CN104759606B - Rapid progressive solidification technique device for high manganese steel rolling mortal wall casting - Google Patents

Rapid progressive solidification technique device for high manganese steel rolling mortal wall casting Download PDF

Info

Publication number
CN104759606B
CN104759606B CN201510183763.9A CN201510183763A CN104759606B CN 104759606 B CN104759606 B CN 104759606B CN 201510183763 A CN201510183763 A CN 201510183763A CN 104759606 B CN104759606 B CN 104759606B
Authority
CN
China
Prior art keywords
foundry goods
cold mould
pony sill
mortar wall
rolled mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510183763.9A
Other languages
Chinese (zh)
Other versions
CN104759606A (en
Inventor
高宗为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XUZHOU DAYI HEAVY FORGING EQUIPMENT Co.,Ltd.
Original Assignee
Zhejiang Institute of Mechanical and Electrical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Institute of Mechanical and Electrical Engineering Co Ltd filed Critical Zhejiang Institute of Mechanical and Electrical Engineering Co Ltd
Priority to CN201510183763.9A priority Critical patent/CN104759606B/en
Publication of CN104759606A publication Critical patent/CN104759606A/en
Application granted granted Critical
Publication of CN104759606B publication Critical patent/CN104759606B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a rapid progressive solidification technique device for a high manganese steel rolling mortal wall casting. The rapid progressive solidification technique device comprises a cope box, a core and a base. The core is arranged in the cope box. The bottom of the cope box is fixedly connected with the base. The base comprises a base frame and a cooling device. An annular groove is formed in the base frame. The annular groove is arranged in the cooling device and forms an annular water flow channel. The water flow channel is communicated with a water inlet pipe and a water outlet pipe. In work, the cooling face of the cooling device is tightly attached to the work face of an inner cavity of the casting. By the adoption of the rapid progressive solidification technique device, it is guaranteed that the cast structure of a rolling mortal wall, especially the important work portion of the rolling mortal wall is small in crystal particle size and free of a shrinkage cavity, shrinkage porosity and a slag inclusion defect in the casting process.

