CN104751003A CN201510175647.2A CN201510175647A CN104751003A CN 104751003 A CN104751003 A CN 104751003A CN 201510175647 A CN201510175647 A CN 201510175647A CN 104751003 A CN104751003 A CN 104751003A
Authority
CN
China
Prior art keywords
centerdot
theta
model
ice
power transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510175647.2A
Other languages
English (en)
Inventor
武鑫
苏睿
芮晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Original Assignee
North China Electric Power University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University filed Critical North China Electric Power University
Priority to CN201510175647.2A priority Critical patent/CN104751003A/zh
Publication of CN104751003A publication Critical patent/CN104751003A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明提出了一种覆冰输电导线倾角的预测计算方法。首先基于覆冰输电导线倾角的历史数据构建其差分时间序列,然后对差分时间序列建立自回归计量模型并运用最终预测误差准则估算模型阶p,运用岭回归方法估算模型参数,最后应用建立的模型预测计算覆冰输电线倾角在未来若干小时内的数值。此方法可动态预测覆冰输电导线的倾角,具有实时性强和精确度高的特点,有效解决了覆冰输电导线倾角预测的技术难题,为输电塔线体系的冰致失效分析提供了数据支持。

Description

一种覆冰输电导线倾角预测计算方法
技术领域
本发明涉及一种覆冰输电导线倾角的预测计算方法,适用于在低温雨雪气象环境下分析和预测计算覆冰输电导线的倾角变化情况。
背景技术
输电线路的覆冰,主要是受输电线周围的地形与环境的影响。影响输电线路覆冰的主要原因是微地形和微气象,一般情况下,同样的经纬度和海拔,覆冰是否有无,覆冰是否严重,微地形起绝对的作用。在大气候相同的条件下,微地形决定微气象。在地形确定的情况下,微气象对于导线覆冰起着主要的作用。然而,由于微气象的复杂性,其预测准确率较低。
对于输电导线的覆冰问题,目前国内外的研究主要集中在导线覆冰厚度与重量增长的模拟、试验和预测以及除冰、融冰技术的实施。相对于导线的覆冰厚度和覆冰重量,覆冰导线的张力和倾角过大是导致输电塔线体系失效的主要原因。亟需基于某段覆冰输电导线倾角实时变化数据,预测此段覆冰导线倾角未来变化情况,从而为输电塔线体系失效分析提供数据支持。
发明内容
本发明的目的在于解决在低温雨雪气象环境下覆冰输电导线倾角预测的技术难题,为覆冰输电导线输电塔线体系失效分析提供数据支持。本发明提供一种覆冰输电导线倾角的预测计算方法,具有预测结果可靠,精度高的特点。
本发明解决上述问题的技术方案包括下述步骤:
1)设一个n期时间序列的覆冰输电导线的倾角数据为X={x1 x2 … xn};
2)X的一阶差分序列为Y={y1 y2 … yn-1},yi=xi+1-xi 1≤i≤n-1;
3)差分序列Y的自回归模型为:
yt=θ1yt-12yt-2+…+θpyt-pt
式中p为模型的滞后期;t为时间序列Y中的时间刻度,可取大于等于p且小于等于n-1的任意自然数;yt,yt-1,…,yt-p为时间序列Y中任意连续的p个元素;θ1,θ2,…,θp为自回归参数;ξt为误差项;
4)对于模型的滞后期或模型阶数p,可以采用最终预测误差(FPE)准则判断;
FPE ( k ) = σ ^ 2 ( k ) · ( n - 1 + k + 1 n - 1 - k - 1 ) , k = 1,2 , . . . , p
式中为取k=1,2,…,p时的样本误差方差σ2的估计;
FPE ( p ^ ) = min 1 ≤ k ≤ p FPE ( k )
即为所求模型阶数p的最终预测误差准则估计;
5)自回归模型中的自回归参数,θ1,θ2,…,θp,可采用岭回归方法获得其估计值采用的岭回归方法如下所示:
差分序列Y的自回归模型可改写为:
yt=Φ·θ+ξt
式中
θ=[θ1 θ2 … θp]T
Φ=[yt-1 yt-2 … yt-p]
通过岭回归方法对自回归参数的预估公式为:
θ ^ = Φ + [ Q ]
式中Φ+=ΦT[ΦΦT+αI]-1,ΦT为Φ的转置矩阵,I为单位矩阵,α为偏常数(0≤α<∞);通过取不同的α值,作出yt(α)的岭迹图,进行岭迹分析,求得优化的α值;
