount, achieving reusing of i iron fixed mount, saving material, reducing cost, have high popularizing value.
Described i iron fixed mount simple and reasonable; convenient processing and manufacture; comprise fixed mount main body 101 and protection tube 102; after finishing using; fixed mount main body 101 can be taken out from the body of wall of building, and protection tube 102 is embedded in body of wall, as a part for body of wall; that is: adopt method of operating provided by the invention, the main body of i iron fixed mount can realize reusing.
Concrete, described fixed mount main body 101 comprises base 103 and two backstays 104, described base 103 adopts steel plate, and described base 103 is processed as rectangular slab, armor plate strength is high, not yielding, easy for installation, in the preferred version of this embodiment, make described base 103 be fitted in the mark of described formwork for placing, on building site, need when building to use formwork for placing, formwork for placing adopts dull and stereotyped, is fitted on formwork for placing by base 103, the quality of fit of i iron fixed mount and formwork for placing is high, easy to use; The structure of rectangular slab is simple, and easy to process, described base 103 is fitted on formwork for placing, high with the quality of fit of body of wall, easy for installation; Simultaneously, backstay 104 is vertically fixed on described base 103, for i iron being clamped between described two backstays 104, adding man-hour, backstay 104 adopts reinforcing bar, and the scope of application of reinforcing bar is wide, toughness and compressive property good, impact force during concreting can be born, not easily bending or fracture, use safety; Meanwhile, reinforcing bar is convenient to further processing, can either increase the fastness after installing with base 103, is convenient to again i iron to be fixed between two backstays 104, safe and reliable, easy to use.Described base 103 adopts the mode of welding to be fixed with described backstay 104 to be connected, and connected mode is simple and reliable, and the fastness of connection is good, after building, is convenient to take out from body of wall.
As the preferred version of this embodiment, the line of ink marker is adopted to mark or whitewash mark in described step S100, in actual mechanical process, the line of ink marker or to whitewash marking operation simple, result of use is good, and after mark, mark is obvious, not easily spent by wiping or erased, being convenient to the position that staff accurately installs i iron fixed mount.
After the template of body of wall installs described fixed mount main body 101, protection tube 102 is sleeved on described backstay 104, formwork for placing between protection tube 102 and base 103, base 103 fixation; Or described base 103 is positioned on formwork for placing, protection tube 102 directly contacts described base 103, base 103 easier for installation.In the preferred version of this embodiment; the length of described protection tube 102 is not less than the thickness of described body of wall; protection tube 102 is in casting process; be mainly used for protection objective bar 104 not adhered to by concrete; therefore; the length of protection tube 102 is not less than the thickness of body of wall, after concreting, is convenient to backstay 104 and takes out from protection tube 102.
Protection tube 102 is after building, and as the passage that backstay 104 takes out from body of wall, as the preferred version of this embodiment, protection tube 102 adopts pvc pipe, and the use of pvc pipe is extensive, low cost of manufacture; And there is good tension, compressive strength, and not easily break in casting process, safe and reliable; The resistance of fluid is little, and in casting process, concrete can be good at filling full whole body of wall, good with the tube wall filling effect of pvc pipe, and then the pouring quality of whole body of wall is high; Good corrosion resistance, concrete slurry has certain corrosivity, and in concreting process or after building, protection tube 102 is stayed in body of wall, as a part for body of wall, long service life.
Then, the location of i iron is carried out.I iron is arranged between described two backstays 104, by adjusting the height of i iron and then i iron can be increased being fixed on fastness on described backstay 104, namely, the height of adjustment i iron is to correct position, nut is arranged on backstay 104, tightens nut and i iron is fixed between backstay 104 and nut.During concrete operations, nut can tighten between i iron and formwork for placing, is convenient to the fixing of i iron, is also convenient to tightening and screwing out of nut; In preferred version preferably, each described location is arranged two nuts, between two described nuts, packing ring is set, two nuts are after tightening, produce axial force between nut, the frictional force between nut and bolt tooth is increased, and then the phenomenon preventing nut from automatically getting loose occurs, fixed effect is better, uses safer.
I iron when mounted, as the preferred version of this embodiment, in described step S300, cushion block is placed between described base 103 and described i iron, the edge of a wing of described i iron is clamped between corresponding two described backstays 104, the described cushion block and fit in the surface on one of them edge of a wing of described i iron.According to installing by force intensity of i iron, after ensureing that i iron is embedded in body of wall, play best load effect; Meanwhile, i iron easy for installation, simple to operate, after installation, position is fixing not easily moves, and when building, concrete can wrap up i iron fast.
In the preferred version of above-mentioned embodiment, in described step S400, before described nut is installed, steel plate is placed between described nut and described i iron, make described backstay 104 through described steel plate, install and after tightening described nut, make described steel plate be clamped between described nut and described i iron.I iron fixing more firm, after being tightened by nut, the coupling mechanism force of nut passes to i iron by steel plate, i iron stressed more even, and fixed effect is better.
In the preferred version of this embodiment; in described step S400; the screw thread matched with described nut be positioned at stretch out described protection tube 102 described backstay 104 on; be convenient to the processing of screw thread; when namely processing described screw thread, do not need to process on the whole bar of backstay 104, reduce difficulty of processing; save the time, and then reduce cost.
Body of wall build complete after; after treating that body of wall is fixed-type; fixed mount main body 101 is needed to take out; as the preferred version of this embodiment; in described step S500; take out described fixed mount main body 101 to comprise: the end for the described nut that is spirally connected of knocking described backstay 104, the movement vertically of described backstay 104 makes the connection of itself and described protection tube 102 loosen, and pulls described base 103 to depart from described protection tube 102 completely to it.Simple and quick, be convenient to fixed mount main body 101 to take out from body of wall, after taking out described fixed mount main body 101, use concrete slurry to fill the space of base 103, ensure the planeness of body of wall and attractive in appearance.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. an i iron fixed mount method of operating; it is characterized in that; described i iron fixed mount comprises fixed mount main body and protection tube; two backstays that described fixed mount main body comprises the base of template, two nuts and is positioned on described base; described two backstay intervals are arranged; and described two backstays are perpendicular to the plate face of described base, the method comprises:
Step S100, build body of wall before, the position that the formwork for placing of body of wall both sides corresponds to i iron to be fixed marks;
Step S200, mounting and fixing support main body, make the corresponding described position of described backstay run through the described formwork for placing of both sides, and make described protection tube be set on described backstay and be positioned at the scope to be built of described body of wall;
Step S300, installation i iron, make described i iron to be fixed accordingly between described two backstays;
Step S400, installation tighten described nut on described backstay, make described i iron to be fixed be clamped between described base and described nut;
Step S500, body of wall have been built and after solidifying, have been removed described nut and take out described fixed mount main body, making described protection tube be retained in described body of wall.
2. i iron fixed mount method of operating according to claim 1, is characterized in that,
In described step S100, adopt line of ink marker mark or whitewash mark.
3. i iron fixed mount method of operating according to claim 1, is characterized in that,
In described step S200, described base is made to be fitted in the mark of described formwork for placing.
4. i iron fixed mount method of operating according to claim 1, is characterized in that,
In described step S200, the length of described protection tube is not less than the thickness of described body of wall.
5. i iron fixed mount method of operating according to claim 4, is characterized in that,
Described protection tube is pvc pipe.
6. i iron fixed mount method of operating according to claim 1, is characterized in that,
In described step S300, between described base and described i iron, place cushion block, the edge of a wing of described i iron is clamped between corresponding two described backstays, the described cushion block and fit in the surface on one of them edge of a wing of described i iron.
7. i iron fixed mount method of operating according to claim 1, is characterized in that,
In described step S400, before described nut is installed, between described nut and described i iron, place steel plate, make described backstay through described steel plate, install and after tightening described nut, make described steel plate be clamped between described nut and described i iron.
8. i iron fixed mount method of operating according to claim 7, is characterized in that,
Described backstay is reinforcing bar.
9. i iron fixed mount method of operating according to claim 8, is characterized in that,
In described step S400, the screw thread matched with described nut is positioned at and stretches out on the described backstay of described protection tube.
10. i iron fixed mount method of operating according to claim 1, is characterized in that,
In described step S500; take out described fixed mount main body to comprise: the end for the described nut that is spirally connected of knocking described backstay; the movement vertically of described backstay makes the connection of itself and described protection tube loosen, and pulls described base to depart from described protection tube completely to it.
CN201510137836.0A 2015-03-26 2015-03-26 Method for operating H-shaped steel fixing rack Pending CN104790679A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510137836.0A CN104790679A (en) 2015-03-26 2015-03-26 Method for operating H-shaped steel fixing rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510137836.0A CN104790679A (en) 2015-03-26 2015-03-26 Method for operating H-shaped steel fixing rack

