CN108086355B - Pre-buried channel flow installing and fixing method under cast-in-place piping lane traditional handicraft - Google Patents

Pre-buried channel flow installing and fixing method under cast-in-place piping lane traditional handicraft Download PDF

Info

Publication number
CN108086355B
CN108086355B CN201711334396.3A CN201711334396A CN108086355B CN 108086355 B CN108086355 B CN 108086355B CN 201711334396 A CN201711334396 A CN 201711334396A CN 108086355 B CN108086355 B CN 108086355B
Authority
CN
China
Prior art keywords
buried channel
channel flow
top die
holdfast
piping lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711334396.3A
Other languages
Chinese (zh)
Other versions
CN108086355A (en
Inventor
赵春梅
李成亮
王峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201711334396.3A priority Critical patent/CN108086355B/en
Publication of CN108086355A publication Critical patent/CN108086355A/en
Application granted granted Critical
Publication of CN108086355B publication Critical patent/CN108086355B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to the pre-buried channel flow installing and fixing methods under a kind of cast-in-place piping lane traditional handicraft, first carry out reinforcing bar binding and weld locating sleeve on reinforcing bar after reinforcing bar is bound;Locating sleeve is perpendicular with surface of wall;Holdfast is connected with pre-buried channel flow;Holdfast passes through locating sleeve;Weld top die roller in holdfast end;Wall medial and lateral template is installed;Protective layer cushion block is set on the wall steel bar bound, wears split bolt, places cement top die roller, adjusts interior outboard template spacing, conduit and top die roller is made to combine closely with two side templates;Template is reinforced with split bolt, cement top die roller and primary and secondary bolt;Casting concrete is permanently fixed pre-buried channel flow.Pre-buried channel flow installing and fixing method under the cast-in-place piping lane traditional handicraft of the present invention, ensure that the installation accuracy of pre-buried channel flow, reduces construction error, improve work efficiency, saved construction cost.

Description

Pre-buried channel flow installing and fixing method under cast-in-place piping lane traditional handicraft
Technical field
The present invention relates to a kind of construction techniques, in particular to pre- under a kind of cast-in-place piping lane traditional handicraft Bury conduit installing and fixing method.
Background technique
There is a large amount of electromechanical pipeline equipment to need that fixation is installed when city integrated piping lane engineering construction, uses traditional postposition Anchor bolt+there are problems for angle steel channel steel welding support fixed form, the requirement of pipe gallery construction can not have been fully met.With The further genralrlization of piping lane engineering in China, more advanced pre-buried channel flow+finished product bracket substitute traditional postposition Anchor bolt+angle steel channel steel bracket, starts to widely apply in piping lane engineering.
Pre-buried channel flow is widely used in the railway traffic engineerings such as subway, high-speed rail, subway, installing and fixing method also relative at It is ripe, but in piping lane construction field, when carrying out piping lane construction especially with conventional template system, pre-buried channel flow still belongs to new skill Art, installing and fixing method is relatively simple, and more problems.
In order to solve problems of the existing technology, " the pre-buried channel flow peace under cast-in-place piping lane traditional handicraft is proposed Fill fixing means ", it is ensured that pre-buried channel flow installation accuracy and construction quality reduce construction error, improve working efficiency.
Still based on traditional cast-in-place structural, template is mainly plank sheathing, Wood-plastic formwork, combination for piping lane construction at this stage Steel form and emerging aluminum alloy mould plate.Pre-buried channel flow is mainly disposed on piping lane side wall.When piping lane wall construction, steel is first carried out Then muscle binding installs pre-buried channel flow, followed by the installation reinforcing of template, last casting concrete.Existing pre-buried channel flow Conduit is mainly fixed on reinforcing bar or is fixed in template using certain reinforcement measure by installing and fixing method, the disadvantage is that Conduit installation accuracy is poor, and construction efficiency is low, and later period installation process is costly.
When with traditional handicraft construction Pipe rack, the existing main fixing means of pre-buried channel flow, first is that will with binding silk Conduit ties up on wall steel bar (or being directly welded in conduit on wall steel bar), second is that location hole is opened in template, with positioning spiral shell Bolt is positioned, and conduit is fixed in template.
The prior art has the following problems:
(1) conduit is tied up on wall steel bar to the fixation side of (or being directly welded in conduit on wall steel bar) using binding silk Formula be easy to cause conduit position inaccurate, especially it cannot be guaranteed that conduit and template since there are large errors for artificial assembling reinforcement It combines closely, causes conduit deep mixed away from metope, be unable to satisfy the required precision of subsequent electromechanical installation.
(2) it using location hole is opened in template, is positioned with positioning bolt, conduit is fixed on the fixation side in template There is also disadvantages for formula, if be temporarily fixed on reinforcing bar using by conduit, will appear the positioning spiral shell on conduit in template installation Bolt can not pass through the case where location hole in template, bring great difficulty to template installation;If using conduit is solid in advance Be scheduled in template, template installation when will appear again the problem of conduit holdfast is collided with piping lane lengthways main steel bar (longitudinal reinforcement is thicker, Adjustment is difficult), the case where causing template that can not install.
Summary of the invention
In view of the deficiency of the prior art, the present invention, which provides one kind, ensures pre-buried channel flow installation accuracy and engineering matter Amount reduces construction error, improves the pre-buried channel flow installing and fixing method under the cast-in-place piping lane traditional handicraft of working efficiency.
The technical solution used in the present invention is:
A kind of pre-buried channel flow installing and fixing method under cast-in-place piping lane traditional handicraft when piping lane wall construction, first carries out steel Muscle binding, then installs pre-buried channel flow, and the installation of template reinforces, last casting concrete,
After reinforcing bar is bound, locating sleeve is welded on reinforcing bar;Guarantee locating sleeve in the height of metope and length side To accurate positioning;
Locating sleeve is perpendicular with surface of wall;
Holdfast is connected with pre-buried channel flow;
Holdfast passes through locating sleeve;
Weld top die roller in holdfast end;
The overall size that pre-buried channel flow, holdfast and top die roller are added is wall thickness;
The spacing of interior outboard template is wall thickness when molding;
Wall medial and lateral template is installed;Protective layer cushion block is set on the wall steel bar bound, wears split bolt, Cement top die roller is placed, interior outboard template spacing is adjusted, conduit and top die roller is made to combine closely with two side templates;With to drawing spiral shell Bolt, cement top die roller and primary and secondary skeletal frame reinforce template;
Casting concrete is permanently fixed pre-buried channel flow.
Locating sleeve internal diameter is 1mm bigger than holdfast diameter, keeps holdfast free to slide in casing, and casing length is greater than 50mm.
When pre-buried channel flow is mounted on piping lane exterior wall, sealing piece is added on top die roller, sealing piece specification is 50*50*3's Steel plate.
The present invention compared with the prior art the utility model has the advantages that
Pre-buried channel flow installing and fixing method under the cast-in-place piping lane traditional handicraft of the present invention ensure that the installation essence of pre-buried channel flow Degree, reduces construction error, improves work efficiency, saved construction cost.
Detailed description of the invention
Fig. 1 is the constructing structure schematic diagram of the pre-buried channel flow installing and fixing method under the cast-in-place piping lane traditional handicraft of the present invention;
Fig. 2 is the partial enlargement diagram of the A of Fig. 1.
Main component symbol description in attached drawing:
In figure:
1, pre-buried channel flow 2, locating sleeve
3, horizontal distribution reinforcing bar 4, holdfast
5, top die roller 6, split bolt
7, sealing piece 8, template
9, Reinforcement.
Specific embodiment
Referring to the drawings and embodiment the present invention will be described in detail:
Attached drawing 1-2 is it is found that a kind of pre-buried channel flow installing and fixing method under cast-in-place piping lane traditional handicraft, piping lane wall construction When, reinforcing bar binding is first carried out, then installation pre-buried channel flow 1, the installation reinforcing of template, last casting concrete,
After reinforcing bar is bound, locating sleeve 2 is welded on reinforcing bar;Guarantee locating sleeve 2 in the height and length of metope Direction accurate positioning;
Locating sleeve 2 and surface of wall are perpendicular;
Holdfast 4 is connected with pre-buried channel flow 1;
Holdfast 4 passes through locating sleeve 2;
Weld top die roller 5 in 4 end of holdfast;
The overall size that pre-buried channel flow 1, holdfast 4 are added with top die roller 5 is wall thickness;
The spacing of medial and lateral template 8 is wall thickness when molding;To make conduit and top die roller be bonded tightly with two side templates It is close;
Wall medial and lateral template is installed;Protective layer cushion block is set on the wall steel bar bound, wears split bolt, Cement top die roller is placed, interior outboard template spacing is adjusted, conduit and top die roller is made to combine closely with two side templates;
Template is reinforced with split bolt 6, cement top die roller and primary and secondary skeletal frame;
If reinforcement location is inaccurate, conduit and top die roller can also be free to slide by locating sleeve, to guarantee that conduit exists Along the accurate positioning of wall thickness direction.
Casting concrete is permanently fixed pre-buried channel flow.
Processing and fabricating locating sleeve and steel top die roller;Locating sleeve specification is selected by the diameter of conduit holdfast, and one As in the case of;
Locating sleeve internal diameter is 1mm bigger than holdfast diameter, keeps holdfast free to slide in casing, and casing length is greater than 50mm.
When pre-buried channel flow is mounted on piping lane exterior wall, sealing piece 7 is added on top die roller, sealing piece specification is 50*50*3 Steel plate.
Top die roller is used to be made with the round steel of holdfast same diameter, and length wants strict control, it is necessary to assure conduit The size for adding top die roller is wall thickness.
Locating sleeve is welded on the wall steel bar bound, is fixed temporarily pre-buried channel flow.A piece pre-buried channel flow setting Locating sleeve and top die roller at two.
Locating sleeve position must assure that pre-buried channel flow position meets by design requirement, to guarantee pre-buried channel flow in Yan Qiang Face height and length direction accurate positioning.
Pre-buried channel flow installing and fixing method under the cast-in-place piping lane traditional handicraft of the present invention ensure that the installation essence of pre-buried channel flow Degree, reduces construction error, improves work efficiency, saved construction cost.
The above described is only a preferred embodiment of the present invention, not making in any form to structure of the invention Limitation.Any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention, Belong within the scope of technical solution of the present invention.

