- prefabricated
- external wall
- wallboards
- wall structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
The invention relates to an assembly type concrete stairwell external wall structure and a construction method thereof. The structure comprises prefabricated bearing longitudinal shear wallboards, prefabricated bearing transverse shear wallboards, a prefabricated beam, a non-bearing out-hung wallboard and hanging board connection pieces. The prefabricated bearing longitudinal shear wallboards and the prefabricated bearing transverse shear wallboards are adopted for the outer side part of a rest platform, and the prefabricated beam and the non-bearing out-hung wallboard are adopted for the outer side portion of a step plate. One side of each prefabricated bearing longitudinal shear wallboard is connected with a stairwell cast-in-situ edge component through a lateral connection rebar, and the other side of each prefabricated bearing longitudinal shear wallboard is connected with the prefabricated beam through a reserved rebar overlapping region, and the prefabricated bearing longitudinal shear wallboards are connected with stair beams and rest platform floors in the vertical direction of the prefabricated bearing longitudinal shear wallboards. The left sides and the right sides of the prefabricated bearing transverse shear wallboards are connected with the stairwell cast-in-situ edge components through lateral connection rebars. The assembly type concrete stairwell external wall structure is light in weight, good in wall limb stability, good in structural antitorque effect, easy and convenient to construct and low in cost.
Description
Technical field
The present invention relates to a kind of assembly concrete staircase external wall structure and its construction method, belong to armored concrete knot
Structure field of engineering technology.
Background technology
At present, prefabricated assembled concrete staircase exterior wall assembling structure or all using prefabricated load-bearing shear wall plate,
Or all using plug-in non-bearing out-hung panel, there is problems with both constructions:
1. following problem is configured with using prefabricated load-bearing shear wall plate all:A. exterior wall is long, and rigidity is big, but marks time position
Put out big hole and contact weak with agent structure;Unbraced length is long, and wall stability has hidden danger;Itself deadweight is subjected only to, material does not fill
Divide Developed fiber strength.B. the conventional shears ladder of high residential building, generally requires in the middle part of exterior wall, and a section medium position of marking time sets up connection two
The cast-in-place post of block plate, the cast-in-place part formwork are loaded down with trivial details;C. it is because of section non-floor at the floor absolute altitude of marking time, temporarily solid in installation process
Determine precast shear wall difficult.
2. following problem is configured with using plug-in non-bearing out-hung panel all:Staircase span is big, is usually placed in building
The outside of layer plane, and protrusion is more, under geological process, torsional effect substantially, is difficult to meet the requirement of specification when floor is higher.
The content of the invention
In order to solve that the prefabricated assembled concrete staircase exterior wall routine wall limb stability brought of assembling structure is poor, construct
The problem that difficulty is big and torsional effect is big, it is an object of the present invention to provide a kind of prefabricated assembled concrete staircase exterior wall
Assembling structure.
In order to realize above-mentioned task, the present invention adopts following technical solution:Outside a kind of assembly concrete staircase
Wall construction, it is characterised in that including prefabricated load-bearing longitudinal direction shear wall slab, prefabricated load-bearing transverse shearing force wallboard, precast beam, non-bearing
Out-hung panel and link plate connector, in half space Outboard Sections using the prefabricated load-bearing longitudinal direction shear wall slab and prefabricated load-bearing
Transverse shearing force wallboard, adopts the precast beam and non-bearing out-hung panel in step plate Outboard Sections;The prefabricated load-bearing longitudinal direction
Shear wall slab, its side are connected with the cast-in-place edge member of staircase by laterally attached reinforcing bar, and opposite side is taken by reserved steel bar
Connect region to be connected with precast beam, and be connected with stair stringer and half space floor in its vertical direction;The prefabricated load-bearing is horizontal
Shear wall slab, its left and right sides are connected with the cast-in-place edge member of staircase by laterally attached reinforcing bar, and its vertical direction with
Half space floor connects.
Further, non-bearing out-hung panel combines to form flexible connection structure with the link plate connector of staircase agent structure
Make, the displacement mode that the construction is combined with translation using rotation displacement mode or rotation.
Further, the edge joint position of the non-bearing out-hung panel is blocked using the sealing joint strip.
Further, the connecting node structure of the reinforcement detailing, link plate connector and agent structure of the non-bearing out-hung panel
Making should be according to bearing capacity and normally being checked using two kinds of limit states.
Further, link plate connector combines to form flexible connection construction, reduces response of the structure under geological process, it is ensured that
Non-bearing out-hung panel adapts to the maximum story drift of agent structure under geological process.
The invention also discloses assembly concrete staircase external wall structure construction method, comprises the steps:
First, the non-bearing out-hung panel is first lifted to specified location, add temporary support, adjust the link plate connection
Part makes height, axial location and the perpendicularity of the non-bearing out-hung panel meet requirement;
Second, the precast beam is then lifted to specified location, beam two ends are placed on the prefabricated load-bearing longitudinal direction shear wall
In the interim support pre-set on plate, node concrete is poured;
3rd, the connection of the precast beam and the non-bearing out-hung panel is fixed by the link plate connector;
4th, blocked with building sealant, to ensure the prefabricated assembled concrete staircase exterior wall assembling structure
Water resistance.
Further, in second step, precast beam is placed on the precast beam of prefabricated load-bearing longitudinal direction shear wall slab side when constructing
Interim support on, two components are poured together by the cast-in-place region being reserved on the shear wall slab of prefabricated load-bearing longitudinal direction.
Beneficial effect:Present invention is mainly used for the articulated constuction design of prefabricated assembled concrete staircase exterior wall, solution
The wall limb stability that certainly the conventional assembling structure of prefabricated assembled concrete staircase exterior wall is present at present is poor, and difficulty of construction is big and right
Structure integral rigidity affects excessive problem.The present invention is applied to the stair of many high level prefabricated assembled concrete shear wall structures
Between exterior wall assembling structure.
Assembly concrete staircase external wall structure of the present invention, with tradition all using prefabricated load-bearing shear wall plate construct,
Or all compared using the construction of plug-in non-bearing out-hung panel, employ prefabricated load-bearing shear wall plate and plug-in non-load bearing wall
The make that plate combines, has the advantages that from heavy and light, wall limb good stability, structure anti-torsion effect be good, easy construction, tool
The present the following aspects of body surface:
1)From heavy and light.Non-bearing out-hung panel can be facilitated construction transport and lifted, reduced structure certainly using light material
Weight.
2)Wall limb good stability.Prefabricated load-bearing shear wall plate is provided only on half space part, has floor plates to support up and down,
The unbraced length of wall limb is little, good stability.
3)The antitorque effect of structure is good.The structure of prefabricated load-bearing shear wall composition has good torsional rigidity, can reduce
Structure because reversing the deformation for producing under geological process, do not destroy under little shake by protection structure.
4)Easy construction, low cost.With all using the construction of prefabricated load-bearing shear wall plate compared with, reduce concrete
Native load-bearing wall panel straight screw sleeve connection quantity, eliminates the cast-in-place sleeper between two blocks of wallboards, facilitates construction, reduce cost,
Job site connection hidden danger is reduced, build guality is improve.
Description of the drawings
Fig. 1 is prefabricated assembled concrete staircase exterior wall assembling structure schematic diagram of the present invention.
Fig. 2 is prefabricated assembled concrete staircase exterior wall assembling structure schematic diagram of the present invention two.
Fig. 3 is prefabricated load-bearing longitudinal direction shear wall slab organigram.
Fig. 4 is prefabricated load-bearing transverse shearing force wall board structure schematic diagram.
Fig. 5 is that A-A sections are shown in detail intention in Fig. 1.
Fig. 6 is that B-B sections are shown in detail intention in Fig. 2.
In figure, the prefabricated load-bearing longitudinal direction shear wall slabs of 1.1-;1.11 longitudinal shear reinforcing steel bars of wallboards;The prefabricated load-bearing Transverse Shears of 1.2-
Power wallboard;1.21 transverse shearing force reinforcing steel bars of wallboards;2- precast beams;2.1- precast beam reinforced bar;3- non-bearing out-hung panels;4- link plates connect
Fitting;5- sealing joint strips;The cast-in-place edge members of 6-;7- half spaces;8- step plates;10- siphonal lobe wallboards;11- heat-insulation layers;
The interim supports of 12-.
Specific embodiment
Prefabricated assembled concrete staircase exterior wall assembling structure of the present invention is described with reference to the accompanying drawings as follows:
Embodiment 1
The present invention design a kind of prefabricated assembled concrete staircase exterior wall assembling structure, its schematic diagram such as Fig. 1, Fig. 3,
Shown in Fig. 4 and Fig. 5.Including prefabricated load-bearing longitudinal direction shear wall slab 1.1, prefabricated load-bearing transverse shearing force wallboard 1.2, precast beam 2, non-hold
Weight out-hung panel 3 and link plate connector 4,7 Outboard Sections of half space using the prefabricated load-bearing longitudinal direction shear wall slab 1.1 and
Prefabricated load-bearing transverse shearing force wallboard 1.2, adopts the precast beam 2 and non-bearing out-hung panel 3 in 8 Outboard Sections of step plate(On
The horizontal joint of lower two pieces of non-bearing out-hung panels 3 is located at the top edge of precast beam 2, the two pieces of non-bearing out-hung panels in left and right it is perpendicular
To seam positioned at the middle part of precast beam 2);The prefabricated load-bearing longitudinal direction shear wall slab 1.1, its side passes through laterally attached reinforcing bar and building
Between ladder, cast-in-place edge member 6 connects, and opposite side is connected with precast beam 2 by reserved steel bar overlapping regions, and in its vertical direction
It is connected with stair stringer and half space floor;The prefabricated load-bearing transverse shearing force wallboard 1.2, its left and right sides is by laterally attached
The cast-in-place edge member of reinforcing bar and staircase 6 is connected, and is connected with 7 floor of half space in its vertical direction.The plug-in wall of non-bearing
Plate 3 combines formation flexible connection construction with the link plate connector 4 of staircase agent structure, the construction using rotate displacement mode or
The displacement mode that rotation is combined with translation.The edge joint position of non-bearing out-hung panel 3 is blocked using the sealing joint strip 5.
The connecting node construction of the reinforcement detailing of non-bearing out-hung panel 3, link plate connector 4 and agent structure should be according to holding
Loading capability and normally checked using two kinds of limit states.The combination of link plate connector 4 forms flexible connection construction, reduces structure
Response under geological process, it is ensured that non-bearing out-hung panel 3 adapts to the maximum layer meta of agent structure under geological process
Move angle.
Prefabricated assembled concrete staircase exterior wall assembling structure construction procedure is as follows:
First, the prefabricated load-bearing longitudinal direction is determined according to horizontal layout and size of prefabricated assembled concrete staircase etc.
The scantling of shear wall slab 1.1, prefabricated load-bearing transverse shearing force wallboard 1.2 and precast beam 2, enters according to overall structure result of calculation
The Deepen Design of row prefabricated components;Secondly, according to the deadweight of the non-bearing out-hung panel 3(Weight containing window), wind load, earthquake make
With and the load action such as temperature stress Disadvantageous combination, carry out the connection section of the non-bearing out-hung panel 3 and link plate connector 4
Point design;Finally, prefabricated load-bearing longitudinal direction shear wall slab 1.1, prefabricated load-bearing transverse shearing force wallboard 1.2, precast beam 2 and non-hold
After 3 installation of weight out-hung panel, the water-proofing treatment between plate stitch is carried out using the sealing joint strip 5.
During construction, the non-bearing out-hung panel 3 is first lifted to specified location, add temporary support, adjust the link plate
Connector 4 makes height, axial location and the perpendicularity of the non-bearing out-hung panel 3 meet requirement;Then lift described prefabricated
Beam 2 arrives specified location, and beam two ends are placed on the interim support 12 pre-set on the prefabricated load-bearing longitudinal direction shear wall slab 1.1
On so that reinforcing steel bars of wallboards 1.11 is mutually overlapped with precast beam reinforced bar 2.1, then pours node concrete;Connected by the link plate
Fitting 4 fixes the connection of the precast beam 2 and the non-bearing out-hung panel 3;Finally, blocked with building sealant.
Embodiment 2
As shown in Fig. 2, Fig. 6, the structure and construction method and reality of prefabricated assembled concrete staircase exterior wall assembling structure
Apply example 1 similar, differ primarily in that:In the precast beam 2 and non-bearing out-hung panel 3 of 8 Outboard Sections of step plate, upper and lower two pieces non-
The horizontal joint of load-bearing out-hung panel 3 is located in the middle part of the beam body of precast beam 2.Therefore repeat no more.
Claims (7)
1. a kind of assembly concrete staircase external wall structure, it is characterised in that including prefabricated load-bearing longitudinal direction shear wall slab
(1.1), prefabricated load-bearing transverse shearing force wallboard(1.2), precast beam(2), non-bearing out-hung panel(3)With link plate connector(4),
In half space(7)Outboard Sections are using the prefabricated load-bearing longitudinal direction shear wall slab(1.1)And prefabricated load-bearing transverse shearing force
Wallboard (1.2), in step plate(8)Outboard Sections adopt the precast beam(2)With non-bearing out-hung panel(3);
The prefabricated load-bearing longitudinal direction shear wall slab(1.1), its side is by laterally attached reinforcing bar and the cast-in-place edge member of staircase
(6)Connection, opposite side pass through reserved steel bar overlapping regions and precast beam(2)Connection, and in its vertical direction and stair stringer and stop
Breath platform floor connection;
The prefabricated load-bearing transverse shearing force wallboard(1.2), its left and right sides is by laterally attached reinforcing bar and the cast-in-place edge of staircase
Component(6)Connection, and in its vertical direction and half space(7)Floor connects.
2. assembly concrete staircase external wall structure according to claim 1, it is characterised in that non-bearing out-hung panel
(3)With the link plate connector of staircase agent structure(4)Combination forms flexible connection construction, and the construction is adopted and rotates displacement mode
Or rotate the displacement mode combined with translation.
3. assembly concrete staircase external wall structure according to claim 1, it is characterised in that the non-bearing is plug-in
Wallboard(3)Edge joint position adopt sealing joint strip(5)Closure.
4. assembly concrete staircase external wall structure according to claim 1, it is characterised in that the non-bearing is plug-in
Wallboard(3)Reinforcement detailing, link plate connector(4)Should make according to bearing capacity and normally with the connecting node construction of agent structure
Checked with two kinds of limit states.
5. assembly concrete staircase external wall structure according to claim 1, it is characterised in that link plate connector(4)
Combination forms flexible connection construction, reduces response of the structure under geological process, it is ensured that non-bearing out-hung panel(3)Make in earthquake
The maximum story drift of agent structure is adapted to under.
6. the construction method of the assembly concrete staircase external wall structure according to any one of claim 1-5, its feature
It is to comprise the steps:
First, first lift the non-bearing out-hung panel(3)To specified location, temporary support is added, adjust the link plate connection
Part(4)Make the non-bearing out-hung panel(3)Height, axial location and perpendicularity meet and require;
Second, then lift the precast beam(2)To specified location, beam two ends are placed on the prefabricated load-bearing longitudinal direction shear wall slab
(1.1)On in the interim support that pre-sets, pour node concrete;
3rd, by the link plate connector(4)The fixation precast beam(2)With the non-bearing out-hung panel(3)Connection;
4th, blocked with building sealant, to ensure the water resistance of the assembly concrete staircase external wall structure.
7. construction method according to claim 6, it is characterised in that in second step, precast beam(2)It is placed on during construction
Prefabricated load-bearing longitudinal direction shear wall slab(1.1)The precast beam of side(2)Interim support on, by prefabricated load-bearing longitudinal direction shear wall slab
(1.1)On cast-in-place region two components are poured together.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410708361.1A CN104790564B (en) | 2014-12-01 | 2014-12-01 | Assembly type concrete stairwell external wall structure and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410708361.1A CN104790564B (en) | 2014-12-01 | 2014-12-01 | Assembly type concrete stairwell external wall structure and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104790564A CN104790564A (en) | 2015-07-22 |
CN104790564B true CN104790564B (en) | 2017-03-22 |
Family
ID=53555711
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410708361.1A Expired - Fee Related CN104790564B (en) | 2014-12-01 | 2014-12-01 | Assembly type concrete stairwell external wall structure and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104790564B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105155856A (en) * | 2015-08-06 | 2015-12-16 | 上海同凝节能科技有限公司 | Construction method using prefabricated assembly type external retaining wall |
CN109339220B (en) * | 2018-11-02 | 2023-11-03 | 山东海龙建筑科技有限公司 | Assembled integral stairwell and production and construction method thereof |
CN109441031B (en) * | 2018-12-18 | 2023-11-14 | 中铁建工集团有限公司 | Structure Liang Yincang type overhanging type open rotary stair structure and construction method thereof |
CN111663725A (en) * | 2020-05-12 | 2020-09-15 | 中建科技有限公司 | Fabricated stair for subway wind well and connecting method of fabricated stair and corner platforms of fabricated stair |
CN112663798B (en) * | 2020-12-16 | 2022-12-27 | 成都城投远大建筑科技有限公司 | Connecting structure and method for external wall panel and precast beam |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0567070A1 (en) * | 1992-04-21 | 1993-10-27 | Oliver Franz | Staircase for multi-floor building |
CN103510723A (en) * | 2013-09-23 | 2014-01-15 | 安徽宇泰建筑科技集团有限公司 | Integrally assembled type frame structure housing system |
CN104131635A (en) * | 2014-06-20 | 2014-11-05 | 中国建筑第四工程局有限公司 | Method and platform for constructing peripheral shear wall of prefabricated staircase |
CN204531069U (en) * | 2014-12-01 | 2015-08-05 | 中国建筑股份有限公司 | A kind of assembly concrete staircase external wall structure |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004263517A (en) * | 2003-03-04 | 2004-09-24 | Daisue Construction Co Ltd | Supporting structure of precast concrete staircase |
-
2014
- 2014-12-01 CN CN201410708361.1A patent/CN104790564B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0567070A1 (en) * | 1992-04-21 | 1993-10-27 | Oliver Franz | Staircase for multi-floor building |
CN103510723A (en) * | 2013-09-23 | 2014-01-15 | 安徽宇泰建筑科技集团有限公司 | Integrally assembled type frame structure housing system |
CN104131635A (en) * | 2014-06-20 | 2014-11-05 | 中国建筑第四工程局有限公司 | Method and platform for constructing peripheral shear wall of prefabricated staircase |
CN204531069U (en) * | 2014-12-01 | 2015-08-05 | 中国建筑股份有限公司 | A kind of assembly concrete staircase external wall structure |
Also Published As
Publication number | Publication date |
---|---|
CN104790564A (en) | 2015-07-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104790564B (en) | Assembly type concrete stairwell external wall structure and construction method thereof | |
US5526625A (en) | Building panel and buildings using the panel | |
CA2297972C (en) | Building panels for use in the construction of buildings | |
CN105569355B (en) | It is a kind of to include the assembly method of prefabricated components modularization house | |
US9487943B2 (en) | Component building system | |
KR100830240B1 (en) | Method for hybridizing light-weight composite wall and concrete floor in light-weight composite structure using adapter | |
CN110805144B (en) | Full-assembly type high-rise/super high-rise concrete frame support structure system and construction method thereof | |
CN114635503A (en) | Fair-faced concrete wall flexibly connected with concrete frame column and construction method | |
WO1996021069A1 (en) | A structural member | |
PL128494B1 (en) | Ceiling,in particular for dwelling houses and method of making the same | |
CN204531069U (en) | A kind of assembly concrete staircase external wall structure | |
KR200178874Y1 (en) | Pc concrete wall panel | |
JP7264690B2 (en) | METHOD FOR MANUFACTURING CONCRETE WALL STRUCTURE AND BUILDING STRUCTURE | |
US4372088A (en) | Structure with slab beams | |
CN217299267U (en) | Full-assembly type building | |
CN111088858A (en) | Prefabricated gable of circulated use and connection structure thereof | |
US2219043A (en) | Floor construction | |
AU707101B2 (en) | A structural member | |
CN217175198U (en) | Connecting structure of steel bar truss floor bearing plate and reinforced concrete wall | |
CN217299310U (en) | Prefabricated floor and prefabricated floor connected node | |
US20090064615A1 (en) | Building Element and a Building Structure Comprising the Building Element | |
CN212715340U (en) | Prefabricated vertical member of welded connection reinforced concrete | |
JP7435979B2 (en) | Earthquake reinforcement structure for existing buildings using CLT | |
CN216740000U (en) | Assembly system | |
CN207228314U (en) | Beamless hollow floor chamber concrete-filled steel tube shear wall combined structure system and mould system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170322 Termination date: 20191201 |
|
CF01 | Termination of patent right due to non-payment of annual fee |