Publications (1)

Publication Number Publication Date
CN104790679A true CN104790679A (en) 2015-07-22

Family

ID=53555825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510137836.0A Pending CN104790679A (en) 2015-03-26 2015-03-26 Method for operating H-shaped steel fixing rack

Country Status (1)

Country Link
CN (1) CN104790679A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002349070A (en) * 2001-05-24 2002-12-04 Dai Nippon Construction Erection adjusting tool for pillar and pillar erecting method using the same
CN202787926U (en) * 2012-09-06 2013-03-13 江苏扬州建工建设集团有限公司 Overhanging scaffold simple and convenient to disassemble and assemble
CN103195235A (en) * 2013-04-03 2013-07-10 江苏南通六建建设集团有限公司 Design and calculation for detachable steel plate type steel fixture
CN203361603U (en) * 2013-06-17 2013-12-25 中国建筑第五工程局有限公司 Detachable anchoring part of building-type steel beam overhanging scaffold
CN104196226A (en) * 2014-09-18 2014-12-10 中建一局集团第二建筑有限公司 Profiled-steel beam fixing anchor structure and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002349070A (en) * 2001-05-24 2002-12-04 Dai Nippon Construction Erection adjusting tool for pillar and pillar erecting method using the same
CN202787926U (en) * 2012-09-06 2013-03-13 江苏扬州建工建设集团有限公司 Overhanging scaffold simple and convenient to disassemble and assemble
CN103195235A (en) * 2013-04-03 2013-07-10 江苏南通六建建设集团有限公司 Design and calculation for detachable steel plate type steel fixture
CN203361603U (en) * 2013-06-17 2013-12-25 中国建筑第五工程局有限公司 Detachable anchoring part of building-type steel beam overhanging scaffold
CN104196226A (en) * 2014-09-18 2014-12-10 中建一局集团第二建筑有限公司 Profiled-steel beam fixing anchor structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN102134879B (en) Embedding accuracy control construction method for embedded part of overlong equipment foundation platform
CN102864745B (en) The girder pre-stressed pipeline three-dimensional locating device of PC
CN202141447U (en) Surface strain gauge mounting support and protecting device combination for steel structure
CN108086355B (en) Pre-buried channel flow installing and fixing method under cast-in-place piping lane traditional handicraft
CN206889000U (en) Tunnel side wall waterstop positioning fixture
CN209571794U (en) In a kind of shear wall direct-burried distribution box with can turnover type fix device
CN205088965U (en) Can dismantle floor gauge control instrument
CN106758663B (en) Buried rubber fastening band installs positioning construction method in one kind
CN104790679A (en) Method for operating H-shaped steel fixing rack
KR20090068887A (en) The tilting member measure apparatus for the slope mold installation
CN201610553U (en) Plug-in anti-twist device of angle steel
CN109944332A (en) A kind of system and operating method suitable for there is the pre-embedded bolt of high-precision requirement quickly to position
CN205343431U (en) Prefabricated wall body grout sleeve strip solid matter exposes accurate positioning die of reinforcing bar
CN213742217U (en) Embedded detachable overhanging scaffold positioning and fastening system
CN205711566U (en) A kind of pre-embedded bolt, sleeve, the auxiliary transverse alignment instrument of ironware Fast Installation
CN209620634U (en) A kind of fixed device of embedded iron parts
CN104989101A (en) Discharging platform construction method
CN107965059A (en) A kind of installation method of wall groove-type built-in fitting
CN107695243A (en) A kind of rebar fixing device of angle bender
CN109434757B (en) Auxiliary installation device capable of adjusting inclination angle of embedded bolt and application method thereof
CN209793635U (en) Auxiliary mounting device capable of adjusting inclination angle of embedded bolt
CN104989113B (en) A kind of downcomer built-in fitting center positioning device and method
CN207749837U (en) Prefabricated column reserved steel bar fixes constructing device
CN108411794B (en) Precise positioning device and positioning method for positioning framework of spherical hinge under swivel bridge
CN204492014U (en) I iron fixed mount

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150722