CN104734261A - Indoor power supply switching mode power source based on four-network fusion and obtaining method thereof - Google Patents

Indoor power supply switching mode power source based on four-network fusion and obtaining method thereof Download PDF

Info

Publication number
CN104734261A
CN104734261A CN201310714067.7A CN201310714067A CN104734261A CN 104734261 A CN104734261 A CN 104734261A CN 201310714067 A CN201310714067 A CN 201310714067A CN 104734261 A CN104734261 A CN 104734261A
Authority
CN
China
Prior art keywords
voltage
charging
power supply
spider web
storage battery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310714067.7A
Other languages
Chinese (zh)
Other versions
CN104734261B (en
Inventor
包静
杜翛
张小龙
陈志东
金太洙
魏兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Group Heilongjiang Co Ltd
China Mobile Group Sichuan Co Ltd
China Mobile Group Gansu Co Ltd
Original Assignee
China Mobile Group Heilongjiang Co Ltd
China Mobile Group Sichuan Co Ltd
China Mobile Group Gansu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Group Heilongjiang Co Ltd, China Mobile Group Sichuan Co Ltd, China Mobile Group Gansu Co Ltd filed Critical China Mobile Group Heilongjiang Co Ltd
Priority to CN201310714067.7A priority Critical patent/CN104734261B/en
Publication of CN104734261A publication Critical patent/CN104734261A/en
Application granted granted Critical
Publication of CN104734261B publication Critical patent/CN104734261B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The invention discloses an indoor power supply switching mode power source based on four-network fusion and an obtaining method thereof and relates to the technical field of communication power sources. The obtaining method of the indoor power supply switching mode power source based on four-network fusion comprises the steps that the voltage of a storage battery in an indoor cobweb of four-network fusion is monitored during direct-current charging; when the storage battery of the energy supply system breaks down during charging, an auxiliary storage battery is started; the auxiliary battery charges a storage battery of the energy supply system according to the voltage of a battery pack during the fault and a preset large current progressive increase charging normal data table.

Description

The indoor power supply Switching Power Supply merged based on four nets and its implementation
Technical field
The present invention relates to communication power supply technical field, particularly a kind of indoor power supply Switching Power Supply based on four net fusions and its implementation.
Background technology
Communication DC power supply develops rapidly along with the development of communication master device for many years, and power technology is constantly brought forth new ideas, functions of the equipments are constantly perfect, meets the demand for development of communication industry in time.Representative base station products is more and more abundanter, and has their own characteristics each.From overall development, the basic trend that distributed base station represents undoubtedly " base station of future generation ", especially in the 3G mobile network in future, distributed base station will obtain application widely.At present, three kinds of 3G standards have distributed base station product, and a lot of manufacturer strengthens while 3G distributed base station Innovation Input, also 2G distributed base station product is constantly released, the cohesion as cloth power-supply system with height (is gathered property and is referred to each power-supply system distribution node high degree of autonomy, by a set of power-supply management system in this locality and supervisory control system) and continuity (continuity refers to that the corresponding all power supply of MPS process system of each power-supply system distribution node is continuous print, get a little by this locality, zoom out power supply on the spot).Therefore, distributed power supply system can effectively solve distributed communication network powerup issue, so the application of distributed base station can be more and more extensive, operator more and more payes attention to the investment construction of distributed base station.
Because the reliability requirement of macro base station to equipment is higher, the quantity of outdoor macro station is also few, and major part adopts indoor macro station.As ZTE Corporation power supply product ZXDU58S/T301, ZXDU68S/T601 etc.This cover power-supply device powered both to the transmission equipment in machine room and baseband pool BBU, and the mode simultaneously also zoomed out by direct current powers (RRU quantity can be multiple) to the remote radio RRU on roof or steel tower.This centralized supply power mode is convenient to the centralized maintenance of equipment, but being subject to direct current draws remote restriction.Adopt this supply power mode, Lightning Protection needs emphasis to solve, and the two ends of zooming out circuit at direct current both increase DC lightning prevention case.
If direct current zooms out distance and is subject to engineering design restriction, baseband pool BBU and remote radio RRU must power separately: baseband pool BBU and transmission equipment are still at indoor machine room, the indoor type base station power of a set of intermediate size can be selected, as ZTE Corporation power supply product ZXDU58S151, ZXDU58S/T301, ZXDU68S/T601 etc.; Indoor wall current ZXDU58H900 can be selected for the RRU device be assemblied on roof terrace, or embedded power supply ZXDU58B121; Be placed on roof or other outdoor places if select, can outdoor power be used, as ZXDU58W600, ZXDU58W121 etc., according to quantity and the power consumption selection of RRU; For the remote radio RRU device be assemblied on steel tower, outdoor power can only be selected, as ZTE Corporation power supply product ZXDU58W600, ZXDU58W121 etc., according to quantity and the power consumption selection of RRU.
But the development netted along with 2G, 3G, 4G and WLAN tetra-and fusion, to this four net applicable, and the distributed power source that can be melted into this four net requires also more and more higher.Also do not provide a kind of distributed indoor power supply power supply that can be used for this four net and merge in prior art, therefore industry needs to solve some technical problems related to this.Such as: the technical problem how power supply powers in four nets; Intensive and for example along with TD-LTE site facilities, requires that number of power sources is increased sharply, the technical problems such as the discharge and recharge when processing scheme when certain power failure and several power supply exist simultaneously.
Summary of the invention
Cannot realize the lower distributed indoor power supply power supply of four nets fusions to solve in prior art, cannot solve the technical problem relating to power supply fault and discharge and recharge etc., the present invention proposes a kind of indoor power supply Switching Power Supply based on four net fusions and its implementation.
Based on an implementation method for the indoor power supply Switching Power Supply that four nets merge, comprising:
The voltage during storage battery DC charging of energy supply system in the indoor spider web merged is netted in monitoring four;
When the charging of the storage battery of described energy supply system is broken down, start booster battery;
Voltage according to battery pack during fault increases progressively rechargeable standard tables of data with the big current preset, and the storage battery of described booster battery to described energy supply system charges.
Based on the indoor power supply Switching Power Supply that four nets merge, comprising:
Monitoring module, for monitoring the voltage during storage battery DC charging of energy supply system in indoor spider web that four nets merge;
Added Management module, when the charging for the storage battery when described energy supply system is broken down, starts booster battery; And increasing progressively rechargeable standard tables of data according to the voltage of battery pack during fault with the big current preset, the storage battery of described booster battery to described energy supply system charges.
The invention provides a kind of four nets that are applicable to merge the implementation method of lower distributed indoor spider web power supply and net based on four the indoor power supply Switching Power Supply merged, in the method, C-RAN distributed spider web indoor power supply miniature alternating current-direct current main switch power supply can all devices in supervisory and control system, can when energy supply system fault, when meeting each network and equipment is powered, storage battery is charged, achieve when electrical network no-voltage, system communication is powered by central C-RAN spider web and is installed the technique effect that total plumbic acid/lithium electricity electric power storage group energy supply system still normally works concentratedly.
Accompanying drawing explanation
Accompanying drawing is used to provide a further understanding of the present invention, and forms a part for specification, together with embodiments of the present invention for explaining the present invention, is not construed as limiting the invention.In the accompanying drawings:
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
The built-in function schematic diagram of a kind of indoor power supply Switching Power Supply based on four net fusions that Fig. 1 provides for the embodiment of the present invention 1;
The flow chart of the implementation method of a kind of indoor power supply Switching Power Supply based on four net fusions that Fig. 2 provides for the embodiment of the present invention 1;
The networking diagram of the distributed indoor spider web that four nets that Fig. 3 provides for the embodiment of the present invention 2 merge;
Another group schematic diagram of the C-RAN distributed spider web indoor power supply miniature AC-DC switch power supply networking that Fig. 4 provides for the embodiment of the present invention 2;
The structural representation of a kind of indoor power supply Switching Power Supply based on four net fusions that Fig. 5 provides for the embodiment of the present invention 2.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.Further, following embodiment is possibility of the present invention, embodiment put in order and the numbering of embodiment and its order preferably performed have nothing to do.
Embodiment 1
The built-in function schematic diagram of the power switch power supply shown in composition graphs 1, the present embodiment provides a kind of implementation method of the indoor power supply Switching Power Supply based on four net fusions.
With reference to Fig. 1, this power switch power supply can specifically regard as the miniature alternating current-direct current of a kind of C-RAN distributed spider web indoor power supply primary/from by Switching Power Supply.This power switch power supply can transfer master mode to according to different user demands and automatically from by mode.It can divide four major parts substantially.Part I be auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module (being equivalent to Added Management module), AC(exchange)-DC(direct current) rectification module, monitoring module.Part II is mixed type different electric pressure batteries output control module.Part III is that non-continuous service distributed group net mode spider web distributed intelligence divides distribution output control module.Part IV is C-RAN spider web convergence type, enclosed type, the three-in-one output control module of divergence form (being equivalent to output control module), C-RAN spider web be equivalent to dynamic equalization transceiver module for the balanced transmission/reception module part of Electrodynamic balance).Comprise double loop power supply modular converter, 1-4 high-power magnetic relay, signal processing module etc. in addition.Wherein, central authorities' C-RAN spider web is powered and is installed total plumbic acid/lithium electricity electric power storage group energy supply system (being equivalent to energy supply system) concentratedly and can be built in this power switch power supply, also can individualism, it can be as storage battery distributed indoor networking that four nets merge and provides direct current.
As can be known from Fig. 1, double loop power supply modular converter 48-54v mono-tunnel access principal and subordinate spider web direct current supply introducing is delivered to No. 1 high-power magnetic relay and is entered principal and subordinate's redundancy backup mode of operation.Another road of double loop power supply modular converter 48-54v access 220V alternating current is to 1-3AC-DC rectification module.1-3AC-DC rectification module direct current exports and supplies the balanced sending module of Electrodynamic balance through No. 4 high-power magnetic relaies to the continuous service C-RAN spider web in principal load DC output unit.Monitoring module starts the minimum operational voltage value of the balanced 36-48v supply network of first order direct current cables core that setting No. 4 high-power magnetic relaies directly supply.Namely principal load voltage values 30v.C-RAN distributed spider web indoor power supply miniature alternating current-direct current main switch power supply starts to power to the first secondary spider web.Monitoring module starts auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module, is powered and is installed concentratedly total plumbic acid/lithium electricity electric power storage group energy supply system by power spider web and central C-RAN spider web of No. 2/3 high-power magnetic relay and outside one two three level Four and set up management of charging and discharging passage.Monitoring module is powered by signal processing module, continuous service C-RAN spider web and is installed total plumbic acid/lithium electricity electric power storage group energy supply system for power spider web and central C-RAN spider web of the balanced sending/receiving module of Electrodynamic balance and outside one two three level Four concentratedly and establish a communications link.
As shown in Figure 2, the method mainly comprises:
Step 101, the voltage during storage battery DC charging of energy supply system in the indoor spider web merged is netted in monitoring module monitoring four.
Specifically, this step 101 is by such as under type realization:
In the indoor spider web that four nets merge, run lower than standard float charge voltage 10% during the storage battery DC charging of energy supply system; Whether voltage during monitoring module monitoring storage battery current charge runs lower than standard float charge voltage 10%.
Such as: shown in composition graphs 1, monitoring module is monitored central C-RAN spider web and is powered and install total plumbic acid/lithium electricity electric power storage group energy supply system batteries concentratedly and run lower than standard float charge voltage 10%.
Step 102, when the charging that monitoring module monitors the storage battery of energy supply system is broken down, then starts booster battery (this booster battery can be built in Added Management module, can individualism) by Added Management module.
Specifically, this step 102 can be: when the charging voltage of the storage battery of energy supply system is less than first threshold voltage (as 48V), charging current is less than first threshold electric current (as 5-20A), and does not change in official hour (as half an hour), then start booster battery.
Such as: shown in composition graphs 1, monitoring module monitors central C-RAN spider web and powers and install total plumbic acid/lithium electricity electric power storage group energy supply system charging module concentratedly and break down (higher or lower than standard float charge voltage 10% etc. during as stopped charging or charging).Monitoring module starts auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module, to adopt C-RAN distributed spider web remote storage battery 48V self adaptation elasticity to charge with self adaptation elasticity equalizing charge mode to charge in batteries, concrete charging modes refer step 103.
Step 103, Added Management module increases progressively rechargeable standard tables of data according to the voltage of battery pack during fault and default big current, controls the storage battery of booster battery to energy supply system and charges.
Specifically, this step 103 is by such as under type realization:
Added Management module using the voltage of the storage battery of energy supply system during fault as beginning charging voltage value, according to start charging voltage value and the big current preset increase progressively in rechargeable standard tables of data with the even charging voltage desired value determination charging current value and the charging interval that start charging voltage value corresponding record, according to charging current and charging interval, the storage battery to energy supply system charges booster battery.
Such as: shown in composition graphs 1, step 103 can be:
1, when the first stage, charging started, first should detect the central C-RAN spider web that charges to power and install the voltage of total plumbic acid/lithium electricity electric power storage group energy supply system battery concentratedly, if battery tension is lower than 48v, charging current is less than 5-20A, and keeps not changing in half an hour.
2, first auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module carries out big current and increases progressively and the self adaptation elasticity charge mode that successively decreases.
3, plumbic acid even charging voltage 51V, charging current 0.16-0.20c, starts large current charge half an hour.
The built-in standard big current of auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module increases progressively and self adaptation elasticity charge mode comparison data storehouse of successively decreasing, and the big current namely preset increases progressively rechargeable standard tables of data.
Illustrate: battery capacity 500ah big current increases progressively rechargeable standard database;
4, after auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module large current charge half an hour with the numeric ratio of rechargeable standard database to conforming to completely, this illustrates that battery capacity is normal, can enter next stage and increase progressively the charging stage.
5, auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module setting charging current 0.185c.On the former basis of big current, increase increases progressively half an hour of charging.
6, auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module big current increases progressively charging to increase after half an hour with the numeric ratio of rechargeable standard database conforming to completely.
7, auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module resets new even charging voltage 54V, charging current 0.17c, starts new round big current and increases progressively charge mode.
8, auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module large current charge improves 10-30% with the numeric ratio of rechargeable standard database to magnitude of voltage after half an hour.This illustrates that battery capacity reduces 10-30%.The next stage tapered charge stage can be entered.
9, auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module resets new even charging voltage 56.1V, charging current 0.155c, starts to enter tapered charge pattern.And charge 150 minutes.
10, auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module tapered charge stops half an hour of charging after 150 minutes.
11, when the self adaptation elasticity equalizing system of auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module is enabled in and keeps even charging voltage 561V constant, carry out stopping to charge half an hour, accumulator voltage self adaptation elasticity is balanced, and namely the oneself of cell batteries high voltage and cell batteries low-voltage charges and balances.
12, auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module resets new even charging voltage 56.4V, charging current 0.145c, starts to enter tapered charge pattern, and charges 120 minutes.
13, auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module large current charge improves 30-60% with the numeric ratio of rechargeable standard database to magnitude of voltage after half an hour.This illustrates that battery capacity reduces 30-60%.
14, monitoring module reports battery capacity not reach the alarm required discharge time.
15, C-RAN distributed spider web indoor power supply miniature alternating current-direct current master slave switch on-chip power auxiliary centre C-RAN spider web accumulator cell charging and discharging balanced management module stops charging.Each principal and subordinate No. 1 high-power magnetic relay closedown departs from and central C-RAN spider web is powered installs the connection of total plumbic acid/lithium electric electric power storage group energy supply system concentratedly.
Preferably, the method that the present embodiment provides also can comprise following process:
The interchange provided when the indoor spider web merged for four nets has a power failure, and when the battery capacity of energy supply system has fallen specified volume, the operating voltage of high-power magnetic relay is reduced to guarantee voltage value; Guarantee the power supply of convergence type spider web, adopt half mode to power to enclosed type and divergence form spider web.
Such as: shown in composition graphs 1, this process is specifically as follows:
Monitoring module is under interchange power-off condition.Battery capacity reduces 30-60%.Take following steps to ensure power supply.
The magnitude of voltage that monitoring module sets No. 4 minimum work of high-power magnetic relay is 40v.Ensure that continuous service C-RAN spider web when battery discharging to work long hours requirement for the balanced sending module maximizing of Electrodynamic balance.
Monitoring module control C-RAN spider web convergence type, enclosed type, the three-in-one output control module of divergence form.Guarantee the power supply guarantee of convergence type spider web.Powering to enclosed type, divergence form spider web adopts semi-load modes to power.
Monitoring module control continuous service C-RAN spider web carries out spider web for the supply power voltage that the balanced sending/receiving module of Electrodynamic balance improves the first secondary direct current cables optoelectronic composite cable short distance core balanced power supply network to 55v and powers.
Monitoring module controls non-continuous operation distributed group net mode spider web distributed intelligence and divides distribution output control unit to carry out the preparation of second load.
Monitoring module is monitored the first secondary spider web supply power voltage by signal processing module and is improved rear mixed type different electric pressure batteries output control module, terminal voltage situation of change during battery discharging.
Preferably, the master/slave Switching Power Supply of the miniature alternating current-direct current of the distributed spider web of the C-RAN in the present embodiment indoor power supply can also judge certain primary or from using Switching Power Supply fault, exist side by side and depart from the function of spider web by it.
Because under normal circumstances C-RAN distributed spider web indoor power supply miniature alternating current-direct current master slave switch power-supply device be separately responsible for institute the one two three level Four spider web is powered.Spider web for Electrodynamic balance balanced sending/receiving module (being equivalent to dynamic equalization transceiver module) E F A B C D(with reference to shown in Fig. 3) carry out the monitoring of principal and subordinate's electric power outputting current voltage.And wireless Parallel Control is carried out to principal and subordinate's power work I/O mode.
When a certain two or three level Four spider web loads strengthen, principal and subordinate's power-supply device output current can be caused to strengthen (the main >0 of △ I, △ I is from C district >0, △ I is from B district >0, △ I is from D district >0), and output voltage reduces (the main <0 of △ V, △ V is from C district <0, △ V is from B district <0, △ V is from D district <0) product of the changing value of voltage and electric current is load (△ I master+△ I is from C district+△ I from B district+△ I from D district) × (△ V master+△ V is from C district+△ V from B district+△ V from D district) <0.
When a certain two or three level Four spider web loads reduce, principal and subordinate's power-supply device output current can be caused to reduce (the main <0 of △ I, △ I is from C district <0, △ I is from B district <0, △ I is from D district <0), and output voltage raises (the main >0 of △ V, △ V is from C district >0, △ V is from B district >0, △ V is from D district >0) product of the changing value of voltage and electric current is negative (△ I master+△ I is from C district+△ I from B district+△ I from D district) × (△ V master+△ V is from C district+△ V from B district+△ V from D district) <0.
When a certain two or three level Four spider web principal and subordinate power-supply devices break down, the output voltage of this principal and subordinate's power-supply device can raise or reduce, electric current is caused to raise equally or reduce, i.e. (△ IE+ △ IF+ △ IC+ △ ID) × (△ VE+ △ VF+ △ VC+ △ VD) >0.Due to
△IE=△IC+△ID
△IF=△IA+△IB
Therefore the input and output electric current in the indoor spider web merged in each network and voltage is netted by monitoring four, and according to the change of input and output electric current and voltage, namely the positive and negative of (△ IE+ △ IF+ △ IC+ △ ID) × (△ VE+ △ VF+ △ VC+ △ VD) is analyzed, for Electrodynamic balance balanced sending/receiving module E F A B C D, spider web can judge whether whether principal and subordinate's power supply normally works, and take treatment measures immediately.By contrast, such scheme has the connection do not needed between spider web principal and subordinate power-supply device, reduces failure rate, and the equal independent operating of one two three level Four spider web principal and subordinate power-supply device, shows as the technique effect without master slave relation simultaneously.
Present embodiments provide a kind of implementation method being applicable to the lower distributed indoor spider web power supply of four net fusions, in the method, C-RAN distributed spider web indoor power supply miniature alternating current-direct current main switch power supply can all devices in supervisory and control system, can when energy supply system fault, when meeting each network and equipment is powered, storage battery is charged, and self-diagnostic function is powerful, and first carry out big current by auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module and increase progressively to solve to overlap principal and subordinate's power supply principal and subordinate battery charging current limiter function with the self adaptation elasticity charging modes that successively decreases more, and battery is to the equal flow problem of the problem of filling and multisystem, achieve when electrical network no-voltage, system communication is powered by central C-RAN spider web and is installed the technique effect that total plumbic acid/lithium electricity electric power storage group energy supply system still normally works concentratedly.
Embodiment 2
Realize for the ease of method in embodiment 1, networking diagram shown in the present embodiment composition graphs 3 or 4, there is provided a kind of indoor power supply Switching Power Supply merged based on four nets, the C-RAN distributed spider web indoor power supply miniature alternating current-direct current master slave switch power supply that this power switch power supply can be used as in embodiment 1 uses.
In networking diagram with reference to the distributed indoor spider web of four net fusions shown in Fig. 3, provide a kind of indoor power supply Switching Power Supply merged based on four nets of the distributed indoor group of web-based applications in this four nets fusion.
In the present embodiment, the silk screen that the Nature spider is made into used for reference by said spider web, if there is insect to cast net, and the distributed indoor power supply system that the principle design that the vibration through signal silk just can be heard the news and be taken food four nets merge.Spider web level Four Energy transmission control system.Namely according to 2G, 3G, 4G, WLAN(WLAN (wireless local area network) on every one-level silk screen), RRU(Remote Radio Unit) load timesharing, segmentation change.Match for Electrodynamic balance balanced transmission/reception module (i.e. dynamic equalization transceiver module) A, B, C, D, E, F and the master/slave Switching Power Supply of (spider) distributed spider web indoor power supply miniature alternating current-direct current 48v (namely main or from power switch power supply) through the spider web on signal silk, form a set of completely newly dynamic divergence form power spider web, dynamic seal closed form of spider web, dynamic convergence type of powering and to power spider web.Silk screen at different levels is different according to the load-carrying importance of institute, adopts differentiation to power output Support Mode.Thus reach the realization that the best power supply plan of whole compartment system configures automatically.
With reference to Fig. 3, Part I; The radio signal coverage system that forms of distributed indoor spider webs that four nets of this programme merge is primarily of distributed spider web indoor power supply miniature alternating current-direct current 48v main switch power supply, the indoor baseband processing unit of 2G/3G/4G-BBU()/WLAN-ONU(optical network unit) composition, representative is the Nature spider.
Part II; (spider) first to set up with direct current cables with composite optical cable as signal optical fibre passage silk screen between the balanced 36-48v supply network of transport vehicle first order direct current cables core and BBU to RRU.
The direct current cables of balanced for first order direct current cables core 36-48v supply network mixing, for the balanced sending module F of Electrodynamic balance, is carried out DC-DC-with composite optical cable silk screen and is connected-isolates-peel off and set up second level optoelectronic composite cable short distance direct current 48-54v supply network silk screen by spider web.Optoelectronic composite cable carries out powering and transfer of data to the RRU of spider web by fiber optic tap and cable-fed device.
First secondary is the most crucial silk screen of native system.By (spider) directly control and management.Signal source comprises base-station transceiver system, RRU RF remote, 2G/4G multifrequency active power filtering isolation mixer, 2G/WLAN multifrequency active power filtering isolation mixer, 3G/4G multifrequency active power filtering isolation mixer and 2G active signal amplifying coupler and 4G active signal amplifies the equipment such as power splitter, active one pole dipole antenna.Realize the first secondary, four active+passive+active+passive nets merge indoor distributed system.
Part III; Second level optoelectronic composite cable short distance direct current 48-54v supply network is carried out DC-DC-connection-isolation-stripping for balanced sending module F and the E of Electrodynamic balance and sets up the 3rd level Four antenna feeder supplying channels silk screen by spider web.Third level radio frequency antenna feeder cable short-distance and medium-distance direct current 48-54v supply network passage.Fourth stage radio frequency antenna feeder cable extra long distance direct current 54-60v supply network passage.Antenna feeder cable is powered to equipment such as the RRU on spider web by coupler and antenna feed electrical equipment.
First secondary is that native system controls dynamic divergence form and to power spider web.Its condition of work is that (spider) power supply and wireless device export the direct elasticity of supply of energy and be greater than actual demand Power supply elasticity.The control of the amplitude fluctuated according to the spider web that dynamic equilibrium curve and moving equilibrium analysis carry out output voltage electric current for Electrodynamic balance balanced transmission/reception module E F A B by spider web.
The third level is that native system controls dynamic convergence type and to power spider web.Its condition of work be (spider) supply first secondary export energy meet after, supplying to the third level.The original equilibrium point of amplitude of being fluctuated according to the spider web that dynamic equilibrium curve and moving equilibrium analysis carry out output voltage electric current for Electrodynamic balance balanced transmission/reception module E F C by spider web controls.
The fourth stage is that native system controls dynamic seal closed form and to power spider web.Its condition of work is that (spider) power supply and wireless device export the direct elasticity of supply of energy and equal demand elasticity.The spider web that spider web carries out output voltage electric current for Electrodynamic balance balanced sending/receiving module E F D according to dynamic equilibrium curve and moving equilibrium analysis fluctuates, and by same amplitude around equilibrium point upper and lower undulated control, spider web system capacity is exported and reaches balanced.
Wireless aspect: the wireless portion of this programme is exactly four nets are merged according to area type antenna cover radius equipment and system that indoor distribution spider web mode wireless signal cover to be divided into four nets and to merge spider web A, B, C, D 4th district.
Four nets merge spider webs (i.e. four nets merge distributed indoor spider webs) A, B bis-district and peripheral indoor distributed system be covering power compared with the wireless spider web pattern of Vernonia parishii Hook. F. type, belong to priority setting guarantee hot spot region.C, D district and peripheral indoor distributed system are that covering power less convergence type combines with enclosed type wireless spider web pattern, belong to non-priority support secondary regions.Therefore this programme considers that end antenna-feedback system needs to share, and when practical application, lays with WLAN antenna cover radius, carries out the information source power planning other system, to accomplish that equivalence covers, thus can save the power resource of information source.
The power supply aspect of this network: the power supply that the area type according to wireless aspect divides this programme provides whole silk screen power supply monitoring and redundancy backup to be the brains of whole electric power system for principal and subordinate two the distributed spider web indoor power supply of composition miniature alternating current-direct current 48v main switch power supply.And be responsible for the power supply of A, B district nucleus.B, C, D region completes power supply by the miniature alternating current-direct current 48v of distributed spider web indoor power supply from Switching Power Supply.Central authorities' C-RAN spider web is powered and is installed total plumbic acid/lithium electricity electric power storage group energy supply system (i.e. energy supply system) concentratedly and adopt the different electric pressure low-voltage storage battery way of output.So not only electric shock accidents can be prevented.And C-RAN(novel radio Access Network can be ensured) distributed indoor spider web runs normally, and after the incision of part storage battery, its operation isolates with geodetic network the operating state being in suspension.Meanwhile, energy supply system can utilize indoor distribution ruuning situation option program to carry out the adjustment System energy content of battery and export, thus ensures the demand of building diverse location indoor distribution wireless coverage.
In order to the power switch power supply in more detailed description embodiment, please according to the C-RAN shown in Fig. 4 the networking of distributed spider web indoor power supply miniature AC-DC switch power supply another group schematic diagram.Wherein, C-RAN distributed spider web indoor power supply miniature alternating current-direct current main switch power supply can all devices in supervisory and control system, and self-diagnostic function is powerful; Namely C-RAN distributed spider web indoor power supply miniature alternating current-direct current main switch power supply is primary is also stand-by power supply.Central authorities C-RAN spider web is powered and installed total plumbic acid/lithium electricity electric power storage group energy supply system concentratedly is total battery supply center, and the 2/3/4G/RRU/WLAN being responsible for the distributed spider web subregion of the supply every a part of C-RAN of building provides power supply, C-RAN spider web belongs to communication and controller switching equipment for the balanced sending/receiving module of Electrodynamic balance, is generally positioned in the distributed spider web subregion of C-RAN, its Main Function be to the miniature alternating current-direct current of C-RAN distributed spider web indoor power supply from Switching Power Supply to its power supply control, C-RAN spider web power supply safety voltage-type divides Power entry module can according to the concrete power supply situation in scene, by automatic or manual program control and change power supply state, more accurate, safety, power to relevant device, C-RAN spider web convergence type, enclosed type, the three-in-one output control module of divergence form (i.e. output control module) each output branch road all should be separately protected, and arbitrary branch trouble should not affect the normal work of other branch roads, simultaneously, namely when electrical network no-voltage, system communication is powered by central C-RAN spider web and is installed total plumbic acid/lithium electricity electric power storage group energy supply system concentratedly and still normally work.Simultaneously this programme is in order to solve when number of power sources increases, many cover principal and subordinate power supply principal and subordinate battery charging current limiter functions, and battery is to the equal flow problem of the problem of filling and multisystem.Adopting is powered by monitoring module, central C-RAN spider web installs total plumbic acid/lithium electricity electric power storage group energy supply system concentratedly, auxiliary centre C-RAN spider web storage battery elasticity charge and discharge balancing administration module (i.e. Added Management module), C-RAN spider web carry out controlling and solving for Electrodynamic balance equilibrium sending/receiving module.
Respectively the networking of distributed indoor spider web of merging at four nets and the networking of the master/slave Switching Power Supply of the miniature alternating current-direct current of distributed spider web indoor power supply are illustrated above.Specifically describe the indoor power supply Switching Power Supply merged based on four nets that the present embodiment be applied in above-mentioned networking provides below, the namely structure of the master/slave Switching Power Supply of the miniature alternating current-direct current of distributed spider web indoor power supply, as shown in Figure 5, mainly comprise: monitoring module 10, Added Management module 20.
Monitoring module 10, for monitoring the voltage during storage battery DC charging of indoor spider web that four nets merge (i.e. four nets merge distributed indoor spider webs) middle energy supply system;
Added Management module 20, when the charging for the storage battery when energy supply system is broken down, starts booster battery; And increasing progressively rechargeable standard tables of data according to the voltage of battery pack during fault with the big current preset, the storage battery of booster battery to energy supply system charges.
Specifically, monitoring module 10, specifically in the indoor spider web of four net fusions, whether voltage when monitoring the storage battery DC charging of energy supply system runs lower than standard float charge voltage 10%; And whether the storage battery of monitoring energy supply system meets the condition of fault, the condition of fault is: the charging voltage of storage battery is less than first threshold voltage, and charging current is less than first threshold electric current, and does not change in official hour.
Added Management module 20, be less than first threshold voltage specifically for the charging voltage monitoring the storage battery of energy supply system when monitoring module, charging current is less than first threshold electric current, and does not change in official hour, starts booster battery.
Added Management module 20, increases progressively rechargeable standard tables of data specifically for storing default big current; And using the voltage of the storage battery of energy supply system during fault as beginning charging voltage value, according to start charging voltage value and the big current preset increase progressively in rechargeable standard tables of data with the even charging voltage desired value determination charging current value and the charging interval that start charging voltage value corresponding record, according to charging current and charging interval, the storage battery to energy supply system charges booster battery.
Further, the power supply that the present embodiment provides also comprises: output control module 30, dynamic equalization transceiver module 40.
Output control module 30, for the power supply of control convergence type spider web, enclosed type spider web and divergence form spider web.
Monitoring module 10, the interchange also for providing when the indoor spider web merged for four nets has a power failure, and when the battery capacity of energy supply system has fallen specified volume, the operating voltage of high-power magnetic relay is reduced to guarantee voltage value; Correspondingly, monitoring module 10, also guarantees the power supply of convergence type spider web for controlling output control module 30, adopts half mode to power to enclosed type and divergence form spider web.
According to the change of input and output electric current and voltage, dynamic equalization transceiver module 40, for monitoring input and output electric current in indoor spider web that four nets merge in each network and voltage, and determines whether primary and/or stand-by power supply Switching Power Supply normally works.
This dynamic equalization module 40 specifically determine the master/slave Switching Power Supply of the miniature alternating current-direct current of C-RAN distributed spider web indoor power supply after the step 104 that process that whether primary and/or stand-by power supply Switching Power Supply normally works can refer in embodiment 1 can also judge certain primary or from using Switching Power Supply fault, the description part of the function departing from spider web by it of existing side by side, is not repeated herein.
The products such as the said equipment that the embodiment of the present invention provides or device belong to the flow and method of computer program for foundation, and according to each step corresponding consistent mode completely with method flow in embodiment of the method 1 and/or accompanying drawing, the functional module provided.And because this functional module is the software service realized by the mode of computer program, so the functional module specifically do not mentioned for device embodiment 2, owing to considering that the content recorded according to said method embodiment has enough made those skilled in the art determine directly, expectedly to realize the functional module that described step must set up, so be not repeated herein from each process step of method record.

Claims (10)

1., based on an implementation method for the indoor power supply Switching Power Supply of four net fusions, it is characterized in that, comprising:
The voltage during storage battery DC charging of energy supply system in the indoor spider web merged is netted in monitoring four;
When the charging of the storage battery of described energy supply system is broken down, start booster battery;
Voltage according to battery pack during fault increases progressively rechargeable standard tables of data with the big current preset, and the storage battery of described booster battery to described energy supply system charges.
2. method according to claim 1, is characterized in that, the voltage during storage battery DC charging of energy supply system in the indoor spider web merged is netted in described monitoring four, specifically comprises:
In the indoor spider web that four nets merge, run lower than standard float charge voltage 10% during the storage battery DC charging of energy supply system;
Whether voltage when monitoring described storage battery current charge runs lower than standard float charge voltage 10%.
3. method according to claim 1 and 2, is characterized in that, when the charging of the described storage battery when described energy supply system is broken down, starts booster battery, specifically comprises:
When the charging voltage of the storage battery of described energy supply system is less than first threshold voltage, charging current is less than first threshold electric current, and does not change in official hour, then start booster battery.
4. method according to claim 1 and 2, it is characterized in that, the described voltage according to battery pack during fault and the big current preset increase progressively rechargeable standard tables of data, and the storage battery of described booster battery to described energy supply system charges, and specifically comprises:
Using the voltage of the storage battery of energy supply system during fault as beginning charging voltage value, according to beginning charging voltage value and described default big current increase progressively in rechargeable standard tables of data with the even charging voltage desired value determination charging current value of described beginning charging voltage value corresponding record and charging interval, according to described charging current and described charging interval, the storage battery to described energy supply system charges described booster battery.
5. method according to claim 1 and 2, is characterized in that, the method also comprises:
The interchange provided when the indoor spider web merged for four nets has a power failure, and when the battery capacity of described energy supply system has fallen specified volume, the operating voltage of high-power magnetic relay is reduced to guarantee voltage value;
Guarantee the power supply of convergence type spider web, adopt half mode to power to enclosed type and divergence form spider web.
6., based on the indoor power supply Switching Power Supply that four nets merge, it is characterized in that, comprising:
Monitoring module, for monitoring the voltage during storage battery DC charging of energy supply system in indoor spider web that four nets merge;
Added Management module, when the charging for the storage battery when described energy supply system is broken down, starts booster battery; And increasing progressively rechargeable standard tables of data according to the voltage of battery pack during fault with the big current preset, the storage battery of described booster battery to described energy supply system charges.
7. power switch power supply according to claim 6, is characterized in that,
Described monitoring module, specifically in the indoor spider web of four net fusions, whether voltage when monitoring the storage battery DC charging of energy supply system runs lower than standard float charge voltage 10%; And whether the storage battery monitoring described energy supply system meets the condition of fault, the condition of described fault is: the charging voltage of storage battery is less than first threshold voltage, and charging current is less than first threshold electric current, and does not change in official hour;
Described Added Management module, charging voltage specifically for monitoring the storage battery of energy supply system when described monitoring module is less than first threshold voltage, charging current is less than first threshold electric current, and does not change in official hour, starts booster battery.
8. the power switch power supply according to claim 6 or 7, is characterized in that,
Described Added Management module, increases progressively rechargeable standard tables of data specifically for storing default big current; And using the voltage of the storage battery of energy supply system during fault as beginning charging voltage value, according to beginning charging voltage value and described default big current increase progressively in rechargeable standard tables of data with the even charging voltage desired value determination charging current value of described beginning charging voltage value corresponding record and charging interval, according to described charging current and described charging interval, the storage battery to described energy supply system charges described booster battery.
9. the power switch power supply according to claim 6 or 7, is characterized in that, also comprise:
Output control module, for the power supply of control convergence type spider web, enclosed type spider web and divergence form spider web;
Described monitoring module, the interchange also for providing when the indoor spider web merged for four nets has a power failure, and when the battery capacity of described energy supply system has fallen specified volume, the operating voltage of high-power magnetic relay is reduced to guarantee voltage value;
Described monitoring module, also guarantees the power supply of convergence type spider web for controlling described output control module, adopt half mode to power to enclosed type and divergence form spider web.
10. the power switch power supply according to claim 6 or 7, is characterized in that, also comprise:
According to the change of input and output electric current and voltage, dynamic equalization transceiver module, for monitoring input and output electric current in indoor spider web that four nets merge in each network and voltage, and determines whether primary and/or stand-by power supply Switching Power Supply normally works.
CN201310714067.7A 2013-12-20 2013-12-20 Indoor power supply switching mode power source based on four-network fusion and obtaining method thereof Active CN104734261B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310714067.7A CN104734261B (en) 2013-12-20 2013-12-20 Indoor power supply switching mode power source based on four-network fusion and obtaining method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310714067.7A CN104734261B (en) 2013-12-20 2013-12-20 Indoor power supply switching mode power source based on four-network fusion and obtaining method thereof

Publications (2)

Publication Number Publication Date
CN104734261A true CN104734261A (en) 2015-06-24
CN104734261B CN104734261B (en) 2017-02-22

Family

ID=53457854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310714067.7A Active CN104734261B (en) 2013-12-20 2013-12-20 Indoor power supply switching mode power source based on four-network fusion and obtaining method thereof

Country Status (1)

Country Link
CN (1) CN104734261B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2832262A1 (en) * 2001-11-09 2003-05-16 France Telecom METHOD AND DEVICE FOR SUPPLYING ELECTRICAL ENERGY TO AN APPARATUS
CN101620441B (en) * 2009-08-05 2014-02-12 重庆百年通信设备有限公司 Monitoring system in communication computer room
CN102480164A (en) * 2010-11-26 2012-05-30 中兴通讯股份有限公司 Hybrid energy power supply system and hybrid energy power supply method
CN103138298A (en) * 2011-11-24 2013-06-05 陕西科林能源发展股份有限公司 Control circuit system for solar electric vehicle charging station
CN102593907A (en) * 2012-02-29 2012-07-18 华为技术有限公司 Power supply method and device as well as base station

Also Published As

Publication number Publication date
CN104734261B (en) 2017-02-22

Similar Documents

Publication Publication Date Title
AU2015311401B2 (en) Power supply system and method
US10447343B2 (en) System and method for controlling radio base station, and related device
CN109572454B (en) Charging system of intelligent charging station for electric automobile
US10523027B2 (en) Power supply apparatus and power supply method
CN101728849B (en) Hybrid battery management system, battery management method and hybrid standby power supply system
CN107681672A (en) The interactive approach of charging pile interactive terminal and charging pile access power network
CN103607038B (en) Method for implementing serial power supplying of multistage spare power automatic switching devices in power grid
CN103248038B (en) Base station power supply network system and base station emergency power supply method
CN202679050U (en) Communication base station centralized power supply system
CN105472786B (en) A kind of distributed base station and communication system
CN112671081A (en) Universally-adaptive multi-module parallel power supply system
CN103607012A (en) Special direct-current input power supply for inverter
CN114161983B (en) Electric vehicle battery replacement system and charging method of battery pack
CN113725880B (en) 5G intelligent power management system, power supply system and power supply method of stock base station
CN112072664A (en) Multi-input multi-output power supply device and integrated cabinet
CN104754706B (en) A kind of multi-internet integration method of supplying power to and network
CN112103981A (en) Intelligent peak-valley power supply management system
CN209767152U (en) Direct current microgrid power supply system based on energy pool
CN110970943A (en) Hybrid micro-grid system and control method thereof
CN104734261A (en) Indoor power supply switching mode power source based on four-network fusion and obtaining method thereof
CN106849298B (en) Distributed AC/DC power supply module for prefabricated cabin of transformer substation
CN114123468A (en) Pickup energy storage shelter and multi-scene application method thereof
CN209329769U (en) A kind of base station power supply control apparatus
CN211351805U (en) AC-DC integrated energy storage equipment and system
CN105356592A (en) Intelligent power supply apparatus and method of uninterrupted power supply system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant