CN104790272B - Method for constructing rock cliff side slope gallery road - Google Patents

Method for constructing rock cliff side slope gallery road Download PDF

Info

Publication number
CN104790272B
CN104790272B CN201510126730.0A CN201510126730A CN104790272B CN 104790272 B CN104790272 B CN 104790272B CN 201510126730 A CN201510126730 A CN 201510126730A CN 104790272 B CN104790272 B CN 104790272B
Authority
CN
China
Prior art keywords
side slope
steel wire
railing
rock
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510126730.0A
Other languages
Chinese (zh)
Other versions
CN104790272A (en
Inventor
兰泽民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kweiyang Skill Landscape Engineering Co Ltd Attractive In Appearance
Original Assignee
Kweiyang Skill Landscape Engineering Co Ltd Attractive In Appearance
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kweiyang Skill Landscape Engineering Co Ltd Attractive In Appearance filed Critical Kweiyang Skill Landscape Engineering Co Ltd Attractive In Appearance
Priority to CN201510126730.0A priority Critical patent/CN104790272B/en
Publication of CN104790272A publication Critical patent/CN104790272A/en
Application granted granted Critical
Publication of CN104790272B publication Critical patent/CN104790272B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/002Design or lay-out of roads, e.g. street systems, cross-sections ; Design for noise abatement, e.g. sunken road
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G2/00Vegetative propagation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Botany (AREA)
  • Developmental Biology & Embryology (AREA)
  • Environmental Sciences (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a method for constructing a rock cliff side slope gallery road. The method comprises the following steps: (1) erecting a temporary scaffold or arranging a steel wire net; (2) drilling holes and anchoring reinforcing steel bars; (3) casting a concrete roadbed; (4) standing handrails; (5) erecting pull rods; (6) completing the construction, and removing the scaffold. The method for constructing the rock cliff side slope gallery road has the advantages that due to the adoption of the rock cliff side slope gallery road, not only is the security problem of artificial ecological restoration constructors of rock cliff side slopes solved, but also rolling rock can be certainly prevented, and the security coefficients of roads, railways and buildings are improved; a function of retaining rock water seepage and rain is also achieved, and with the combination of side slope greening, beneficial conditions are provided for plants to grow, and ecological restoration is promoted; the method is applicable to artificial ecological restoration of rock cliff side slops around roads, railways and buildings in mountain areas.

Description

The construction method of cliff side slope plank road
Technical field
The present invention relates to road, furthermore, is related to plank road, more particularly to the construction method of side slope plank road.
Background technology
It is well known that plank road is a kind of road built along overhanging cliff.With highway, railway and mountain area structure Build, necessarily lead to many cliff side slopes, some side slopes are very precipitous.Architectural engineering can be damaged to ecological environment around, and And the also potential safety hazard of Rolling Stone.The clear-cutting forestland of these side slope vegetations is up to more than 10 years;Therefore people are generally using artificial Ecological recovery is carried out, i.e., in cliff side slope serike, applied fertilizer, watered, conserving, pruning etc..But artificial ecology is recovered most A big difficult problem is that workmen does not have place, the problem that cannot be guaranteed personal safety.
At present, the patent that plank road is related in Chinese patent database only has No. 2008201510213《Can demolition for slope Plank road frame》1, the patented technology be for have landslide threaten when, allow people quickly through provisional facility, it is impossible to for rock The operation that precipice side slope artificial ecology is recovered needs.So far, there is no the patent application of side slope plank road construction method.
The content of the invention
The present invention is intended to provide the construction method of cliff side slope plank road, to set up cliff side slope plank road, so as to solve cliff Side slope artificial ecology recovers the operation of workmen and safety guarantee problem.
The cliff side slope plank road that the inventive method is set up, the road not gone sightseeing for visitor, but to ensure artificial ecology Recovering workmen carries out operating the passage with safety guarantee.
The cliff side slope plank road construction method that inventor provides, comprises the following steps:
(1) cripple is built, steel wire is laid
Cripple is built in the side slope for intending construction, steel wire is laid on cliff, be allowed to cover side slope face, or utilized The steel wire of the original anti-Rolling Stone of cliff side slope;
(2) drilling and anchor bar
According to the quality situation of construction rock mass, it is determined that the position of drilling, depth and diameter, quality is softer, drilling it is straight Footpath is bigger, depth is deeper, and rock stratum is firm just to can guarantee that plank road is stablized;After drilling reinforcing bar is inserted in the hole and anchored, anchor rib Mutually connected with reinforcing bar colligation;
(3) way of concrete foundations is poured into a mould
In the upper concrete of anchor rib so as to solidify the roadbed that Formation cross-section is triangle;
(4) railing is erect
Railing is erect using the steel wire laid is inserted and secured in steel wire, and colligation forms overall hurdle Bar;Close to have connecting rod or chain cable or backplate per between two railings, to protect workmen;Railing adds with steel wire junction Setscrew is fixed, and ensures that it is consolidated;
(5) pull bar is added
One end of pull bar is connected with the banister top erect, and the pull bar other end is fixed on side slope;
(6) scaffold is withdrawn
Concrete setting, construction are finished, and withdraw cripple.
It is plane above the triangle of above-mentioned way of concrete foundations, outer one side is perpendicular to ground level, and inner one side is tight Keep to the side slope and grade of side slope is adapted or constitutes greening pool with side slope, bankets in the pond, planting plants.
Above-mentioned drilling depth is usually 500~800mm, and the diameter of drilling is usually φ 16~φ 22mm.
The height of above-mentioned railing is 1.8~2m, and railing intersects vertically with pull bar, fixed with bolt.
The construction method of the present invention has advantages below:It is artificial that the cliff side slope plank road for obtaining not only solves cliff side slope The safety guarantee problem of ecological recovery workmen, and have certain protective capacities to Rolling Stone, lift highway, railway, building The safety coefficient of thing;Also there is the solid water function to rock mass infiltration and rainwater, if with reference to greening side slope, provided for plant growth Advantage, promotes ecological recovery.It is extensive suitable for the artificial ecology of cliff side slope around mountain highway, railway and construction of structures It is multiple.
Description of the drawings
Fig. 1 is the cliff side slope plank road sectional view of the inventive method construction;Fig. 2 shows for plank road with reference to the section of greening side slope It is intended to.In figure:1 is way of concrete foundations, and 2 is steel wire, and 3 is anchor rib, and 4 is railing, and 5 is pull bar, and 6 is reinforcing bar, and 7 is side slope rock Body, 8 to banket, and 9 is plant.
Specific embodiment
Embodiment 1 is using the cliff side slope plank road of the inventive method construction as shown in figure 1, construction method is as follows:
Cripple is built first, and steel wire is laid on cliff;Afterwards according to the quality situation of construction rock mass, it is determined that boring Hole site, determines that drilling depth is 500mm and a diameter of φ 16mm;After drilling reinforcing bar is inserted in the hole and anchored, anchor rib Mutually connected with the reinforcing bar colligation of a diameter of φ 8mm;Then in the upper concrete of anchor rib so as to which solidifying Formation cross-section is The roadbed of triangle;It is plane above the triangle of way of concrete foundations, outer one side is perpendicular to ground level, and inner one side is tight Keep to the side slope and grade of side slope is adapted.
Railing is erect using the steel wire laid is inserted and secured in steel wire, and colligation forms overall hurdle Bar;Close to have connecting rod or chain cable or backplate per between two railings, to protect workmen;Railing adds with steel wire junction Setscrew is fixed, and ensures that it is consolidated;One end of pull bar is connected with the banister top erect, and is fixed with bolt, the height of railing For 1.8m;The pull bar other end is fixed on side slope;Treat that concrete setting, construction are finished, finally withdraw cripple.
Embodiment 2 is using the cliff side slope plank road of the inventive method construction as shown in Fig. 2 construction method is as follows:
Cripple is built first, using the steel wire of the original anti-Rolling Stone of cliff side slope, according to the quality of construction rock mass Situation, determines that bore position, drilling depth are 600mm and a diameter of φ 22mm;After drilling reinforcing bar is inserted in the hole and is anchored, Anchor rib is mutually connected with the reinforcing bar colligation of a diameter of φ 6mm;In the upper concrete of anchor rib so as to solidify Formation cross-section For the roadbed of triangle;It is plane above the triangle of way of concrete foundations, outer one side is perpendicular to ground level, inner one side Greening pool is constituted with side slope, is banketed in the pond, planting plants.
Railing is erect using the steel wire laid is inserted and secured in steel wire, and colligation forms overall hurdle Bar;Close to have connecting rod or chain cable or backplate per between two railings, to protect workmen;Railing adds with steel wire junction Setscrew is fixed, and ensures that it is consolidated;One end of pull bar intersects vertically with the banister top erect, and is fixed with bolt;Pull bar is another One end is fixed on side slope;The height of railing is 2m.Concrete setting is treated, construction is finished, finally withdraw cripple.

Claims (4)

1. the construction method of cliff side slope plank road, its feature is comprised the following steps:
(1) build cripple and lay steel wire
Cripple is built in the side slope for intending construction, steel wire is laid on cliff, be allowed to cover side slope face, or utilize cliff The steel wire of the original anti-Rolling Stone of side slope;
(2) drilling and anchor bar
According to the quality situation of construction rock mass, it is determined that the depth and diameter of drilling, quality is softer, and the diameter of drilling is bigger, deep Degree is deeper, and rock stratum is firm just to can guarantee that plank road is stablized;After drilling reinforcing bar is inserted in the hole and anchored, anchor rib mutually uses reinforcing bar Colligation connects;
(3) way of concrete foundations is poured into a mould
In the upper concrete of anchor rib so as to solidify the roadbed that Formation cross-section is triangle;
(4) railing is erect
Railing is erect using the steel wire laid is inserted and secured in steel wire, and colligation forms overall railing;Tightly Adjacent has connecting rod or chain cable or backplate per between two railings, to protect workmen;Railing adds expansion with steel wire junction Screw is fixed, and ensures that it is consolidated;
(5) pull bar is added
One end of pull bar is connected with the banister top erect, and the pull bar other end is fixed on side slope;
(6) construction is finished, and withdraws scaffold
Concrete setting is treated, construction is finished, and withdraws cripple.
2. construction method as claimed in claim 1, it is characterised in that the depth of the drilling is usually 500~800mm, bores The diameter in hole is usually φ 16~φ 22mm.
3. construction method as claimed in claim 1, it is characterised in that be plane above the triangle roadbed, outer one side Perpendicular to ground level, inner one side is adapted against side slope and grade of side slope or constitutes greening pool with side slope, in greening pool Banket, planting plants.
4. construction method as claimed in claim 1, it is characterised in that the height of the railing is 1.8~2m, railing hangs down with pull bar It is straight intersecting, fixed with bolt.
CN201510126730.0A 2015-03-23 2015-03-23 Method for constructing rock cliff side slope gallery road Expired - Fee Related CN104790272B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510126730.0A CN104790272B (en) 2015-03-23 2015-03-23 Method for constructing rock cliff side slope gallery road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510126730.0A CN104790272B (en) 2015-03-23 2015-03-23 Method for constructing rock cliff side slope gallery road

Publications (2)

Publication Number Publication Date
CN104790272A CN104790272A (en) 2015-07-22
CN104790272B true CN104790272B (en) 2017-05-10

Family

ID=53555433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510126730.0A Expired - Fee Related CN104790272B (en) 2015-03-23 2015-03-23 Method for constructing rock cliff side slope gallery road

Country Status (1)

Country Link
CN (1) CN104790272B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113529530B (en) * 2021-06-21 2022-08-19 浙江万里建设工程有限公司 Construction method of anchor-inserted triangular formwork support for overhead cantilever trestle

Also Published As

Publication number Publication date
CN104790272A (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN105041349B (en) A kind of excavating construction method that station is digged on the basis of Subway Tunnel shield tunnel
CN106400813B (en) A kind of foundation pit support system and its construction method
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN106498953A (en) Cut slope composite supporting construction and its construction method
CN105421470B (en) Assembled anchor pole arched framework combined type ecological revetment construction method
CN104746517B (en) A kind of suspension roof support system of total length below artesian head
CN104989425B (en) A kind of tunneling is into hole supporting construction and its method for protecting support
CN102002956B (en) Multi-level fully-closed reinforcement technology of exposed fault zone of excavated side slope
CN109537604A (en) A method of utilizing screw pile bolt anchorage Cut Slopes of Expansive Soil
CN201027311Y (en) Water discharge type anchor stock frame beam for reinforcing side slope
CN110374111A (en) A kind of slope cooperates with support system with steel pipe piled anchor
CN104047222A (en) Bridge structure near mountain and by river and construction method of bridge
CN212077981U (en) Combined slope supporting structure
CN104878719A (en) Mutually-embedded reinforced ecological retaining wall construction method
CN205954638U (en) Half semi -rigid flexible supporting construction of deep basal pit lateral wall
CN204662494U (en) Highway retaining wall reinforced structure
CN204283438U (en) Portal supporting and protection structure
CN104790272B (en) Method for constructing rock cliff side slope gallery road
CN206477341U (en) A kind of foundation pit support system
CN204530357U (en) Cliff side slope plank road
CN216920384U (en) Highway tunnel entrance to a cave section landslide body side slope protection additional strengthening that collapses
CN114263187B (en) Foundation pit bottom plate force transmission structure and construction method thereof
CN205804383U (en) A kind of Whirlwind tank water-stop curtain
CN111501459B (en) Roadbed structure of mountain road and construction method thereof
CN113718802A (en) Ecological concrete rock-soil slope protection structure and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170510

Termination date: 20180323