Description

A kind of potassium steel rolled mortar wall foundry goods rapid sequential solidification technology device
Technical field
The invention belongs to plant equipment manufacturing technology field, and in particular to a kind of potassium steel rolled mortar wall foundry goods rapid sequential coagulates Gu technique device.
Technical background
Gyratory crusher is the industrial departments such as metallurgy, chemical industry, building materials, water power, mine, transport development to each of different hardness Planting Ore or rock carries out a kind of broken and plant equipment in small, broken bits, with structure reliability, smooth running, production efficiency height, tune The features such as perfect square is just, product granularity is uniform.As shown in figure 1, wherein, part 1 ' is rolled mortar wall to its operation principle, the crushing wall of part 2 ', part 3 ' is bevel gear, part 4 ' is eccentric swing mechanism.
In disintegrating machine, rolled mortar wall and crushing wall are two critical components during equipment operation, when disintegrating machine works, The two workpiece are extruded by broken material, impacted and abrasion, so as to fail rapidly, therefore the product of its working life decision device Matter quality and work efficiency, improve the fabricating quality of rolled mortar wall and crushing wall, its wearability are particularly improved, such that it is able to improve The working life of disintegrating machine, work efficiency, and reduce equipment loss.
As shown in Fig. 2 a, 2b, A portions are its important process positions to rolled mortar wall structure.Rolled mortar wall is needed in use Good shock resistance and wear resistance, therefore the method production rolled mortar wall that conventional high manganese steel material is cast, but it is high Manganese steel is a kind of essential coarse grained metal material, and because heat treatment process is without phase transformation, it is impossible to by heat treatment crystal grain thinning, so High manganese steel casting casts the grain size size in original structure in addition to requiring foundry goods without casting flaws such as shrinkage cavity and porosity, field trashes To foundry goods shock resistance and it is anti-wear can produce important impact, for rolled mortar wall, obtain crystal grain it is tiny, without shrinkage cavity The cast sturcture of the defect such as shrinkage porosite and slag inclusion, is the difficult problem in foundry production.
In existing rolled mortar wall casting process scheme, sand casting technology is most generally used, Fig. 3 a, 3b show two kinds Different founding method, in Fig. 3 a, 3b, 1 '-running gate system, 2 '-feeding head, 3 '-molding sand, 4 '-rolled mortar wall (foundry goods), 5 '-cope, 6 '-drag box.In Fig. 3 a, orientation when rolled mortar wall casts is identical with during work, and working position is under foundry goods Portion, but because working position foundry goods is thicker, foundry goods top is relatively thin, and in solidification, foundry goods top first solidifies, and solidifies behind bottom, under Behind portion solidify when due to cannot get upper metal feeding, must foundry goods bottom working position produce shrinkage cavity shrinkage porosity.Therefore, cast Part working position is inevitably present shrinkage porosity defect of contraction cavity, affects performance and working life.
In Fig. 3 b, foundry goods working position upward, feeding is carried out using rising head to foundry goods working position, it is possible to achieve foundry goods from Under supreme consecutive solidification, it is to avoid foundry goods produces shrinkage porosity defect of contraction cavity, but because foundry goods working position is upper and contact with rising head, According to metal freezing principle, Inclusions During Solidification of Steel floats upwards, and this characteristic is assembled at field trash final set position.Then Foundry goods working position field trash is relatively more, and now the important process position of foundry goods belongs to final set position on foundry goods top, casting Part setting time is long, thus coarse grains.Therefore, foundry goods working position may without shrinkage porosity defect of contraction cavity, but because crystal grain it is thick Greatly, field trash is more, and shock resistance when foundry goods works must be poor with wear resistance.
The content of the invention
More than analysis can knowable to, simple sand casting is difficult to obtain high-quality potassium steel rolled mortar wall foundry goods, is This casting difficult problem is solved, the invention provides a kind of potassium steel rolled mortar wall foundry goods quick solidification apparatus, this invention ensures that and roll Mortar wall be particularly the important process position of rolled mortar wall obtain in casting process crystal grain it is tiny and without shrinkage cavity and porosity, without slag inclusion lack Sunken cast sturcture.
To reach above-mentioned purpose, the present invention is adopted the following technical scheme that:Potassium steel rolled mortar wall foundry goods rapid sequential solidification dress Put, including cope, core and base, the built-in core of cope, the bottom of cope is fixedly connected with base, base includes bottom Mounting and cold mould, pony sill forms a cannelure, and the cannelure loads cold mould, and cold mould forms annular flow channel, and the current lead to Road connects water inlet pipe and outlet pipe, and during work, the cooling surface of cold mould is close to the inner chamber work surface of foundry goods.
Preferably, the water stream channel of cold mould is inwards unclosed, this inwardly side port by the outer of the inner cylinder of pony sill Wall is sealed.
Preferably, it is fixedly connected by several bolts between cold mould and pony sill, bolt stretches through from the bottom up of pony sill To the base of cold mould.
Preferably, water inlet pipe, outlet pipe stretch into the water stream channel of cold mould from the external world by pony sill after respectively, water inlet pipe and Water outlet pipe part is in opposite sides.
Preferably, the phase contact portion between cold mould and pony sill loads two sealing rings, and two sealing rings are respectively at cold mould Water stream channel the top of side port inwardly, bottom.
Preferably, push pedal is loaded between the outer ring of cold mould and the exterior circular column of pony sill, during work, the lower surface of foundry goods is affixed on The top of push pedal;Several push rods are movably stretched into from the bottom of pony sill, and the lower surface to push pedal is rectified in it, can be pushed up upwards Push pedal.
Preferably, the lower surface of cope fits in the upper surface of pony sill, and both are accordingly provided with location hole, pass through Alignment pin firm position.
Preferably, core forms the upper part inner-cavity structure of rolled mortar wall, core by core print and the Internal hole positioning of pony sill Pre-buried running gate system and rising head.
The present invention relates to a kind of novel technique device that important foundry goods-rolled mortar wall casts on a kind of gyratory crusher, should Technical scheme, at foundry goods important process position using cooling technology is forced, makes foundry goods important compared with existing sand casting technology While position obtains fine grain structure in process of setting, consecutive solidification is realized, it is to avoid foundry goods produces shrinkage cavity and porosity and folder Debris defect, fundamentally solves the quality of rolled mortar wall casting.The results showed, what the technical scheme was produced rolls mortar Wall, its service life is 2 times of 1.5 ∽ of ordinary sand casting method.
Description of the drawings
Fig. 1 is gyratory crusher fundamental diagram.
Fig. 2 a, 2b are rolled mortar wall structure charts.
Fig. 3 a, 3b are two kinds of existing schemes of rolled mortar wall sand casting.
Fig. 4 is apparatus of the present invention production structure principle chart.
Fig. 5 is the assembling relationship figure of base and Tui Song mechanisms.
Fig. 6 a, 6b are the assembly relation structure decomposition figures of base and Tui Song mechanisms.
Fig. 7 a, 7b are cast outer mold structure figures.
Fig. 8 a, 8b are cope moulding making figures.
Fig. 9 a, 9b are core making figures.
Figure 10 a, 10b are core box structure charts.
Figure 11 is that foundry goods pushes away loose state diagram.
In Fig. 4-11,1- water inlet pipes, 2- bolts, 3- sealing rings, 4- running gate systems, 5- cores, 6- rising heads, 7- Outlet pipe, 8- push rods, 9- pony sills, 10- alignment pins, 11- push pedals, 12- cold moulds, 13- rolled mortar walls (foundry goods), on 14- Sandbox, 15- foam hangers, 16- moulding external molds, 17- molding sand, 18- coremaking filling sand, 19- core boxes, 20- coremaking base plates, 21- clamps wedge.
Specific embodiment
The preferred embodiment of the present invention is elaborated below in conjunction with the accompanying drawings.
As shown in figure 4, the present embodiment device includes cope 14, core 5, base and Tui Song mechanisms, base includes base Frame 9 and cold mould 12, pony sill 9 forms a cannelure 9-1, and the cannelure loads cold mould 12, and the inner side of cold mould 12 is formed inwards not The annular flow channel 12-1 of closing, the side port inwardly of water stream channel is sealed by the outer wall of the inner cylinder 9-2 of pony sill 9, cold It is fixedly connected by several bolts 2 between type 12 and pony sill 9, bolt 2 stretches through to the bottom of cold mould 12 from the bottom up of pony sill 9 Side.Phase contact portion between cold mould 12 and pony sill 9 loads sealing ring 3, and sealing ring 3 can fill two, be respectively at cold mould 12 The side port top and the bottom inwardly of water stream channel 12-1.The outer wall upward of cold mould 12 is mutually fitted with the outer wall that descends inwardly of rolled mortar wall (foundry goods) 13 Match somebody with somebody.
Water inlet pipe 1, outlet pipe 7 are respectively from the extraneous water stream channel 12-1 by stretching into cold mould 12 after pony sill 9, water inlet pipe 1 is in opposite sides with outlet pipe 7.
Load push pedal 11 between the outer ring of cold mould 12 and the exterior circular column 9-3 of pony sill 9.The upper surface and pony sill of cold mould 12 The upper surface of 9 inner cylinder 9-2 maintains an equal level, and the upper surface of push pedal 11 maintains an equal level with the upper surface of the exterior circular column 9-3 of pony sill 9. The lower surface of rolled mortar wall (foundry goods) 13 is affixed on the top of push pedal 11.Several push rods 8 are movably stretched into from the bottom of pony sill 9, Rectify the lower surface to push pedal 11 in it, so as to pushing tow push pedal 11 upwards.
The lower plane of cope 14 is fitted with the upper surface of pony sill 9, and both are accordingly provided with location hole, by positioning Pin 10 is positioned.
Core 5 is positioned by core print 5-1 with the endoporus 9-4 of pony sill 9, forms the upper part inner-cavity structure of rolled mortar wall, sand The pre-buried running gate system 4 of core 5 and rising head 6, running gate system 4 and rising head 6 are all extended at the molding of foundry goods 13.
Cold mould 12 constitutes pressure cooling system by water inlet pipe 1, outlet pipe 7, and in casting solidification process, rolled mortar wall is in weight Inner chamber work surface is close to cold mould cooling surface in the presence of power, promotes cold mould persistently to keep to the cooling energy in rolled mortar wall process of setting Power.
Cold mould 12 is made by pure copper material, with good heat conductivity.Constitute the cold mould 12 that foundry goods forces cooling effect Linked together with pony sill with sealing ring by connecting bolt, make foundry goods obtain the same of small grains at important process position When, realize solidification, it is to avoid shrinkage porosity defect of contraction cavity.
Tui Song mechanisms install in the base, and it includes assembly relation such as Fig. 5 institutes of push rod and push pedal, base and Tui Song mechanisms Show, its three-dimensional assembly relation is as shown in Fig. 6 a, 6b.
Cope is by the direct moulding of external mold, and external mold is corresponding with rolled mortar wall external form, using metal pattern, its structure such as Fig. 7 a, Shown in 7b, filling moulding after set cope, the hanger of rolled mortar wall adopts foam loose piece 15, foam loose piece not delivery to pour in die cavity Gasify at high temperature during note.
Rising head 6 and cast passage 4 needed for technique is made up of corresponding insulating riser sleeve and refractory tube, is directly buried during moulding In entering sand mold, modeling process is as shown in Fig. 8 a, 8b.
Core forms the inner-cavity structure of rolled mortar wall with cold mould, and wherein core forms the inner-cavity structure on rolled mortar wall top, cast System is directly imbedded by refractory tube and running gate system passage is directly constituted in core, the centre that wherein sprue should be in core, and It is corresponding with the refractory tube position of cope.
Core by core box filling moulding, its molding operation as shown in Fig. 9 a, 9b, the structure of core box 19 as shown in Figure 10 a, 10b, Core box is spliced by two half portions are relative, and two half portions form two corresponding lugs, and lug corresponding two-by-two during moulding is adopted Wedge shape clamping plate 21 is clamped.
After base, core and cope mould assembling constitute die cavity, by running gate system casting of molten metal, molten metal solidification When, because cold mould is in the presence of cooling water, relatively low temperature and powerful heat absorption capacity are kept, make rolled mortar wall important process portion The thick wall part of position quick solidification in the presence of cold mould, to making foundry goods bottom also obtain higher degree of supercooling because quickly cooling down, According to the principle of dynamics of metal freezing, rate of cooling is faster, and degree of supercooling is bigger, and now crystal grain is more tiny, so as to ensure to roll mortar Wall working position obtains tiny crystal grain.
Though foundry goods working position is thick wall part, the heat conduction and heat absorption capacity also quick solidification due to cold mould, and foundry goods Top with sand mold because contacting, and the capacity of heat transmission is poor with cooling capacity, and solidification is relatively slow, thereby may be ensured that carry out from bottom to up it is suitable Sequence solidifies, and good feeding capacity is arranged to bottom at top, and final inclusion floating enters foundry goods top inoperative position and rising head It is interior, obtain foundry goods working position and organize without shrinkage cavity and porosity and inclusion defects, and crystal grain is tiny.Therefore, it is possible to ensure to obtain High-quality rolled mortar wall foundry goods.
When casting solidification enters the contraction phase after finishing, foundry goods is shunk due to cold mould produces inhibition, therefore in base Design Tui Song mechanisms, Tui Song mechanisms are made up of push pedal 11 with push rod 8, and a thrust upwards, push rod 8 are applied to push rod during work The distance upwards of push pedal 11 is promoted, foundry goods is unclamped with cold mould, as shown in figure 11, it is ensured that foundry goods free shrink, prevent foundry goods Cracking.
Rolled mortar wall foundry goods is produced by apparatus of the present invention, compared with traditional sand casting technology, with advantages below:
1st, foundry goods work crystal grain is tiny, it is to avoid shrinkage cavity and porosity defect, it is to avoid field trash leads in foundry goods working position The casting quality for crossing apparatus of the present invention production is good, and long service life, production practices show, its service life is same type normal sands 1.5~2 times of type foundry goods life-span.
2nd, in apparatus of the present invention, base is permanent structure, constitutes the nowel of foundry goods, when casting and molding is produced, only needs to make Cope and core, required molding operation is simple, and molding sand usage amount is few, and its molding sand usage amount only has ordinary sand casting Less than half, therefore moulding expense is few, low cost.
3rd, the labor intensity of workman can be reduced by apparatus of the present invention, while casting accuracy is higher, is suitable for rolled mortar wall Produce in enormous quantities.

Claims (6)

1. a kind of potassium steel rolled mortar wall foundry goods rapid sequential solidification technology device, including cope, core and base, in cope Sand loading core, the bottom of cope is fixedly connected with base, it is characterized in that:Base includes pony sill and cold mould, and pony sill forms one Cannelure, the cannelure loads cold mould, and cold mould forms annular flow channel, and the water stream channel connects water inlet pipe and outlet pipe, work When making, the cooling surface of cold mould is close to the inner chamber work surface of foundry goods;The water stream channel of cold mould it is inwards unclosed, this inwards by The outer wall of the inner cylinder of pony sill is sealed;It is fixedly connected by several bolts between cold mould and pony sill, bolt is from pony sill Bottom up stretches through to the base of cold mould.
2. potassium steel rolled mortar wall foundry goods rapid sequential solidification technology device as claimed in claim 1, is characterized in that:Water inlet pipe, Outlet pipe stretches into respectively the water stream channel of cold mould from the external world after pony sill, and water inlet pipe is with water outlet pipe part in opposite sides.
3. potassium steel rolled mortar wall foundry goods rapid sequential solidification technology device as claimed in claim 1, is characterized in that:Cold mould and bottom Phase contact portion between mounting loads two sealing rings, and two sealing rings are respectively in the side port inwardly of the water stream channel of cold mould Portion, bottom.
4. potassium steel rolled mortar wall foundry goods rapid sequential solidification technology device as claimed in claim 1, is characterized in that:Outside cold mould Load push pedal between the exterior circular column of circle and pony sill, during work, the lower surface of foundry goods is affixed on the top of push pedal;Several push rods are the bottom of from The bottom of mounting is movably stretched into, and the lower surface to push pedal is rectified in it, can pushing tow push pedal upwards.
5. potassium steel rolled mortar wall foundry goods rapid sequential solidification technology device as claimed in claim 1, is characterized in that:Cope Lower surface fits in the upper surface of pony sill, and both are accordingly provided with location hole, by alignment pin firm position.
6. potassium steel rolled mortar wall foundry goods rapid sequential solidification technology device as claimed in claim 1, is characterized in that:Core passes through Core print and the Internal hole positioning of pony sill, form the upper part inner-cavity structure of rolled mortar wall, the pre-buried running gate system of core and rising head.
CN201510183763.9A 2015-04-17 2015-04-17 Rapid progressive solidification technique device for high manganese steel rolling mortal wall casting Active CN104759606B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510183763.9A CN104759606B (en) 2015-04-17 2015-04-17 Rapid progressive solidification technique device for high manganese steel rolling mortal wall casting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510183763.9A CN104759606B (en) 2015-04-17 2015-04-17 Rapid progressive solidification technique device for high manganese steel rolling mortal wall casting

Publications (2)

Publication Number Publication Date
CN104759606A CN104759606A (en) 2015-07-08
CN104759606B true CN104759606B (en) 2017-05-03

Family

ID=53641882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510183763.9A Active CN104759606B (en) 2015-04-17 2015-04-17 Rapid progressive solidification technique device for high manganese steel rolling mortal wall casting

Country Status (1)

Country Link
CN (1) CN104759606B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106180659B (en) * 2016-08-30 2018-01-02 烟台万隆真空冶金股份有限公司 A kind of strand directional solidification and the Combined water chill mould of regional choice cooling
CN112846080B (en) * 2021-01-05 2022-12-02 中国第一重型机械股份公司 Integral casting control method for rudder blade casting for large ship
CN114799085A (en) * 2022-05-16 2022-07-29 合肥市瑞宏重型机械有限公司 Cavity exhaust device and exhaust method for slag ladle casting

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6012306A (en) * 1983-06-30 1985-01-22 Hashimoto Forming Co Ltd Forming die for wheel cover
CN201357206Y (en) * 2009-02-27 2009-12-09 湖南五星重工有限公司 Mold for lost foam casting for large-scale high manganese steel crushing walls, roll crushing walls and toothed plates
CN201357209Y (en) * 2009-02-27 2009-12-09 湖南五星重工有限公司 Mold for circular truncated cone-shaped non-uniform wall thickness casting
CN202239494U (en) * 2011-09-14 2012-05-30 马鞍山市海天重工科技发展有限公司 Chilling block device for lost foam casting of crushing wall
CN102962397B (en) * 2012-11-02 2015-12-02 浙江双金机械集团股份有限公司 A kind of circular cone sand making machine crushing wall casting moulds and casting technique
CN103878312B (en) * 2012-12-19 2016-08-31 江苏华东风能科技有限公司 The system for casting and pouring of wind-driven generator taper support foundry goods
CN204524232U (en) * 2015-04-17 2015-08-05 浙江机电职业技术学院 Potassium steel rolled mortar wall foundry goods rapid sequential coagulation system

Also Published As

Publication number Publication date
CN104759606A (en) 2015-07-08

Similar Documents

Publication Publication Date Title
CN100443217C (en) Making process of binaural connector for contact network
CN204657416U (en) A kind of combined type Mould for casting ball
CN104107897B (en) The squeeze casting mould of straight tooth column metal gear and casting method thereof
CN105880486A (en) Die and method for casting wheel hub
CN104759606B (en) Rapid progressive solidification technique device for high manganese steel rolling mortal wall casting
CN103056336B (en) S-shaped spoke plate track wheel blank cast and casting method thereof
CN103273006A (en) Sand lined metal mould casting brake shoe tool device and production method thereof
CN101780537A (en) Method for casting low-alloy cast steel automobile axle housing through V-process technology
CN103273012B (en) The fitting device of a kind of Sand-Faced Metal Mould Casting wedge and production method
CN112658210B (en) Sectional casting method for subway bogie special-shaped steel casting
CN101954469B (en) Manufacturing method of bucket tooth and applied mould thereof
CN202398784U (en) Cast sand mould
CN204524232U (en) Potassium steel rolled mortar wall foundry goods rapid sequential coagulation system
CN102935493B (en) Method for manufacturing large hollow steel ingots by forced cooling with single sleeves
CN202984580U (en) Cylinder cover casting die
CN101954458B (en) Method for manufacturing crushing wall or rolling mortar wall pouring system of cone crusher during sand-coated casting of inner/outer metal molds
CN206794672U (en) A kind of process modeling structure using graphitization expansion feeding HWS calipers
CN206578261U (en) A kind of casting mould of high abrasion composite hammer head
CN101342574A (en) Design method for large-scale transverse beam casting parts
CN206536014U (en) Low pressure casting wheel mold bottom die water cooling plant
CN104759594B (en) Fast progressive solidification device for high manganese steel broken wall casting
CN204603225U (en) Potassium steel crushing wall foundry goods rapid sequential coagulation system
CN111889628A (en) Sequential solidification process for hydraulic cylinder casting
CN103551509A (en) HXB2 axle box casting method
CN101693286B (en) Novel device and method for moulding pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170731

Address after: Jiangsu city of Xuzhou province Xuzhou Industrial Park Road on the west side of the new

Patentee after: XUZHOU YIZHONG FORGING EQUIPMENT CO., LTD.

Address before: Hangzhou City, Zhejiang province Binjiang District 310053 shore road 528

Patentee before: Zhejiang Institute of Mechanical & Electrical Engineering

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: West side of Xinquan Road, Xuzhou Industrial Park, Jiangsu Province

Patentee after: XUZHOU DAYI HEAVY FORGING EQUIPMENT Co.,Ltd.

Address before: West side of Xinquan Road, Xuzhou Industrial Park, Jiangsu Province

Patentee before: XUZHOU YIZHONG FORGING EQUIPMENT Co.,Ltd.

CP01 Change in the name or title of a patent holder