Claims (3)

1. the pre-buried channel flow installing and fixing method under a kind of cast-in-place piping lane traditional handicraft, when piping lane wall construction, reinforcing bar is first carried out Then pre-buried channel flow, the installation reinforcing of template, last casting concrete are installed in binding, which is characterized in that
After reinforcing bar is bound, locating sleeve is welded on reinforcing bar;Guarantee that locating sleeve is fixed in the height and length direction of metope Level is true;
Locating sleeve is perpendicular with surface of wall;
Holdfast is connected with pre-buried channel flow;
Holdfast passes through locating sleeve;
Weld top die roller in holdfast end;
The overall size that pre-buried channel flow, holdfast and top die roller are added is wall thickness;
The spacing of interior outboard template is wall thickness when molding;
Wall medial and lateral template is installed;Protective layer cushion block is set on the wall steel bar bound, wears split bolt, is placed Top die roller adjusts interior outboard template spacing, pre-buried channel flow and top die roller is made to combine closely with two side templates;
Template is reinforced with split bolt, cement top die roller and primary and secondary skeletal frame;
Casting concrete is permanently fixed pre-buried channel flow.
2. the pre-buried channel flow installing and fixing method under cast-in-place piping lane traditional handicraft according to claim 1, it is characterised in that:
Locating sleeve internal diameter is 1mm bigger than holdfast diameter, and holdfast is free to slide in casing, and casing length is greater than 50mm.
3. the pre-buried channel flow installing and fixing method under cast-in-place piping lane traditional handicraft according to claim 1, it is characterised in that: pre- When burying conduit and being mounted on piping lane exterior wall, sealing piece is added on top die roller, sealing piece specification is the steel plate of 50*50*3.
CN201711334396.3A 2017-12-14 2017-12-14 Pre-buried channel flow installing and fixing method under cast-in-place piping lane traditional handicraft Active CN108086355B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711334396.3A CN108086355B (en) 2017-12-14 2017-12-14 Pre-buried channel flow installing and fixing method under cast-in-place piping lane traditional handicraft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711334396.3A CN108086355B (en) 2017-12-14 2017-12-14 Pre-buried channel flow installing and fixing method under cast-in-place piping lane traditional handicraft

Publications (2)

Publication Number Publication Date
CN108086355A CN108086355A (en) 2018-05-29
CN108086355B true CN108086355B (en) 2019-12-03

Family

ID=62175501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711334396.3A Active CN108086355B (en) 2017-12-14 2017-12-14 Pre-buried channel flow installing and fixing method under cast-in-place piping lane traditional handicraft

Country Status (1)

Country Link
CN (1) CN108086355B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113357A (en) * 2018-09-12 2019-01-01 江西省安特机械有限公司 A kind of pre-buried trough fixation device of piping lane and its fixing means
CN109487823A (en) * 2018-12-12 2019-03-19 中国十七冶集团有限公司 The accurate installation method of groove type embedded part in city integrated piping lane punching block system
CN109610506A (en) * 2018-12-17 2019-04-12 中国十七冶集团有限公司 A kind of bracing means and construction method for steel form pre-buried channel flow
CN109826441B (en) * 2018-12-29 2021-03-23 济南城建集团有限公司 Lateral pre-embedding installation method for C-shaped hafen groove of concrete structure
CN109853949A (en) * 2019-01-10 2019-06-07 江苏南通三建集团股份有限公司 Pipe laying preformed groove technique after a kind of cast-in-place concrete wall
CN111809895A (en) * 2020-06-28 2020-10-23 中国二十冶集团有限公司 Positioning device and positioning method for positioning embedded channel
CN113432745B (en) * 2021-06-23 2024-05-14 中国三峡建设管理有限公司 Construction process for transferring concrete dam distributed optical fiber sensing temperature measurement system into permanent monitoring gallery

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001073453A (en) * 1999-09-06 2001-03-21 Okabe Co Ltd Building construction method
CN107254888A (en) * 2017-08-02 2017-10-17 广西路桥工程集团有限公司 The fixing means of piping lane neck

Also Published As

Publication number Publication date
CN108086355A (en) 2018-05-29

Similar Documents

Publication Publication Date Title
CN108086355B (en) Pre-buried channel flow installing and fixing method under cast-in-place piping lane traditional handicraft
CN102996143B (en) Construction method of fully pouring tunnel inverted arch
CN107130686B (en) Prefabrication and assembly construction column foundation anchor bar accurate positioning method
CN100538011C (en) Railway large-bore tunnel overhead contact built-in sliding chute construction method
CN102562094B (en) Cast-in-place construction method for support structure of tunnel groove formwork
CN108952165B (en) Construction method for prefabricating and embedding row of sleeve pipe assemblies
CN203639932U (en) Pre-embedded foundation structure used for installation of machine column of high-column signal machine of railway
CN208733666U (en) A kind of fixing bolt preformed hole template tool
CN103388343A (en) Super-long and large horizontal embedded part reverse construction method
CN102003071A (en) Prestressing channel drilling and positioning construction process of prestressed beam by utilizing tensioning method
CN204491390U (en) A kind of big cross section fish-belly box beam structure
CN108253193B (en) Wall pipeline pre-embedding construction method
CN111576232B (en) Linear control construction method for precast beam top plate
CN110359485A (en) A kind of pre-buried trough fixation device of steel form and its construction method
CN103806426B (en) Earth pressure gauge adjustable position secure mounting arrangements
CN103161313A (en) Connection method of main reinforcement of constructional column of infilled wall and framed girder
CN203701066U (en) Soil pressure meter position-adjustable fixed installation device
CN104153451A (en) Construction method for installing concrete pipeline through prefabricated supporting block
CN111535482A (en) Aluminum mould construction concrete structure and tool and electromechanical reservation pre-embedding construction method
CN105735228A (en) Construction method and installation accuracy control method of rack systems of high-lift rack climbing type ship lift
CN205000639U (en) Modular wear floor cover
CN210420851U (en) Bridge bearing pad stone anchor bolt hole positioning device
CN205117363U (en) Accurate positioner of two lined steel muscle in tunnel
CN102286940B (en) Construction method for remoulding old pier columns of bridges
CN211850026U (en) Adjustable installation device of board-like built-in fitting based on BIM technique

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant