CN104763003A - Sounding pipe device for concrete pile or pile foundation and installing method of sounding pipe device - Google Patents

Sounding pipe device for concrete pile or pile foundation and installing method of sounding pipe device Download PDF

Info

Publication number
CN104763003A
CN104763003A CN201510204001.2A CN201510204001A CN104763003A CN 104763003 A CN104763003 A CN 104763003A CN 201510204001 A CN201510204001 A CN 201510204001A CN 104763003 A CN104763003 A CN 104763003A
Authority
CN
China
Prior art keywords
pile
pile foundation
concrete pile
magazine
sound detecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510204001.2A
Other languages
Chinese (zh)
Other versions
CN104763003B (en
Inventor
陈国民
肖荣锋
李涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201510204001.2A priority Critical patent/CN104763003B/en
Publication of CN104763003A publication Critical patent/CN104763003A/en
Application granted granted Critical
Publication of CN104763003B publication Critical patent/CN104763003B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention relates to a sounding pipe device for a concrete pile or pile foundation and an installing method of the sounding pipe device. The sounding pipe device comprises sounding pipes arranged in the length direction of the concrete pile or pile foundation, sounding pipe extension sections, holders and sealing covers. The holders are fixedly arranged in the side wall of the concrete pile or pile foundation, and the holders are provided with through holes communicated with the outer side of the concrete pile or pile foundation. The lower ends of the sounding pipe extension sections are communicated with the upper ends of the sounding pipes, and the upper ends of the sounding pipe extension sections are communicated with the through holes in the holders. The sealing covers are installed outside the side wall of the concrete pile or pile foundation and used for sealing the through holes in the holders. The reserved sounding pipe device is suitable for construction detection of the concrete pile or pile foundation and later detection, and the reserved sounding pipe device can monitor and retest the integrity of a concrete pile or pile foundation structure after geological environment change and geological disasters exist to the concrete pile or pile foundation in future.

Description

A kind of sound detecting pipe device for concrete pile or pile foundation and mounting method thereof
Technical field
The present invention relates to building operation technique field, be specifically related to a kind of for concrete pileor the sound detecting pipe device of pile foundation and mounting method thereof.
Background technology
In order to detect concrete pile or whether pile foundation concrete pouring quality is qualified, usual employing supersonic reflectoscope detects, meet after the concreting of concrete pile or pile foundation, ultrasonic detecting probe is utilized to enter symmetrical reserving hole channel, detect that the concrete of stake or pile foundation is actual builds shaping situation, in concrete pile or pile foundation, the pre-buried pre-buried duct entered for the probe of checkout equipment is called sound detecting pipe.
Existing sound detecting pipe installs the concreting compactness inspection be mainly used for concrete pile or pile foundation, and after detection, can carry out permanent closure to the port of beam stake or foundation pile external surface, not re-use, its actual using function is single; There is geo-environmental change and after there is geological disaster, can not realize monitoring and repetition measurement beam stake or base pile integrity in concrete pile or pile foundation.
Summary of the invention
For the problems referred to above that prior art exists, an object of the present invention is to provide a kind of raising sound detecting pipe scope of application and function, and the sound detecting pipe device that can retain for a long time that construction fringe cost is low.
Another object of the present invention is to provide a kind of sound detecting pipe device mounting method that can retain for a long time.
For realizing above-mentioned first object, the present invention adopts following technical scheme: a kind of sound detecting pipe device for concrete pile or pile foundation, comprise the sound detecting pipe arranged along concrete pile or pile foundation length direction, it is characterized in that: also comprise sound detecting pipe extension, magazine and closing cap; Described magazine is fixedly installed in the sidewall of concrete pile or pile foundation, magazine has and the through hole be communicated with outside concrete pile or pile foundation; The described lower end of sound detecting pipe extension is communicated with the upper end of sound detecting pipe, and the upper end of sound detecting pipe extension is communicated with the through hole on magazine; Described closing cap is arranged on outside the sidewall of concrete pile or pile foundation, and the through hole on sealed magazine.
As optimization, described magazine is made up of connecting portion and installation portion; Described connecting portion is near sound detecting pipe extension, and installation portion is near the outside of concrete pile or pile foundation, and the diameter of connecting portion is greater than the diameter of installation portion.
As optimization, described closing cap is made up of limiting section and sealing; Described limiting section is socketed in the outside of magazine installation portion, and the side of the end of limiting section and magazine connecting portion offsets; The diameter of described sealing is greater than the diameter of magazine connecting portion.
For realizing above-mentioned second object, the present invention adopts following technical scheme: one is used for concrete pileor the sound detecting pipe mounting method of pile foundation, described sound detecting pipe device is as described in such scheme; Installation steps comprise:
S1: by existing sound detecting pipe installation specification and technical requirements, by the multiple sound detecting pipes determined, lays in assembling reinforcement process by the cross section of concrete pile or pile foundation;
S2: preset multiple port elevation location on concrete pile or pile foundation, multiple port elevation location distributes along concrete pile or pile foundation hoop, and different at the height of concrete pile or pile foundation axis, at the pre-buried magazine of each port elevation location;
S3: the two ends of the sound detecting pipe extension be processed to form are communicated with the through hole on magazine with corresponding sound detecting pipe respectively;
S4: after the concreting of concrete pile or pile foundation, cleaning magazine, is then fixed on the port elevation location of concrete pile or pile foundation by closing cap, the through hole that the closing cap at port elevation location place will be embedded on the magazine at port elevation location place seals.
Relative to prior art, tool of the present invention has the following advantages:
1, this sound detecting pipe device is applicable to concrete pile or pile foundation construction detection, also be applicable to concrete pile or pile foundation and occur geo-environmental change and after there is geological disaster, this sound detecting pipe device can realize monitoring and repetition measurement the integrality of concrete pile or piling strtucture body in the future.
2, compared with this mounting method is installed with traditional pile foundation sound ranging pipes, frock is simple and direct, concise in technology, is easy to install formed.
3, this mounting method can improve the sound detecting pipe scope of application and function, and it is preset and retains sound detecting pipe and detect duct follow-up significant, has great versatility, builds in room, the structure engineering such as municipal administration, road and bridge construction all can widely use in building trade.
Accompanying drawing explanation
The laying schematic cross-section of the sound detecting pipe device of Fig. 1 to be cross section be circular concrete pile or pile foundation.
The laying schematic cross-section of Fig. 2 to be cross section the be concrete pile of rectangle or sound detecting pipe device of pile foundation
Fig. 3 is the schematic side view of Fig. 1.
Fig. 4 is the schematic side view of Fig. 2.
Fig. 5 is the scheme of installation of sound detecting pipe device.
Fig. 6 be magazine with closing cap coordinate schematic diagram.
In figure, concrete pile or pile foundation 1, vertical reinforcement 2, sound detecting pipe 3, magazine 4, connecting portion 41, installation portion 42, closing cap 5, limiting section 51, sealing 52, surely follows closely 6.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in further detail.
In describing the invention, it will be appreciated that, term " on ", D score, the orientation of the instruction such as " outward " or position relationship be based on orientation shown in the drawings or position relationship, only the present invention for convenience of description and simplified characterization, instead of indicate or imply that the device of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore can not be interpreted as limitation of the present invention.
Embodiment 1: see Fig. 1 to Fig. 6, a kind of sound detecting pipe device for concrete pile or pile foundation, comprise arrange along concrete pile or pile foundation 1 length direction sound detecting pipe 3, sound detecting pipe extension, magazine 4 and closing cap 5.
Magazine 4 is fixedly installed in the sidewall of concrete pile or pile foundation 1, and the end of magazine 4 can be stretched out outside concrete pile or pile foundation 1 sidewall, magazine 4 has and the through hole be communicated with outside concrete pile or pile foundation 1.
Magazine 4 is made up of connecting portion 41 and installation portion 42; Connecting portion 41 is near sound detecting pipe extension, and installation portion 42 is near the outside of concrete pile or pile foundation 1, and the diameter of connecting portion 41 is greater than the diameter of installation portion 42.Particularly, magazine 4 is fixedly installed in the sidewall of concrete pile or pile foundation 1 by pre-buried mode.Magazine 4 can adopt PVC material to make, not only low price, and anticorrosive property is strong.
The lower end of sound detecting pipe extension is communicated with the upper end of sound detecting pipe 3, and the upper end of sound detecting pipe extension is communicated with the through hole on magazine 4, thus formation one and the passage be communicated with outside concrete pile or pile foundation 1, be convenient to ultrasonic detecting probe and pass through.Sound detecting pipe extension can adopt the material identical with sound detecting pipe to make, such as steel pipe, steel bellowsor plastic pipe.
Closing cap 5 is arranged on outside the sidewall of concrete pile or pile foundation 1, and for the through hole on sealed magazine 4.Closing cap 5 is made up of limiting section 51 and sealing 52; Limiting section 51 is socketed in the outside of magazine 4 installation portion 42, and the side of the end of limiting section 51 and magazine 4 connecting portion 41 offsets; Limiting section 51 installation portion 42 that is best and magazine 4 preferably adopts friction tight mode.For the ease of closing cap 5 being fixed on the sidewall of concrete pile or pile foundation 1, the diameter of sealing 52 is greater than the diameter of magazine 4 connecting portion 41, particularly, in the submarginal part of sealing 52, multiple installing hole is circumferentially set, by set bolt or steady nail 6 etc. through this installing hole, closing cap 5 is fixed on the sidewall of concrete pile or pile foundation 1, thus blocking the through hole on magazine 4.When needs detect again to concrete pile or pile foundation 1, only need to open closing cap, easy to use.
The above-mentioned fit structure of magazine 4 and closing cap 5 is not only convenient to be installed, and effectively can guarantee that through hole on magazine 4 seals by closing cap 5, prevents closing cap 5 from coming off.
Embodiment 2: one is used for concrete pileor the sound detecting pipe mounting method of pile foundation, described in described sound detecting pipe device embodiment 1; Installation steps comprise:
S1: by existing sound detecting pipe installation specification and technical requirements, by the multiple sound detecting pipes 3 determined, lays in assembling reinforcement process by the cross section of concrete pile or pile foundation 1;
S2: preset multiple port elevation location on concrete pile or pile foundation 1, multiple port elevation location is along concrete pile or pile foundation 1 circumference (i.e. hoop) distribution, and it is different at the height of concrete pile or pile foundation 1 axis, to guarantee concrete pile or piling strtucture overall integrity, at the pre-buried magazine 4 of each port elevation location;
S3: the two ends of the sound detecting pipe extension be processed to form are communicated with the through hole on magazine 4 with corresponding sound detecting pipe 3 respectively, namely a magazine 4 is communicated with by a sound detecting pipe extension with a sound detecting pipe 3 accordingly;
S4: after concrete pile or pile foundation 1 concreting, cleaning magazine 4, then closing cap 5 is fixed on the port elevation location of concrete pile or pile foundation 1, the through hole that the closing cap 5 at this port elevation location place will be embedded on the magazine 4 at port elevation location place seals, namely formation is preset, and the later stage detects duct to concrete pile or pile foundation sound ranging pipes.
Detect duct by the multiple default concrete pile determined or pile foundation sound ranging pipes, can realize one is in geological environment unconverted early stage, carries out concreting compactness inspection to concrete pile or pile foundation; Two is retain the port (through hole namely on magazine) that concrete pile or pile foundation sidewall are preset, no matter be present or future, there is geo-environmental change and after there is geological disaster, can realize monitoring and repetition measurement the integrality of concrete pile or piling strtucture in concrete pile and pile foundation.
What finally illustrate is, above embodiment is only in order to illustrate technical scheme of the present invention and unrestricted, although with reference to preferred embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that, can modify to technical scheme of the present invention or equivalent replacement, and not departing from aim and the scope of technical solution of the present invention, it all should be encompassed in the middle of right of the present invention.

Claims (4)

1. one kind for concrete pileor the sound detecting pipe device of pile foundation, comprise edge concrete pileor the sound detecting pipe (3) that pile foundation (1) length direction is arranged, it is characterized in that: also comprise sound detecting pipe extension, magazine (4) and closing cap (5);
Described magazine (4) is fixedly installed on concrete pileor in the sidewall of pile foundation (1), magazine (4) has with concrete pileor the through hole that pile foundation (1) outside is communicated with;
The lower end of described sound detecting pipe extension is communicated with the upper end of sound detecting pipe (3), and the upper end of sound detecting pipe extension is communicated with the through hole on magazine (4);
Described closing cap (5) is arranged on concrete pileor outside the sidewall of pile foundation (1), and for the through hole on sealed magazine (4).
2. as claimed in claim 1 for concrete pileor the sound detecting pipe device of pile foundation, it is characterized in that: described magazine (4) is made up of connecting portion (41) and installation portion (42);
Described connecting portion (41) is near sound detecting pipe extension, and installation portion (42) is close concrete pileor the outside of pile foundation (1), the diameter of connecting portion (41) is greater than the diameter of installation portion (42).
3. as claimed in claim 2 for concrete pileor the sound detecting pipe device of pile foundation, it is characterized in that: described closing cap (5) is made up of limiting section (51) and sealing (52);
Described limiting section (51) is socketed in the outside of magazine (4) installation portion (42), and the side of the end of limiting section (51) and magazine (4) connecting portion (41) offsets;
The diameter of described sealing (52) is greater than the diameter of magazine (4) connecting portion (41).
4. one kind for concrete pileor the sound detecting pipe mounting method of pile foundation, it is characterized in that: described sound detecting pipe device is as claimed in claim 3; Installation steps comprise:
S1: by existing sound detecting pipe installation specification and technical requirements, by the multiple sound detecting pipes (3) determined, presses concrete pileor the cross section of pile foundation (1) is laid in assembling reinforcement process;
S2: concrete pileor the upper default multiple port elevation location of pile foundation (1), multiple port elevation location edge concrete pileor the distribution of pile foundation (1) circumference, and concrete pileor the height of pile foundation (1) axis is different, at the pre-buried magazine of each port elevation location (4);
S3: the two ends of the sound detecting pipe extension be processed to form are communicated with the through hole on magazine (4) with corresponding sound detecting pipe (3) respectively;
S4: concrete pileor after pile foundation (1) concreting, cleaning magazine (4), is then fixed on closing cap (5) concrete pileor the port elevation location of pile foundation (1), the through hole that the closing cap (5) at port elevation location place will be embedded on the magazine (4) at port elevation location place seals.
CN201510204001.2A 2015-04-27 2015-04-27 A kind of sound detecting pipe device for concrete-pile or pile foundation and installation method thereof Active CN104763003B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510204001.2A CN104763003B (en) 2015-04-27 2015-04-27 A kind of sound detecting pipe device for concrete-pile or pile foundation and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510204001.2A CN104763003B (en) 2015-04-27 2015-04-27 A kind of sound detecting pipe device for concrete-pile or pile foundation and installation method thereof

Publications (2)

Publication Number Publication Date
CN104763003A true CN104763003A (en) 2015-07-08
CN104763003B CN104763003B (en) 2016-06-08

Family

ID=53645070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510204001.2A Active CN104763003B (en) 2015-04-27 2015-04-27 A kind of sound detecting pipe device for concrete-pile or pile foundation and installation method thereof

Country Status (1)

Country Link
CN (1) CN104763003B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1090205A (en) * 1964-11-11 1967-11-08 Tot Aaneming Van Werken Voorhe Improvements in and relating to the production of concrete diaphragm walls
US4146348A (en) * 1976-12-08 1979-03-27 Konoike Construction Co., Ltd. Method for executing impermeable construction joints for diaphragm walls
CN2105068U (en) * 1991-10-23 1992-05-20 陕西省公安局 Formed hole drawing tube used for ultrosonic detecting quality of pile base
CN1124385C (en) * 1996-05-14 2003-10-15 张国梁 The job practices of pilework and special equipment thereof
CN101487250A (en) * 2009-02-26 2009-07-22 中冶京唐建设有限公司 Concrete vacuum dehydration construction method for filling pile
CN104196062A (en) * 2014-08-19 2014-12-10 陈默 Continuous sounding pipe installation method and device for detecting concrete filling pile
CN204551553U (en) * 2015-04-27 2015-08-12 中冶建工集团有限公司 A kind of sound detecting pipe device for concrete pile or pile foundation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1090205A (en) * 1964-11-11 1967-11-08 Tot Aaneming Van Werken Voorhe Improvements in and relating to the production of concrete diaphragm walls
US4146348A (en) * 1976-12-08 1979-03-27 Konoike Construction Co., Ltd. Method for executing impermeable construction joints for diaphragm walls
CN2105068U (en) * 1991-10-23 1992-05-20 陕西省公安局 Formed hole drawing tube used for ultrosonic detecting quality of pile base
CN1124385C (en) * 1996-05-14 2003-10-15 张国梁 The job practices of pilework and special equipment thereof
CN101487250A (en) * 2009-02-26 2009-07-22 中冶京唐建设有限公司 Concrete vacuum dehydration construction method for filling pile
CN104196062A (en) * 2014-08-19 2014-12-10 陈默 Continuous sounding pipe installation method and device for detecting concrete filling pile
CN204551553U (en) * 2015-04-27 2015-08-12 中冶建工集团有限公司 A kind of sound detecting pipe device for concrete pile or pile foundation

Also Published As

Publication number Publication date
CN104763003B (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN104330819B (en) A kind of microseismic sensors recoverable erecting device and installation method
CN107034877B (en) Combine post jacking device and its construction method in pile end stake side
CN204040035U (en) A kind of positioning guiding structure of steel pile casting
CN102635129B (en) Method for detecting steel reinforcement cage pre-buried under cast-in-place pile
CN105546270A (en) Lining structure, pipe and pipe repairing method
CN109707383A (en) Pipe jacking construction method
CN104595728A (en) Pre-warning monitoring system for leakage of underground pipeline joint and working method of system
CN204781016U (en) Gasbag formula open trench tunnel movement joint seal structure
CN204551553U (en) A kind of sound detecting pipe device for concrete pile or pile foundation
KR101855162B1 (en) Pipe connect structure and pipe water leak sensing method for watertightness check
WO2012078557A3 (en) Hydrophilic end seal
CN104763003B (en) A kind of sound detecting pipe device for concrete-pile or pile foundation and installation method thereof
CN107503758B (en) Originating hole water stop device of miniature pipe curtain push bench
CN103952980B (en) A kind of Cable stayed Bridge Main Tower cableway pipe installation and locating method
CN109281408A (en) A kind of pipe gallery built-in fitting
CN204983282U (en) Curtain stand clamping device with extending structure
CN110486538A (en) A kind of service sleeve connect plugging structure and method for blocking with pipeline
KR101796078B1 (en) Vertical displacement monitor for harbor facility
CN207453976U (en) A kind of miniature tube curtain push-bench originates water stop device for opening
CN105650381A (en) Sedimentation self-adaptive rectangular telescopic connecting device of civil engineering foundation structure
FI128880B (en) A drainage system
CN206189451U (en) Prefabricated piping lane component of double -cabin
CN209874001U (en) Civil air defense engineering drainage device
CN210180452U (en) Building settlement observation device
JP2016211244A (en) Construction method for supporting suspension anchor, and support structure for suspension anchor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant