一种可控震源分区同时扫描激发方法 Download PDFInfo
- Publication number
- CN104755959A CN104755959A CN201480002783.5A CN201480002783A CN104755959A CN 104755959 A CN104755959 A CN 104755959A CN 201480002783 A CN201480002783 A CN 201480002783A CN 104755959 A CN104755959 A CN 104755959A
- Authority
- CN
- China
- Prior art keywords
- district
- shot
- distance
- area
- shot point
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/02—Generating seismic energy
Landscapes
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Remote Sensing (AREA)
- Acoustics & Sound (AREA)
- Environmental & Geological Engineering (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Physics & Mathematics (AREA)
- Geophysics (AREA)
- Numerical Control (AREA)
- Control Of Position, Course, Altitude, Or Attitude Of Moving Bodies (AREA)
Abstract
本发明公开了一种可控震源分区同时扫描激发方法,采用以下步骤实现:1)将工区划分为A区、B区,A区位于工区两侧靠近边界的位置,B区位于工区的中部;所述的A区有两个区块,按顺序分为A1区、A2区;2)按炮点分区调整激发顺序;计算在Ready信号队列中每两个炮点之间的距离,距离大于最小同时激发距离的为满足同时扫描激发条件的炮点;如果同时扫描激发条件的炮点分别位于A1和A2区,不进行激发,其它区进行激发;在Ready信号队列中位于B区的炮点进行滑动扫描或者交替扫描,当Reday信号队列中位于B区的炮点有多个,要计算炮点距离工区中点的距离,距离小的优先执行滑动扫描或者交替扫描。
Description
技术领域
本发明属于地球物理勘探技术领域,是地震资料采集中一种可控震源分区同时扫描激方法。
背景技术
使用可控震源地震进行地震采集时,可控震源完成一次振动,需要几秒-几十秒时间,一次振动也是一次扫描,所用时间称为扫描时间,根据施工要求,一个炮点的激发可以由单台震源振动一次完成,也可以由几台震源组合振动几次叠加完成,不管使用什么参数,完成一个炮点的激发是需要耗费一定时间的,为了提高振动效率,适应高精度、高密度地震勘探的发展,各种可控震源高效激发方式被提出和应用,如交替扫描、滑动扫描、同时扫描、同时滑动扫描等等。
可控震源高效采集的原理是通过压缩相邻两炮的距离间隔或者时间间隔来达到单位时间内完成更多地炮点激发来实现效率的提高;交替扫描是采用两组或多组震源,一组可控震源A完成炮点激发后,另一组震源B立即进行激发,在B进行激发时,A可以进行搬家到下一个炮点做激发准备;滑动扫描是在交替扫描的基础上进行了改进,在A组震源震动还没结束时,B组震源就可以进行激发,A与B之间激发的最小时间称为滑动时间;同时扫描是在两组震源相隔一定的距离时,可以同时进行激发,这个距离称为最小同时激发距离,如果两组震源小于这个距离则不能进行同时激发;同时滑动扫描是滑动扫描和同时扫描的结合,两组可控震源同时在两个炮点激发后,在大于滑动扫描时间后,另外两组可控震源可以继续进行同时扫描。
在可控震源进行同时扫描时,因为最小距离的限制,要求工区要有一定的长度,要不然就会造成一部分炮点不能实现同时扫描,这些不能实现同时扫描的炮点分布于工区的中部,因为工区的其它炮点和这些炮点的距离都小于同时扫描要求最小距离,所以不能实现同时扫描,从距离上来看,越靠近工区边缘的部位,满足同时激发的几率越大。根据统计,大部分工区的长度是有一定限制的,因此工区长度限制了同时扫描激发方式的应用。
对于同时扫描,上文已指出:要实现同时扫描,两组震源必须大于最小同时激发距离,按照震源分布方式,同时扫描可以有两种实现方式,方式一是把震源分为两组,这两组震源相隔的距离大于最小同时激发距离,两组之间的震源进行配对,完成同时扫描,激发完毕后,震源以大致相同的速率向前移动,两组震源保持最小同时激发距离,这样能够保证两组震源能够实现同时扫描。方式二是把所有的震源分布于工区范围内,每个震源负责一定的区域,区域分配的原则是以障碍物为分解线和均匀的原则,方式二的优点在于减小了震源总移动距离,适用于工区地形复杂,震源移动困难的工区,另外在工区长度小于最小同时激发距离的2倍时也适用,在不满足同时激发条件时,震源以交替或者滑动扫描的方式进行激发。方式二和方式一相比,因为震源的分布方式,满足同时激发最小距离的要求的震源数量降低了,同时扫描的比例也降低了。
发明内容
本发明旨在寻找一种能够提高可控震源施工效率的可控震源分区同时扫描激发方法。
本发明采用以下步骤实现:
1)将工区划分为A区、B区,A区位于工区两侧靠近边界的位置,B区位于工区的中部;
所述的A区有两个区块,按顺序分为A1区、A2区;
所述的A区、B区各自长度划分按照下式确定:
(L-l)/3≤LA≤(L-l)/2
式中:工区长度为L,最小同时激发距离为l;
A区的长度LA:
当LA=(L-l)/3时,A区每一个炮点都能和B区的炮点进行同时扫描,当LA=(L-l)/2时,位于A区和B区满足同时激发条件的两个炮点以同方向移动时,能够完成所有炮点的激发;
B区长度LB:由A区长度按下式确定:
LB=(L-2LA)/2。
2)按炮点分区调整激发顺序;
所述的调整激发顺序是:
(1)计算在Ready信号队列中每两个炮点之间的距离,距离大于最小同时激发距离的为满足同时扫描激发条件的炮点;
如果同时扫描激发条件的炮点分别位于A1和A2区,不进行激发,其它区进行激发;
步骤(1)执行的是同时扫描激发,优先级最高,当步骤(1)没有找到满足条件的炮点时,则执行步骤(2);
(2)在Ready信号队列中位于B区的炮点进行滑动扫描或者交替扫描,当Reday信号队列中位于B区的炮点有多个,要计算炮点距离工区中点的距离,距离小的优先执行滑动扫描或者交替扫描。
野外采集时,步骤(1)和(2)是循环激发,步骤(2)执行完毕后再执行步骤(1)。
本发明工区的中部炮点满足同时激发条件的几率要小于位于工区边缘部位的炮点,而进行炮点激发时,越是获得更多的同时激发的比例,则效率越高,因此提高了同时激发炮点的比例,就能提高激发效率。
本发明通过设定指定的区域为只能进行同时扫描的区域来达到提高同时激发的比例,在震源数量较多并且散布于工区范围时,可以采用此方式,可以应用于当工区长度不足时来实现同时扫描激发,能够提高同时激发所占的比例,根据工区的范围不同,可以提高放炮效率10-20%。
附图说明
图1是本发明区域划分示意图;
图2施工区域长度划分方法1;
图3施工区域长度划分方法2;
具体实施方式
本发明采用以下步骤实现:
1)将工区划分为A区、B区,A区位于工区两侧靠近边界的位置,B区位于工区的中部,如图1所示,工区共分为3个区;
所述的A区有两个区块,按顺序分为A1区、A2区;
所述的A区、B区各自长度划分按照下式确定:
(L-l)/3≤LA≤(L-l)/2
式中:工区长度为L,最小同时激发距离为l;
A区的长度LA:
当LA=(L-l)/3时,A区每一个炮点都能和B区的炮点同时扫描,如图2所示,A1区和B区的图案填充区域最小距离为l;当LA=(L-l)/2时,位于A区和B区满足同时激发条件的两个炮点以同方向移动时,能够完成所有炮点的激发,如图3所示,A1区和B区的图案填充区域同方向边界处的距离为l;
图2所示的特例适合地表条件复杂,障碍物较多的工区,而图3所示的特例适合地表条件较好的工区。
B区长度LB:由A区长度按下式确定:
LB=(L-2LA)/2。
2)按炮点分区调整激发顺序,保证位于A区和B区的满足同时激发条件的炮点被优先激发;
所述的调整激发顺序是:
(1)计算在Ready信号队列中每两个炮点之间的距离,距离大于最小同时激发距离的为满足同时扫描激发条件的炮点;
如果同时扫描激发条件的炮点分别位于A1和A2区,不进行激发,其它区进行激发;
步骤(1)执行的是同时扫描激发,优先级最高,当步骤(1)没有找到满足条件的炮点时,则执行步骤(2);
(2)在Ready信号队列中位于B区的炮点进行滑动扫描或者交替扫描,当Reday信号队列中位于B区的炮点有多个,要计算炮点距离工区中点的距离,距离小的优先执行滑动扫描或者交替扫描。
野外采集时,步骤(1)和(2)是循环激发,步骤(2)执行完毕后再执行步骤(1)。
Claims (1)
1.一种可控震源分区同时扫描激发方法,其特征在于采用以下步骤实现:
1)将工区划分为A区、B区,A区位于工区两侧靠近边界的位置,B区位于工区的中部;
所述的A区有两个区块,按顺序分为A1区、A2区;
所述的A区、B区各自长度划分按照下式确定:
(L-l)/3≤LA≤(L-l)/2
式中:工区长度为L,最小同时激发距离为l;
A区的长度为LA:
当LA=(L-l)/3时,A区每一个炮点都能和B区的炮点进行同时扫描,当LA=(L-l)/2时,位于A区和B区满足同时激发条件的两个炮点以同方向移动时,能够完成所有炮点的激发;
B区长度LB:由A区长度按下式确定:
LB=(L-2LA)/2
2)按炮点分区调整激发顺序;
所述的调整激发顺序是:
(1)计算在Ready信号队列中每两个炮点之间的距离,距离大于最小同时激发距离的为满足同时扫描激发条件的炮点;
如果同时扫描激发条件的炮点分别位于A1和A2区,不进行激发,其它区进行激发;
(2)在Ready信号队列中位于B区的炮点进行滑动扫描或者交替扫描,当Reday信号队列中位于B区的炮点有多个,要计算炮点距离工区中点的距离,距离小的优先执行滑动扫描或者交替扫描
步骤(1)执行的是同时扫描激发,优先级最高,当步骤(1)没有找到满足条件的炮点时,则执行步骤(2);
野外采集时,步骤(1)和(2)是循环激发,步骤(2)执行完毕后再执行步骤(1)。
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2014/082860 WO2016011629A1 (zh) | 2014-07-23 | 2014-07-23 | 一种可控震源分区同时扫描激发方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104755959A true CN104755959A (zh) | 2015-07-01 |
Family
ID=53593840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201480002783.5A Pending CN104755959A (zh) | 2014-07-23 | 2014-07-23 | 一种可控震源分区同时扫描激发方法 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN104755959A (zh) |
WO (1) | WO2016011629A1 (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105676270A (zh) * | 2015-12-31 | 2016-06-15 | 中国石油天然气集团公司 | 脉冲激发系统的控制方法和装置 |
CN105785434A (zh) * | 2016-03-23 | 2016-07-20 | 中国石油天然气集团公司 | 一种野外采集站定位方法及装置 |
CN108205155A (zh) * | 2017-12-27 | 2018-06-26 | 中国石油天然气集团公司 | 一种可控震源交替独立同步激发方法、装置及系统 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107015270B (zh) * | 2017-04-20 | 2019-06-11 | 中国石油天然气集团公司 | 扫描信号计算方法及装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5079749A (en) * | 1990-06-06 | 1992-01-07 | Union Oil Company Of California | Seismic raytracing method and apparatus |
US5410517A (en) * | 1994-05-13 | 1995-04-25 | Exxon Production Research Company | Method for cascading sweeps for a seismic vibrator |
CN103605154A (zh) * | 2013-11-06 | 2014-02-26 | 中国石油集团东方地球物理勘探有限责任公司 | 一种可控震源分频同时激发方法 |
CN103675901A (zh) * | 2012-09-04 | 2014-03-26 | 中国石油天然气集团公司 | 一种时频域可控震源近地表吸收补偿方法 |
CN104375165A (zh) * | 2013-08-15 | 2015-02-25 | 中国石油天然气集团公司 | 一种可控震源分区同时扫描激发方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3742147A1 (de) * | 1987-12-09 | 1989-06-22 | Prakla Seismos Ag | Verfahren zur erfassung seismischer daten |
CN102645670B (zh) * | 2011-02-22 | 2014-06-04 | 中国石油天然气集团公司 | 一种基于叠加响应分析的观测系统优化设计方法 |
CA2833968C (en) * | 2011-05-13 | 2017-12-12 | Saudi Arabian Oil Company | Coupled time-distance dependent swept frequency source acquisition design and data de-noising |
US9304215B2 (en) * | 2011-12-30 | 2016-04-05 | Landmark Graphics Corporation | Receiving seismic signals from seismic signal sources |
-
2014
- 2014-07-23 CN CN201480002783.5A patent/CN104755959A/zh active Pending
- 2014-07-23 WO PCT/CN2014/082860 patent/WO2016011629A1/zh active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5079749A (en) * | 1990-06-06 | 1992-01-07 | Union Oil Company Of California | Seismic raytracing method and apparatus |
US5410517A (en) * | 1994-05-13 | 1995-04-25 | Exxon Production Research Company | Method for cascading sweeps for a seismic vibrator |
CN103675901A (zh) * | 2012-09-04 | 2014-03-26 | 中国石油天然气集团公司 | 一种时频域可控震源近地表吸收补偿方法 |
CN104375165A (zh) * | 2013-08-15 | 2015-02-25 | 中国石油天然气集团公司 | 一种可控震源分区同时扫描激发方法 |
CN103605154A (zh) * | 2013-11-06 | 2014-02-26 | 中国石油集团东方地球物理勘探有限责任公司 | 一种可控震源分频同时激发方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105676270A (zh) * | 2015-12-31 | 2016-06-15 | 中国石油天然气集团公司 | 脉冲激发系统的控制方法和装置 |
CN105676270B (zh) * | 2015-12-31 | 2019-03-15 | 中国石油天然气集团公司 | 脉冲激发系统的控制方法和装置 |
CN105785434A (zh) * | 2016-03-23 | 2016-07-20 | 中国石油天然气集团公司 | 一种野外采集站定位方法及装置 |
CN108205155A (zh) * | 2017-12-27 | 2018-06-26 | 中国石油天然气集团公司 | 一种可控震源交替独立同步激发方法、装置及系统 |
Also Published As
Publication number | Publication date |
---|---|
WO2016011629A1 (zh) | 2016-01-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104375165A (zh) | 一种可控震源分区同时扫描激发方法 | |
CN104755959A (zh) | 一种可控震源分区同时扫描激发方法 | |
US11181610B2 (en) | Positioning light beam emission system, method and indoor positioning system | |
WO2008068730A3 (en) | Dynamic source parameter selection for seismic vibrator data acquisition | |
EA201070615A1 (ru) | Формирование геологической модели | |
CN108205155B (zh) | 一种可控震源交替独立同步激发方法、装置及系统 | |
CN1363046A (zh) | 同时使用几个地震源对一个地下区域进行地震监视的方法 | |
CN104422951A (zh) | 一种可控震源动态滑动扫描激发方法 | |
Janik et al. | Seismic structure of the lithosphere between the East European Craton and the Carpathians from the net of CELEBRATION 2000 profiles in SE Poland | |
CN104422963A (zh) | 一种变偏移距vsp资料时差校正方法 | |
EP2657724A3 (en) | Methods and Apparatus for Generating Deghosted Seismic Data | |
EP3004935B1 (en) | Blended land seismic data acquisition employing dispersed source arrays with variable sweep length | |
CN106501771B (zh) | 定位光信号发射系统、方法及定位系统 | |
CN106597523B (zh) | 一种可控震源动态扫描方法及装置 | |
EP2634602A3 (en) | Methods and Apparatus for Automated Noise Removal from Seismic Data | |
CN105842660B (zh) | 光束发射/接收系统、接收方法和室内定位系统及方法 | |
JP4307427B2 (ja) | レーザ測量装置及びレーザ測量方法 | |
CN102590861A (zh) | 基于接收阵列的地震波束形成方法 | |
CN109270576A (zh) | 多通道三维地震物理模拟数据采集方法及装置 | |
CN111352150B (zh) | 一种优化震源生产组合方式的方法及装置 | |
CN104136940A (zh) | 地震源同步方法 | |
CN111948703B (zh) | 混合震源激发的地震勘探方法及装置 | |
CN113109864B (zh) | 地震勘探炮点变观方法及装置 | |
CN112444876A (zh) | 一种地震数据处理方法及装置 | |
EP3215874B1 (en) | Marine surveying |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150701 |