CN1047423C - Method for building house - Google Patents
Method for building house Download PDFInfo
- Publication number
- CN1047423C CN1047423C CN 94112274 CN94112274A CN1047423C CN 1047423 C CN1047423 C CN 1047423C CN 94112274 CN94112274 CN 94112274 CN 94112274 A CN94112274 A CN 94112274A CN 1047423 C CN1047423 C CN 1047423C
- Authority
- CN
- China
- Prior art keywords
- supporter
- fixed body
- floor
- construction
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention provides a new construction method for building houses, which comprises the following steps (A) foundations are built; (B) beams and columns are built, and building modes of the beams and columns of the present invention are the same as traditional-known building modes. The present invention is characterized in that floorslabs are built; before the beams are grouted, fixing bodies are embedded in symmetrical positions between the beams; a plurality of guide holes are arranged on side edges of each fixing body; both ends of a supporting body are respectively provided with screw rods bending upwards, and the number of the screw rods is corresponding to the number of the guide holes; the screw rods penetrate through guide holes by screw caps, so that the supporting bodies can be fixedly locked with the fixing bodies. Therefore, mould plates can be arranged between the supporting bodies, while no log is required for supporting. The present invention can be used for the grouting construction of floorslabs.
Description
The present invention relates to a kind of method for building house.
The construction method of general housing is broadly divided into the following step: the construction of (1) ground; (2) construction of post; (3) construction of beam; (4) construction of metope; (5) construction of floor, the construction of being somebody's turn to do (5) floor refers to the floor construction that second floor is above especially, sees also Fig. 1, usually before building floor 1, template 2 a usefulness modular angles wood 3 and an a great deal of Chinese toon 4 to be supported into a plane with template 2 earlier, again in template 2 top grout injections and shaping floor 1.This Chinese toon 4 is complete makes for the tree bar, and building a floor, to consume a Chinese toon quite a lot of, though this Chinese toon 4 is recyclable, the whole of China will be very surprising down to the timber that the whole world consumed, and assembling process is also slower.These problems are perplexing the building dealer always.
The objective of the invention is to propose a kind of new job practices of building the room, mainly provide the construction method of the above floor of housing second floor, abandon commonly use support the technology of template with Chinese toon, and to be fixed in locking one support body supports template on the fixed body on two curb girders, build floor, to save Zhi Chunyong timber and engineering time.
The present invention is a kind of like this method for building house: it comprises following steps, wherein, (A) construction of ground, (B) construction of beam column, identical with known mode of construction; It is characterized in that: (C) floor is constructed to, before beam grouting, symmetrical in twos position prior to beam is embedded a fixed body, side at this fixed body has several guide holes, other establishes a supporter, its two end respectively be provided with upwards bending and quantity corresponding to the screw rod of the guide hole number on the fixed body, described screw rod is arranged in the guide hole and by nut and makes supporter and fixed body locking, can directly put template this moment between each supporter, and need not support with log again, and carry out the floor grouting construction, can reserve a spatial hole in each screw rod and the sealed place of nut during grouting, after the grouting floor is done admittedly, again nut and screw rod are moved back lock, and then supporter is separated stripping with fixed body, and the spatial hole that will before reserve filled up with cement, can finish the structure of floor.
A kind of advantage of building the room novel construction method of the present invention is, because of replacing template without log, thereby but economization timber reduce manufacturing cost, and can shorten the construction time, save time, the saving of labor.For builing industry, be a breakthrough in fact.
Now with a preferred embodiment, and conjunction with figs. the invention will be further described.
The housing that Fig. 1 system commonly uses is built schematic diagram.
Fig. 2 is this part schematic diagram of creating a preferred embodiment.
Fig. 3 is this schematic diagram of creating a preferred embodiment.
At first, consult Fig. 2, Fig. 3, the novel construction method of a kind of housing of the present invention includes following step:
(A) construction of ground, identical with known construction method;
(B) construction of beam column, identical with known construction method;
(C) construction of floor, this beam 10 is embedded a fixed body 11 in symmetrical in twos position in advance before grouting, and the side of this fixed body 11 is provided with several guide holes 11a, 11b, and be provided with a hook 111 in one appropriate location, fixed body 11 belows; One supporter 12; Yu Erduan respectively be provided with upwards bending and quantity corresponding to the guide hole 11a on the fixed body 11; the screw rod 12a of 11b; 12b; described screw rod 12a; 12b is arranged in guide hole 11a; among the 11b and by nut 13 lockings; make supporter 12 be locked in fixed body 11; respectively set firmly the chain 121 of a suitable length again in these supporter 12 two ends; this chain 121 can be hooked on the hook 111; between this supporter 12 forms every on can put template 20; so that the grouting of floor; need not replace template as commonly using the quite a lot of log of consumption; and screw rod 12a is arranged in whenever in when grouting; 12b and nut 13 parts are reserved a spatial hole (promptly not being in the milk); so that after the grouting floor is done admittedly; can be with nut 13 and screw rod 12a; lock is moved back in the locking of 12b; and then supporter 12 separated with fixed body 11; and aforementioned chain 121 because of with hook 111 hooks of fixed body 11; because the protective effect of chain can prevent that supporter 12 is because of screw rod 12a; the danger that 12b and fixed body 11 fall when moving back lock, protection constructor's safety.Template 20 can be removed after moving back lock, and the spatial hole of before being reserved is filled up with cement, can finish the construction of whole floor.
Claims (2)
1. a method for building house comprises following steps, (A) construction of ground, and (B) construction of beam column is characterized in that:
(C) floor is constructed to, before beam grouting, symmetrical in twos position prior to beam is embedded a fixed body, side at this fixed body has several guide holes, other establishes a supporter, its two end respectively be provided with upwards bending and quantity corresponding to the screw rod of the guide hole number on the fixed body, described screw rod is arranged in the guide hole and by nut and makes supporter and fixed body locking, in between each supporter, directly put template, and carry out the floor grouting construction, reserve a spatial hole in each screw rod and the sealed place of nut during grouting, after the grouting floor is done admittedly, again nut and screw rod are moved back lock, supporter is separated with fixed body, stripping, and the spatial hole that will before reserve filled up with cement, can finish the structure of floor.
2. a kind of method for building house according to claim 1; establish a hook in described fixed body bottom; the suitable chain of a length is respectively established at described supporter two ends; when this supporter and fixed body locking; this chain is hooked on the hook; supporter and fixed body move back when lock because the protective effect of chain, can prevent that supporter and template from falling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 94112274 CN1047423C (en) | 1994-08-23 | 1994-08-23 | Method for building house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 94112274 CN1047423C (en) | 1994-08-23 | 1994-08-23 | Method for building house |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1117549A CN1117549A (en) | 1996-02-28 |
CN1047423C true CN1047423C (en) | 1999-12-15 |
Family
ID=5036062
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 94112274 Expired - Fee Related CN1047423C (en) | 1994-08-23 | 1994-08-23 | Method for building house |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1047423C (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3134025A4 (en) | 2014-04-22 | 2018-01-10 | T.A.G. Medical Devices - Agriculture Cooperative Ltd. | Dental implants |
-
1994
- 1994-08-23 CN CN 94112274 patent/CN1047423C/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN1117549A (en) | 1996-02-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109138483B (en) | Device for alternatively jacking storey-increasing building by utilizing high-strength concrete columns and steel slide ways and construction method thereof | |
CN108708481B (en) | Construction method for constructional column without formwork support | |
CN107366356A (en) | Assembled architecture agent structure | |
CN203021923U (en) | Big cantilever bent cap steel truss construction platform | |
CN202706198U (en) | Building structure | |
CN201535064U (en) | Template for buildings | |
CN105332506A (en) | Formwork support system for parallel multi-section stair and method for constructing same | |
CN105019657A (en) | Building construction system | |
CN1047423C (en) | Method for building house | |
CN1078524A (en) | Brick-and-concrete buildings constructional column, collar tie beam cast-in-situ construction method and device | |
CN1190578C (en) | Integrated raising method for self-supporting house roof and its equipment | |
CN102213032A (en) | Construction method for connecting reinforcing bars of structural columns | |
CN208251318U (en) | A kind of light steel house of assembly type | |
CN204876577U (en) | Building construction system | |
CN204876579U (en) | Building construction system | |
CN111997345B (en) | Lifting scaffold hangs hoist system upside down | |
CN113216634A (en) | Concrete cave dwelling and construction method thereof | |
CN113622594A (en) | Construction method for constructional column without formwork | |
CN208917660U (en) | Cast-in-place landscape arch bridge | |
JP2812178B2 (en) | Bridge pier construction method by self-elevating formwork method | |
CN105003075A (en) | Building construction system | |
CN115162697B (en) | Special-shaped column construction work I-shaped steel cantilever platform and construction method | |
CN221856019U (en) | Assembled steel construction stair | |
CN209163462U (en) | A kind of building structure reinforcement component | |
CN221761333U (en) | Basement high and large formwork support system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |