CN104763059A - Connecting part and frame structure for building and method for assembling frame structure through connecting part - Google Patents

Connecting part and frame structure for building and method for assembling frame structure through connecting part Download PDF

Info

Publication number
CN104763059A
CN104763059A CN201510074485.3A CN201510074485A CN104763059A CN 104763059 A CN104763059 A CN 104763059A CN 201510074485 A CN201510074485 A CN 201510074485A CN 104763059 A CN104763059 A CN 104763059A
Authority
CN
China
Prior art keywords
connecting portion
building
connector
beam column
column material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510074485.3A
Other languages
Chinese (zh)
Inventor
穆罕默德·泰戈西·赛海钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510074485.3A priority Critical patent/CN104763059A/en
Publication of CN104763059A publication Critical patent/CN104763059A/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention provides a connecting part for a profile combined modular building. The connecting part comprises a center part and a plurality of connecting portions; the plurality of connecting portions extend outward from the center part; the connecting portions extend to different directions. The invention also provides beam column materials for the building. The beam column materials comprise an extension portion and two end portions. The beam column materials are characterized in that at least one of the end portions is matched with at least one of the connecting portions of the connecting part in shape. The invention also provides a building frame structure and the building which are built through the connecting part and the beam column materials and a building method thereof.

Description

Connector for building, frame construction and the method by connector assembling frame structure
Technical field
The frame construction that the present invention relates to a kind of connector for building and use this connector to assemble, and the method using this connector assembling frame structure.
Background technology
Traditional building structure is generally non-modularization and not reconfigurable structure, such as post and panel structure, reinforced concrete structure etc.These buildings need to design its frame construction as required in advance, and construction speed is relatively slower, be difficult to be decomposed and move to other places after building completes.
Constantly to increase in view of to the requirement of building house fast and easily, occur modular can the house of rapid-assembling.This type of house can when not needing the building implements of various complexity, the fast construction as playing with building blocks, and can fast dismantling remove after again build in other places again.No. 200610127616.0th, Chinese invention application discloses a kind of such building structure.
Fig. 1 is the schematic diagram of the section module combining structure of prior art.As shown in Figure 1, by retaining mechanism a lateral type profile framework b is fixed on longitudinal profile framework c and forms building frame construction.Described lateral type profile framework b is by being connected on the frame of longitudinal load bearing section bar framework c against fixing mode, T-shape projection c1 on the frame of longitudinal profile framework c almost bears all wt that lateral type profile framework b passes over, and the frictional force that the support force supporting lateral type profile framework b is produced by retaining mechanism a pinched protrusion c1 provides.Visible, the stressed intensity being limited by junction of the carrying of this frame construction.When the contact portion and retaining mechanism a of two section bars producing very large stress, distortion can be produced at weak part or damaging.Be limited by the connected mode of component, the structure of prior art is not suitable for building higher building.
Summary of the invention
In order to solve the problems of the technologies described above, an aspect of of the present present invention provides a kind of section combination modular architectural connector, comprises a central module and several from the outward extending connecting portion of central module; Wherein, the shape of described connecting portion and the shape of described section bar suitable.
Preferably, described connecting portion extends to different directions.
Preferably, described connecting portion is provided with the fastening devices for tie-beam column material.
Preferably, described fastening devices is screw.
Preferably, described connecting portion is provided with positioner, for locating the beam column material be connected with described connecting portion.
Preferably, described positioner is the laminated structure outwardly extended from connecting portion, and the shape of its shape and beam column material end is suitable, can stop that described beam column material moves to the center of connector.
Preferably, connecting portion described at least one comprises the guiding rib parallel with the bearing of trend of connecting portion being arranged on connecting portion lateral surface.
Preferably, the connecting portion being provided with guiding rib described in also comprises and is arranged on connecting portion end and the junction plate be connected with the end of guiding rib.
Preferably, at least one is also comprised from the outward extending secondary connecting portion of described central module; Described secondary connecting portion is arranged between two adjacent connecting portions.
Preferably, described secondary connecting portion axle by the axle of described two adjacent connecting portions in the plane that its bearing of trend is formed.
Preferably, the axle of described secondary connecting portion and the plane parallel to be made up of at its bearing of trend the axle of described two adjacent connecting portions.
Preferably, described secondary connecting portion is connected with the beam column parts outside the beam column parts be connected on described two adjacent connecting portions by reinforcement feature.
Preferably, described secondary connecting portion is connected with the secondary connecting portion on the connector being in diagonal position by reinforcement feature.
Preferably, the shape of the shape of at least one connecting portion of described connector and the bindiny mechanism of external building structure is suitable.
Preferably, described external building structure is the functional structure layer being arranged on building outside.
Another aspect of the present invention provides a kind of beam for building column material, comprises extension and two ends, it is characterized in that: at least one shape of the shape of end described at least one and the connecting portion of described connector is suitable.
Preferably, described beam column material is architectural shape, and its extension and end have identical cross section.
Preferably, at least one end of described architectural shape is provided with the fastening devices for connecting described connector.
Preferably, described fastening devices is the perforation suitable with the screwhole position on the connecting portion of described connector.
Preferably, described architectural shape comprises the tubular frame of a hollow.
Preferably, described architectural shape is made up of two parallel sheet materials clamping cores.
The present invention also provides a kind of building frame construction, it is characterized in that: assembled by described connector and described beam column material.
Preferably, its external surface is connected with functional structure layer by described connector.
Preferably, described functional structure layer is air conditioning interlayer or heat preservation energy-saving deck.
The present invention also provides a kind of building, it is characterized in that: comprise described building frame construction.
The present invention also provides a kind of method using described connector and described beam column material to build building frame, comprises the following steps: many beam column materials are vertically fixed with building foundation or lower floor's connector and are connected by (1); (2) at the end installation connecting element of vertical beam column material; (3) beam column material is laterally arranged between two adjacent connectors.
Preferably, repeat step (1) ~ (3), build tier building framework.
Preferably, described connector is used; Also be included in the end reinforcement by connection parts of described secondary connecting portion, and by step that the other end of reinforcement feature is connected with corresponding connector or beam column material.
The present invention also provides a kind of building method of building, it is characterized in that: the method described in use builds the frame construction of described building.
When technical scheme of the present invention solves and builds building by section bar in prior art, what the defect due to section bar overlapping mode caused is difficult to the problem of building highrise building.Technical scheme of the present invention both can realize modularization fast construction building as prior art, can be used for again building firm highrise building.Further, except the building of square layout can be built, the irregular building of triangle, polygon layout can also be built, the space that modularized house more changes and freely designs can be given.Except can be used for building of traditional modularized house, the present invention can also be used for the fast construction of the frame construction of general house.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the section module combining structure of prior art;
Fig. 2 is the structural representation of an example of the building frame construction that embodiment of the present invention relates to;
Fig. 3 is the structural representation of the connector that embodiment of the present invention relates to;
Fig. 4 is the assembled schematic diagram of connector and the beam column material related to by embodiment of the present invention;
Fig. 5 is the cross sectional representation of an example of the section bar that embodiment of the present invention relates to;
Fig. 6 is the structural representation of the connector that another embodiment of the present invention relates to;
Fig. 7 is the structural representation of the connector that another embodiment of the present invention relates to;
Fig. 8 is the schematic diagram of another building frame construction that embodiment of the present invention relates to;
Fig. 9 (a) is the lateral view of building frame construction linkage function deck;
Fig. 9 (b) is the cross sectional representation of building frame construction linkage function deck.
Detailed description of the invention
Illustrated embodiment sets forth the present invention with reference to the accompanying drawings below.This time disclosed embodiment can be thought and is illustration in all respects, and tool is not restricted.Scope of the present invention not limit by the explanation of following embodiment, only by shown in the scope of claims, and comprises and to have same looking like and all distortion in right with right.
For solving the problem, the invention provides a kind of building frame construction using connector.Fig. 2 is the structural representation of the building frame construction 1 that embodiment of the present invention relates to.Described building frame construction 1 comprises connector 2 and beam column material 3.Wherein, connector 2 is positioned at the junction of many beam column materials 3, for connecting many beam column materials 3.Described connector 2 comprises central module 20 and multiple from central module 20 main connecting portion 21 outwardly, and can also comprise multiple secondary connecting portion 22 be connected on central module 20, main connecting portion and secondary connecting portion center extension line are respective axle.Between adjacent two main connecting portions 21, there is certain angle, secondary connecting portion 22 is arranged between adjacent two main connecting portions, the axle of secondary connecting portion 22 can at the axle of adjacent two main connecting portions in the plane that its bearing of trend is formed, also can with the plane parallel be made up of at its bearing of trend the axle of adjacent two main connecting portions, if necessary also can not in above-mentioned parallel plane.Connecting portion 2 is provided with fastening devices (as screw 212) and positioner (as catch 211) (see Fig. 3), for locating with beam column material 3 and fixing.The end of beam column material 3 has the shape suitable with the connecting portion of connector 2, and has the fastening devices (as bored a hole 32, see Fig. 2) corresponding to the fastening devices of connector 2.
Building frame construction of the present invention is illustrated below in conjunction with embodiment.
embodiment 1
Fig. 3 is the structural representation of the connector 2 that embodiment of the present invention relates to.As shown in Fig. 3 (a), the connector 2 that the present embodiment relates to comprises central module 20 and 6 main connecting portions 21 being given prominence to by central module 20 and 12 secondary connecting portions 22.Angle between adjacent two main connecting portions 21 is 90 °, and when namely connector 2 is placed in state shown in Fig. 3 (a), 6 main connecting portions 21 extend respectively in the positive negative direction of the x, y, z of 3-D walls and floor.A secondary connecting portion 22 is provided with between every two adjacent main connecting portions 21, and the axle of this secondary connecting portion 22 is in the plane that the axle of two that are adjacent main connecting portions 21 is formed, and with the bearing of trend of the axle of two main connecting portions 21, there is certain angle, preferably the angle of the axle of this secondary connecting portion and the axle of one of them main connecting portion 21 is 30 °, 45 ° or 60 °, such connector 2 can be arranged altogether 12 secondary connecting portions 22.Main connecting portion 21 is provided with locating stop piece 211 in its one end near connector 2 central module, and for the position of positioning beam column material 3, the width of locating stop piece 211 is can not stop that the bearing of trend of secondary connecting portion 22 is as the criterion.Main connecting portion 21 is provided with some screws 212 between locating stop piece 211 and the one end away from connector 2 central module, for being fixed with beam column material 3.Fig. 3 (b) is the structure chart of the connector 2 eliminating locating stop piece 211, can be clearly seen that the structure of connector 2 from Fig. 3 (b).
The two ends of beam column material 3 have the shape corresponding to main connecting portion 21, namely have with the inside depression 31(of the same shape of main connecting portion 21 see Fig. 2), also there are some the bore a hole 32(s corresponding to the screw 212 on main connecting portion 21 simultaneously see Fig. 2).Can choice for use unlike material and structure according to beam column material 3 use position between floors and load-bearing requirements.Preferably, beam column material 3 can use cross section to have the section bar of the shape corresponding to main connecting portion 21, the section bar such as disclosed in No. 200610127616.0th, Chinese invention application.Section bar is intercepted the length needed, process perforation 32 in end, namely can be used as beam column material 3 and use, so just can process beam column material 3 as required at the construction field (site), eliminate produce in factory step, modularization fast construction can be realized.
Centered by connector 2, required beam column material 3 is installed in a desired direction and just can obtains required building block.Specifically, connector 2 main connecting portion 21 is inserted the depression 31 of beam column material 3 upper end, now, the upper end-face edge of beam column material 3 contacts the locating stop piece 211 of main connecting portion 21, screw 212 on main connecting portion 21 is just in time relative with the perforation 32 on beam column material 3, passes perforation 32 and be screwed into screw 212 beam column material 3 and connector 2 to be fixed with bolt.At this, the effect of locating stop piece 211 is prevent the central module of beam column material 3 distance join part 2 from crossing near and producing and interfere with each other on the one hand, as long as be on the other hand realize beam column material 3 to be inserted into the end screw 212 can be made to be in assembling position, convenient operation with perforation 32.In the same way the beam column material 3 in other directions needed is installed on connector 2 one by one, just can obtains the building block of a required form.If need more massive building block, as long as at the periphery continuation connector 2 tie-beam column material 3 of above gained building block until be combined into form and the scale of needs.Meanwhile, secondary connecting portion 22 may be used for the oblique reinforcing of building block.Can external reinforcement feature 4 on secondary connecting portion 22, reinforcement feature 4 one end connects a secondary connecting portion 22 of connector 2, its other end can be connected to (see Fig. 4) on beam column material 3 by fastening devices, also can be directly connected to the secondary connecting portion 22(of another connector 2 being in diagonal position as shown in Fig. 4 dotted line by fastening devices).Connection between secondary connecting portion 22 and reinforcement feature 4 can adopt various ways such as being socketed, screw thread is fixed, buckle is fixed.
Fig. 4 is the assembled schematic diagram of connector and the beam column material related to by embodiment of the present invention.When whole building frame construction built by needs connector and beam column material, first some beam column materials 3 are vertically fixed on building foundation, and at the upper end installation connecting element 2 of beam column material 3.Then on the secondary connecting portion 22 on the main connecting portion 21 two ends of some horizontal beam column materials 3 being arranged on respectively the horizontal direction of the connector 2 corresponding to its installation site and by reinforcement feature 4, secondary connecting portion 22 being connected to offside or beam column material 3.This completes building of first floor building frame construction.Then, some beam column materials 3 are fixed on the main connecting portion 21 extended upward of above-mentioned connector 2, and at the upper end installation connecting element 2 of beam column material 3, then the beam column material 3 of transverse direction is connected with second layer connector 2 and auxiliary connection connecting portion 22, this completes building of second layer building frame construction.Repeat aforesaid operations, just can build high-rise building frame construction.Building frame construction is installed wallboard and floor and other required annexes and just can complete building of building.
If beam column material 3 adopts cross section to have the section bar of the shape corresponding to main connecting portion 21, the process more simple and fast building building block or building structure can be made.Be described for the section bar disclosed in No. 200610127616.0th, Chinese invention application below.This section bar has cross section as shown in Figure 5, and its first location termination 12a and the 3rd location termination 15a defines a square space 16.Meanwhile, the cross section of the main connecting portion 21 of the connector 2 now used is also for square, and its size is with identical.When building, intercept the section bar of certain length first as required as beam column material.Then measure distance and the present position of the screw 212 on the main connecting portion 21 of connector 2 and main connecting portion 21 end, the relevant position of the same distance in end of distance section bar processes the perforation 32 of mating with screw 212 size.Like this, just can, using the section bar after processing as beam column material 3, said method be used to build building block or building structure.No. 200610127616.0th, Chinese invention application also discloses the method for building house with described section bar, and in the framework that the method is formed at beam column material 3, the metope of Knockdown block, becomes house.The building using connector of the present invention 2 and this forced fit to build can make the assembling metope that uses the same method, and fast construction can have the highrise building of enough stability like this.
embodiment 2
The present embodiment proposes some distortion to connector 2 on the basis of embodiment 1, and these distortion go for the different parts of different beam column materials 3 or building.Fig. 6 is the structural representation of the connector 2 that the present embodiment relates to.Connector 2 shown in Fig. 6 (a) adds the guiding rib 213 parallel with the bearing of trend of main connecting portion 21 on the basis of embodiment 1 on the main connecting portion of part 21.In this example, guiding rib 213 is arranged on the lateral surface of main connecting portion 21 as shown in Figure 6 (a).Like this, connector 2 both can connect the beam column material 3 that cross section fits like a glove with it, also can connect the beam column material 3 that cross section is larger.
On the basis of Fig. 6 (a), arrange a junction plate 214 again in the end of the main connecting portion 21 of part, as shown in Figure 6 (b), junction plate 214 is connected with the end of main connecting portion 21 and the end of guiding rib 213, is provided with screw.Such connector 2 may be used for being connected with other conventional building construction of illustrating in non-invention, such as building foundation etc.
embodiment 3
The connector 2 of embodiment 1 may be used for the arbitrary node of building structure, and it has six direction.But at some position of building structure, not on six direction, all want tie-beam column material 3, like this, the connector 2 of six direction not only can waste certain making material, and additional main connecting portion 21 also may impact the construction of building structure owing to stretching out the certain length of node.For avoiding such problem, as shown in Figure 7, the main connecting portion 21 of the part of the connector 2 of the present embodiment is cancelled.
In the figure 7, after the main connecting portion 21 of part of connector 2 is cancelled, only remain the part of original locating stop piece 211 to central module, the function of locating stop piece 211 becomes the protection catch of the internal construction of protection connector 2.But be not limited only to this, main for this part connecting portion 21 can be fully phased out, namely in the direction in which not from the outward extending part in the center of connector 2.
Fig. 7 (a) ~ (c) is the configuration diagram that connector 2 eliminates the main connecting portion 21 on 1 ~ 3 direction respectively.Connector 2 shown in Fig. 7 (a) is applicable to the node being positioned at building structure external surface, and it is not to the main connecting portion 21 that building structure outside extends; Connector 2 shown in Fig. 7 (b) is applicable to the junction in two faces being positioned at building structure external surface, and it is outside two the main connecting portions 21 extended along the bearing of trend in two faces to building structure not; Connector 2 shown in Fig. 7 (c) is applicable to the junction in three faces being positioned at building structure external surface, and it is outside three the main connecting portions 21 extended along the bearing of trend in three faces to building structure not.
Can cancel similar with the main connecting portion of part 21, the secondary connecting portion 22 adjacent with the main connecting portion 21 be cancelled also can be cancelled.Such as, in the connector 2 shown in Fig. 7 (a), 4 the secondary connecting portions 22 adjacent with that the main connecting portion 21 be cancelled can be cancelled; In the connector 2 shown in Fig. 7 (b), 4 the secondary connecting portions 22 adjacent with each main connecting portion 21 be cancelled can be cancelled, owing to there being a secondary connecting portion 22 simultaneously adjacent with two main connecting portions 21 be cancelled, having 7 secondary connecting portions 22 can be cancelled; In the connector 2 shown in Fig. 7 (c), 9 that the main connecting portion 21 be cancelled with 3 is adjacent secondary connecting portions 22 can be cancelled.
embodiment 4
The connector 2 of embodiment 1 has six direction, and adjacent direction is perpendicular to one another, corresponding to each positive and negative axis of 3 D stereo coordinate system.This connector 2 is applicable to the building structure of building regular shape.But sometimes need to build irregular building structure, be not vertical angle between such as two adjacent metopes, then need the connector 2 of the present embodiment.
With the connector 2 of embodiment 1 unlike, the positive negative direction that the main connecting portion 21 of the connector 2 of the present embodiment is not limited to the x, y, z axle shown in Fig. 3 extends, but can extend to any direction, the quantity of main connecting portion 21 also not necessarily 6.Such as, the a certain node of building is three sidewalls intersections, angle between its three sidewalls is followed successively by 90 °, 120 ° and 150 °, the layout of levels is identical, the form of the connector 2 now needed is: have the angle between main connecting portion 21 and three main connecting portions extended in the horizontal direction, 21, three main connecting portions 21 extended in the horizontal direction that vertically both direction extends and be followed successively by 90 °, 120 ° and 150 °.Build building frame with this connector 2, and along framework direction assembling wall, namely can obtain the building that required wall angle is followed successively by 90 °, 120 ° and 150 °.If need the building of building other forms, correspondingly adjust quantity and the angle of the main connecting portion 21 of connector 2.
In the connector 2 of the present embodiment, the bearing of trend of the main connecting portion 21 of horizontal direction is uncertain, and secondary connecting portion 22 is in order to provide skewed horizontal load, therefore, the direction of the secondary connecting portion 22 of the connector 2 of the present embodiment is also uncertain, and secondary connecting portion 22 extends in the plane that two that are adjacent main connecting portions 21 are formed.
In the embodiment above, the bearing of trend of the axle of secondary connecting portion 22 in the plane that the axle of adjacent two main connecting portions is formed, but is not limited thereto.Sometimes, the plane that adjacent two main connecting portions are formed is used to install the structure such as wallboard, is arranged on by secondary connecting portion 22 in plane that adjacent two main connecting portions are formed to produce with the installation of other structures to conflict.Now, secondary connecting portion 22 can be arranged on the position outside wallboard, namely the axle of secondary connecting portion 22 be arranged in the plane in the parallel plane outside formed with the axle of adjacent two main connecting portions.
In the present embodiment, the cross section of main connector 21 is square, and it adopts screw to coordinate with bolt to come and beam column material 3 is fixed, but is not limited thereto.The cross section of main connector 21 can be circle, polygon or arbitrary shape, and correspondingly, the shape of beam column material 3 end needs to close with the matching form of the cross section of main connector 21.Other modes such as main connector 21 can also be buckle, riveted joint with the fixed form of beam column material 3, weld.
In the present embodiment, employ section bar disclosed in No. 200610127616.0th, Chinese invention application as beam column material 3, its two ends have the shape corresponding to main connecting portion 21, namely there is the inside depression 31 with the same shape of main connecting portion 21, but be not limited only to this, also can use the section bar of other types.Fig. 8 is the schematic diagram of another building frame construction that embodiment of the present invention relates to, and as shown in Figure 8, beam column material 3 can also be the beam column material 3a of the tubular structure with a hollow, and its cross section can be square; Also can be the beam column material 3b clamping core by two parallel sheet materials and make, during installation, two parallel sheet materials are fixed on main connecting portion 21 in modes such as welding or riveted joints.
In the present embodiment, being provided with a secondary connecting portion 22 between adjacent two main connectors 21, for providing skewed horizontal load, but being not limited thereto.Connector 2 also can not arrange secondary connecting portion 22, or only between the main connector of part 21, arranges secondary connecting portion 22.
In the present embodiment, main connector 21 is provided with a locating stop piece, but is not limited thereto.Also can not arrange locating stop piece, but need artificial location like this, fitting operation is convenient not.Locating stop piece also can be set to other forms, is not such as the shape of catch, but arranges the point of several projection in the cross section surrounding of main connector 21, both can play the effect of location, save material again.
In the present embodiment, connector 2 tie-beam column material 3 forms building frame construction 1, but is not limited thereto, and all right linkage function deck of connector 2, forms functional structure layer, as shown in Fig. 9 (a) at building frame construction 1 external surface.Fig. 9 (a) is the lateral view of building frame construction linkage function deck; Fig. 9 (b) is the cross sectional representation of building frame construction linkage function deck.As shown in Figure 9 (b), building frame construction 1 is connected with 32 building envelopes formed 5 with cladding material 31 by connector 2, thus forms functional structure layer 4 between building frame construction 1 and building envelopes 5.This functional structure layer 4 can not fill any material, thus make functional structure layer 4 become a cavity, so both can form an air barrier, avoiding the external world to cross cold or overheated air directly enters in building frame construction 1, simultaneously can also as air circulation or temperature regulating course, make interior of building air fresher, temperature is preferably.In functional structure layer 4, also thermal insulation or fire proofing material be can fill, as materials such as mineral wool, Polystyrene plastic plate or polyphenylene granule heat-insulating slips, the efficient thermal insulation of building or fire prevention made.
In the present embodiment, the form of main connector 21 has as shown in Figure 3 and Figure 6 three kinds, is applicable to respectively connect from different structures, but is not limited thereto.When needs connect the undocumented external building structure of above-described embodiment with connector 2, the form of the main connector 21 be connected with this external building structure can be set to be used in prior art connecting the linkage of this building structure.Such as, corresponding shape can be set to when being connected with building envelopes; When being connected with the plate-like structure such as advertising lamp box, curtain wall, the tabular etc. of larger area can be arranged in its end.
In the present embodiment, beam column Advantageous materials uses section bar disclosed in No. 200610127616.0th, Chinese invention application, but is not limited thereto.This section bar is generally aluminium alloys and makes, and is difficult to carry the load of highrise building, therefore, the material of the more high strength such as steel can be used to make this section bar, as beam column material of the present invention.For cost-saving, also only can adopt high-strength material at the beam column material of vertical supporting, the beam column material of cross binding still adopts aluminum alloy materials.Beam column material of the present invention also can adopt the prefabricated component of unlike material.In order to carry highrise building, connector 2 of the present invention adopts the material of the higher-strengths such as steel to make usually, and its making can adopt known various intermetallic composite coating modes.
The present invention can coordinate section bar to realize the fast construction in common shape house by standardized connector (connector of embodiment 1), and need not for the independent that manufactures parts in this house.Meanwhile, the present invention can also be used for the fast construction designing complicated special-shaped house.After special-shaped house desigh is good, the form of the various parts needed for its frame construction just can be determined according to its design, the non-standard accessory of the required part that can be prefabricated in the factory like this, then uses the non-standard accessory of standard fitting mating part to realize the modularization fast construction in house when mounted.

Claims (29)

1. a section combination modular architectural connector, comprises a central module and several from the outward extending connecting portion of central module;
Wherein, the shape of described connecting portion and the shape of described section bar suitable.
2. connector according to claim 1, is characterized in that:
Described connecting portion extends to different directions.
3. connector according to claim 2, is characterized in that:
Described connecting portion is provided with the fastening devices for tie-beam column material.
4. connector according to claim 3, is characterized in that:
Described fastening devices is screw.
5. connector according to claim 3, is characterized in that:
Described connecting portion is provided with positioner, for locating the beam column material be connected with described connecting portion.
6. connector according to claim 5, is characterized in that:
Described positioner is the laminated structure outwardly extended from connecting portion, and the shape of its shape and beam column material end is suitable, can stop that described beam column material moves to the center of connector.
7. connector according to claim 3, is characterized in that:
Connecting portion described at least one comprises the guiding rib parallel with the bearing of trend of connecting portion being arranged on connecting portion lateral surface.
8. connector according to claim 7, is characterized in that:
The described connecting portion being provided with guiding rib also comprises and is arranged on connecting portion end and the junction plate be connected with the end of guiding rib.
9. connector according to claim 2, is characterized in that:
Also comprise at least one from the outward extending secondary connecting portion of described central module;
Described secondary connecting portion is arranged between two adjacent connecting portions.
10. connector according to claim 9, is characterized in that:
The axle of described secondary connecting portion by the axle of described two adjacent connecting portions in the plane that its bearing of trend is formed.
11. connectors according to claim 9, is characterized in that:
Axle and the plane parallel be made up of at its bearing of trend the axle of described two adjacent connecting portions of described secondary connecting portion.
12. connectors according to claim 9, is characterized in that:
Described secondary connecting portion is connected with the beam column parts outside the beam column parts be connected on described two adjacent connecting portions by reinforcement feature.
13. connectors according to claim 9, is characterized in that:
Described secondary connecting portion is connected with the secondary connecting portion on the connector being in diagonal position by reinforcement feature.
14., according to the connector in claim 1 ~ 13 described in any one, is characterized in that:
The shape of the shape of at least one connecting portion of described connector and the bindiny mechanism of external building structure is suitable.
15. connectors according to claim 14, is characterized in that:
Described external building structure is the functional structure layer being arranged on building outside.
16. 1 kinds of beam for building column materials, comprise extension and two ends, it is characterized in that:
The shape of at least one connecting portion of the connector in the shape of end described at least one and claim 1 ~ 15 described in any one is suitable.
17. beam for building column materials according to claim 16, is characterized in that:
Described beam column material is architectural shape, and its extension and end have identical cross section.
18. beam for building column materials according to claim 17, is characterized in that:
At least one end of described architectural shape is provided with the fastening devices for connecting the connector described in claim 3.
19. beam for building column materials according to claim 18, is characterized in that:
Described fastening devices is the perforation suitable with the screwhole position on the connecting portion of connector according to claim 4.
20. beam for building column materials according to claim 17, is characterized in that:
Described architectural shape comprises the tubular frame of a hollow.
21. beam for building column materials according to claim 17, is characterized in that:
Described architectural shape clamps core by two parallel sheet materials and forms.
22. 1 kinds of building frame constructions, is characterized in that:
Assembled by the beam column material in the connector in claim 1 ~ 15 described in any one and claim 16 ~ 21 described in any one.
23. building frame constructions according to claim 22, is characterized in that:
Its external surface is connected with functional structure layer by connector according to claim 15.
24. building frame constructions according to claim 23, is characterized in that:
Described functional structure layer is air conditioning interlayer or heat preservation energy-saving deck.
25. 1 kinds of buildings, is characterized in that:
Comprise the building frame construction in claim 22 ~ 24 described in any one.
26. 1 kinds of methods using the beam column material in the connector in claim 1 ~ 15 described in any one and claim 16 ~ 21 described in any one to build building frame, comprise the following steps:
(1) vertical for many beam column materials to be fixed with building foundation or lower floor's connector is connected;
(2) at the end installation connecting element of vertical beam column material;
(3) beam column material is laterally arranged between two adjacent connectors.
27. methods of building building frame according to claim 26, is characterized in that:
Repeat step (1) ~ (3), build tier building framework.
28. methods of building building frame according to claim 26, is characterized in that:
Use the connector described in claim 9;
Also be included in the end reinforcement by connection parts of described secondary connecting portion, and by step that the other end of reinforcement feature is connected with corresponding connector or beam column material.
The building method of 29. 1 kinds of buildings, is characterized in that:
The method of any one in claim 26 ~ 28 is used to build the frame construction of described building.
CN201510074485.3A 2015-02-12 2015-02-12 Connecting part and frame structure for building and method for assembling frame structure through connecting part Pending CN104763059A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510074485.3A CN104763059A (en) 2015-02-12 2015-02-12 Connecting part and frame structure for building and method for assembling frame structure through connecting part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510074485.3A CN104763059A (en) 2015-02-12 2015-02-12 Connecting part and frame structure for building and method for assembling frame structure through connecting part

Publications (1)

Publication Number Publication Date
CN104763059A true CN104763059A (en) 2015-07-08

Family

ID=53645123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510074485.3A Pending CN104763059A (en) 2015-02-12 2015-02-12 Connecting part and frame structure for building and method for assembling frame structure through connecting part

Country Status (1)

Country Link
CN (1) CN104763059A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816127A (en) * 2017-10-31 2018-03-20 广西旭腾实业集团有限公司 Aluminium alloy structure novel fabricated building system and its assembly method
CN108797802A (en) * 2018-05-11 2018-11-13 艺搭环保科技(上海)有限公司 One kind building module and builds object
CN109024879A (en) * 2018-05-11 2018-12-18 艺搭环保科技(上海)有限公司 One kind building profile, builds frame and its component
CN109339225A (en) * 2018-11-08 2019-02-15 北京场道市政工程集团有限公司 A kind of elastic building frame with anti-seismic structure
CN110424538A (en) * 2019-08-22 2019-11-08 昆明理工大学 A kind of internal connecting type bean column node
CN110522331A (en) * 2019-07-19 2019-12-03 北京工业大学 A kind of assembly bathroom chassis

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0978701A (en) * 1995-09-14 1997-03-25 San Shitei Kk Fitting type joint member
CN1912301A (en) * 2006-08-31 2007-02-14 赛海钢 Section bar frame and module structure and house constructed by section bar frame and constructing method
CN202073185U (en) * 2011-05-05 2011-12-14 杨东佐 Beam column connection piece and building frame structure
CN203594106U (en) * 2013-07-17 2014-05-14 徐子朗 Upper-and-lower layer strut connecting component of integrated houses
CN203878744U (en) * 2014-04-27 2014-10-15 绍兴精工绿筑集成建筑系统工业有限公司 Floor structural module
CN203924359U (en) * 2014-05-14 2014-11-05 湖南绿广景观新材料有限公司 A kind of stand column and beam connector

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0978701A (en) * 1995-09-14 1997-03-25 San Shitei Kk Fitting type joint member
CN1912301A (en) * 2006-08-31 2007-02-14 赛海钢 Section bar frame and module structure and house constructed by section bar frame and constructing method
CN202073185U (en) * 2011-05-05 2011-12-14 杨东佐 Beam column connection piece and building frame structure
CN203594106U (en) * 2013-07-17 2014-05-14 徐子朗 Upper-and-lower layer strut connecting component of integrated houses
CN203878744U (en) * 2014-04-27 2014-10-15 绍兴精工绿筑集成建筑系统工业有限公司 Floor structural module
CN203924359U (en) * 2014-05-14 2014-11-05 湖南绿广景观新材料有限公司 A kind of stand column and beam connector

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816127A (en) * 2017-10-31 2018-03-20 广西旭腾实业集团有限公司 Aluminium alloy structure novel fabricated building system and its assembly method
CN107816127B (en) * 2017-10-31 2018-12-11 广西旭腾实业集团有限公司 Aluminium alloy structure assembled architecture system and its assembly method
CN108797802A (en) * 2018-05-11 2018-11-13 艺搭环保科技(上海)有限公司 One kind building module and builds object
CN109024879A (en) * 2018-05-11 2018-12-18 艺搭环保科技(上海)有限公司 One kind building profile, builds frame and its component
CN108797802B (en) * 2018-05-11 2024-05-07 艺搭环保科技(上海)有限公司 Building module and building object
CN109339225A (en) * 2018-11-08 2019-02-15 北京场道市政工程集团有限公司 A kind of elastic building frame with anti-seismic structure
CN109339225B (en) * 2018-11-08 2023-12-05 北京场道市政工程集团有限公司 Elastic building frame with anti-seismic structure
CN110522331A (en) * 2019-07-19 2019-12-03 北京工业大学 A kind of assembly bathroom chassis
CN110522331B (en) * 2019-07-19 2021-11-16 北京工业大学 Assembled bathroom chassis
CN110424538A (en) * 2019-08-22 2019-11-08 昆明理工大学 A kind of internal connecting type bean column node

Similar Documents

Publication Publication Date Title
KR102447901B1 (en) Connection system and method for prefabricated volumetric construction modules
CN104763059A (en) Connecting part and frame structure for building and method for assembling frame structure through connecting part
JP5833564B2 (en) Paneled structural system for building
JP3782817B1 (en) Structural type and construction method of steel house
CN104213637A (en) Integrated type steel structure building
KR101642088B1 (en) Assembled Structures of Prefabricated Houses
CN204112483U (en) Integrated form steel building
JP2000336768A (en) Bracket for attaching exterior wall panel and manufacture thereof
JP4748637B2 (en) Building unit joint structure
JP5396663B2 (en) Building material connection structure
JP5641456B2 (en) Building material connection structure
CN118309162A (en) Beam column connecting piece and beam column connecting structure and assembled building
JP4853422B2 (en) Gate frame with connection of composite beams and wooden columns
KR101980663B1 (en) Modular unit for container
KR101902097B1 (en) Module type building structure
JPH1046664A (en) Beam penetrative steel frame system
KR20210133483A (en) Unit module having wall structure forassembly-type building
JP6860354B2 (en) Building structure
KR20090092540A (en) Attachment of Unit Modular System, Modular Unit And Manufacturing Method of The Modular Unit
JP4425143B2 (en) Modular building unit and assembly method
KR100660210B1 (en) Large horizontal space type building module and method for executing the same
JP2020051038A (en) Fixing structure of spandrel wall panel
JP3596455B2 (en) Connection structure between composite beams and wooden columns
JP4898288B2 (en) Stairwell reinforcement structure
JP4839161B2 (en) Wooden frame structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150708

WD01 Invention patent application deemed withdrawn after publication