6)第n+1,…,n+j期输电导线覆冰倾角的预测值可用下述公式计算:
y ^ n = x ^ n + 1 - x n = θ ^ 1 y n - 1 + θ ^ 2 y n - 2 + . . . + θ ^ p y n - p ⇒ x ^ n + 1 = x n + θ ^ 1 y n - 1 + θ ^ 2 y n - 2 + . . . + θ ^ p y n - p x ^ n + j = x ^ n + j - 1 + θ ^ 1 y ^ n + j - 1 + θ ^ 2 y ^ n + j - 2 + . . . + θ ^ p y ^ n + j - p
式中j>n;“^”代表预测值;
本发明上述步骤3)中的模型阶数p的范围由步骤4)决定。
本发明上述步骤3)中的自回归参数,θ1,θ2,…,θp,估计值由步骤5)获得。
本发明的技术效果在于:首先运用已有的覆冰输电导线倾角数据构建差分时间序列;其次对差分时间序列建立自回归计量模型,运用最终预测误差准则估算模型阶数p,运用岭回归方法估算模型参数;最后计算出覆冰输电线倾角在未来若干小时内的预测值。本发明对覆冰输电导线倾角进行动态预测,具有实时性强和精度高的特点,有效解决了低温雨雪冰冻情况下覆冰输电导线倾角预测的技术难题。
附图说明
图1是覆冰输电线倾角预测计算方法流程图。
图2是大镇线-73#2011年12月23日覆冰输电导线倾角预测结果;
图3是大镇线-73#2012年1月2日覆冰输电导线倾角预测结果;
图4是大镇线-73#2012年2月8日覆冰输电导线倾角预测结果。
具体实施方式
见图1,一种覆冰输电导线倾角的预测计算方法,本发明具体步骤如下:
1)设一个n期时间序列的覆冰输电导线的倾角数据为X={x1 x2 … xn};
2)X的一阶差分序列为Y={y1 y2 … yn-1},yi=xi+1-xi 1≤i≤n-1;
3)差分序列Y的自回归模型为:
yt=θ1yt-12yt-2+…+θpyt-pt
式中p为模型的滞后期;t为时间序列Y中的时间刻度,可取大于等于p且小于等于n-1的任意自然数;yt,yt-1,…,yt-p为时间序列Y中任意连续的p个元素;θ1,θ2,…,θp为自回归参数;ξt为误差项;
4)对于模型的滞后期或模型阶数p,可以采用最终预测误差(FPE)准则判断;
FPE ( k ) = σ ^ 2 ( k ) · ( n - 1 + k + 1 n - 1 - k - 1 ) , k = 1,2 , . . . , p
式中为取k=1,2,…,p时的样本误差方差σ2的估计;
FPE ( p ^ ) = min 1 ≤ k ≤ p FPE ( k )
即为所求模型阶数p的最终预测误差准则估计;
5)自回归模型中的自回归参数,θ1,θ2,…,θp,可采用岭回归方法获得其估计值采用的岭回归方法如下所示:
差分序列Y的自回归模型可改写为:
yt=Φ·θ+ξt
式中
θ=[θ1 θ2 … θp]T
Φ=[yt-1 yt-2 … yt-p]
通过岭回归方法对自回归参数的预估公式为:
θ ^ = Φ + [ Q ]
式中Φ+=ΦT[ΦΦT+αI]-1,ΦT为Φ的转置矩阵,I为单位矩阵,α为偏常数(0≤α<∞);通过取不同的α值,作出yt(α)的岭迹图,进行岭迹分析,求得优化的α值;
6)第n+1,…,n+j期输电导线覆冰倾角的预测值可用下述公式计算:
y ^ n = x ^ n + 1 - x n = θ ^ 1 y n - 1 + θ ^ 2 y n - 2 + . . . + θ ^ p y n - p ⇒ x ^ n + 1 = x n + θ ^ 1 y n - 1 + θ ^ 2 y n - 2 + . . . + θ ^ p y n - p x ^ n + j = x ^ n + j - 1 + θ ^ 1 y ^ n + j - 1 + θ ^ 2 y ^ n + j - 2 + . . . + θ ^ p y ^ n + j - p
式中j>n;“^”代表预测值;
本发明所述步骤3)中的模型阶数p的范围由步骤4)决定。
本发明所述步骤3)中的自回归参数,θ1,θ2,…,θp,估计值由步骤5)获得。
图2~图4为大镇线-73#3组时间序列覆冰输电导线倾角预测结果图。
下面结合附图和实施工作流程对本发明进行详细说明。本发明收集了3组云南电网昭通地区大镇线-73#覆冰导线倾角达到危险区域的时间序列,组成了3组覆冰输电导线倾角时间序列X1、X2、X3
获得任一组序列Xi(i=1,2,3)的差分序列Yi
运用最终预测误差准则估算自回归模型的阶数p=3,运用岭回归方法估算自回归模型的参数,θ1,θ2,…,θp
根据获得的上述自回归模型,计算出覆冰输电线倾角在未来8小时内的预测值,并与实际值相比较,获得预测的绝对最大误差和绝对平均误差。表1为云南电网昭通地区大镇线-73#覆冰导线预测倾角绝对误差值。
表1 各时间序列预测倾角绝对误差
绝对误差 序列1 序列2 序列3
绝对最大误差(%) 20.30 12.57 3.56
绝对平均误差(%) 9.73 5.88 1.03
从表1可以发现,该方法的预测值绝对最大误差≤20.3%,而绝对平均误差≤9.73%。该方法可以有效的预测覆冰输电导线倾角值,极其适用于在低温雨雪气象环境下预测覆冰输电导线的倾角。

Claims (3)

1.一种覆冰输电导线倾角的预测计算方法,其具体步骤如下:
1)设一个n期时间序列的覆冰输电导线的倾角数据为X={x1 x2 … xn};
2)X的一阶差分序列为Y={y1 y2 … yn-1},yi=xi+1-xi 1≤i≤n-1;
3)差分序列Y的自回归模型为:
yt=θ1yt-12yt-2+…+θpyt-pt
式中p为模型的滞后期;t为时间序列Y中的时间刻度,可取大于等于p且小于等于n-1的任意自然数;yt,yt-1,…,yt-p为时间序列Y中任意连续的p个元素;θ1,θ2,…,θp为自回归参数;ξt为误差项;
4)对于模型的滞后期或模型阶数p,可以采用最终预测误差(FPE)准则判断;
FPE ( k ) = σ ^ 2 ( k ) · ( n - 1 + k + 1 n - 1 - k - 1 ) , k = 1,2 , · · · , p
式中为取k=1,2,…,p时的样本误差方差σ2的估计;
FPE ( p ^ ) min 1 ≤ k ≤ p FPE ( k )
即为所求模型阶数p的最终预测误差准则估计;
5)自回归模型中的自回归参数,θ1,θ2,…,θp,可采用岭回归方法获得其估计值采用的岭回归方法如下所示:
差分序列Y的自回归模型可改写为:
yt=Φ·θ+ξt
式中
θ=[θ1 θ2 … θp]T
Φ=[yt-1 yt-2 … yt-p]
通过岭回归方法对自回归参数的预估公式为:
θ ^ = Φ + [ Q ]
式中Φ+=ΦT[ΦΦT+αI]-1,ΦT为Φ的转置矩阵,I为单位矩阵,α为偏常数(0≤α<∞);通过取不同的α值,作出yt(α)的岭迹图,进行岭迹分析,求得优化的α值;
6)第n+1,…,n+j期输电导线覆冰倾角的预测值可用下述公式计算:
y ^ n = x ^ n + 1 - x n = θ ^ 1 y n - 1 + θ ^ 2 y n - 2 + · · · + θ ^ p y n - p ⇒ x ^ x + 1 = x n + θ ^ 1 y n - 1 + θ ^ 2 y n - 2 + · · · + θ ^ p y n - p
x ^ n + j = x ^ n + j - 1 + θ ^ 1 y ^ n + j - 1 + θ ^ 2 y ^ n + j - 2 + · · · + θ ^ p y ^ n + j - p
式中j>n;“^”代表预测值;
2.根据权利要求1所述的覆冰输电导线倾角的预测计算方法,其特征在于:所述步骤3)中的模型阶数p的范围由步骤4)决定。
3.根据权利要求1所述的覆冰输电导线倾角的预测计算方法,其特征在于:所述步骤3)中的自回归参数,θ1,θ2,…,θp,的估计值由步骤5)获得。
CN201510175647.2A 2015-04-15 2015-04-15 一种覆冰输电导线倾角预测计算方法 Pending CN104751003A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510175647.2A CN104751003A (zh) 2015-04-15 2015-04-15 一种覆冰输电导线倾角预测计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510175647.2A CN104751003A (zh) 2015-04-15 2015-04-15 一种覆冰输电导线倾角预测计算方法

Publications (1)

Publication Number Publication Date
CN104751003A true CN104751003A (zh) 2015-07-01

Family

ID=53590678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510175647.2A Pending CN104751003A (zh) 2015-04-15 2015-04-15 一种覆冰输电导线倾角预测计算方法

Country Status (1)

Country Link
CN (1) CN104751003A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108036731A (zh) * 2017-12-26 2018-05-15 国家电网公司 电缆覆冰监测方法及系统
CN109186474A (zh) * 2018-10-11 2019-01-11 南京信息工程大学 一种基于岭回归的气溶胶光学厚度反演偏差纠正方法
CN114148845A (zh) * 2021-11-26 2022-03-08 河北华丰能源科技发展有限公司 一种水平检测控制系统

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103105257A (zh) * 2013-01-29 2013-05-15 华北电力大学 一种基于动力特性的覆冰致输电塔线结构失效的预警方法
CN103279646A (zh) * 2013-05-02 2013-09-04 云南电力试验研究院(集团)有限公司电力研究院 一种预测覆冰输电导线张力的计算方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103105257A (zh) * 2013-01-29 2013-05-15 华北电力大学 一种基于动力特性的覆冰致输电塔线结构失效的预警方法
CN103279646A (zh) * 2013-05-02 2013-09-04 云南电力试验研究院(集团)有限公司电力研究院 一种预测覆冰输电导线张力的计算方法

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
WU XIN等: "Ice-Coated AC Transmission Lines Tension Prognosis with Autoregressive Model", 《2012 3RD INTERNATIONAL CONFERENCE ON SYSTEM SCIENCE, ENGINEERING DESIGN AND MANUFACTURING INFORMATIZATION》 *
刘红卫: "线性回归模型中多重共线性问题的应对策略及其几点改进", 《中国优秀博硕士学位论文全文数据库(硕)基础科学辑》 *
张凤莲: "多元线性回归中多重共线性问题的解决办法探讨", 《中国优秀硕士学位论文全文数据库 基础科学辑》 *
李进文: "选择药物动力学模型的最终预测误差准则", 《中国药理学通报》 *
杨书玲 等: "基于AR模型的载频测量", 《无线电工程》 *
杨磊 等: "基于最小二乘自回归模型的覆冰输电导线张力与倾角预测模型", 《第四届全国架空输电线路技术交流研讨会论文集》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108036731A (zh) * 2017-12-26 2018-05-15 国家电网公司 电缆覆冰监测方法及系统
CN108036731B (zh) * 2017-12-26 2020-04-28 国家电网公司 电缆覆冰监测方法及系统
CN109186474A (zh) * 2018-10-11 2019-01-11 南京信息工程大学 一种基于岭回归的气溶胶光学厚度反演偏差纠正方法
CN114148845A (zh) * 2021-11-26 2022-03-08 河北华丰能源科技发展有限公司 一种水平检测控制系统
CN114148845B (zh) * 2021-11-26 2023-09-12 河北华丰能源科技发展有限公司 一种水平检测控制系统

Similar Documents

Publication Publication Date Title
CN107169645B (zh) 一种计及暴雨灾害影响的输电线路故障概率在线评估方法
CN110598290B (zh) 考虑气候变化的流域未来水电发电能力预测方法和系统
CN109492823B (zh) 一种对输电线路覆冰厚度的预测方法
CN103673960A (zh) 用于预测输电线路上的覆冰状态的方法和装置
CN104932035A (zh) 一种台风强度预报方法及系统
CN103927872A (zh) 一种基于浮动车数据预测多时段行程时间分布的方法
CN102938021A (zh) 一种输电线路覆冰负荷定量估计及预测方法
CN111428942B (zh) 基于变网格技术提取微地形因子的线路覆冰厚度预测方法
CN108090614B (zh) 一种基于相关系数的空间风场预测模型建立方法
Chavan et al. Probable maximum precipitation estimation for catchments in Mahanadi river basin
CN105095670B (zh) 基于连续雨凇的输电线路覆冰厚度增长率分布图绘制方法
CN105278004B (zh) 一种电网输电线路区段的气象情况分析方法
CN104915534A (zh) 基于序列学习的电力铁塔变形分析与决策方法
CN113435630B (zh) 一种产流模式自适应的流域水文预报方法及系统
CN105447770A (zh) 电网气象监测数据应用于精细化气象预报的评估方法
CN106682831A (zh) 电网舞动区域预测预警方法及系统
CN104462863A (zh) 一种推求河道区间入流的计算方法
CN104751003A (zh) 一种覆冰输电导线倾角预测计算方法
CN104484722A (zh) 一种基于cim标准的气象因子影响电网灾害模型建模方法
Li et al. Multivariable time series prediction for the icing process on overhead power transmission line
JP2016164493A (ja) 情報処理装置、情報処理システム、情報処理方法及びプログラム
CN112711919A (zh) 基于中小尺度模式耦合的导线覆冰预报方法及系统
CN114912355A (zh) 输电线路短期覆冰预测方法、装置和存储介质
CN103353295A (zh) 一种精确预测大坝坝体垂直变形量的方法
Verstraten et al. Sensitivity of Australian roof drainage structures to design rainfall variability and climatic change

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150701