CN104751296A - Oceanographic engineering quality control information system - Google Patents
Oceanographic engineering quality control information system Download PDFInfo
- Publication number
- CN104751296A CN104751296A CN201510181860.4A CN201510181860A CN104751296A CN 104751296 A CN104751296 A CN 104751296A CN 201510181860 A CN201510181860 A CN 201510181860A CN 104751296 A CN104751296 A CN 104751296A
- Authority
- CN
- China
- Prior art keywords
- inspection
- overall budget
- information
- acceptance
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A90/00—Technologies having an indirect contribution to adaptation to climate change
- Y02A90/10—Information and communication technologies [ICT] supporting adaptation to climate change, e.g. for weather forecasting or climate simulation
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
The invention relates to the field of offshore oil engineering and provides an oceanographic engineering quality control information system. The oceanographic engineering quality control information system comprises a management setting module, a construction quality managing module, a debugging quality managing module, a file managing module and a statistical analyzing module, wherein the management setting module is used for setting a user login password and authorities of a user, setting essential data and preserving welder qualifications; the construction quality managing module is used for determining construction quality acceptance when monitors that information input by a general contractor is examined and approved by an owner party and a third party; the debugging quality managing module is used for acquiring the information input by the general contractor and recording left problems for subsequent elimination; the file managing module is used for uploading, checking and downloading item information; and the statistical analyzing module is used for extracting various data input in the earlier stages according to a user command and giving an analysis result. The oceanographic engineering quality control information system is capable of finishing daily quality inspection work, performing real-time quality information statistics, collecting the statistical information and generating weekly reports and monthly reports needed in working automatically, and the aid of the oceanographic engineering quality control information system, traditional paper file transmission can be replaced to achieve automatic real-time data statistics, so that efficiency in quality management is improved greatly.
Description
Technical field
The present invention relates to Offshore Engineering field, is a kind of infosystem managed Offshore Engineering quality.
Background technology
At present, in Offshore Engineering field, quality test results and quality information are with paper medium recording, and all kinds of flow process of reporting mainly leans on manual delivery, so not only cost is high, serious waste of resources, and information share, inquiry and historical data review inefficiency.
Summary of the invention
The object of this invention is to provide a kind of oceanographic engineering quality management and control infosystem, it can realize the information system management of sharing of quality information and quality document, quality management efficiency is improved, eliminates artificial factor, saved cost.
Technical scheme of the present invention is as follows:
The invention provides a kind of oceanographic engineering quality management and control infosystem, it comprises:
Management arranges module, build guality administration module, debugging quality management module, document management module, statistical analysis module;
Management arranges module, for arranging login password, the authority of user, and the maintenance of basic data and the maintenance and management of welder's qualification;
Build guality administration module, for obtaining the material information of overall budget side by browser typing, and after confirming that this material information reaches standard-required, receive weld information, NDT data, the Detection Information of the typing of overall budget side, and when monitoring proprietor and the third party approval results for weld information by after checking and accepting, confirm that build guality is checked and accepted by generating acceptance report;
Debugging quality management module, is used for obtaining the information entering field device of overall budget side's typing, to enter field device test after checking information, and be recorded into the leftover problem after field device inspection; The equipment obtaining the typing of overall budget side is installed and equipment debugging data, and the leftover problem in recording unit debug process, and leftover problem is eliminated according to the order obtained after overall budget side follows the tracks of process;
Document management module is used for uploading for user, consult, download items relevant information, and described item related information segmentation is stored in the database carried, and by the form of library and picture library to user;
Statistical analysis module, for the Various types of data of order extraction system typing in early stage inputted according to user, and carries out analytic statistics to it, provides analysis result, be presented to user with the form gathering form or statistical graph.
Further, described management arranges module, comprising:
Password Management unit, is used for obtaining the password that user resets, and replaces oneself original login password with the password of this replacement;
Service management unit, is used for, amendment newly-increased according to the user account information that gets, deletion action order, manages user account information, and organizes different users and give different System Privileges;
Basic data maintenance unit, is used for obtaining the search of user's input, newly-increased, amendment, deletion data operation order, and safeguards basic data according to these orders;
Welding qualification management unit, is used for welder's qualification expiration time and existing time to do difference operation; Judge that difference result is less than setting-up time threshold value, when difference result is less than setting-up time threshold value, then sends early warning information reminding user and renew; What input according to user renews order, completes renewing of welding qualification.
Further, the user's group in described service management unit comprises:
Project overall budget side, project proprietor, project third party, project construction side, project maritime affairs side and keeper; Described project overall budget side is endowed data inputting and Back ground Information checks authority; Described project proprietor, project third party, project construction side, project maritime affairs side are endowed the page and check and the workflow power of examination and approval.
Further, described build guality administration module comprises:
For the architecture quality control unit of governance structure material and the weldquality between it; Described architecture quality control unit specifically comprises:
The structured material data that subelement receives the input of overall budget side checked and accepted by structured material, according to the order of proprietor, this material data mated with standard material data, if fit through, then generate acceptance report by checking and accepting;
Structure group is to quality control subelement, request is checked and accepted in the inspection declaration list that reception overall budget policy is uploaded completing the right weld information of structure group and reservation, wait for the confirmation that proprietor and the third party scene of dividing out mutually carries out an acceptance inspection to the weld information of inspection declaration, obtain the check and acceptance result of overall budget side's typing and after the qualified examination confirmation getting proprietor and third party's weld seam right to this structure group, generate acceptance report by checking and accepting; Otherwise the inspection declaration list received by returning is rectified and improved for overall budget side;
Weld appearance controls subelement and receives overall budget side and check and accept request to group to the weld appearance inspection declaration list of qualified weld seam and reservation, waits for the confirmation that owner and third party carry out an acceptance inspection according to the inspection declaration record scene of making an appointment, overall budget side; Obtain the typing of overall budget side check and acceptance result and getting after proprietor and third party qualified examinations to check and acceptance result confirm, by checking and accepting generation acceptance report; Otherwise the weld appearance inspection declaration list received by returning is rectified and improved for overall budget side;
Magnetic powder inspection quality control subelement, receive the magnetic powder inspection sampling observation information of overall budget policy butt welded seam presentation quality acceptance(check) weld seam, this magnetic powder inspection sampling observation information comprises NDT figure number, the magnetic powder inspection result selected overall budget side; Magnetic sampling observation weld seam quantity; Request of data is sent to server according to described NDT figure number; Under receiving the NDT figure number of server feedback, total weld seam number, group have been inspected number by random samples to passing number, outward appearance passing number, regulation magnetic sampling observation ratio, magnetic powder inspection criterion of acceptability, information and have inspected percent information by random samples, magnetic powder inspection result and magnetic powder inspection criterion of acceptability are compared, if reach magnetic powder inspection criterion of acceptability, then continue to inspect the magnetic inspecting percent information and regulation by random samples by random samples ratio to compare, when after the magnetic sampling observation ratio reaching regulation, generate acceptance report by checking and accepting; Otherwise prompting overall budget side continues sampling observation; If magnetic powder inspection result does not reach magnetic powder inspection criterion of acceptability, then send defective examination and for overall budget side, underproof weld seam is reprocessed;
UT (Ultrasonic Testing) quality control subelement, receive the UT (Ultrasonic Testing) sampling observation information of overall budget policy butt welded seam presentation quality acceptance(check) weld seam, this UT (Ultrasonic Testing) comprises NDT figure number, the UT (Ultrasonic Testing) result that overall budget side is selected; Ultrasound wave sampling observation weld seam quantity; Request of data is sent to server according to described NDT figure number; Receive total weld seam number, group under the NDT figure number of server feedback to the ultrasound wave sampling observation ratio of passing number, outward appearance passing number, regulation, UT (Ultrasonic Testing) criterion of acceptability, inspect number by random samples and inspected ratio by random samples; UT (Ultrasonic Testing) result and UT (Ultrasonic Testing) criterion of acceptability are compared, if reach UT (Ultrasonic Testing) criterion of acceptability, then continuing to inspect the ultrasound wave inspecting percent information and regulation by random samples by random samples ratio to compare, when after the ultrasound wave sampling observation ratio reaching regulation, generating acceptance report by checking and accepting; Otherwise prompting overall budget side continues sampling observation; If UT (Ultrasonic Testing) result does not reach UT (Ultrasonic Testing) criterion of acceptability, then send defective examination and for overall budget side, underproof weld seam is reprocessed.
Further, described architecture quality control unit also comprises:
NDT data-interface is used for batch and imports data, described data comprise following in one or more: NDT basic data, ultrasound wave sampling observation data, magnetic sampling observation data, NDT Examined data.
Further, described build guality administration module also comprises:
For the pipeline quality control unit of management and control piping material and the weldquality between it; Described pipeline quality control unit specifically comprises:
Piping material checks and accepts subelement, pipeline group controls subelement, radiographic inspection quality control subelement and permeation flaw detection quality control subelement to quality control subelement, pipeline weld appearance quality control subelement, carbon dust flaw detection pipeline quality;
Piping material checks and accepts the piping material data that subelement receives the input of overall budget side, and these piping material data are mated with standard pipe wire material data by the order according to proprietor, if fit through, then generates report by checking and accepting;
Pipeline group receives overall budget policy to quality control subelement and checks and accepts request to completing the pipeline group that the right weld information of pipeline group uploads to inspection declaration list and reservation, wait for the confirmation that proprietor and the third party scene of dividing out mutually carries out an acceptance inspection to the pipeline weld information of inspection declaration, obtain the check and acceptance result of overall budget side's typing and after the qualified examination confirmation getting proprietor and third party's weld seam right to this pipeline group, generate acceptance report by checking and accepting; Otherwise the inspection declaration list received by returning is rectified and improved for overall budget side;
Pipeline weld appearance controls subelement and receives overall budget side and check and accept request to group to the pipeline weld appearance inspection declaration list of qualified weld seam and reservation, waits for the confirmation that owner and third party carry out an acceptance inspection according to the inspection declaration record scene of making an appointment, overall budget side; Obtain the typing of overall budget side check and acceptance result and getting after proprietor and third party qualified examinations to check and acceptance result confirm, by checking and accepting generation acceptance report; Otherwise the pipeline weld appearance inspection declaration list received by returning is rectified and improved for overall budget side;
Magnetic powder inspection pipeline quality controls subelement and receives the sampling observation weld information that overall budget side's weld seam qualified to the inspection of quality of pipeline weld appearance carries out the rear typing of on-the-spot magnetic powder inspection sampling observation, and this magnetic powder inspection sampling observation information comprises NDT figure number, the magnetic powder inspection result selected overall budget side; Magnetic sampling observation weld seam quantity; Request of data is sent to server according to described NDT figure number; Under receiving the NDT figure number of server feedback, total weld seam number, group have been inspected number by random samples to passing number, outward appearance passing number, regulation magnetic sampling observation ratio, magnetic powder inspection criterion of acceptability, information and have inspected percent information by random samples, magnetic powder inspection result and magnetic powder inspection criterion of acceptability are compared, if reach magnetic powder inspection criterion of acceptability, then continue to inspect the magnetic inspecting percent information and regulation by random samples by random samples ratio to compare, when after the magnetic sampling observation ratio reaching regulation, generate acceptance report by checking and accepting; Otherwise prompting overall budget side continues sampling observation; If magnetic powder inspection result does not reach magnetic powder inspection criterion of acceptability, then send defective examination and for overall budget side, underproof pipeline weld seam is reprocessed;
The weld seam that radiographic inspection quality control subelement receives the butt welded seam presentation quality acceptance(check) of overall budget side carries out the sampling observation weld information that on-the-spot radiographic inspection inspects rear typing by random samples, this sampling observation weld information comprises the NDT figure number that overall budget side is selected, data requesting instructions is sent to server, server is according to this data requesting instructions, total weld seam number under adding up this NDT figure number, group is to passing number, outward appearance passing number, regulation ray sampling observation ratio, radiographic inspection criterion of acceptability, inspect number by random samples and inspected ratio by random samples, radiographic inspection result and radiographic inspection criterion of acceptability are compared, if reach radiographic inspection criterion of acceptability, then continue to inspect the radiographic inspection inspecting percent information and regulation by random samples by random samples ratio to compare, when after the radiographic inspection sampling observation ratio reaching regulation, acceptance report is generated by checking and accepting, otherwise prompting overall budget side continues sampling observation, if radiographic inspection result does not reach radiographic inspection criterion of acceptability, then send defective examination and for overall budget side, underproof pipeline weld seam is reprocessed,
The weld seam that permeation flaw detection quality control subelement receives the butt welded seam presentation quality acceptance(check) of overall budget side carries out the sampling observation weld information after on-the-spot permeation flaw detection sampling observation, this sampling observation weld information comprises the NDT figure number that overall budget side is selected, data requesting instructions is sent to server, server is according to this data requesting instructions, total weld seam number under adding up this NDT figure number, group is to passing number, outward appearance passing number, regulation infiltration sampling observation ratio, permeation flaw detection criterion of acceptability, inspect number by random samples and inspected ratio by random samples, permeation flaw detection result and permeation flaw detection criterion of acceptability are compared, if reach permeation flaw detection criterion of acceptability, then continue to inspect the permeation flaw detection inspecting percent information and regulation by random samples by random samples ratio to compare, when after the permeation flaw detection sampling observation ratio reaching regulation, acceptance report is generated by checking and accepting, otherwise prompting overall budget side continues sampling observation, if permeation flaw detection result does not reach permeation flaw detection criterion of acceptability, then send defective examination and for overall budget side, underproof pipeline weld seam is reprocessed.
Further, described build guality administration module also comprises:
The fitting-out anti-corrosion material data that subelement receives the input of overall budget side checked and accepted by fitting-out anti-corrosion material, according to the order of proprietor, these fitting-out anti-corrosion material data mated with standard fitting-out anti-corrosion material data, if fit through, then by checking and accepting and generating report;
Sandblasting syndrome unit, receive overall budget policy and sandblasting inspection inspection declaration list that blasting treatment uploads has been completed to fitting-out anti-corrosion material and request is checked and accepted in reservation, Deng until the confirmation that carries out an acceptance inspection according to the inspection declaration record scene of making an appointment, overall budget side of owner and third party, obtain the typing of overall budget side sandblasting check and acceptance result and getting after proprietor and third party qualified examinations to sandblasting check and acceptance result confirm, by checking and accepting generation acceptance report; Otherwise the sandblasting inspection inspection declaration list received by returning is rectified and improved for overall budget side;
Request is checked and accepted in the paint detection inspection declaration list that paint detection subelement reception overall budget policy is uploaded completing paint application on blasting treatment basis and reservation, Deng until proprietor and the third party confirmation that carries out an acceptance inspection of the scene of dividing out mutually to receive the inspection declaration information of overall budget side in system after, obtain the typing of overall budget side paint application check and acceptance result and getting after proprietor and third party qualified examinations to paint application check and acceptance result confirm, by checking and accepting generation acceptance report; Otherwise the paint detection inspection declaration list received by returning is rectified and improved for overall budget side;
The application adhesion inspection inspection declaration list that application adhesion test subelement reception overall budget policy is uploaded completing the test of application adhesion and reservation examination request, Deng until proprietor and the third party confirmation that carries out an acceptance inspection of the scene of dividing out mutually to receive the inspection declaration information of overall budget side in system after, if acceptance(check), then in systems in which qualified examination is carried out to this application adhesion detecting information; Obtain the typing of overall budget side application adhesion check and acceptance result and getting after proprietor and third party qualified examinations to application adhesion check and acceptance result confirm, by checking and accepting generation acceptance report; Otherwise the application adhesion inspection inspection declaration list received by returning is rectified and improved for overall budget side.
Further, described oceanographic engineering quality management and control infosystem also comprises:
Enter the debugging quality management module of field device and Installation and Debugging quality thereof for management and control, described debugging quality management module specifically comprises:
Equipment admission verification unit receives the details entering field device and the reservation field test request of the typing of overall budget side, Deng until proprietor, producer, third party to the confirmation of reservation field test request, receives and preserves the leftover problem entering field device found in the field inspection process of overall budget side's typing and follow the tracks of solution for the later stage; Settled leftover problem is closed according to the order of overall budget side;
Equipment installs details and the reservation field test request that verification unit receives the equipment to be installed of overall budget side's typing, waits for that proprietor, producer, third party are to the confirmation of reservation field test request;
Equipment debugging verification unit receives debugging form, the debugger information of the typing of overall budget side, Deng until proprietor, producer, third party to the confirmation of reservation field test request, receives and preserves the leftover problem found in the debug process of overall budget side's typing and follow the tracks of solution for the later stage; Settled leftover problem is closed according to the order of overall budget side.
Further, described proprietor, producer, third party, to the confirmation process of reservation field test request, comprising:
After inserting approval information and official seal online, the word page is locked, open word document locking process simultaneously at background server end, the document is signed electronically, complete the confirmation to reservation field test request.
Further, described statistical analysis module is when fetching data, first in xml file, data are stored, and the form by obtaining line by line, data substep is taken out, is drawn in front end page, multiple storing process is write in SQL database, by needing the data of statistical study to carry out computational analysis in the server, then result being write in xml file, from xml file, data being drawn in front end page more afterwards.
Beneficial effect of the present invention is: inspection declaration, approval process, electronization; Support multi-user, administration of multiple roles, security of system is reliable; Fast custom can be realized for disparity items; Qualitative data Statistic analysis models, pictorialization, can provide decision support for different levels personnel, quality management efficiency improved, eliminates artificial factor.
Accompanying drawing explanation
Fig. 1 is the frame diagram of oceanographic engineering quality management and control infosystem of the present invention.
Embodiment
Below in conjunction with drawings and Examples, the present invention is elaborated.
The invention provides a kind of oceanographic engineering quality management and control infosystem, it can realize the data interaction function such as typing, the tracking of data, the analysis of data of data.As shown in Figure 1, the frame diagram of oceanographic engineering quality management and control infosystem is given.
As seen from Figure 1, this foreign construction quality management and control infosystem comprise management arrange module 1, build guality administration module 2, debugging quality management module 3, document management module 4, statistical analysis module 5.Below modules is explained in detail respectively:
Management arranges module 1, comprises Password Management unit 11, service management unit 12, basic data maintenance unit 13 and welder's qualification management unit 14.
Password Management unit 11 is used for obtaining the password that user resets, and replaces oneself original login password with the password of this replacement.When getting the login password of user's input, the password preserved in login password therewith Password Management unit being compared, if unanimously, then allowing user to log in.
Service management unit 12, for, amendment newly-increased according to the user account information got, deletion action order, manages user account information, and organizes the different System Privileges of imparting to different users; These accounts informations comprise: keeper, project overall budget side, project proprietor, project third party, project construction side, project maritime affairs side.
In this service management unit 12, by setting up different user's groups, different users being organized and gives different System Privileges, realizing the distribution of multi-user's different rights in same system.This invention comprises six user's groups altogether, is project overall budget side, project proprietor, project third party, project construction side, project maritime affairs side and keeper respectively.Wherein project overall budget side is endowed data inputting and Back ground Information and the authority such as checks; Project proprietor, project third party, project construction side, project maritime affairs side are endowed the page and check and the authorities such as workflow examination & approval.
The Sharepoint2007 that the present invention is based on Microsoft carries out secondary development, its permission system can arrive the rank of each record, that is, each storehouse, list, file, file, list items can arrange authority separately, on this basis, realize the control to some " field " authority by secondary development.System obtains the Back ground Information logging in people, comprising login account, name, mailbox, unit one belongs to, affiliated company, place grouping (grouping here refers to that user belongs to project overall budget side, project proprietor, project third party, project construction side, project maritime affairs side or keeper), judge to divide into groups in this user place, send instructions to backstage, screening organizes relevant data to this user, be buffered in XML file, by the acquisition instruction of the page, in XML file, get required data, feed back in front page layout.In the process of inspection declaration entry information, the data of the accounts information of inspection declaration people and typing are stored in SQL database in the lump.Different members in same grouping, check and revising the page, by sending data acquisition instruction to server, obtain data and the typing people accounts information of typing, the page judge current login account information whether and the accounts information of these data of typing consistent, if consistent, give the authority of revising and deleting this inspection declaration list; If inconsistent, only check the authority of this inspection declaration list.And in each user's group, add different users, inherit the authority of parent user group, then follow-up member in this user's group has this user and organizes identical authority.Each user right writes on separately in the territory of server, consistent with the territory user in server OS, and that is, the user in system has possessed the security identical with user in operating system.The all page of user all just can must be checked after login system, and the data security therefore in system has just had guarantee.
Basic data maintenance unit 13, is used for obtaining the search of user's input, newly-increased, amendment, deletion data operation order, and safeguards basic data according to these orders.In the SQL database of these basic data presence servers.These basic datas comprise:
WBS (the Work Breakdown Structure of project, work breakdown structure (WBS)) data, comprise the partitioned project of project, kinds of construction, inspection lot, the partitioned project of typing, kinds of construction, inspection lot provide affiliated selection for the data inputting of links under build guality administration module;
Weld defects type, comprise people, machine (machine), material (material), method (welding method), five kinds, ring (welding surroundings), belonging to weld seam defective under build guality administration module, type provides selection, also facilitates simultaneously and carry out statistical study to each weld defects type proportion in statistical study;
Weld defects reason, sorts out defective for welding reason, conveniently under build guality administration module, provides selection during the defective welding analysis of causes;
Construction joint Back ground Information, comprises the weld seam Back ground Information that in the build guality administration module 2 of typing, architecture quality control unit 21 relates to, the convenient weld information selecting Site Welding to complete in architecture quality management and control during newly-built inspection declaration list;
Pipeline weld seam Back ground Information, the weld seam Back ground Information that the build guality administration module 2 underground pipelines quality control unit 22 comprising typing relates to, the convenient weld information selecting Site Welding to complete in pipeline quality management and control during newly-built inspection declaration list.
Welding qualification management unit 14, the function that can realize the expired real-time early warning of welder's qualification and fast renew.Management process is as follows: step 1, and welder's qualification expiration time and existing time are done difference operation; Step 2, judges that difference result is less than setting-up time threshold value, when difference result is less than setting-up time threshold value, then sends early warning information; Step 3, what input according to user renews order, completes renewing of welding qualification, restarts step 1 more afterwards.
Build guality administration module 2, is used for obtaining the weld information, NDT data, Detection Information etc. of user by browser typing, and is stored in the database of server, to realize carrying out real-time quality following function to each weld information.Build guality administration module 2 comprises as lower unit: architecture quality control unit 21, pipeline quality control unit 22, fitting-out anticorrosive quality control unit 23.
Architecture quality control unit 21, is used for obtaining the weld information, NDT data, Detection Information etc. of user by browser typing, and is stored in the database of server, to realize carrying out real-time quality following function to each construction joint information.It comprises: structured material checks and accepts subelement 211, structure group to quality control subelement 212, weld appearance quality control subelement 213, carbon dust flaw detection quality control subelement 214, UT (Ultrasonic Testing) quality control subelement 215.Conveniently batch data typing, this architecture quality control unit 21 can also comprise NDT ((Nondestructive Testing, Non-Destructive Testing, also known as nondestructive examination) data-interface 216 (not shown).
Wherein the structured material data that subelement 211 receives the input of overall budget side checked and accepted by structured material, and this material data is mated with standard material data by proprietor, if fit through, then generate acceptance report by checking and accepting; Otherwise, declaration again;
Structure group is to quality control subelement 212, (overall budget side carries out inspection declaration by completing the right weld information of structure group at the scene by system to completing the inspection declaration list that the right weld information of structure group uploads to receive overall budget policy, the construction joint Back ground Information that overall budget side is selected from basic data maintenance unit 13 is comprised in this inspection declaration list) and reservation examination request, wait for and also confirm that the scene of dividing out mutually carries out an acceptance inspection to the weld information of inspection declaration proprietor and third party receive the inspection declaration information of overall budget side in system after, after onsite acceptance, if acceptance(check), then system receives the on-the-spot structure group butt welded seam information check and acceptance result of overall budget side's typing, the weld seam right to this structure group carries out qualified examination to wait for proprietor, if acceptance(check), then the structure group butt welded seam information of this acceptance(check) flow into weld appearance quality control subelement 213, if check and accept defective, overall budget side can receive this inspection declaration list that proprietor returns, overall budget policy is rectified and improved this weld seam to scene by the inspection declaration list return, inspection declaration again in systems in which after completing, if three inspection declarations are not all passed through, this weld seam will face the destiny of cutting and rewelding, and this weld seam record, by welding seam No new for acquisition one, starts the inspection declaration flow process of a new round.
After weld appearance control subelement 213 receives the structure group butt welded seam information of acceptance(check), overall budget side carries out visual examination of weld to group to qualified weld seam to on-the-spot, and visual examination of weld result to be entered in system and to send reservation and check and accept request, the inspection declaration record scene of making an appointment, overall budget side that owner and third party control in subelement 213 according to weld appearance carries out an acceptance inspection, overall budget root carries out corresponding typing to check and acceptance result in systems in which according to onsite acceptance record, wait for that owner and third party are to the confirmation of check and acceptance result, if confirmation acceptance(check), then these weld appearance data flow into magnetic powder inspection quality control subelement 214, if check and accept defective, overall budget side will receive the weld appearance inspection declaration list will returned by proprietor, overall budget policy is rectified and improved this weld seam to scene by the weld appearance inspection declaration list returned, inspection declaration again in systems in which after completing, if three inspection declarations are not all passed through, this weld seam will face the destiny of cutting and rewelding, this weld seam record, by welding seam No new for acquisition one, starts the inspection declaration flow process of a new round.
Magnetic powder inspection quality control subelement 214, the weld seam receiving the butt welded seam presentation quality acceptance(check) of overall budget side carries out the sampling observation weld information of the rear typing of on-the-spot magnetic powder inspection sampling observation, this magnetic powder inspection sampling observation comprises the NDT figure number selected overall budget side, the NDT figure number that system is selected according to overall budget side, data requesting instructions is sent to server, the request instruction that server sends according to the page, under adding up this NDT figure number, total weld seam number, group are inspected ratio by random samples to passing number, outward appearance passing number, regulation magnetic, inspect number by random samples, are inspected ratio and magnetic powder inspection criterion of acceptability by random samples.Magnetic powder inspection result and magnetic powder inspection criterion of acceptability are compared, if reach magnetic powder inspection criterion of acceptability, then continue to judge that overall budget side has inspected the magnetic sampling observation ratio whether ratio reaches regulation by random samples, if do not reach the magnetic sampling observation ratio of regulation, then overall budget side need again to go the acceptance(check) of on-the-spot butt welded seam presentation quality other do not inspect weld seam by random samples and carry out magnetic powder inspection sampling observation, and the weld information of typing sampling observation in systems in which, the field information such as the detection length of typing, report number (this weld seam is report number belonging to weld appearance quality control), fusion length, position while welding is stored in SQL database by system, if overall budget side carries out on-the-spot magnetic powder inspection to the weld seam inspected by random samples detect defective (i.e. magnetic powder inspection result does not reach magnetic powder inspection criterion of acceptability), then overall budget side carries out first time immediately to defective weld seam and reprocesses, carry out magnetic powder inspection again to the weld seam reprocessed to detect, in systems in which typing first time reprocess after the field information such as detection length, report number, fusion length, position while welding, these field informations of typing are stored in SQL database by system, after first time is reprocessed, magnetic powder inspection detects or underproof weld seam carries out repair for 2nd time inspection declaration, and send instruction in systems in which to proprietor and third party, proprietor and third party get the information of system feedback, ratify two in systems in which to return, system sends approval instruction to overall budget side, after overall budget side sees the approval instruction of this weld seam in systems in which, scene is gone to carry out repair for 2nd time, and magnetic powder inspection detection is carried out after repair for 2nd time, if testing result is still defective, then scene rectification is carried out to this weld seam, given new welding seam No in systems in which, again inspection declaration.
UT (Ultrasonic Testing) quality control subelement 215, the weld seam receiving the butt welded seam presentation quality acceptance(check) of overall budget side carries out the sampling observation weld information of the rear typing of on-the-spot UT (Ultrasonic Testing) sampling observation, this UT (Ultrasonic Testing) sampling observation weld information comprises the NDT figure number selected overall budget side, system is according to this NDT figure number, data requesting instructions is sent to server, the request instruction that server sends according to the page, total weld seam number under adding up this NDT figure number, group is to passing number, outward appearance passing number, regulation ultrasound wave sampling observation ratio, inspect number by random samples, ratio and UT (Ultrasonic Testing) criterion of acceptability are inspected by random samples.UT (Ultrasonic Testing) result and UT (Ultrasonic Testing) criterion of acceptability are compared, if reach UT (Ultrasonic Testing) criterion of acceptability, then continue to judge to have inspected the ultrasound wave sampling observation ratio whether ratio reaches regulation by random samples, if ratio of having inspected by random samples does not reach the ultrasound wave sampling observation ratio of regulation, other of then pointing out overall budget side again to go the acceptance(check) of on-the-spot butt welded seam presentation quality are not inspected weld seam by random samples and are carried out UT (Ultrasonic Testing) sampling observation, and the weld information of typing sampling observation in systems in which, system is by the detection length of typing, report number (this weld seam is report number belonging to weld appearance quality control), fusion length, the field informations such as position while welding are stored in SQL database, if overall budget side carries out on-the-spot UT (Ultrasonic Testing) to the weld seam inspected by random samples detect defective (namely UT (Ultrasonic Testing) result reaches UT (Ultrasonic Testing) criterion of acceptability), then overall budget side carries out first time immediately to defective weld seam and reprocesses, carry out again UT (Ultrasonic Testing) to the weld seam reprocessed to detect, in systems in which typing first time reprocess after the field information such as detection length, report number, fusion length, position while welding, these field informations of typing are stored in SQL database by system, after first time is reprocessed, UT (Ultrasonic Testing) detects or underproof weld seam carries out repair for 2nd time inspection declaration, and send instruction in systems in which to proprietor and third party, proprietor and third party get the information of system feedback, ratify two in systems in which to return, system sends approval instruction to overall budget side, after overall budget side sees the approval instruction of this weld seam in systems in which, scene is gone to carry out repair for 2nd time, and UT (Ultrasonic Testing) detection is carried out after repair for 2nd time, if testing result is still defective, then scene rectification is carried out to this weld seam, given new welding seam No in systems in which, again inspection declaration.
NDT data-interface 216 is used for batch and imports data in EXCEL file, and as NDT basic data, UT (ultrasound wave) inspects data by random samples, MT (magnetic) inspects data by random samples, NDT Examined data.
Pipeline quality control unit 22 is used for obtaining the pipeline weld information, Detection Information etc. of user by browser typing, and is stored in the database of server, to realize carrying out real-time quality following function to each pipeline weld information.It comprises: piping material checks and accepts subelement 221, pipeline group controls subelement 224, radiographic inspection quality control subelement 225 and permeation flaw detection quality control subelement 226 to quality control subelement 222, pipeline weld appearance quality control subelement 223, carbon dust flaw detection pipeline quality.
Wherein piping material checks and accepts the piping material data that subelement 221 receives the input of overall budget side, and these piping material data are mated with standard pipe wire material data by proprietor, if fit through, then generates report by checking and accepting; Otherwise, declaration again;
Pipeline group is to quality control subelement 222, receive overall budget policy to the inspection declaration list (overall budget side carries out inspection declaration by completing the right weld information of pipeline group at the scene by system) completing the right weld information of pipeline group and upload, Deng the on-the-spot confirmation carried out an acceptance inspection to the weld information of inspection declaration until proprietor and third party divide out after receiving the inspection declaration information of overall budget side mutually, after onsite acceptance, receive the pipeline group butt welded seam check and acceptance result of overall budget side's typing, wait for that proprietor confirms (if acceptance(check) to the examination of this check and acceptance result, the weld seam that then proprietor is right to this pipeline group in systems in which carries out qualified examination), after confirming acceptance(check), this pipeline group butt welded seam information flow into pipeline weld appearance quality control subelement 223, if check and accept defective, overall budget side will receive the pipeline group butt welded seam inspection declaration list will returned by proprietor, overall budget policy is rectified and improved this weld seam to scene by the pipeline group butt welded seam inspection declaration list return, inspection declaration again in systems in which after completing, if three inspection declarations are not all passed through, this weld seam will face the destiny of cutting and rewelding, and this weld seam record, by welding seam No new for acquisition one, starts new round inspection declaration flow process,
After pipeline weld appearance control subelement 223 receives the pipeline group butt welded seam information of acceptance(check), prompting overall budget side carries out visual examination of weld to group to qualified weld seam to scene, receive overall budget side be entered into the visual examination of weld result in system and preengage the request of examination, wait for the confirmation that owner and third party carry out an acceptance inspection according to the inspection declaration record scene of making an appointment, overall budget side in pipeline weld appearance control subelement 223, after onsite acceptance, receive overall budget side's typing check and acceptance result, and wait proprietor to confirm (if acceptance(check), the pipeline weld seam that then proprietor is qualified to outward appearance in systems in which carries out qualified examination), after confirming acceptance(check), the pipeline weld seam data that this outward appearance is qualified flow into magnetic powder inspection quality control subelement 224, if check and accept defective, overall budget side will receive the pipeline weld appearance inspection declaration list returned by proprietor, overall budget policy is rectified and improved this weld seam to scene by the weld appearance inspection declaration list returned, inspection declaration again in systems in which after completing, if three inspection declarations are not all passed through, this weld seam will face the destiny of cutting and rewelding, this weld seam record, by welding seam No new for acquisition one, starts the inspection declaration flow process of a new round.
Control in subelement 224 at magnetic powder inspection pipeline quality, overall budget side's weld seam qualified to the inspection of quality of pipeline weld appearance carries out on-the-spot magnetic powder inspection sampling observation, and sampling observation weld information is entered in system, this sampling observation weld information comprises the NDT figure number that overall budget side is selected, system is according to this NDT figure number, data requesting instructions is sent to server, the request instruction that server sends according to the page, total weld seam number under adding up this NDT figure number, group is to passing number, outward appearance passing number, regulation magnetic sampling observation ratio, inspect number by random samples, ratio and magnetic powder inspection criterion of acceptability are inspected by random samples.Magnetic powder inspection result and magnetic powder inspection criterion of acceptability are compared, if reach magnetic powder inspection criterion of acceptability, then continue to judge that overall budget side has inspected the magnetic sampling observation ratio whether ratio reaches regulation by random samples, if overall budget side has inspected the magnetic sampling observation ratio that ratio does not reach regulation by random samples, overall budget side need again to go the acceptance(check) of on-the-spot butt welded seam presentation quality other do not inspect weld seam by random samples and carry out magnetic powder inspection sampling observation, and the weld information of typing sampling observation in systems in which, system is by the detection length of typing, report number (this weld seam is report number belonging to weld appearance quality control), fusion length, the field informations such as position while welding are stored in SQL database, detect defective if overall budget side carries out on-the-spot magnetic powder inspection to the weld seam inspected by random samples, then overall budget side carries out first time immediately to defective weld seam and reprocesses, carry out magnetic powder inspection again to the weld seam reprocessed to detect, in systems in which typing first time reprocess after detection length, report number, fusion length, the field informations such as position while welding, these field informations of typing are stored in SQL database by system, after first time is reprocessed, magnetic powder inspection detects or underproof weld seam carries out repair for 2nd time inspection declaration, and send instruction in systems in which to proprietor and third party, proprietor and third party get the information of system feedback, ratify two in systems in which to return, system sends approval instruction to overall budget side, after overall budget side sees the approval instruction of this weld seam in systems in which, scene is gone to carry out repair for 2nd time, and magnetic powder inspection detection is carried out after repair for 2nd time, if testing result is still defective, then scene rectification is carried out to this weld seam, given new welding seam No in systems in which, again inspection declaration.
In radiographic inspection quality control subelement 225, the weld seam of overall budget side's butt welded seam presentation quality acceptance(check) carries out on-the-spot radiographic inspection sampling observation, and sampling observation weld information is entered in system, the NDT figure number that this sampling observation weld information treasure-house overall budget side is selected, system is according to this NDT figure number, data requesting instructions is sent to server, the request instruction that server sends according to the page, under adding up this NDT figure number, total weld seam number, group are inspected ratio by random samples to passing number, outward appearance passing number, regulation ray, inspect number by random samples, are inspected ratio and radiographic inspection criterion of acceptability by random samples.Radiographic inspection result and radiographic inspection criterion of acceptability are compared, if reach radiographic inspection criterion of acceptability, then continue to judge to have inspected the radiographic inspection sampling observation ratio whether percent information reaches regulation by random samples, if overall budget side has inspected the radiographic inspection sampling observation ratio that ratio reaches regulation by random samples, then confirm that examination is passed through, if overall budget side has inspected the radiographic inspection sampling observation ratio that ratio does not reach regulation by random samples, overall budget side need again to go the acceptance(check) of on-the-spot butt welded seam presentation quality other do not inspect weld seam by random samples and carry out radiographic inspection sampling observation, and the weld information of typing sampling observation in systems in which, the field information such as the detection length of typing, report number (this weld seam is report number belonging to weld appearance quality control), fusion length, position while welding is stored in SQL database by system, detect defective if overall budget side carries out on-the-spot radiographic inspection to the weld seam inspected by random samples, then overall budget side carries out first time immediately to defective weld seam and reprocesses, carry out again radiographic inspection to the weld seam reprocessed to detect, in systems in which typing first time reprocess after detection length, report number, fusion length, the field informations such as position while welding, these field informations of typing are stored in SQL database by system, after first time is reprocessed, radiographic inspection detects or underproof weld seam carries out repair for 2nd time inspection declaration, and send instruction in systems in which to proprietor and third party, proprietor and third party get the information of system feedback, ratify two in systems in which to return, system sends approval instruction to overall budget side, after overall budget side sees the approval instruction of this weld seam in systems in which, scene is gone to carry out repair for 2nd time, and radiographic inspection detection is carried out after repair for 2nd time, if testing result is still defective, then scene rectification is carried out to this weld seam, given new welding seam No in systems in which, again inspection declaration.
In permeation flaw detection quality control subelement 226, the weld seam of overall budget side's butt welded seam presentation quality acceptance(check) carries out on-the-spot permeation flaw detection sampling observation, and sampling observation weld information is entered in system, the NDT figure number that system is selected according to overall budget side, data requesting instructions is sent to server, the request instruction that server sends according to the page, under adding up this NDT figure number, total weld seam number, group are permeated sampling observation ratio to passing number, outward appearance passing number, regulation, inspect number by random samples, are inspected ratio and permeation flaw detection criterion of acceptability by random samples.Permeation flaw detection result and permeation flaw detection criterion of acceptability are compared, if reach permeation flaw detection criterion of acceptability, then continuing to judge to have inspected the permeation flaw detection sampling observation ratio whether percent information reaches regulation by random samples, when after the permeation flaw detection sampling observation ratio reaching regulation, generating acceptance report by checking and accepting, if overall budget side has inspected the infiltration sampling observation ratio that ratio does not reach regulation by random samples, overall budget side need again to go the acceptance(check) of on-the-spot butt welded seam presentation quality other do not inspect weld seam by random samples and carry out permeation flaw detection sampling observation, and the weld information of typing sampling observation in systems in which, the field information such as the detection length of typing, report number (this weld seam is report number belonging to weld appearance quality control), fusion length, position while welding is stored in SQL database by system, detect defective if overall budget side carries out on-the-spot permeation flaw detection to the weld seam inspected by random samples, then overall budget side carries out first time immediately to defective weld seam and reprocesses, carry out permeation flaw detection again to the weld seam reprocessed to detect, in systems in which typing first time reprocess after detection length, report number, fusion length, the field informations such as position while welding, these field informations of typing are stored in SQL database by system, after first time is reprocessed, permeation flaw detection detects or underproof weld seam carries out repair for 2nd time inspection declaration, and send instruction in systems in which to proprietor and third party, proprietor and third party get the information of system feedback, ratify two in systems in which to return, system sends approval instruction to overall budget side, after overall budget side sees the approval instruction of this weld seam in systems in which, scene is gone to carry out repair for 2nd time, and permeation flaw detection detection is carried out after repair for 2nd time, if testing result is still defective, then scene rectification is carried out to this weld seam, given new welding seam No in systems in which, again inspection declaration.
Fitting-out anticorrosive quality control unit 23, be used for detecting for Outfitting Material and preservative treatment situation thereof, and realizing fitting-out anticorrosive quality controlling functions according to testing result, it comprises: subelement 231, sandblasting syndrome unit 232, paint detection subelement 233 and application adhesion test subelement 234 checked and accepted by fitting-out anti-corrosion material.
The fitting-out anti-corrosion material data that subelement 231 receives the input of overall budget side checked and accepted by fitting-out anti-corrosion material, and these fitting-out anti-corrosion material data are mated with standard fitting-out anti-corrosion material data by proprietor, if fit through, then by checking and accepting and generating report; Otherwise, declaration again;
Sandblasting syndrome unit 232, receive overall budget policy to have completed sandblasting inspection inspection declaration list (overall budget side carries out blasting treatment by completing fitting-out corrosion-resistant material at the scene and carries out inspection declaration by system) that blasting treatment uploads and reservation to fitting-out anti-corrosion material and check and accept and ask, wait proprietor and the third party confirmation that receive the inspection declaration information of overall budget side in system after, the scene of dividing out mutually carries out an acceptance inspection to the sandblasting information of inspection declaration, after onsite acceptance, receive the onsite acceptance result of overall budget side's typing, wait for that proprietor and third party are to the feedback of this onsite acceptance result, if (proprietor and third party's acceptance(check), then in systems in which qualified examination is carried out to this sandblasting information), after obtaining proprietor and third party's acceptance(check) confirmation, this sandblasting acceptance information flow into paint detection subelement 233, if check and accept defective, overall budget side will receive the sandblasting inspection inspection declaration list returned by proprietor, overall budget policy carries out again blasting treatment to scene to this material to by the sandblasting inspection inspection declaration list return, inspection declaration again in systems in which after completing, if three inspection declarations are not all passed through, this sandblasting will face and again process, and sandblasting new for acquisition one is numbered by sandblasting record again specifically, start the inspection declaration flow process of a new round.
Paint detection subelement 233 receives paint detection inspection declaration list (overall budget side has completed the paint process of fitting-out anti-corrosion material at the scene and carried out inspection declaration by system) that overall budget policy uploads completing paint application on blasting treatment basis and request is checked and accepted in reservation, wait proprietor and the third party confirmation that receive the inspection declaration information of overall budget side in system after, the scene of dividing out mutually carries out an acceptance inspection to the paint application information of inspection declaration, after onsite acceptance, receive the onsite acceptance result of overall budget side's typing, wait for proprietor and third party to the feedback of this onsite acceptance result (if acceptance(check), then proprietor and third party carry out qualified examination to this paint application information in systems in which), after obtaining proprietor and third party's acceptance(check) confirmation, the qualified information of this paint detection flow into application adhesion test subelement 234, if check and accept defective, overall budget side will receive the paint detection inspection declaration list returned by proprietor, overall budget policy is rectified and improved this paint to scene by the paint detection inspection declaration list return, inspection declaration again in systems in which after completing, if three inspection declarations are not all passed through, this paint application will face and again process, and paint application new for acquisition one is numbered by paint application record again specifically, start the inspection declaration flow process of a new round.
Application adhesion test subelement 234 receives application adhesion inspection inspection declaration list (overall budget side has completed the test of application adhesion at the scene and carried out inspection declaration by system) that overall budget policy uploads completing the test of application adhesion and reservation and checks and accepts and ask, wait proprietor and the third party confirmation that receive the inspection declaration information of overall budget side in system after, the scene of dividing out mutually carries out an acceptance inspection to the application adhesion detecting information of inspection declaration, after onsite acceptance, receive the onsite acceptance result of overall budget side's typing, wait for proprietor and third party to the feedback of this onsite acceptance result (if acceptance(check), then proprietor and third party carry out qualified examination to this application adhesion detecting information in systems in which), after obtaining proprietor and third party's acceptance(check) confirmation, then fitting-out anticorrosive quality is qualified in checking and accepting, if check and accept defective, overall budget side will receive the application adhesion test inspection declaration list returned by proprietor, overall budget policy is rectified and improved this application adhesion to scene by the application adhesion test inspection declaration list return, inspection declaration again in systems in which after completing, if three inspection declarations are not all passed through, this application adhesion will face and again process, and application adhesion new for acquisition one is numbered by application adhesion record again specifically, start the inspection declaration flow process of a new round.
Debugging quality management module 3, being used for typing enters the information of field device, testing, being recorded into the leftover problem after field device inspection, carrying out equipment installation and equipment debugging, and follow the tracks of the leftover problem in equipment debugging process entering field device.It comprises equipment admission verification unit 31, equipment installs verification unit 31 and equipment debugging verification unit 33.
Admission test stage, equipment admission verification unit 31 receives the details entering field device of overall budget side's typing, and the time of going field test of arranging in systems in which, wait for that proprietor, producer, third party examine, and monitor proprietor, producer, third party's examination & approval when all passing through, overall budget side, proprietor, producer, third party go on-the-spotly to carry out admission inspection to equipment, if proprietor, producer, third party have a side not agree to, overall budget side needs to make another appointment declaration again.Until, proprietor, producer, third party all examine by till.In overall budget side, proprietor, producer, third party carry out in admission checkout procedure to equipment, be recorded into the leftover problem of field device, be entered in system, and leftover problem tracking is carried out to these problems, in inspection afterwards, find that the leftover problem of typing solves, then close corresponding problem in systems in which, system records automatically closes people and close event.
Equipment fixing link, equipment installs the details that verification unit 32 receives the equipment to be installed of overall budget side's typing, and arrange in systems in which go the field erected time, wait for that proprietor, producer, third party examine, and monitor examination & approval when all passing through, overall budget side, proprietor, producer, third party go on-the-spotly to carry out equipment installation to equipment, if proprietor, producer, third party have a side not agree to, overall budget side needs to make another appointment declaration again.Until, proprietor, producer, third party all examine by till.
Equipment debugging link, equipment debugging verification unit 33 receives the debugging form of overall budget side's typing, debugger information, wait for proprietor, producer, third party exchanges lattice examination & approval of taking temperature, and monitor debugging form determine errorless after, receive the time of the premise equipment debugging of overall budget side's typing, wait for proprietor, producer, third party examines the time of overall budget side's agreement in systems in which, determine proprietor, producer, when third party's examination & approval are all passed through, specify the personnel going field apparatus to debug in systems in which, overall budget side, proprietor, producer, third party goes to scene to carry out equipment debugging to equipment.Obtain the leftover problem in the debug process be entered in system, and leftover problem tracking is carried out to these problems, in inspection afterwards, find that the leftover problem of typing solves, then close corresponding problem in systems in which, system records automatically closes people and close event; If proprietor, producer, third party have a side not agree to, overall budget side needs to make another appointment declaration again.
In debugging quality management module 3, when proprietor, producer, third party examine, need in examination & approval report, to insert official seal according to business, this just must realize electronic signature with the form inserting official seal, does not allow amendment in the document of adding a cover electronic seal.After system acceptance to side's agreement trigger command of examination & approval, open WORD process locking process simultaneously at background server end, online insertion approval information and official seal, to WORD document, sign electronically to the document, after completing, word document is saved as pdf form, then rev down process rev.In addition, in the process of backstage opening document, run into multi-user possibly to open a document simultaneously and edit, just make mistakes possibly when at this moment preserving, employing background process controls, locked by the document opened, other users of in good time reminding user, in the form of editor's the document, prevent the document storing of backstage editor from makeing mistakes.
Document management module 4, is used for uploading for user, consult, download items associated documents.These files include but not limited to examination & approval report, inspection declaration single mode plate, the acceptance report that build guality administration module 2 and debugging quality management module 3 generate, the statistical report or form etc. that generate in statistical analysis module 5.Download and the collection of material are provided to user by the form of library and picture library in this document management module 4.And these pictures and file do not take the form of ordinary file in the server to realize, but all divided being stored in carries in sharepoint database, merely can not find these documents and picture in the server, this strengthens the security of system documentation data undoubtedly.
At document management module 4, use seamless technology to open office external member online in front end, realize the perfect display in office external member of data, statistical graph and picture.System is when going out report, need the format design electronic report for report, data in system can ideally be represented in word document, and can download and online printing, for different fields, on corresponding word, diverse location is specified mutually, to contents different in each fritter loading system, finally the information in system is write in word document.
At statistical analysis module 5, the Various types of data of extraction system typing in early stage, and these data analysis are added up, provide analysis result, represent with the form gathering form or statistical graph.When fetching data, first in xml file, data are stored, and the form by obtaining line by line, data substep is taken out, being drawn in front end page, in SQL database, writing multiple storing process, carrying out computational analysis in the server by needing the data of statistical study, then result is write in xml file, from xml file, data are drawn in front end page more afterwards.
In navigation page, statistical study can be done to project entirety, also can carry out statistical study to qualification rate under project, and these statistic analysis result represent with the form gathering form or statistical graph.Gathering the upper right side of form or statistical graph, arranging two buttons, one is print button, and one is save button, so just can preserve in good time and print each statistical graph.
Above-described embodiment, to invention has been further detailed description, the foregoing is only the specific embodiment of the present invention, being not limited to the present invention.
Claims (10)
1. an oceanographic engineering quality management and control infosystem, is characterized in that, comprising:
Management arranges module (1), build guality administration module (2), debugging quality management module (3), document management module (4), statistical analysis module (5);
Management arranges module (1), for arranging login password, the authority of user, and the maintenance of basic data and the maintenance and management of welder's qualification;
Build guality administration module (2), for obtaining the material information of overall budget side by browser typing, and after confirming that this material information reaches standard-required, receive weld information, NDT data, the Detection Information of the typing of overall budget side, and when monitoring proprietor and the third party approval results for weld information by after checking and accepting, confirm that build guality is checked and accepted by generating acceptance report;
Debugging quality management module (3), is used for obtaining the information entering field device of overall budget side's typing, to enter field device test after checking information, and be recorded into the leftover problem after field device inspection; The equipment obtaining the typing of overall budget side is installed and equipment debugging data, and the leftover problem in recording unit debug process, and leftover problem is eliminated according to the order obtained after overall budget side follows the tracks of process;
Document management module (4) is used for uploading for user, consult, download items relevant information, and described item related information segmentation is stored in the database carried, and by the form of library and picture library to user;
Statistical analysis module (5), for the Various types of data of order extraction system typing in early stage inputted according to user, and carries out analytic statistics to it, provides analysis result, be presented to user with the form gathering form or statistical graph.
2. oceanographic engineering quality management and control infosystem according to claim 1, it is characterized in that, described management arranges module, comprising:
Password Management unit (11), is used for obtaining the password that user resets, and replaces oneself original login password with the password of this replacement;
Service management unit (12), is used for, amendment newly-increased according to the user account information that gets, deletion action order, manages user account information, and organizes different users and give different System Privileges;
Basic data maintenance unit (13), is used for obtaining the search of user's input, newly-increased, amendment, deletion data operation order, and safeguards basic data according to these orders;
Welding qualification management unit (14), is used for welder's qualification expiration time and existing time to do difference operation; Judge that difference result is less than setting-up time threshold value, when difference result is less than setting-up time threshold value, then sends early warning information reminding user and renew; What input according to user renews order, completes renewing of welding qualification.
3. oceanographic engineering quality management and control infosystem according to claim 2, it is characterized in that, the user's group in described service management unit (12) comprises:
Project overall budget side, project proprietor, project third party, project construction side, project maritime affairs side and keeper; Described project overall budget side is endowed data inputting and Back ground Information checks authority; Described project proprietor, project third party, project construction side, project maritime affairs side are endowed the page and check and the workflow power of examination and approval.
4. oceanographic engineering quality management and control infosystem according to claim 1, it is characterized in that, described build guality administration module comprises:
For the architecture quality control unit (21) of governance structure material and the weldquality between it; Described architecture quality control unit (21) specifically comprises:
The structured material data that subelement (211) receives the input of overall budget side checked and accepted by structured material, according to the order of proprietor, this material data mated with standard material data, if fit through, then generate acceptance report by checking and accepting;
Structure group is to quality control subelement (212), request is checked and accepted in the inspection declaration list that reception overall budget policy is uploaded completing the right weld information of structure group and reservation, wait for the confirmation that proprietor and the third party scene of dividing out mutually carries out an acceptance inspection to the weld information of inspection declaration, obtain the check and acceptance result of overall budget side's typing and after the qualified examination confirmation getting proprietor and third party's weld seam right to this structure group, generate acceptance report by checking and accepting; Otherwise the inspection declaration list received by returning is rectified and improved for overall budget side;
Weld appearance controls subelement (213) and receives overall budget side and check and accept request to group to the weld appearance inspection declaration list of qualified weld seam and reservation, waits for the confirmation that owner and third party carry out an acceptance inspection according to the inspection declaration record scene of making an appointment, overall budget side; Obtain the typing of overall budget side check and acceptance result and getting after proprietor and third party qualified examinations to check and acceptance result confirm, by checking and accepting generation acceptance report; Otherwise the weld appearance inspection declaration list received by returning is rectified and improved for overall budget side;
Magnetic powder inspection quality control subelement (214), receive the magnetic powder inspection sampling observation information of overall budget policy butt welded seam presentation quality acceptance(check) weld seam, this magnetic powder inspection sampling observation information comprises NDT figure number, the magnetic powder inspection result selected overall budget side; Magnetic sampling observation weld seam quantity; Request of data is sent to server according to described NDT figure number; Under receiving the NDT figure number of server feedback, total weld seam number, group have been inspected number by random samples to passing number, outward appearance passing number, regulation magnetic sampling observation ratio, magnetic powder inspection criterion of acceptability, information and have inspected percent information by random samples, magnetic powder inspection result and magnetic powder inspection criterion of acceptability are compared, if reach magnetic powder inspection criterion of acceptability, then continue to inspect the magnetic inspecting percent information and regulation by random samples by random samples ratio to compare, when after the magnetic sampling observation ratio reaching regulation, generate acceptance report by checking and accepting; Otherwise prompting overall budget side continues sampling observation; If magnetic powder inspection result does not reach magnetic powder inspection criterion of acceptability, then send defective examination and for overall budget side, underproof weld seam is reprocessed;
UT (Ultrasonic Testing) quality control subelement (215), receive the UT (Ultrasonic Testing) sampling observation information of overall budget policy butt welded seam presentation quality acceptance(check) weld seam, this UT (Ultrasonic Testing) comprises NDT figure number, the UT (Ultrasonic Testing) result that overall budget side is selected; Ultrasound wave sampling observation weld seam quantity; Request of data is sent to server according to described NDT figure number; Receive total weld seam number, group under the NDT figure number of server feedback to the ultrasound wave sampling observation ratio of passing number, outward appearance passing number, regulation, UT (Ultrasonic Testing) criterion of acceptability, inspect number by random samples and inspected ratio by random samples; UT (Ultrasonic Testing) result and UT (Ultrasonic Testing) criterion of acceptability are compared, if reach UT (Ultrasonic Testing) criterion of acceptability, then continuing to inspect the ultrasound wave inspecting percent information and regulation by random samples by random samples ratio to compare, when after the ultrasound wave sampling observation ratio reaching regulation, generating acceptance report by checking and accepting; Otherwise prompting overall budget side continues sampling observation; If UT (Ultrasonic Testing) result does not reach UT (Ultrasonic Testing) criterion of acceptability, then send defective examination and for overall budget side, underproof weld seam is reprocessed.
5. oceanographic engineering quality management and control infosystem according to claim 4, is characterized in that, described architecture quality control unit (21) also comprises:
NDT data-interface (216) is used for batch and imports data, described data comprise following in one or more: NDT basic data, ultrasound wave sampling observation data, magnetic sampling observation data, NDT Examined data.
6. oceanographic engineering quality management and control infosystem according to claim 4, is characterized in that, described build guality administration module (2) also comprises:
For the pipeline quality control unit (22) of management and control piping material and the weldquality between it; Described pipeline quality control unit (22) specifically comprises:
Piping material checks and accepts subelement (221), pipeline group controls subelement (224), radiographic inspection quality control subelement (225) and permeation flaw detection quality control subelement (226) to quality control subelement (222), pipeline weld appearance quality control subelement (223), carbon dust flaw detection pipeline quality;
Piping material checks and accepts the piping material data that subelement (221) receives the input of overall budget side, and these piping material data are mated with standard pipe wire material data by the order according to proprietor, if fit through, then generates report by checking and accepting;
Pipeline group receives overall budget policy to quality control subelement (222) and checks and accepts request to completing the pipeline group that the right weld information of pipeline group uploads to inspection declaration list and reservation, wait for the confirmation that proprietor and the third party scene of dividing out mutually carries out an acceptance inspection to the pipeline weld information of inspection declaration, obtain the check and acceptance result of overall budget side's typing and after the qualified examination confirmation getting proprietor and third party's weld seam right to this pipeline group, generate acceptance report by checking and accepting; Otherwise the inspection declaration list received by returning is rectified and improved for overall budget side;
Pipeline weld appearance controls subelement (223) and receives overall budget side and check and accept request to group to the pipeline weld appearance inspection declaration list of qualified weld seam and reservation, waits for the confirmation that owner and third party carry out an acceptance inspection according to the inspection declaration record scene of making an appointment, overall budget side; Obtain the typing of overall budget side check and acceptance result and getting after proprietor and third party qualified examinations to check and acceptance result confirm, by checking and accepting generation acceptance report; Otherwise the pipeline weld appearance inspection declaration list received by returning is rectified and improved for overall budget side;
Magnetic powder inspection pipeline quality controls subelement (224) and receives the sampling observation weld information that overall budget side's weld seam qualified to the inspection of quality of pipeline weld appearance carries out the rear typing of on-the-spot magnetic powder inspection sampling observation, and this magnetic powder inspection sampling observation information comprises NDT figure number, the magnetic powder inspection result selected overall budget side; Magnetic sampling observation weld seam quantity; Request of data is sent to server according to described NDT figure number; Under receiving the NDT figure number of server feedback, total weld seam number, group have been inspected number by random samples to passing number, outward appearance passing number, regulation magnetic sampling observation ratio, magnetic powder inspection criterion of acceptability, information and have inspected percent information by random samples, magnetic powder inspection result and magnetic powder inspection criterion of acceptability are compared, if reach magnetic powder inspection criterion of acceptability, then continue to inspect the magnetic inspecting percent information and regulation by random samples by random samples ratio to compare, when after the magnetic sampling observation ratio reaching regulation, generate acceptance report by checking and accepting; Otherwise prompting overall budget side continues sampling observation; If magnetic powder inspection result does not reach magnetic powder inspection criterion of acceptability, then send defective examination and for overall budget side, underproof pipeline weld seam is reprocessed;
The weld seam that radiographic inspection quality control subelement (225) receives the butt welded seam presentation quality acceptance(check) of overall budget side carries out the sampling observation weld information that on-the-spot radiographic inspection inspects rear typing by random samples, this sampling observation weld information comprises the NDT figure number that overall budget side is selected, data requesting instructions is sent to server, server is according to this data requesting instructions, total weld seam number under adding up this NDT figure number, group is to passing number, outward appearance passing number, regulation ray sampling observation ratio, radiographic inspection criterion of acceptability, inspect number by random samples and inspected ratio by random samples, radiographic inspection result and radiographic inspection criterion of acceptability are compared, if reach radiographic inspection criterion of acceptability, then continue to inspect the radiographic inspection inspecting percent information and regulation by random samples by random samples ratio to compare, when after the radiographic inspection sampling observation ratio reaching regulation, acceptance report is generated by checking and accepting, otherwise prompting overall budget side continues sampling observation, if radiographic inspection result does not reach radiographic inspection criterion of acceptability, then send defective examination and for overall budget side, underproof pipeline weld seam is reprocessed,
The weld seam that permeation flaw detection quality control subelement (226) receives the butt welded seam presentation quality acceptance(check) of overall budget side carries out the sampling observation weld information after on-the-spot permeation flaw detection sampling observation, this sampling observation weld information comprises the NDT figure number that overall budget side is selected, data requesting instructions is sent to server, server is according to this data requesting instructions, total weld seam number under adding up this NDT figure number, group is to passing number, outward appearance passing number, regulation infiltration sampling observation ratio, permeation flaw detection criterion of acceptability, inspect number by random samples and inspected ratio by random samples, permeation flaw detection result and permeation flaw detection criterion of acceptability are compared, if reach permeation flaw detection criterion of acceptability, then continue to inspect the permeation flaw detection inspecting percent information and regulation by random samples by random samples ratio to compare, when after the permeation flaw detection sampling observation ratio reaching regulation, acceptance report is generated by checking and accepting, otherwise prompting overall budget side continues sampling observation, if permeation flaw detection result does not reach permeation flaw detection criterion of acceptability, then send defective examination and for overall budget side, underproof pipeline weld seam is reprocessed.
7. the oceanographic engineering quality management and control infosystem according to claim 4 to 6 any one, is characterized in that, described build guality administration module (2) also comprises:
The fitting-out anti-corrosion material data that subelement (231) receives the input of overall budget side checked and accepted by fitting-out anti-corrosion material, according to the order of proprietor, these fitting-out anti-corrosion material data are mated with standard fitting-out anti-corrosion material data, if fit through, then by checking and accepting and generating report;
Sandblasting syndrome unit (232), receive overall budget policy and sandblasting inspection inspection declaration list that blasting treatment uploads has been completed to fitting-out anti-corrosion material and request is checked and accepted in reservation, Deng until the confirmation that carries out an acceptance inspection according to the inspection declaration record scene of making an appointment, overall budget side of owner and third party, obtain the typing of overall budget side sandblasting check and acceptance result and getting after proprietor and third party qualified examinations to sandblasting check and acceptance result confirm, by checking and accepting generation acceptance report; Otherwise the sandblasting inspection inspection declaration list received by returning is rectified and improved for overall budget side;
Request is checked and accepted in the paint detection inspection declaration list that paint detection subelement (233) reception overall budget policy is uploaded completing paint application on blasting treatment basis and reservation, Deng until proprietor and the third party confirmation that carries out an acceptance inspection of the scene of dividing out mutually to receive the inspection declaration information of overall budget side in system after, obtain the typing of overall budget side paint application check and acceptance result and getting after proprietor and third party qualified examinations to paint application check and acceptance result confirm, by checking and accepting generation acceptance report; Otherwise the paint detection inspection declaration list received by returning is rectified and improved for overall budget side;
The application adhesion inspection inspection declaration list that application adhesion test subelement (234) reception overall budget policy is uploaded completing the test of application adhesion and reservation examination request, Deng until proprietor and the third party confirmation that carries out an acceptance inspection of the scene of dividing out mutually to receive the inspection declaration information of overall budget side in system after, if acceptance(check), then in systems in which qualified examination is carried out to this application adhesion detecting information; Obtain the typing of overall budget side application adhesion check and acceptance result and getting after proprietor and third party qualified examinations to application adhesion check and acceptance result confirm, by checking and accepting generation acceptance report; Otherwise the application adhesion inspection inspection declaration list received by returning is rectified and improved for overall budget side.
8. oceanographic engineering quality management and control infosystem according to claim 7, is characterized in that, described oceanographic engineering quality management and control infosystem also comprises:
Enter the debugging quality management module (3) of field device and Installation and Debugging quality thereof for management and control, described debugging quality management module (3) specifically comprises:
Equipment admission verification unit (31) receives the details entering field device and the reservation field test request of the typing of overall budget side, Deng until proprietor, producer, third party to the confirmation of reservation field test request, receives and preserves the leftover problem entering field device found in the field inspection process of overall budget side's typing and follow the tracks of solution for the later stage; Settled leftover problem is closed according to the order of overall budget side;
Equipment installs details and the reservation field test request that verification unit (32) receives the equipment to be installed of overall budget side's typing, waits for that proprietor, producer, third party are to the confirmation of reservation field test request;
Equipment debugging verification unit (33) receives debugging form, the debugger information of the typing of overall budget side, Deng until proprietor, producer, third party to the confirmation of reservation field test request, receives and preserves the leftover problem found in the debug process of overall budget side's typing and follow the tracks of solution for the later stage; Settled leftover problem is closed according to the order of overall budget side.
9. oceanographic engineering quality management and control infosystem according to claim 7, is characterized in that, described proprietor, producer, third party, to the confirmation process of reservation field test request, comprising:
After inserting approval information and official seal online, the word page is locked, open word document locking process simultaneously at background server end, the document is signed electronically, complete the confirmation to reservation field test request.
10. oceanographic engineering quality management and control infosystem according to claim 1, it is characterized in that, described statistical analysis module (5) is when fetching data, first in xml file, data are stored, and the form by obtaining line by line, data substep is taken out, be drawn in front end page, multiple storing process is write in SQL database, computational analysis is carried out in the server by needing the data of statistical study, then result is write in xml file, from xml file, data are drawn in front end page more afterwards.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510181860.4A CN104751296B (en) | 2015-04-16 | 2015-04-16 | A kind of ocean engineering quality management and control information system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510181860.4A CN104751296B (en) | 2015-04-16 | 2015-04-16 | A kind of ocean engineering quality management and control information system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104751296A true CN104751296A (en) | 2015-07-01 |
CN104751296B CN104751296B (en) | 2018-10-12 |
Family
ID=53590938
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510181860.4A Expired - Fee Related CN104751296B (en) | 2015-04-16 | 2015-04-16 | A kind of ocean engineering quality management and control information system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104751296B (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105414813A (en) * | 2015-12-04 | 2016-03-23 | 上海振华重工(集团)股份有限公司 | Welding seam tracking quality control system and method |
CN106327076A (en) * | 2016-08-23 | 2017-01-11 | 成都卡莱博尔信息技术股份有限公司 | Engineering acceptance system capable of supporting automatic inspection report generation |
CN106682913A (en) * | 2016-11-21 | 2017-05-17 | 北海高创电子信息孵化器有限公司 | Product quality inspection management system |
CN107014903A (en) * | 2017-05-09 | 2017-08-04 | 中国石油天然气集团公司 | A kind of pipeline girth weld joint defect positioning method and equipment |
CN107301498A (en) * | 2017-05-26 | 2017-10-27 | 中国铁道科学研究院铁道科学技术研究发展中心 | Generalized information management system for the military service monitoring of high-speed railway wheel rail relation |
CN109583668A (en) * | 2017-09-26 | 2019-04-05 | 同济大学 | Space flight large thin-wall element product processing quality traceability system |
CN109829088A (en) * | 2019-01-15 | 2019-05-31 | 江西通慧科技股份有限公司 | A kind of Expressway Mechanical & Electrical Project detection system |
CN110059898A (en) * | 2018-01-18 | 2019-07-26 | 江苏奥博洋信息技术有限公司 | A kind of online input system inspects method by random samples immediately |
CN110276551A (en) * | 2019-06-21 | 2019-09-24 | 中海油安全技术服务有限公司 | Engineering construction project quality management-control method and system |
CN112288218A (en) * | 2020-09-22 | 2021-01-29 | 成都飞机工业(集团)有限责任公司 | Delivery method based on airplane acceptance process |
CN114912758A (en) * | 2022-04-13 | 2022-08-16 | 中铁宝桥(扬州)有限公司 | International steel structure manufacturing quality control system and method |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140039648A1 (en) * | 2012-08-01 | 2014-02-06 | Saudi Arabian Oil Company | System for inspection and maintenance of a plant or other facility |
-
2015
- 2015-04-16 CN CN201510181860.4A patent/CN104751296B/en not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140039648A1 (en) * | 2012-08-01 | 2014-02-06 | Saudi Arabian Oil Company | System for inspection and maintenance of a plant or other facility |
Non-Patent Citations (2)
Title |
---|
季晋松: "海洋平台项目群管线组质量控制", 《中国优秀硕士学位论文全文数据库工程科技Ⅰ辑》 * |
谢茂林: "海洋石油领域高效质量管控新思路探究", 《管理观察》 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105414813A (en) * | 2015-12-04 | 2016-03-23 | 上海振华重工(集团)股份有限公司 | Welding seam tracking quality control system and method |
CN106327076A (en) * | 2016-08-23 | 2017-01-11 | 成都卡莱博尔信息技术股份有限公司 | Engineering acceptance system capable of supporting automatic inspection report generation |
CN106682913A (en) * | 2016-11-21 | 2017-05-17 | 北海高创电子信息孵化器有限公司 | Product quality inspection management system |
CN107014903A (en) * | 2017-05-09 | 2017-08-04 | 中国石油天然气集团公司 | A kind of pipeline girth weld joint defect positioning method and equipment |
CN107301498A (en) * | 2017-05-26 | 2017-10-27 | 中国铁道科学研究院铁道科学技术研究发展中心 | Generalized information management system for the military service monitoring of high-speed railway wheel rail relation |
CN109583668A (en) * | 2017-09-26 | 2019-04-05 | 同济大学 | Space flight large thin-wall element product processing quality traceability system |
CN110059898A (en) * | 2018-01-18 | 2019-07-26 | 江苏奥博洋信息技术有限公司 | A kind of online input system inspects method by random samples immediately |
CN109829088A (en) * | 2019-01-15 | 2019-05-31 | 江西通慧科技股份有限公司 | A kind of Expressway Mechanical & Electrical Project detection system |
CN110276551A (en) * | 2019-06-21 | 2019-09-24 | 中海油安全技术服务有限公司 | Engineering construction project quality management-control method and system |
CN112288218A (en) * | 2020-09-22 | 2021-01-29 | 成都飞机工业(集团)有限责任公司 | Delivery method based on airplane acceptance process |
CN112288218B (en) * | 2020-09-22 | 2022-08-12 | 成都飞机工业(集团)有限责任公司 | Delivery method based on airplane acceptance process |
CN114912758A (en) * | 2022-04-13 | 2022-08-16 | 中铁宝桥(扬州)有限公司 | International steel structure manufacturing quality control system and method |
Also Published As
Publication number | Publication date |
---|---|
CN104751296B (en) | 2018-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104751296A (en) | Oceanographic engineering quality control information system | |
US7873495B2 (en) | Welding quality control and monitoring system | |
Garina et al. | Increasing productivity of complex product of mechanic engineering using modern quality management methods | |
US8527550B1 (en) | Bridge inspection diagnostic system | |
CN115187125A (en) | Laboratory data management method, device, equipment and medium | |
Macdonald et al. | A comparison of computer support systems for software inspection | |
CN107133338A (en) | Non-destructive Testing Data auditing system | |
CN111815289B (en) | Mine equipment safety detection management system | |
CN117541195A (en) | Intelligent management method and system for audit project | |
CN207070219U (en) | Projects supervision system based on video monitoring | |
KR20220071462A (en) | pipe nondestructive inspection system based cloud | |
CN116245410A (en) | Inspection and detection reporting system and method for oil and gas storage and transportation equipment | |
CN109902209B (en) | Special pressure-bearing equipment user three-dimensional visualization method based on space intelligence | |
CN114860584A (en) | Test report generation method, device and storage medium based on jira platform | |
KR101717597B1 (en) | The dimensional control system based on mobile | |
CN113435687A (en) | Nuclear power supervision analysis system based on big data | |
Zulkifli et al. | Village Funds Supervision by the Village Consultative Body (BPD) in Batumatoru Village, Lariang District, Pasangkayu Regency | |
JP2006040194A (en) | Field work management system | |
CN110909215A (en) | Information acquisition big data analysis system for medium and small enterprises | |
US20030120503A1 (en) | Method, system and computer product for electronic document and records management | |
KR102085282B1 (en) | Method for supporting inspection of welding parts in nuclear power plant | |
Wang | Design and implementation of a process control system for product inspection | |
CN117893263A (en) | Merchant information examination method and device | |
Perdana et al. | Robotic Process Automation in Accounting Firms: Audit Scenarios, Proposed Automation, Future Challenges and Opportunities | |
Lee et al. | On the Performance Management System to Analyse the Effectiveness of Type Approval System for Railway Vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181012 Termination date: 20190416 |
|
CF01 | Termination of patent right due to non-payment of annual fee |