CN202023503U - Particle punching drilling injection device - Google Patents

Particle punching drilling injection device Download PDF

Info

Publication number
CN202023503U
CN202023503U CN2011200381132U CN201120038113U CN202023503U CN 202023503 U CN202023503 U CN 202023503U CN 2011200381132 U CN2011200381132 U CN 2011200381132U CN 201120038113 U CN201120038113 U CN 201120038113U CN 202023503 U CN202023503 U CN 202023503U
Authority
CN
China
Prior art keywords
steel
control valve
injection
particle
steel shot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200381132U
Other languages
Chinese (zh)
Inventor
温林荣
潘广辉
于波
孙艳军
张俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Oilfield Service Corp
Drilling Technology Research Institute of Sinopec Shengli Petroleum Engineering Corp
Original Assignee
China Petrochemical Corp
Drilling Technology Research Institute of Sinopec Shengli Petroleum Administration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petrochemical Corp, Drilling Technology Research Institute of Sinopec Shengli Petroleum Administration Bureau filed Critical China Petrochemical Corp
Priority to CN2011200381132U priority Critical patent/CN202023503U/en
Application granted granted Critical
Publication of CN202023503U publication Critical patent/CN202023503U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a particle punching drilling injection device, which comprises a ground high-pressure main pipeline, split-flow pipelines, split-flow pipeline control valves, steel shot storage jars, hydraulic (or manual) charging valves, storage jar pressure-relieving pipelines, storage jar pressure-relieving valves, steel shots, spiral propellers, steel shot injection control valves and flow-limiting devices. The flow-limiting devices are arranged behind the split-flow pipelines; the split-flow pipeline control valves are arranged between the ground high-pressure main pipeline and the steel shot storage jars; the storage jar pressure-relieving valves are arranged between the steel shot storage jars and drilling liquid pools; the spiral propellers are located under the steel shot storage jars; and the steel shot injection control valves are located between the spiral propellers and the ground high-pressure main pipeline. The particle punching drilling injection device can be used for solving various problems of the existing domestic and abroad grinding material injection devices, simplifying the existing abroad devices, promoting the injection reliability and realizing the steel shot injection for particle punching drilling.

Description

A kind of particle impacting drilling well injection device
Technical field
The utility model relates to a kind of particle impacting drilling well injection device, belongs to oil exploration and development fields.
Background technology
The most advanced both at home and abroad at present steel grit injection device by the exploitation of U.S. particle percussion drilling technology company is too complicated, consumable accessory is many, control is difficult, most tests are all ended because of injection device breaks down, reliability is not resolved, facts have proved that it can not satisfy the successional requirement of particle impacting drilling well well.
In addition, both at home and abroad through 40 years of researches, although successively developed abrasive material injection devices such as orifice plate, supercharging funnel, main flow shunting, accumulator transmission, piston transmission, motor or the control of pump control capsule, but because can not avoid being with gas, introduce other liquid, problem such as injection rate is uncontrollable, therefore, all can not be used for the particle impacting drilling well, above-mentioned situation has seriously restricted the commercialization process of particle impacting drilling technology, and the utility model can address this problem well.
Summary of the invention
Because above-mentioned domestic and international abrasive material injection device exists and can not avoid being with gas in the injection process, introduce other liquid, shortcomings such as injection rate is uncontrollable are with not enough, therefore they all can not be used for injecting particle impacting drilling well steel grit well, Given this, the utility model is used for reference domestic and international 40 years of researches achievements, in conjunction with the actual condition of oil drilling and the technical characterstic of particle impacting drilling well, research has formed a kind of new particle impacting drilling well steel grit injection device, and the purpose of this utility model is to provide a kind of reliable particle impacting drilling well steel grit injection device for the scene.
A kind of particle impacting drilling well injection device of the present utility model comprises ground high voltage charge line, bypass line control valve, bypass line, steel grit holding vessel, surges (or manually) charging valve, holding vessel blowdown line, holding vessel pressure release control valve, steel grit, screw propeller, steel grit injection control valve, high-impact erosion current-limiting apparatus and borehole pump.Described current-limiting apparatus is arranged on after the bypass line, and the bypass line control valve is arranged between ground high voltage charge line and the steel grit holding vessel, and holding vessel pressure release control valve is between steel grit holding vessel and drilling fluid pot; Described screw propeller is positioned under the steel grit holding vessel, and the steel grit injection control valve is between screw propeller and ground high voltage charge line.
Screw propeller is for adopting the high-pressure spiral pusher of special seal structure, is arranged under the steel grit holding vessel, on the steel grit injection control valve.
Current-limiting apparatus is arranged on after the bypass line, before the steel grit injection control valve.
The utility model one be simple in structure, reliability is high, the 2nd, can realize injecting equably continuously, the 3rd, the steel grit injection rate is controlled, adjustable, the 4th, gas or other non-drilling fluid liquid can be injected in the drilling fluid in the injection process.
Description of drawings
Fig. 1. a kind of particle impacting drilling well injection device schematic diagram
1. ground high voltage charge line 2. bypass line control valves 3. bypass line 4. steel grit holding vessels 5. (or manually) charging valve 6. holding vessel blowdown lines 7. holding vessel pressure release control valves 8. steel grits 9. screw propellers 10. steel grit injection control valves 11. current-limiting apparatus 12. borehole pumps that surge
The specific embodiment
Now the utility model will be further described in conjunction with Figure of description.
Comprise in the accompanying drawing left and right two covers identical, separately function independent, can realize the injection device that is used alternatingly.When adopting the utility model to carry out the particle impacting drillng operation, the first step is opened (or the manually) charging valve 5 that surges that is positioned at steel grit holding vessel 4 tops, left side, steel grit 8 is joined in the steel grit holding vessel 4, fill it up with and using drilling fluid toward steel grit holding vessel 4 by drilling well circulating device low-pressure line, steel grit 8 interstitial air in the emptying steel grit holding vessel 4 are closed (or the manually) charging valve 5 that surges.Second step was opened bypass line control valve 2, made steel grit holding vessel 4 reach consistent with the pressure of ground high voltage charge line 1.The 3rd step was opened steel grit injection control valve 10, started screw propeller 9 then, the injection of beginning steel grit.
Steel grit 8 in left-hand unit steel grit holding vessel 4 injects and finishes, and enables the injection device that is positioned at the right side according to above-mentioned steps.Meanwhile, stop to be positioned at the screw propeller 9 of left-hand unit, close the steel grit injection control valve 10 and the bypass line control valve 2 of left-hand unit, open holding vessel pressure release control valve 7, atmospheric pressure is arrived in the pressure pressure release of steel grit holding vessel 4, open (or the manually) charging valve 5 that surges, steel grit 8 is joined in the steel grit holding vessel 4, treat that steel grit 8 injections in the right side injection device steel grit holding vessel 4 finish, and reactivate.
Said process alternately repeats, and just can realize continuously, steel grit is injected in the drilling well ground high pressure line 1 equably, thereby realize the particle impacting drilling well.

Claims (3)

1.一种粒子冲击钻井用钢粒注入装置,包括地面高压主管线(1)、分流管线控制阀(2)、分流管线(3)、钢粒储存罐(4)、液动或手动加料阀(5)、储存罐泄压管线(6)、储存罐泄压控制阀(7)、钢粒(8)、螺旋推进机(9)、钢粒注入控制阀(10)、高抗冲蚀限流装置(11)及钻井泵(12),其特征在于:所述的限流装置(11)设置在分流管线(3)之后,分流管线控制阀(2)设置在地面高压主管线(1)和钢粒储存罐(4)之间,储存罐泄压控制阀(7)在钢粒储存罐(4)与钻井液池之间;所述的螺旋推进机(9)位于钢粒储存罐(4)之下,钢粒注入控制阀(10)位于螺旋推进机(9)与地面高压主管线(1)之间。 1. A steel particle injection device for particle impact drilling, including a ground high-pressure main line (1), a diversion pipeline control valve (2), a diversion pipeline (3), a steel particle storage tank (4), and a hydraulic or manual feeding valve (5), storage tank pressure relief pipeline (6), storage tank pressure relief control valve (7), steel shot (8), screw propeller (9), steel shot injection control valve (10), high erosion limit A flow device (11) and a drilling pump (12), characterized in that: the flow limiting device (11) is arranged behind the diversion pipeline (3), and the diversion pipeline control valve (2) is arranged on the ground high-pressure main line (1) Between the steel particle storage tank (4), the storage tank pressure relief control valve (7) is between the steel particle storage tank (4) and the drilling fluid pool; the screw propeller (9) is located in the steel particle storage tank (4) ), the steel particle injection control valve (10) is located between the screw propeller (9) and the ground high-pressure main line (1). 2.根据权利要求1所述的一种粒子冲击钻井用钢粒注入装置,其特征在于螺旋推进机(9)为采用特殊密封结构的高压螺旋推进机,设置在钢粒储存罐(4)之下、钢粒注入控制阀(10)之上。 2. A steel particle injection device for particle impact drilling according to claim 1, characterized in that the screw propeller (9) is a high-pressure screw propeller with a special sealing structure, and is arranged between the steel particle storage tank (4) Down, the steel shot is injected on the control valve (10). 3.根据权利要求1所述的一种粒子冲击钻井用钢粒注入装置,其特征在于限流装置(11)设置在分流管线(3)之后、钢粒注入控制阀(10)之前。  3. A steel particle injection device for particle impact drilling according to claim 1, characterized in that the flow limiting device (11) is arranged after the shunt pipeline (3) and before the steel particle injection control valve (10). the
CN2011200381132U 2011-01-31 2011-01-31 Particle punching drilling injection device Expired - Fee Related CN202023503U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200381132U CN202023503U (en) 2011-01-31 2011-01-31 Particle punching drilling injection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200381132U CN202023503U (en) 2011-01-31 2011-01-31 Particle punching drilling injection device

Publications (1)

Publication Number Publication Date
CN202023503U true CN202023503U (en) 2011-11-02

Family

ID=44848455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200381132U Expired - Fee Related CN202023503U (en) 2011-01-31 2011-01-31 Particle punching drilling injection device

Country Status (1)

Country Link
CN (1) CN202023503U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619468A (en) * 2011-01-31 2012-08-01 中国石油化工集团公司 Injection device for particle impact drilling
CN108049814A (en) * 2017-12-08 2018-05-18 长江大学 A kind of drilling tool for injecting simultaneously circulating particle

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619468A (en) * 2011-01-31 2012-08-01 中国石油化工集团公司 Injection device for particle impact drilling
CN108049814A (en) * 2017-12-08 2018-05-18 长江大学 A kind of drilling tool for injecting simultaneously circulating particle
CN108049814B (en) * 2017-12-08 2019-04-30 长江大学 A kind of drilling tool injecting simultaneously circulating particle

Similar Documents

Publication Publication Date Title
CN103234890B (en) Low-permeability coal high-pressure gas cycle pulse fracturing anti-reflection experimental device
CN102619468A (en) Injection device for particle impact drilling
WO2013056597A1 (en) Gas extraction method and device with alternating extraction and injection
CN201620781U (en) Drilling fluid shunt control manifold of a continuous circulation drilling system
CN107676092A (en) A kind of liquid carbon dioxide phase transformation explosion rapid hole sealing device and method for sealing
CN104500019A (en) Reinforced anti-reflection method for promoting gas extraction
EP2891763A3 (en) High-rate injection screen with checkable ports
CN112145145A (en) Supercritical carbon dioxide sand-carrying fracturing coal bed device and method
CN104848034B (en) Method for simulating generation, blockage and blockage relieving of solid hydrate in oil gas conveying pipeline
US20210340851A1 (en) Apparatus and method of disbursing materials into a wellbore
CN206174944U (en) System for gap water conservancy diversion subsides analogue means and simulation hydraulic fracturing
CN102979473A (en) Layered pulse pressurization plugging removal device and method for water injection well in oil field
CN203362140U (en) A vehicle-mounted mobile dosing device for mechanical recovery wells
CN203702080U (en) Multiple-joint staged fracturing temporary plugging agent ground input device in horizontal well section
CN109869126B (en) A fracturing tracer simulation experimental device and experimental method
CN106285561B (en) Downhole safety valve system
CN104865129A (en) Skid-mounted multifunctional anti-blowout pipe pressure test system
CN203097791U (en) Layered pulse pressurization plugging removal device for water injection wells in oilfields
CN206220951U (en) A kind of experimental provision of simulation oil well foam blocking side water breakthrough
CN212898453U (en) Leading energizer fracturing unit of natural gas
CN206816224U (en) A kind of vehicle-mounted pressure break diverting agent automatic filling device
CN202082059U (en) Carbon dioxide injection pump device
CN105317411A (en) High-pressure, oxygen-free, yield-increasing and plug-release gas injection device of CBM (Coal Bed Methane) well and using method of high-pressure, oxygen-free, yield-increasing and plug-release gas injection device
CN202108455U (en) Well opening system of abnormally-high-pressure gas well
CN208749395U (en) A kind of secondary grouting gas hole sealing device with pressure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150917

Address after: 100029 Beijing Chaoyang District Hui Xin a No. twelve layer 6

Patentee after: SINOPEC OILFIELD SERVICE CORPORATION

Patentee after: Drilling Well Technology Institute, Shengli Petroleum Engineering Co., Ltd., SINOPEC

Address before: 100728 Beijing, Chaoyangmen, North Street, No. 22, No.

Patentee before: China Petrochemical Group Corp.

Patentee before: Well-Drilling Technology Inst., Shengli Petroleum Administration, SINOPEC

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111102

Termination date: 20160131

EXPY Termination of patent right or utility model