CN104734069B - De- bowl device for charged for replacement 220kV single conductor linear insulator chains - Google Patents

De- bowl device for charged for replacement 220kV single conductor linear insulator chains Download PDF

Info

Publication number
CN104734069B
CN104734069B CN201510174670.XA CN201510174670A CN104734069B CN 104734069 B CN104734069 B CN 104734069B CN 201510174670 A CN201510174670 A CN 201510174670A CN 104734069 B CN104734069 B CN 104734069B
Authority
CN
China
Prior art keywords
bowl
tooth
cross bar
insulator
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510174670.XA
Other languages
Chinese (zh)
Other versions
CN104734069A (en
Inventor
涂艳洪
周宗国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anshun Power Supply Bureau of Guizhou Power Grid Co Ltd
Original Assignee
Anshun Power Supply Bureau of Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anshun Power Supply Bureau of Guizhou Power Grid Co Ltd filed Critical Anshun Power Supply Bureau of Guizhou Power Grid Co Ltd
Priority to CN201510174670.XA priority Critical patent/CN104734069B/en
Publication of CN104734069A publication Critical patent/CN104734069A/en
Application granted granted Critical
Publication of CN104734069B publication Critical patent/CN104734069B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses a kind of de- bowl devices for charged for replacement 220kV single conductor linear insulator chains,Including longitudinal body of rod,Longitudinal body of rod includes when using towards the front end of bowl body and for extending the rear end held,And longitudinal body of rod is divided into the left and right sides along central axes,Wherein the cross bar I for being transversely to the machine direction the body of rod is transversely arranged in left side,The end set of cross bar I has perpendicular tooth I vertically downward,The M pin operation teeth I of cross bar I and perpendicular tooth I composition inverted L-shapeds,The cross bar II for being transversely to the machine direction the body of rod is transversely arranged in the right side of longitudinal body of rod,The end set of cross bar II has perpendicular tooth II vertically upward,The just L-shaped M pins operation tooth II of cross bar II and perpendicular tooth II compositions,Lever front end portion to rear end direction along longitudinal direction,Cross bar I is located at the top of cross bar II,The end polishing of the perpendicular tooth I and perpendicular tooth II is at an acute angle.The use of the present invention can improve the efficiency that insulator chain is detached from and restores with bowl head, reduce the radiated time and radiation intensity of highfield above earth potential operating personnel.

Description

De- bowl device for charged for replacement 220kV single conductor linear insulator chains
Technical field
The present invention relates to a kind of de- bowl devices for charged for replacement 220kV single conductor linear insulator chains, further relate to one kind The method of charged for replacement 220kV single conductor linear insulator chains.
Background technology
In electric power repair work, in the Work tool used before, the bis- divisions of charged for replacement 220kV are directed to without a kind of Tiltedly row splits the special de- bowl device of the linear insulator chain of conducting wire, especially tired when side of wire first insulator and bowl head to be detached from Difficulty, bowl head docks inaccurate situation with bulb frequent occurrence when recovery, affects ergonomic, reduces working efficiency.
In view of the above problem, it is necessary to a kind of novel de- cup apparatus is designed, using its special construction, by conducting wire Quick release when side first insulator and bowl head are detached from, when recovery, accurately restore the other way around, to avoid above-mentioned drawback, And it ensures the personal safety of operating personnel, while having greatlyd improve working efficiency.
Invention content
In view of this, an object of the present invention, which is to provide one kind, being used for charged for replacement 220kV single conductor linear insulators The de- bowl device of string.Can when in use, the Quick release when side of wire first insulator and bowl head to be detached from, slave phase when recovery Negative direction accurately restores, to time saving and energy saving, and meanwhile it is safe and reliable;It is a kind of using above-mentioned the second object of the present invention is to provide The method of de- bowl device charged for replacement 220kV single conductor linear insulator chains.
An object of the present invention is achieved through the following technical solutions:
This is used for the de- bowl device of charged for replacement 220kV single conductor linear insulator chains, including longitudinal body of rod, the longitudinal rod Body includes the rear end towards the front end of bowl body and for extending gripping when using, and longitudinal body of rod is divided into a left side along central axes Right both sides, wherein the cross bar I for being transversely to the machine direction the body of rod is transversely arranged in left side, the end set of the cross bar I has vertically downward Perpendicular tooth I, the cross bar I and perpendicular tooth I composition inverted L-shaped M pin operation tooth I, the right side of longitudinal body of rod be transversely arranged perpendicular to The end set of the cross bar II, the cross bar II of longitudinal body of rod have perpendicular tooth II vertically upward, the cross bar II and perpendicular tooth II groups Tooth II is operated at just L-shaped M pins, lever front end portion to rear end direction, the cross bar I are located at the top of cross bar II along longitudinal direction, The end polishing of the perpendicular tooth I and perpendicular tooth II is at an acute angle.
Further, the rear end of longitudinal body of rod is provided with the fixation for being detachably connected with exterior insulation operating lever Connection structure.
Further, the fixed connection structure is the connection structure that is screwed.
Further, the length of longitudinal body of rod is 190~230mm, between the cross bar I and the front end face of longitudinal body of rod Fore-and-aft distance be 25~35mm, the fore-and-aft distance between the cross bar II and the front end face of longitudinal body of rod is 80~95mm.
Further, the length of the cross bar I and cross bar II is 40-60mm, width 8-12mm;The perpendicular tooth I and perpendicular tooth The length of II is 50-60mm, width 8-12mm.
Further, it the described method comprises the following steps:
The second object of the present invention is to what is be achieved through the following technical solutions:
The method that charged for replacement 220kV single conductor linear insulator chains are carried out using foregoing de- bowl device, including with Lower step:
Step 1:The insulation operating of selected respective model and length is connected with de- bowl device;
Step 2:After carrying out charged for replacement 220kV single conductor linear insulator chain operation preparations, when insulator chain also When in nature elongation state, insulator pin is in close contact with bowl head inner tip, is deposited in bulb and bowl head interior lower end Between M pin this space also have can be with movable space;
Step 3:De- bowl operation:After ground potential electrician is taken out M pins with special splitting, then, ground potential electrician is hand-held Insulating bar other end selects M pins operation tooth I or M pin operation teeth II to carry out according to the opening direction of the big mouth of bowl head at this time De- bowl operation then sells operation tooth II using M in next step and carries out multiple bowl operation when M, which sells operation tooth I, is used to take off bowl operation;Work as M When pin operation tooth II is for taking off bowl operation, then multiple bowl is carried out using M pin operations tooth I in next step and operated;Operation is sold with the M chosen The bowl head being connected with triangle yoke plate is clipped in the space between M pins operation tooth and longitudinal body of rod ontology by tooth, by by bowl head edge Insulating bar direction is pulled back or the negative direction by bowl head along insulating bar extended line pushes out, by insulator pin and bowl head It separates;
Step 4:Multiple bowl operation:Impaired insulator is changed, after installing new insulator chain, is not led in insulator chain Line is conducted oneself with dignity, i.e., when downward pulling force, insulator pin is substantially at bowl head in same level, is at this moment needed to take and accordingly be arranged Applying prevents insulator chain from arbitrarily shaking;Ground potential electrician in conducting wire horizontal direction holds insulating bar one end, utilizes choosing The good M pins operation tooth for carrying out multiple bowl operation is clipped in bowl head inside the space between 1 ontology of M pins operation tooth and longitudinal body of rod, Bowl head is pushed out along the negative direction of insulating bar extended line or bowl head is pulled back along insulating bar direction, by the bulbec that insulate Head and bowl head restore, and after checking insulator pin completely into bowl head, loosen cord holder, insulator chain is at the uniform velocity restored to nature Elongation state;
Step 5:At this point, there is space movable enough between bulb and bowl head interior lower end, ground potential electrician is hand-held exhausted Edge operating lever other end is sold the M for being inserted in M pin operation tooth ends by big with the end for the M pin operation teeth for carrying out de- bowl operation Mouth direction is sent into inside bowl head, shifts position appropriate onto.
Further, the step 4) in, by holding insulation in one ground potential electrician of insulator chain vertical direction arrangement Substring is cooperated insulator pin and bowl is extensive to prevent insulator chain from arbitrarily shaking by two ground potential electricians It is multiple.
Further, the ground potential electrician holds insulator chain and grabs fixed mode using hand, holds insulator position No more than insulator chain second.
The beneficial effects of the invention are as follows:
The use of the present invention improves the efficiency that insulator chain is detached from and restores with bowl head, it is electric over the ground to reduce highfield The radiated time and radiation intensity of position operating personnel, reduces ground potential operator's operating time on shaft tower, effectively protects Hinder safe operation of electric network and personnel health's safety, while the method design science of the present invention, is easy to personnel assignment and standardization Operation can be accelerated to overhaul defect elimination efficiency, have higher application value.
Other advantages, target and the feature of the present invention will be illustrated in the following description to a certain extent, and And to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, Huo Zheke To be instructed from the practice of the present invention.The target and other advantages of the present invention can be wanted by following specification and right Book is sought to realize and obtain.
Description of the drawings
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing to the present invention make into The detailed description of one step, wherein:
Attached drawing is the de- bowl device structural schematic diagram of the present invention.
Specific implementation mode
Hereinafter reference will be made to the drawings, and the preferred embodiment of the present invention is described in detail.It should be appreciated that preferred embodiment Only for illustrating the present invention, the protection domain being not intended to be limiting of the invention.
As shown in Figure 1, the de- bowl device for charged for replacement 220kV single conductor linear insulator chains of the present invention includes longitudinal The body of rod 1, longitudinal body of rod include when using towards the front end 11 of bowl body and for extending the rear end 12 held, and longitudinal rod Body is divided into the left and right sides along central axes, wherein the cross bar I for being transversely to the machine direction the body of rod is transversely arranged in left side, the end of cross bar I is set The M pin operation tooth I2 of perpendicular tooth I vertically downward, cross bar I and perpendicular tooth I composition inverted L-shaped are equipped with, the right side of the body of rod, which is transversely arranged, hangs down Directly in the cross bar II of longitudinal body of rod, the end set of cross bar II has perpendicular tooth II vertically upward, cross bar II and perpendicular tooth II to form positive L The M pins of shape operate tooth II3, and lever front end portion to rear end direction, cross bar I are located at the top of cross bar II along longitudinal direction, erect tooth I and erect The end polishing of tooth II is at an acute angle, convenient for exiting and restoring M pins.
As a further improvement, it is provided in the rear end of longitudinal body of rod for detachably connecting with exterior insulation operating lever The fixed connection structure connect, in the present embodiment, fixed connection structure is the connection structure that is screwed, and is threadably secured connection knot The de- bowl device of the present invention can be fixed on the insulating bar of respective model by structure, operated at a distance, allow work people Member and electrical body keep enough safe distances.
In the present embodiment, the length of longitudinal body of rod is 210mm, between cross bar I and the front end face of longitudinal body of rod it is longitudinal away from It is 30mm from H1, the fore-and-aft distance H2 between cross bar II and the front end face of longitudinal body of rod is 90mm.
The length of cross bar I and cross bar II are 50mm, width 10mm;The length of perpendicular tooth I and perpendicular tooth II is 55mm, and width is 10mm。
Certain above-mentioned length and width in actual use, can carry out adjustment appropriate according to actual needs.
The use of the present invention takes off the side that bowl device carries out charged for replacement 220kV single conductor linear insulator chains as previously described Method includes the following steps:
Step 1:The insulation operating of selected respective model and length is connected with de- bowl device;
Step 2:After carrying out charged for replacement 220kV single conductor linear insulator chain operation preparations, when insulator chain also When in nature elongation state, insulator pin is in close contact with bowl head inner tip, is deposited in bulb and bowl head interior lower end Between M pin this space also have can be with movable space;
Step 3:De- bowl operation:After ground potential electrician is taken out M pins with special splitting, then, ground potential electrician is hand-held Insulating bar other end selects M pins operation tooth I or M pin operation teeth II to carry out according to the opening direction of the big mouth of bowl head at this time De- bowl operation then sells operation tooth II using M in next step and carries out multiple bowl operation when M, which sells operation tooth I, is used to take off bowl operation;Work as M When pin operation tooth II is for taking off bowl operation, then multiple bowl is carried out using M pin operations tooth I in next step and operated;Operation is sold with the M chosen The bowl head being connected with triangle yoke plate is clipped in the space between M pins operation tooth and longitudinal body of rod ontology by tooth, by by bowl head edge Insulating bar direction is pulled back or the negative direction by bowl head along insulating bar extended line pushes out, by insulator pin and bowl head It separates;
Step 4:Multiple bowl operation:Impaired insulator is changed, after installing new insulator chain, is not led in insulator chain Line is conducted oneself with dignity, i.e., when downward pulling force, insulator pin is substantially at bowl head in same level, is at this moment needed to take and accordingly be arranged Applying prevents insulator chain from arbitrarily shaking;Ground potential electrician in conducting wire horizontal direction holds insulating bar one end, utilizes choosing The good M pins operation tooth for carrying out multiple bowl operation is clipped in bowl head inside the space between 1 ontology of M pins operation tooth and longitudinal body of rod, Bowl head is pushed out along the negative direction of insulating bar extended line or bowl head is pulled back along insulating bar direction, by the bulbec that insulate Head and bowl head restore, and after checking insulator pin completely into bowl head, loosen cord holder, insulator chain is at the uniform velocity restored to nature Elongation state;
Step 5:At this point, there is space movable enough between bulb and bowl head interior lower end, ground potential electrician is hand-held exhausted Edge operating lever other end is sold the M for being inserted in M pin operation tooth ends by big with the end for the M pin operation teeth for carrying out de- bowl operation Mouth direction is sent into inside bowl head, shifts position appropriate onto.
Wherein, in step 4) in, the measure taken in the present embodiment is by arranging one in insulator chain vertical direction Ground potential electrician holds insulator chain, and to prevent insulator chain from arbitrarily shaking, this ground potential electrician holds insulator chain and adopts Fixed mode is grabbed with hand, insulator position is held and is no more than insulator chain second, it is mutual by two ground potential electricians Cooperation restores insulator pin and bowl head.Certainly, in practical operation, can also use other modes to insulator chain into Row is fixed.
The device of the invention, when insulator chain and bowl head to be detached from or restore, utilizes it when carrying out livewire work Special construction, the Quick release when side of wire first insulator and bowl head to be detached from, when recovery, accurately restore the other way around, So as to time saving and energy saving, working efficiency is greatlyd improve, while having ensured the personal safety of operating personnel.
Finally illustrate, the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although with reference to compared with Good embodiment describes the invention in detail, it will be understood by those of ordinary skill in the art that, it can be to the skill of the present invention Art scheme is modified or replaced equivalently, and without departing from the objective and range of the technical program, should all be covered in the present invention Right in.

Claims (5)

1. the de- bowl device for charged for replacement 220kV single conductor linear insulator chains, it is characterised in that:The de- bowl device includes vertical To the body of rod (1), the longitudinal direction body of rod includes when using towards the front end (11) of bowl body and for extending the rear end held (12), and longitudinal body of rod is divided into the left and right sides along central axes, wherein the cross bar I for being transversely to the machine direction the body of rod is transversely arranged in left side, The end set of the cross bar I has the M pin operation teeth I of perpendicular tooth I vertically downward, the cross bar I and perpendicular tooth I composition inverted L-shaped (2), the cross bar II for being transversely to the machine direction the body of rod is transversely arranged in the right side of longitudinal body of rod, and the end set of the cross bar II has vertically Upward perpendicular tooth II, the cross bar II and perpendicular tooth II composition just L-shaped M pin operation tooth II (3), lever front end portion is to rear along longitudinal direction End direction, the cross bar I are located at the top of cross bar II, end at an acute angle, the longitudinal direction of polishing of the perpendicular tooth I and perpendicular tooth II The rear end of the body of rod is provided with the fixed connection structure for being detachably connected with exterior insulation operating lever, the longitudinal direction body of rod Length is 190~230mm, and the fore-and-aft distance (H1) between the cross bar I and the front end face of longitudinal body of rod is 25~35mm, described Fore-and-aft distance (H2) between cross bar II and the front end face of longitudinal body of rod is 80~95mm, the length of the cross bar I and cross bar II For 40-60mm, width 8-12mm;The length of the perpendicular tooth I and perpendicular tooth II is 50-60mm, width 8-12mm.
2. the de- bowl device according to claim 1 for charged for replacement 220kV single conductor linear insulator chains, feature exists In:The fixed connection structure is the connection structure that is screwed.
3. using such as the de- bowl device progress charged for replacement 220kV single conductor linear insulator chains as described in claim 1-2 is any Method, it is characterised in that:It the described method comprises the following steps:
Step 1:The insulation operating of selected respective model and length is connected with de- bowl device;
Step 2:After carrying out charged for replacement 220kV single conductor linear insulator chain operation preparations, when insulator chain also in When natural elongation state, insulator pin is in close contact with bowl head inner tip, is deposited between bulb and bowl head interior lower end M pin also have can be with movable space;
Step 3:De- bowl operation:After ground potential electrician is taken out M pins with special splitting, then, the hand-held insulation of ground potential electrician Operating lever other end selects M pins operation tooth I or M pin operations tooth II to carry out de- bowl according to the opening direction of the big mouth of bowl head at this time Operation then sells operation tooth II using M in next step and carries out multiple bowl operation when M, which sells operation tooth I, is used to take off bowl operation;It is grasped when M is sold When making tooth II for taking off bowl operation, then multiple bowl is carried out using M pin operations tooth I in next step and operated;It will with the M pin operation teeth chosen The bowl head being connected with triangle yoke plate is clipped in the space between M pins operation tooth and longitudinal body of rod ontology, by the way that bowl head edge is insulated Operating lever direction is pulled back or the negative direction by bowl head along insulating bar extended line pushes out, and insulator pin and bowl head are detached It comes;
Step 4:Multiple bowl operation:Change impaired insulator, after installing new insulator chain, insulator chain not by conducting wire from Again, i.e., when downward pulling force, insulator pin is substantially at bowl head in same level, at this moment takes measures to prevent insulator String arbitrarily shakes;Ground potential electrician in conducting wire horizontal direction holds insulating bar one end, and multiple bowl is carried out using what is chosen The M pins operation tooth of operation is clipped in bowl head inside the space between 1 ontology of M pins operation tooth and longitudinal body of rod;With point of step 3 From the operation direction of insulator pin and bowl head on the contrary, bowl head is pushed out along the negative direction of insulating bar extended line or by bowl Head is pulled back along insulating bar direction, and insulator pin and bowl head are restored, and after checking insulator pin completely into bowl head, is put Insulator chain is at the uniform velocity restored to nature elongation state by elastic line device;
Step 5:At this point, have space movable enough between bulb and bowl head interior lower end, the hand-held insulation behaviour of ground potential electrician Make bar other end, with the end for the M pin operation teeth for carrying out de- bowl operation, the M for being inserted in M pin operation tooth ends is sold by big mouth side To being sent into inside bowl head, position appropriate is shifted onto.
4. the method as claimed in claim 3 for carrying out charged for replacement 220kV single conductor linear insulator chains using de- bowl device, It is characterized in that:The step 4) in, by holding insulator chain in one ground potential electrician of insulator chain vertical direction arrangement, To prevent insulator chain from arbitrarily shaking, is cooperated by two ground potential electricians and restore insulator pin and bowl head.
5. the method as claimed in claim 3 for carrying out charged for replacement 220kV single conductor linear insulator chains using de- bowl device, It is characterized in that:The ground potential electrician holds insulator chain and grabs fixed mode using hand, and hand-held insulator position is no more than Insulator chain second.
CN201510174670.XA 2015-04-14 2015-04-14 De- bowl device for charged for replacement 220kV single conductor linear insulator chains Active CN104734069B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510174670.XA CN104734069B (en) 2015-04-14 2015-04-14 De- bowl device for charged for replacement 220kV single conductor linear insulator chains

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510174670.XA CN104734069B (en) 2015-04-14 2015-04-14 De- bowl device for charged for replacement 220kV single conductor linear insulator chains

Publications (2)

Publication Number Publication Date
CN104734069A CN104734069A (en) 2015-06-24
CN104734069B true CN104734069B (en) 2018-08-21

Family

ID=53457665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510174670.XA Active CN104734069B (en) 2015-04-14 2015-04-14 De- bowl device for charged for replacement 220kV single conductor linear insulator chains

Country Status (1)

Country Link
CN (1) CN104734069B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105914654B (en) * 2016-07-01 2018-06-19 国网新疆电力公司昌吉供电公司 Livewire work bowl head setting tool

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101834415A (en) * 2010-05-14 2010-09-15 福建省电力有限公司三明电业局 Method and special tool for live replacement of zinc oxide lightning arrester
CN202872263U (en) * 2012-11-14 2013-04-10 湖南省电力公司长沙电业局 Tool charged for replacing double strings of insulators of double bundle conductors of straight line pole
CN202906333U (en) * 2012-10-08 2013-04-24 河南省电力公司平顶山供电公司 Spring pin reset operation head
CN203233105U (en) * 2013-05-16 2013-10-09 国家电网公司 Multifunctional lapping and removing special tool for live-line work
CN103779807A (en) * 2014-02-11 2014-05-07 国家电网公司 Integrated bowl stirring and pin taking device
CN103904589A (en) * 2014-04-24 2014-07-02 国家电网公司 Pin pulling pliers for replacing tension insulator of ground potential of power transmission line and use method thereof
CN104020318A (en) * 2014-06-17 2014-09-03 国家电网公司 Multifunctional wire hanging rod
CN204030414U (en) * 2014-05-31 2014-12-17 国家电网公司 A kind of straight line pole composite insulator is changed the instrument that square cotter departs from, resets at present
CN104505769A (en) * 2014-12-16 2015-04-08 国家电网公司 Ground potential operation straight line pole socket disassembly and assembly method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10156748A (en) * 1996-11-26 1998-06-16 Nishi Nippon Electric Wire & Cable Co Ltd Manipulator-operating cotter pin fitting tool
JPH1198631A (en) * 1997-09-17 1999-04-09 Hokkai Denki Koji Kk Tools for hot-line work of cotter pin, split pin or the like
CN201252367Y (en) * 2008-09-08 2009-06-03 江苏省电力公司淮安供电公司 Pin removal of ball socket for live working

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101834415A (en) * 2010-05-14 2010-09-15 福建省电力有限公司三明电业局 Method and special tool for live replacement of zinc oxide lightning arrester
CN202906333U (en) * 2012-10-08 2013-04-24 河南省电力公司平顶山供电公司 Spring pin reset operation head
CN202872263U (en) * 2012-11-14 2013-04-10 湖南省电力公司长沙电业局 Tool charged for replacing double strings of insulators of double bundle conductors of straight line pole
CN203233105U (en) * 2013-05-16 2013-10-09 国家电网公司 Multifunctional lapping and removing special tool for live-line work
CN103779807A (en) * 2014-02-11 2014-05-07 国家电网公司 Integrated bowl stirring and pin taking device
CN103904589A (en) * 2014-04-24 2014-07-02 国家电网公司 Pin pulling pliers for replacing tension insulator of ground potential of power transmission line and use method thereof
CN204030414U (en) * 2014-05-31 2014-12-17 国家电网公司 A kind of straight line pole composite insulator is changed the instrument that square cotter departs from, resets at present
CN104020318A (en) * 2014-06-17 2014-09-03 国家电网公司 Multifunctional wire hanging rod
CN104505769A (en) * 2014-12-16 2015-04-08 国家电网公司 Ground potential operation straight line pole socket disassembly and assembly method

Also Published As

Publication number Publication date
CN104734069A (en) 2015-06-24

Similar Documents

Publication Publication Date Title
CN104201489B (en) A kind of novel electric power circuit anti-fall grounding wire line clamping device
EP3660994A1 (en) Manual hydraulic multi-functional extra-high-voltage insulating gear gripper pliers stick for live-wire work and indirect live-wire construction method using pliers stick
CN104734068A (en) Distributing line foreign matter insulation removal device
CN205794209U (en) A kind of insulation tool set sawing branch
CN202934563U (en) Mechanical arm used for removing bird's nests on poles and towers
CN105811308A (en) Special belaying tool for power transmission line
CN104734069B (en) De- bowl device for charged for replacement 220kV single conductor linear insulator chains
CN203839840U (en) Operating rod specially used for wire-clamping device
CN104767149B (en) De- bowl device for charged for replacement 110kV single conductor linear insulator chains
CN201656337U (en) Mobile operating platform
CN103094870A (en) Ice-melting pup joint quick working device for jackstay-typed electric transmission line
CN104577622B (en) A kind of earth lead attaching/detaching apparatus
CN105252452A (en) Multifunctional electric clamp easy to operate
CN206099152U (en) Middle multi -disc insulator specialized tool of direct current strain insulator tower is changed in segmentation
CN103398221B (en) Square forming device for parallel bunched cables
CN204497668U (en) Distribution line foreign matter insulation remover
CN103904589A (en) Pin pulling pliers for replacing tension insulator of ground potential of power transmission line and use method thereof
JP2014007902A (en) High voltage drop wire edge line support
CN103669977B (en) Adjustable stem position instrument in a kind of charged pole operation
CN202855934U (en) Multi-angle ground wire hanging operating rod
CN206758943U (en) Realize the de- bowl device of charged for replacement 110kV single conductor linear insulator chains
CN202353050U (en) Insulating bar for live deicing of transform equipment
CN203640379U (en) Pole position correcting tool for live pole erecting working
CN203747307U (en) Multipurpose insulator pin-removing device
CN201860063U (en) Carrying utensil used for live replacement of insulators

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant