CN104712300A - Fracturing construction pitching device and pitching method thereof - Google Patents

Fracturing construction pitching device and pitching method thereof Download PDF

Info

Publication number
CN104712300A
CN104712300A CN201510075927.6A CN201510075927A CN104712300A CN 104712300 A CN104712300 A CN 104712300A CN 201510075927 A CN201510075927 A CN 201510075927A CN 104712300 A CN104712300 A CN 104712300A
Authority
CN
China
Prior art keywords
pitching
pressure
valve
pipeline
cylinder body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510075927.6A
Other languages
Chinese (zh)
Other versions
CN104712300B (en
Inventor
陈介骄
李朝荣
邓华国
师军
刘振兴
李尤
谭福吉
石双明
冯玉声
易祖坤
任思为
杨亚峰
李伟
王鹏
陈试魏
李明
李亚超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Southwest Petroleum Engineering Co.,Ltd.
China Petrochemical Corp
Sinopec Oilfield Service Corp
Original Assignee
陈介骄
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 陈介骄 filed Critical 陈介骄
Priority to CN201510075927.6A priority Critical patent/CN104712300B/en
Publication of CN104712300A publication Critical patent/CN104712300A/en
Application granted granted Critical
Publication of CN104712300B publication Critical patent/CN104712300B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/14Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools

Abstract

The invention discloses a fracturing construction pitching device and a pitching method thereof, and belongs to the technical field of oil gas drilling and production fracturing construction equipment and construction methods. The fracturing construction pitching device comprises a main cylinder body and a piston push rod arranged in the main cylinder body, the piston push rod divides an inner cavity of the main cylinder body into an independent pitching cavity and an independent pressure-assisted cavity, the end of the pitching cavity is provided with a valve I, the pitching cavity is further provided with a ball entering pipeline with a valve II, the pitching cavity is communicated with the pressure-assisted cavity through a communicating pipeline with a valve III, the pressure-assisted cavity is provided with a pressure relief pipeline with a valve IV, and an elastic mechanism used for resetting the piston push rod is arranged in the main cylinder body. The fracturing construction pitching device achieves pipeline pitching with pressure in the fracturing construction process by introducing the pressure in fracturing construction into the main cylinder body and through the pressure balance process in the main cylinder body, and compared with a traditional pitching device, the fracturing construction pitching device effectively reduces the pitching cost, shortens the pitching period and has the basis of achieving pitching process automation.

Description

A kind of pressing crack construction ball-throwing apparatus and pitching method thereof
Technical field
The present invention relates to a kind of pressing crack construction ball-throwing apparatus and pitching method thereof, especially one can continuously, automation carries out pressing crack construction ball-throwing apparatus and pitching method thereof, belongs to oil gas drilling pressing crack construction equipment and construction method technical field.
Background technology
When different well section is constructed in large-scale segmentation fracturing, by the ball seat specification of sliding sleeve preset in well section, need successively drop into the sealed spheroid of dimension, under sealed spheroid effect, open the sliding sleeve of corresponding well section, then fracturing work construction is carried out to this well section.
For ensureing job safety during conventional pitching operation, first must stop infusion operation, closing production tree main switch, the pressure in pressure break main pipeline be let out to the greatest extent, plug valve can be opened and sealed spheroid is dropped in pressure break main pipeline, then cut-out tap valve.When opening production tree main switch, the pressure reduction existed in well and between pressure break main pipeline can enter well to steel ball and impact, and for eliminating this impact, before unlatching production tree main switch, also will suppress operation to pressure break main pipeline.And whole operating process needs staff to enter in high-voltage construction region carries out manual operation, there is larger potential safety hazard.
The conservative estimation of conventional single pitching process needs more than 10 minutes consuming time, and during Large Construction, main pressure number of devices is more, and for ensureing construction operation continuity to greatest extent, during usual pitching, all masters are installed with standby all maintenances idle running armed state.Enable by the construction of large-scale well staged fracturing that 12 () is main is installed with standby calculating: if pitching 6 times, 10 minutes consuming time of single pitching operation, the operation of whole work progress single-throw ball adds up 1 hours consuming time, 12 () main is installed with the thousands of unit of fuel cost needed for standby equal idle running 1 hour, too increases exhaust emissions amount aggravation atmosphere pollution.
In addition in existing pressing crack construction, need to inject enough displacement fluids the proppant (or acid solution) in well is pressed into target payzone completely before target payzone pressing crack construction terminates, the pitching operation of next target payzone just can be carried out: spheroid enters in well by conventional pitching operating type after proppant (or acid solution) is pressed into target payzone completely, release liquid carries spheroid, and by infusion, spheroid is delivered to target payzone.This operator scheme adds construction liquid consumption, also virtually adds construction running cost and later stage cost of sewage disposal.
Summary of the invention
Goal of the invention of the present invention is: for above-mentioned Problems existing, a kind of pressing crack construction ball-throwing apparatus and pitching method thereof are provided, solve Problems existing in existing operation, the effective saving pitching activity duration, reduce pitching running cost, reduce simultaneously or eliminate the risk of pitching operation with high pressure, and have can the advantage of automation mechanized operation.
The technical solution used in the present invention is as follows:
A kind of pressing crack construction ball-throwing apparatus, comprise Master cylinder body and piston push rod, described piston push rod is arranged in Master cylinder body, and can move along Master cylinder body inner chamber bidirectional reciprocating, is sealed and matched and Master cylinder body inner chamber is divided into independently pitching chamber and pressure compensated cavity between described Master cylinder body and piston push rod; Master cylinder body end, place, described pitching chamber is provided with valve I, and pitching chamber is also provided with goal pipeline, and described goal pipeline is provided with valve II; Described pitching chamber is communicated with by connecting pipe with between pressure compensated cavity, described connecting pipe is provided with valve III; Described pressure compensated cavity is provided with relief pipeline I, and described relief pipeline I is provided with valve IV; The elastic mechanism resetted for piston push rod is provided with in described Master cylinder body.
Further, described pitching chamber is provided with the pressure guiding pipe for being connected with pressure break main pipeline, described pressure guiding pipe is provided with valve V.
Further, described elastic mechanism is Compress Spring, and described Compress Spring is arranged in pressure compensated cavity.
Further, be provided with the guide rod along Master cylinder body axis in described pressure compensated cavity, piston push rod offers the guide groove with guide rod adaptation vertically, and piston push rod is assemblied in by its guide groove on the guide rod in Master cylinder body.
Further, described pitching chamber is provided with relief pipeline II, and described relief pipeline II is provided with valve VI.
Pressing crack construction ball-throwing apparatus of the present invention, further comprises the ball storehouse be connected with described goal pipeline, and the outlet in described ball storehouse is provided with spheroid limited diameter and passes through mechanism.
The pitching method of pressing crack construction ball-throwing apparatus of the present invention, comprises the steps:
A, by-pass valve control I, valve II and valve III is closed condition, and valve IV is opening, spheroid is put into goal pipeline;
B, Open valve II, make spheroid enter the goal pipeline place section in pitching chamber, and valve-off II;
C, the fluid in pressure break main pipeline is introduced pitching chamber, piston push rod enters to the thruster of pressure compensated cavity and makes elastic mechanism generation elastic deformation under the effect of fluid pressure, and spheroid enters the Master cylinder body place section in pitching chamber, and complete Open valve I;
D, valve-off IV, Open valve III, fluid enters pressure compensated cavity by connecting pipe and makes pressure balance between pitching chamber and pressure compensated cavity, makes piston push rod enter to the thruster of pitching chamber, and pushed by spheroid in pressure break main pipeline under the effect of elastic mechanism;
E, valve-off III, the pressure in pressure compensated cavity gushes by Open valve IV, and piston push rod enters to the thruster of pressure compensated cavity and makes elastic mechanism generation elastic deformation under the effect of pitching cavity fluid pressure;
After f, piston push rod are advancing to the position, pitching chamber and pressure break main pipeline cut off by valve-off I;
G, gushed by the pressure in pitching chamber, piston push rod makes piston push rod enter to the thruster of pitching chamber, reset under the effect of elastic mechanism, completes a pitching process.
Further, described pitching chamber is provided with the pressure guiding pipe for being connected with pressure break main pipeline, described pressure guiding pipe is provided with valve V, in described step c, the fluid in pressure break main pipeline is introduced pitching chamber and be operating as: the fluid in pressure break main pipeline is introduced pitching chamber by Open valve V.
Further, described pitching chamber is provided with relief pipeline II, and described relief pipeline II is provided with valve VI, and in described step g, pitching chamber is carried out pressure by Open valve VI and gushed.
Further, described goal pipeline is connected with ball storehouse, and the outlet in described ball storehouse is provided with spheroid limited diameter by mechanism, also comprises and spheroid is put into ball storehouse in order, and successively spheroid is sent into goal pipeline by spheroid limited diameter by mechanism before described pitching operation.
In sum, owing to have employed technique scheme, the invention has the beneficial effects as follows:
(1) described pressing crack construction ball-throwing apparatus is skillfully constructed, reasonable in design, by the pressure of pressing crack construction is introduced Master cylinder body, the process of cylinder interior pressure balance realizes pitching, pressing crack construction ball-throwing apparatus of the present invention can pitching with pressure in the process of pressure break main pipeline pressing crack construction, and the serialization of pitching process can be realized, pitching cost is effectively reduced compared to traditional ball-throwing apparatus, shorten the pitching cycle, and there is the basis realizing pitching process automation, operating personnel can away from high-pressure area operated from a distance, ensure that the safety of pitching process, this device also has miniaturization and the advantage of running cost degradation in addition, greatly reduce transport and the installation cost of construction,
(2) based on this pressing crack construction ball-throwing apparatus and pitching method design, achieve pipe pressurized, pitching under the condition of sequential production, this will make traditional pitching operation be changed: by calculating the piping volume between target payzone and next target payzone, the displacement fluid calculating volume can be injected before target payzone pressing crack construction terminates, pressing crack construction ball-throwing apparatus of the present invention and pitching method can be adopted to drop in well by spheroid after the displacement fluid calculating volume has injected, with release liquid, spheroid is delivered to next target payzone again, and then start the pressing crack construction of next target payzone.This greatly saves the consumption cubical content of pipeline (between next target payzone and the ground) of displacement fluid compared to traditional pitching operation, and saves pitching operating time and equipment operation cost.
Accompanying drawing explanation
Examples of the present invention will be described by way of reference to the accompanying drawings, wherein:
Fig. 1 is pressing crack construction ball-throwing apparatus structural representation of the present invention;
Fig. 2 is pressing crack construction ball-throwing apparatus operating process figure A of the present invention;
Fig. 3 is pressing crack construction ball-throwing apparatus operating process figure B of the present invention;
Fig. 4 is pressing crack construction ball-throwing apparatus operating process figure C of the present invention;
Fig. 5 is pressing crack construction ball-throwing apparatus operating process figure D of the present invention;
Fig. 6 is pressing crack construction ball-throwing apparatus operating process figure E of the present invention.
Mark in figure: 1-Master cylinder body, 101-valve I, 102-guide groove, 103-guide rod, 104-Compress Spring, 105-valve III, 106-valve V, 107-valve IV, 2-piston push rod, 3-pitching chamber, 4-pressure compensated cavity, 5-goal pipeline, 501-valve II, 502-valve VI, 6-ball storehouse, 601-spheroid limited diameter are by mechanism, 7-spheroid, 8-pressure break main pipeline.
Detailed description of the invention
All features disclosed in this manual, or the step in disclosed all methods or process, except mutually exclusive feature and/or step, all can combine by any way.
Arbitrary feature disclosed in this manual (comprising any accessory claim, summary), unless specifically stated otherwise, all can be replaced by other equivalences or the alternative features with similar object.That is, unless specifically stated otherwise, each feature is an example in a series of equivalence or similar characteristics.
Embodiment
Pressing crack construction ball-throwing apparatus of the present invention, its structure as shown in Figure 1, comprise Master cylinder body 1 and piston push rod 2, described piston push rod 2 is arranged in Master cylinder body 1, and can move along Master cylinder body 1 inner chamber bidirectional reciprocating, be sealed and matched between described Master cylinder body 1 and piston push rod 2 and Master cylinder body 1 inner chamber be divided into independently pitching chamber 3 and pressure compensated cavity 4; Master cylinder body 1 end, place, described pitching chamber 3 is provided with valve I 101, and pitching chamber 3 is also provided with goal pipeline 5, and described goal pipeline 5 is provided with valve II 501; Described pitching chamber 3 is communicated with by connecting pipe with between pressure compensated cavity 4, described connecting pipe is provided with valve III 105; Described pressure compensated cavity 4 is provided with relief pipeline I, and described relief pipeline I is provided with valve IV 107; The elastic mechanism resetted for piston push rod 2 is provided with in described Master cylinder body 1.
Described elastic mechanism can be installed in pitching chamber 3 or pressure compensated cavity 4, elastic mechanism can be existing form or the structure design such as elasticity of compression mechanism or tensile elasticity mechanism, its object is to store pressure break main pipeline 8 fluid pressure, and realize pitching by earth pressure release.
The end, pitching chamber 3 of described Master cylinder body 1 is that pipe joint is for being connected with pressure break main pipeline 8, described pressure compensated cavity 4 end face is closed, its main operational principle of pressing crack construction ball-throwing apparatus is as follows: fluid pressure in pressure break main pipeline is introduced (by valve I 101 or separately establish impulse pipeline) pitching chamber 3, piston push rod 2 advances to pressure compensated cavity 4 and makes elastic mechanism generation elastic deformation under pressure, valve III 105 is for the pressure balance of pitching chamber 3 and pressure compensated cavity 4, two chamber pressure equilibrium process Elastic mechanism release resilient force spheroids enter pressure break main pipeline.
In the present embodiment, described Master cylinder body 1 and goal pipeline 5 are arranged with axial at right angle setting, the vertical distance of valve II 501 distance piston push rod 2 outer wall of goal pipeline 5 with the maximum gauge of pitching for Reference Design, the interim spatial accommodation after being entered by valve II 501 to provide spheroid.The external diameter of piston push rod 2 is less than the internal diameter in Master cylinder body 1 pitching chamber 3 in the present embodiment in addition, and pressure can be discharged smoothly by the pipe joint of connecting pipe.
In the present embodiment, described pitching chamber 3 is provided with the pressure guiding pipe for being connected with pressure break main pipeline, described pressure guiding pipe is provided with valve V 106, pressure for being constructed by pressure in main pipeline introduces pitching chamber 3, compared to valve I 101 impulse, have safe and handling strong advantage, can also effectively avoid in addition in valve I 101 opening process may to the damage of piston push rod 2 end face and valve I 101 spool.
In the present embodiment, described elastic mechanism is Compress Spring 104, described Compress Spring 104 is arranged in pressure compensated cavity 4, the navigation designing for piston push rod 2 motion guide is also comprised: in described pressure compensated cavity 4, be provided with the guide rod 103 along Master cylinder body 1 axis in pressure compensated cavity 4, piston push rod 2 offers the guide groove 102 with guide rod 103 adaptation vertically, and piston push rod 2 is assemblied in by its guide groove 102 on the guide rod 103 in Master cylinder body 1.Fig. 1 is the apparatus structure schematic diagram after Compress Spring 104 compresses by piston push rod 2.
The pressing crack construction ball-throwing apparatus of the present embodiment, described pitching chamber 3 is provided with relief pipeline II, and described relief pipeline II is provided with valve VI 502, and described relief pipeline II is arranged on goal pipeline 5.
Pressing crack construction ball-throwing apparatus of the present invention, also comprise the ball storehouse 6 be connected with described goal pipeline 5, the outlet in described ball storehouse 6 is provided with spheroid limited diameter by mechanism 601, spheroid limited diameter is allow the mechanism by certain diameter spheroid by mechanism 601, comprise the lever be arranged in pipeline and the lever hoisting mechanism be connected with lever, lever hoisting mechanism is arranged at pipeline external, passing through of spheroid is controlled by promoting the width controlling lever and internal diameter of the pipeline, suppose that steel ball spheroid format diameter is 40mm, setting lever hoisting mechanism to journey that lever is begun a new line by control panel is 42mm, the steel ball spheroid of 40mm is made to be fallen into valve II 501 top smoothly by lever, diameter is greater than the ball of 40mm then not by lever.
In the present embodiment, described valve I 101 and valve II 501 are stopcock structure, and driven by pneumatic drive unit or electric drive unit, other valve types can be selected according to operating mode.
The pitching method of pressing crack construction ball-throwing apparatus of the present invention, comprises the steps:
A, by-pass valve control I 101, valve II 501 and valve III 105 is closed condition, and valve IV 107 is opening, and spheroid 7 is put into goal pipeline 5;
B, Open valve II 501, make spheroid 7 enter the goal pipeline 5 place section in pitching chamber 3, and valve-off II 501, as shown in Figure 2;
C, by pressure break main pipeline fluid introduce pitching chamber 3, piston push rod 2 enters to pressure compensated cavity 4 thruster and makes elastic mechanism generation elastic deformation under the effect of fluid pressure, spheroid 7 enters the Master cylinder body 1 place section in pitching chamber 3, and complete Open valve I 101, as shown in Figure 3;
D, valve-off IV 107, Open valve III 105, fluid enters pressure compensated cavity 4 by connecting pipe and makes pressure balance between pitching chamber 3 and pressure compensated cavity 4, makes piston push rod 2 enter to pitching chamber 3 thruster under the effect of elastic mechanism, and spheroid 7 is pushed in pressure break main pipeline, as shown in Figure 4;
E, valve-off III 105, the pressure in pressure compensated cavity 4 gushes by Open valve IV 107, and piston push rod 2 enters to the thruster of pressure compensated cavity 4 and makes elastic mechanism generation elastic deformation under the effect of pitching chamber 3 fluid pressure, as shown in Figure 5;
After f, piston push rod 2 are advancing to the position, pitching chamber 3 and pressure break main pipeline cut off by valve-off I 101;
G, gushed by the pressure in pitching chamber 3, piston push rod 2 makes piston push rod 2 enter to pitching chamber 3 thruster, reset under the effect of elastic mechanism, as shown in Figure 6, completes a pitching process.
The pitching method of pressing crack construction ball-throwing apparatus of the present invention, further, described pitching chamber 3 is provided with the pressure guiding pipe for being connected with pressure break main pipeline, described pressure guiding pipe is provided with valve V 106, in described step c, the fluid in pressure break main pipeline is introduced pitching chamber 3 and be operating as: the fluid in pressure break main pipeline is introduced pitching chamber 3 by Open valve V 106.
The pitching method of described pressing crack construction ball-throwing apparatus, further, described pitching chamber 3 is provided with relief pipeline II, and described relief pipeline II is provided with valve VI 502, and in described step g, pitching chamber 3 is carried out pressure by Open valve VI 502 and gushed.
The pitching method of described pressing crack construction ball-throwing apparatus, further, described goal pipeline 5 is connected with ball storehouse 6, the outlet in described ball storehouse 6 is provided with spheroid limited diameter by mechanism 601, also comprise before described pitching operation and spheroid is put into ball storehouse 6 in order, and successively spheroid is sent into goal pipeline 5 by spheroid limited diameter by mechanism 601.
Pressing crack construction ball-throwing apparatus of the present invention, its core design is the power using the pressure in pressure break main pipeline as ball-throwing apparatus work, make use of the characteristic that fracturing liquid compressibility is low simultaneously, has carried out the whole course of work.Adopt piston push rod 2 ball to be advanced the schematic design of pressure break main pipeline, effectively solve and cause spheroid naturally to fall into the problem of difficulty because of pressurised fluid stream body flowing in pressure break main pipeline.
Pressing crack construction ball-throwing apparatus of the present invention and method, be skillfully constructed, reasonable in design, by the pressure of pressing crack construction is introduced Master cylinder body, the process of cylinder interior pressure balance realizes pitching, pressing crack construction ball-throwing apparatus of the present invention can pitching with pressure in the process of pressure break main pipeline pressing crack construction, and the serialization of pitching process can be realized, pitching cost is effectively reduced compared to traditional ball-throwing apparatus, shorten the pitching cycle, and there is the basis realizing pitching process automation, operating personnel can away from high-pressure area operated from a distance, ensure that the safety of pitching process, this device also has miniaturization and the advantage of running cost degradation in addition, greatly reduce transport and the installation cost of construction.
Based on this pressing crack construction ball-throwing apparatus and pitching method design, achieve pipe pressurized, pitching under the condition of sequential production, this will make traditional pitching operation be changed: by calculating the piping volume between target payzone and next target payzone, the displacement fluid calculating volume can be injected before target payzone pressing crack construction terminates, pressing crack construction ball-throwing apparatus of the present invention and pitching method can be adopted to drop in well by spheroid after the displacement fluid calculating volume has injected, with release liquid, spheroid is delivered to next target payzone again, and then start the pressing crack construction of next target payzone.This greatly saves the consumption cubical content of pipeline (between next target payzone and the ground) of displacement fluid compared to traditional pitching operation, and saves pitching operating time and equipment operation cost.
The present invention is not limited to aforesaid detailed description of the invention.The present invention expands to any new feature of disclosing in this manual or any combination newly, and the step of the arbitrary new method disclosed or process or any combination newly.

Claims (10)

1. a pressing crack construction ball-throwing apparatus, it is characterized in that: comprise Master cylinder body (1) and piston push rod (2), described piston push rod (2) is arranged in Master cylinder body (1), and can move along Master cylinder body (1) inner chamber bidirectional reciprocating, be sealed and matched between described Master cylinder body (1) and piston push rod (2) and Master cylinder body (1) inner chamber be divided into independently pitching chamber (3) and pressure compensated cavity (4); Master cylinder body (1) end, described pitching chamber (3) place is provided with valve I (101), and pitching chamber (3) are also provided with goal pipeline (5), and described goal pipeline (5) is provided with valve II (501); Described pitching chamber (3) is communicated with by connecting pipe with between pressure compensated cavity (4), described connecting pipe is provided with valve III (105); Described pressure compensated cavity (4) is provided with relief pipeline I, described relief pipeline I is provided with valve IV (107); The elastic mechanism resetted for piston push rod (2) is provided with in described Master cylinder body (1).
2. pressing crack construction ball-throwing apparatus as claimed in claim 1, is characterized in that: described pitching chamber (3) is provided with the pressure guiding pipe for being connected with pressure break main pipeline, described pressure guiding pipe is provided with valve V (106).
3. pressing crack construction ball-throwing apparatus as claimed in claim 1, is characterized in that: described elastic mechanism is Compress Spring (104), and described Compress Spring (104) is arranged in pressure compensated cavity (4).
4. pressing crack construction ball-throwing apparatus as claimed in claim 1, it is characterized in that: be provided with along the axial guide rod (103) of Master cylinder body (1) in described pressure compensated cavity (4), piston push rod (2) offers the guide groove (102) adaptive with guide rod (103) vertically, and piston push rod (2) is assemblied in by its guide groove (102) on the guide rod (103) in Master cylinder body (1).
5. pressing crack construction ball-throwing apparatus as claimed in claim 1, is characterized in that: described pitching chamber (3) is provided with relief pipeline II, described relief pipeline II is provided with valve VI (502).
6. pressing crack construction ball-throwing apparatus as claimed in claim 1, it is characterized in that: also comprise the ball storehouse (6) be connected with described goal pipeline (5), the outlet of described ball storehouse (6) is provided with spheroid limited diameter by mechanism (601).
7. the pitching method of pressing crack construction ball-throwing apparatus as claimed in claim 1, is characterized in that: comprise the steps:
A, by-pass valve control I (101), valve II (501) and valve III (105) are closed condition, and valve IV (107) is opening, spheroid are put into goal pipeline (5);
B, Open valve II (501), make spheroid enter goal pipeline (5) the place section in pitching chamber (3), and valve-off II (501);
C, by pressure break main pipeline fluid introduce pitching chamber (3), piston push rod (2) enters to pressure compensated cavity (4) thruster and makes elastic mechanism generation elastic deformation under the effect of fluid pressure, spheroid enters Master cylinder body (1) the place section of pitching chamber (3), and complete Open valve I (101);
D, valve-off IV (107), Open valve III (105), fluid enters pressure compensated cavity (4) by connecting pipe and makes pressure balance between pitching chamber (3) and pressure compensated cavity (4), under the effect of elastic mechanism, make piston push rod (2) enter to pitching chamber (3) thruster, and spheroid is pushed in pressure break main pipeline;
E, valve-off III (105), pressure in pressure compensated cavity (4) gushes by Open valve IV (107), and piston push rod (2) enters to pressure compensated cavity (4) thruster and makes elastic mechanism generation elastic deformation under the effect of pitching chamber (3) fluid pressure;
After f, piston push rod (2) are advancing to the position, pitching chamber (3) and pressure break main pipeline cut off by valve-off I (101);
G, gushed by the pressure in pitching chamber (3), piston push rod (2) makes piston push rod (2) enter to pitching chamber (3) thruster, reset under the effect of elastic mechanism, completes a pitching process.
8. the pitching method of pressing crack construction ball-throwing apparatus as claimed in claim 7, it is characterized in that: described pitching chamber (3) is provided with the pressure guiding pipe for being connected with pressure break main pipeline, described pressure guiding pipe is provided with valve V (106), in described step c, the fluid in pressure break main pipeline is introduced pitching chamber (3) and be operating as: the fluid in pressure break main pipeline is introduced pitching chamber (3) by Open valve V (106).
9. the pitching method of pressing crack construction ball-throwing apparatus as claimed in claim 7, it is characterized in that: described pitching chamber (3) is provided with relief pipeline II, described relief pipeline II is provided with valve VI (502), in described step g, pitching chamber (3) are carried out pressure by Open valve VI (502) and are gushed.
10. the pitching method of pressing crack construction ball-throwing apparatus as claimed in claim 7, it is characterized in that: described goal pipeline (5) is connected with ball storehouse (6), the outlet of described ball storehouse (6) is provided with spheroid limited diameter by mechanism (601), also comprise before described pitching operation and spheroid is put into ball storehouse (6) in order, and spheroid is sent into goal pipeline (5) by spheroid limited diameter successively by mechanism (601).
CN201510075927.6A 2015-02-13 2015-02-13 A kind of pressing crack construction ball-throwing apparatus and its pitching method Active CN104712300B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510075927.6A CN104712300B (en) 2015-02-13 2015-02-13 A kind of pressing crack construction ball-throwing apparatus and its pitching method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510075927.6A CN104712300B (en) 2015-02-13 2015-02-13 A kind of pressing crack construction ball-throwing apparatus and its pitching method

Publications (2)

Publication Number Publication Date
CN104712300A true CN104712300A (en) 2015-06-17
CN104712300B CN104712300B (en) 2017-11-10

Family

ID=53411981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510075927.6A Active CN104712300B (en) 2015-02-13 2015-02-13 A kind of pressing crack construction ball-throwing apparatus and its pitching method

Country Status (1)

Country Link
CN (1) CN104712300B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105134160A (en) * 2015-07-13 2015-12-09 中国石油大学(北京) Automatic control device capable of adding spherical turning material on line
CN106917600A (en) * 2017-05-02 2017-07-04 贵州煤层气能源开发有限公司 A kind of rotary multi-ball ball injector
CN108194051A (en) * 2018-03-22 2018-06-22 中国海洋石油集团有限公司 A kind of intelligent control ball injector and hydraulic control valve
CN108775238A (en) * 2018-05-28 2018-11-09 中石化石油工程技术服务有限公司 Continuous ball-throwing apparatus
CN109539916A (en) * 2018-12-21 2019-03-29 中国矿业大学 The dynamite charge device and packing method of accurate controlled loading of explosive amount and charge positions
CN110656916A (en) * 2018-06-28 2020-01-07 东北石油大学 Automatic ball injector for multi-stage fracturing
CN111502626A (en) * 2020-05-18 2020-08-07 常州市易用科技有限公司 High-pressure liquid quantitative sand carrying device
CN111577233A (en) * 2020-05-28 2020-08-25 中国石油天然气集团有限公司 Device and method capable of remotely and automatically and continuously throwing fracturing balls

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080223587A1 (en) * 2007-03-16 2008-09-18 Isolation Equipment Services Inc. Ball injecting apparatus for wellbore operations
CN101549349A (en) * 2009-05-06 2009-10-07 西安金立石油科技有限公司 Delivery pipeline cleaning device
CN201460815U (en) * 2009-07-20 2010-05-12 中国石油天然气股份有限公司 Atmospheric-pressure ball-loading self-sealing type hermetical ball injecting device
CN203515540U (en) * 2013-11-06 2014-04-02 能新科(西安)油气技术有限公司 Balance type mechanical ball injector
CN103939079A (en) * 2013-01-23 2014-07-23 中国石油化工股份有限公司 Wellhead ball throwing device for fracture acidizing and operation method thereof
CN204532318U (en) * 2015-02-13 2015-08-05 陈介骄 A kind of pressing crack construction ball-throwing apparatus

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080223587A1 (en) * 2007-03-16 2008-09-18 Isolation Equipment Services Inc. Ball injecting apparatus for wellbore operations
CN101549349A (en) * 2009-05-06 2009-10-07 西安金立石油科技有限公司 Delivery pipeline cleaning device
CN201460815U (en) * 2009-07-20 2010-05-12 中国石油天然气股份有限公司 Atmospheric-pressure ball-loading self-sealing type hermetical ball injecting device
CN103939079A (en) * 2013-01-23 2014-07-23 中国石油化工股份有限公司 Wellhead ball throwing device for fracture acidizing and operation method thereof
CN203515540U (en) * 2013-11-06 2014-04-02 能新科(西安)油气技术有限公司 Balance type mechanical ball injector
CN204532318U (en) * 2015-02-13 2015-08-05 陈介骄 A kind of pressing crack construction ball-throwing apparatus

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105134160A (en) * 2015-07-13 2015-12-09 中国石油大学(北京) Automatic control device capable of adding spherical turning material on line
CN105134160B (en) * 2015-07-13 2016-06-29 中国石油大学(北京) The online automatic control device adding spherical diverting material
CN106917600A (en) * 2017-05-02 2017-07-04 贵州煤层气能源开发有限公司 A kind of rotary multi-ball ball injector
CN108194051A (en) * 2018-03-22 2018-06-22 中国海洋石油集团有限公司 A kind of intelligent control ball injector and hydraulic control valve
CN108194051B (en) * 2018-03-22 2024-02-09 中国海洋石油集团有限公司 Intelligent control ball injector and hydraulic control valve
CN108775238B (en) * 2018-05-28 2020-12-04 中石化石油工程技术服务有限公司 Continuous ball throwing device
CN108775238A (en) * 2018-05-28 2018-11-09 中石化石油工程技术服务有限公司 Continuous ball-throwing apparatus
CN110656916A (en) * 2018-06-28 2020-01-07 东北石油大学 Automatic ball injector for multi-stage fracturing
CN110656916B (en) * 2018-06-28 2021-05-07 东北石油大学 Automatic ball injector for multi-stage fracturing
CN109539916A (en) * 2018-12-21 2019-03-29 中国矿业大学 The dynamite charge device and packing method of accurate controlled loading of explosive amount and charge positions
CN109539916B (en) * 2018-12-21 2023-11-21 中国矿业大学 Explosive loading device and loading method capable of accurately controlling loading quantity and loading position
CN111502626A (en) * 2020-05-18 2020-08-07 常州市易用科技有限公司 High-pressure liquid quantitative sand carrying device
CN111577233A (en) * 2020-05-28 2020-08-25 中国石油天然气集团有限公司 Device and method capable of remotely and automatically and continuously throwing fracturing balls
CN111577233B (en) * 2020-05-28 2022-03-29 中国石油天然气集团有限公司 Device and method capable of remotely and automatically and continuously throwing fracturing balls

Also Published As

Publication number Publication date
CN104712300B (en) 2017-11-10

Similar Documents

Publication Publication Date Title
CN104712300A (en) Fracturing construction pitching device and pitching method thereof
CN102866072B (en) Pressure vessel pressure cyclic test device
CN204532319U (en) A kind of pressing crack construction ball-throwing apparatus
CN204532323U (en) A kind of ball storehouse for pressing crack construction pitching and ball-throwing apparatus thereof
CN204899928U (en) Hydraulic pressure splitting equipment
CN204532318U (en) A kind of pressing crack construction ball-throwing apparatus
CN201650255U (en) Remote-control cock type steel ball injector
CN2823731Y (en) Wellhead safety hydraulic cut-off system
CN101929330B (en) Remote control cock type steel ball delivery system
CN105041213A (en) Carbon dioxide gas drilling apparatus and method
CN210013682U (en) Ultrahigh-pressure large-drift-diameter multi-runner injection fracturing wellhead device
CN103742119B (en) The water-soluble high-pressure bittern feed system making chamber experiment of a kind of rock salt bank
CN103807544B (en) Gas connector
CN110821452B (en) Same well extracting and injecting underground pump
CN109403941A (en) A kind of pressure break high pressure pipe joint, which remotely surges, bleeds off pressure device and method
CN109681178A (en) A kind of Y tubing string having water attack volume increase function and implementation method
CN203730859U (en) Safety cut-off valve
CN204922517U (en) Portable pipeline anti -icing fluid filling device
WO2017084225A1 (en) Cable-type static-pressure setting tool
CN204807398U (en) Type test water system
CN202023503U (en) Particle punching drilling injection device
CN111255430A (en) Hydraulic sand fracturing system and fracturing method
CN103742116A (en) 70-MPa sand blaster
CN205298107U (en) Sector gate closed hydraulic drive system
CN204627536U (en) Bridging plug setting tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20170626

Address after: 100029 Beijing City, Chaoyang District Hui Street No. six twelfth floor

Applicant after: SINOPEC OILFIELD SERVICE CORPORATION

Applicant after: SINOPEC XINAN OILFIELD SERVICE CORPORATION

Address before: 618000 Deyang province Sichuan City Jingyang District Huaihe Street No. 112

Applicant before: Chen Jiejiao

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210609

Address after: 100728 No. 22 North Main Street, Chaoyang District, Beijing, Chaoyangmen

Patentee after: SINOPEC Group

Patentee after: SINOPEC OILFIELD SERVICE Corp.

Patentee after: Sinopec Southwest Petroleum Engineering Co.,Ltd.

Address before: 100029 Chaoyang District, Beijing Hui Xin Street six, Twelfth level.

Patentee before: SINOPEC OILFIELD SERVICE Corp.

Patentee before: Sinopec Southwest Petroleum Engineering Co.,Ltd.

TR01 Transfer of patent right