CN104695476A - Strengthening method and structure of ramp retaining walls for grading decomposition - Google Patents
Strengthening method and structure of ramp retaining walls for grading decomposition Download PDFInfo
- Publication number
- CN104695476A CN104695476A CN201310640320.9A CN201310640320A CN104695476A CN 104695476 A CN104695476 A CN 104695476A CN 201310640320 A CN201310640320 A CN 201310640320A CN 104695476 A CN104695476 A CN 104695476A
- Authority
- CN
- China
- Prior art keywords
- ramp
- retaining wall
- height
- reinforcing bar
- sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The invention discloses a strengthening method and a strengthening structure of ramp retaining walls for grading decomposition. According to the method, a ramp is divided into two sections, the existing retaining wall structure is adopted on the low section of the ramp, and the retaining walls on two sides of the high section of the ramp are pulled and fixed by reinforcing steel bar haul nets. Reinforced concrete cantilever type retaining walls on the section, higher than 8 m, of the ramp are changed into reinforcement retaining walls, the bearing capacity of the retaining walls is greatly improved, and the stability and the safety reliability of the section, higher than 8 m, of the ramp are ensured. The foundation bearing capacity of the strengthening structure can completely satisfy the requirement of the electrolytic aluminium grading decomposition ramp, the investment is saved, the construction period is shortened, the stress of the structure is clear and reasonable, the potential safety hazard is avoided, and the safety of the structure is guaranteed.
Description
Technical field
the present invention relates to reinforcement means and the structure of a kind of decomposition ramp retaining wall, belong to the reinforcing technique field in electrolytic aluminium decomposition ramp.
Background technology
in the technological process of electrolytic aluminium decomposition, needing to build a length is 300 meters, and width is 42 meters, and the gradient is the ramp of 3%, and ramp least significant end is concordant with natural ground, and peak height is 9 meters.Both sides, ramp are provided with retaining wall, fill and lead up compacting between retaining wall by backfill.Existing retaining wall is steel concrete cantilever structure, when this structure is not too high in ramp, substantially can meet the lateral pressure that backfill applies.But along with the continuous rising in ramp, the lateral pressure that backfill is applied to inside retaining wall is also increasing.When ramp is higher, as still adopted existing steel concrete cantilevered soil-baffling structure, the construction period is longer, invests larger.Therefore need to find in addition a kind of method that ramp retaining wall is reinforced and structure, to guarantee the safety in ramp.
Summary of the invention
the object of the invention is to, reinforcement means and the structure of a kind of decomposition ramp retaining wall is provided, to guarantee stability and the safety in electrolytic aluminium decomposition ramp.
technical scheme of the present invention:
a reinforcement means for decomposition ramp retaining wall, the method is that ramp is divided into two sections, and ramp height still adopts existing retaining wall structure compared with end section; By reinforcing bar drawknot net, the retaining wall drawknot of both sides is fixed between the retaining wall of height upper sector both sides, ramp.
in preceding method, described ramp punishes into two sections height 8 meters; Height is lower than when 8 meters being ramp height comparatively end section, and height is higher than when 8 meters being ramp height upper sector.
in preceding method, reinforced concrete foundation is provided with bottom the retaining wall of described ramp height upper sector, tension rib is embedded with inside retaining wall, between the retaining wall of both sides, backfill construction is carried out in layering, one deck reinforcing bar drawknot net is laid between every layer, reinforcing bar drawknot net welds with the tension rib be embedded in inside retaining wall, is routed to concordant with the retaining wall of both sides always; Then one reinforced concrete circle beam is built at retaining wall top.
in preceding method, when backfill construction is carried out in described layering, every layer of backfill should roll compacting, and compacting degree is more than or equal to 93%; The spacing of reinforcing bar drawknot net is not more than 0.4 meter.
according to the decomposition ramp used soil-baffling structure that preceding method is formed, described ramp with height 8 meters of for boundary, be provided with multistory reinforced drawknot net between the retaining wall of ramp height higher than 8 meters of section both sides, reinforcing bar drawknot net both sides are welded with the tension rib be embedded in retaining wall; Backfill is provided with between multistory reinforced drawknot net.
in aforementioned soil-baffling structure, the interlamellar spacing of described reinforcing bar drawknot net is 0.4 meter.
in aforementioned soil-baffling structure, be provided with reinforced concrete foundation bottom described retaining wall, reinforced concrete foundation is the strip of cross section 1000 × 400mm.
in aforementioned soil-baffling structure, described retaining wall top is provided with C25 reinforced concrete circle beam.
compared with prior art, the present invention makes ramp height into reinforced soil retaining wall higher than the steel concrete cantilever retaining wall of 8 meters of sections, not only can meet the requirement of bearing capacity of foundation soil, and can also investment reduction and reduction of erection time.When carrying out backfill construction, lay one deck backfill, paving one deck reinforcing bar drawknot net, lay one deck reinforcing bar drawknot net every 0.4, reinforcing bar drawknot net welds with the tension rib in retaining wall, can reduction of erection time greatly.The present invention substantially increases the bearing capacity of retaining wall, ensure that ramp height is higher than the stability of 8 meters of sections and security reliability.Bearing capacity of foundation soil of the present invention can meet the requirement in electrolytic aluminium decomposition ramp completely, has saved investment, has shortened the construction period; Structure stress is clear and definite, reasonable, avoids potential safety hazard, ensures the safety of structure.
Accompanying drawing explanation
fig. 1 is structural representation of the present invention;
fig. 2 be in Fig. 1 ramp height higher than the partial enlarged drawing of 8 meters of sections;
fig. 3 is the longitudinal sectional drawing at retaining wall place in Fig. 2.
being labeled as in accompanying drawing: 1-retaining wall, 2-reinforcing bar drawknot net, 3-tension rib, 4-backfill, 5-reinforced concrete foundation, 6-C25 reinforced concrete circle beam.
Detailed description of the invention
below in conjunction with accompanying drawing, the present invention is described in further detail, but not as any limitation of the invention.
a reinforcement means for decomposition ramp retaining wall, as Figure 1-3.The method is that ramp is divided into two sections, and ramp height still adopts existing retaining wall structure compared with end section; By reinforcing bar drawknot net, the retaining wall drawknot of both sides is fixed between the retaining wall of height upper sector both sides, ramp.Ramp punishes into two sections height 8 meters; Height is lower than when 8 meters being ramp height comparatively end section, and height is higher than when 8 meters being ramp height upper sector.Reinforced concrete foundation is provided with bottom the retaining wall of ramp height upper sector, tension rib is embedded with inside retaining wall, between the retaining wall of both sides, backfill construction is carried out in layering, one deck reinforcing bar drawknot net is laid between every layer, reinforcing bar drawknot net welds with the tension rib be embedded in inside retaining wall, is routed to concordant with the retaining wall of both sides always; Then one reinforced concrete circle beam is built at retaining wall top.When backfill construction is carried out in layering, every layer of backfill should roll compacting, and compacting degree is more than or equal to 93%; The spacing of reinforcing bar drawknot net is not more than 0.4 meter.
according to the decomposition ramp used soil-baffling structure that preceding method is formed, as Figure 1-3.Described ramp is with height 8 meters of for boundary, and be provided with multistory reinforced drawknot net 2 between the retaining wall 1 of ramp height higher than 8 meters of section both sides, reinforcing bar drawknot net both sides are welded with the tension rib 3 be embedded in retaining wall; Backfill 4 is provided with between multistory reinforced drawknot net.The interlamellar spacing of reinforcing bar drawknot net is 0.4 meter.Be provided with reinforced concrete foundation 5 bottom retaining wall, reinforced concrete foundation is the strip of cross section 1000 × 400mm.Retaining wall top is provided with C25 reinforced concrete circle beam 6.
Embodiment
fig. 1 is the schematic diagram in ramp used in the technological process of electrolytic aluminium decomposition, and length is 300 meters, and width is 42 meters, and the gradient is 3%, and ramp least significant end is concordant with natural ground, and peak height is 9 meters.Both sides, ramp are provided with retaining wall, fill and lead up compacting between retaining wall by backfill.Fig. 2 is the structural representation of ramp height higher than 8 meters of sections, as seen from Figure 2, this example stops up between cob wall 1 two to arrange reinforcing bar drawknot net 2, when carrying out backfill 4 and constructing, lay one deck backfill 4, paving one deck reinforcing bar drawknot net 2, lay one deck reinforcing bar drawknot net every 0.4, reinforcing bar drawknot net 2 both sides are welded with the tension rib 3 in retaining wall 1.Be provided with reinforced concrete foundation 5 bottom retaining wall, reinforced concrete foundation is the strip of cross section 1000 × 400mm.Retaining wall top is provided with C25 reinforced concrete circle beam 6.When backfill construction is carried out in layering, every layer of backfill should roll compacting, and compacting degree is more than or equal to 93%.
Claims (8)
1. a decomposition reinforcement means for ramp retaining wall, is characterized in that: the method is that ramp is divided into two sections, and ramp height still adopts existing retaining wall structure compared with end section; By reinforcing bar drawknot net, the retaining wall drawknot of both sides is fixed between the retaining wall of height upper sector both sides, ramp.
2. method according to claim 1, is characterized in that: described ramp punishes into two sections height 8 meters; Height is lower than when 8 meters being ramp height comparatively end section, and height is higher than when 8 meters being ramp height upper sector.
3. method according to claim 2, it is characterized in that: bottom the retaining wall of described ramp height upper sector, be provided with reinforced concrete foundation, tension rib is embedded with inside retaining wall, between the retaining wall of both sides, backfill construction is carried out in layering, one deck reinforcing bar drawknot net is laid between every layer, reinforcing bar drawknot net welds with the tension rib be embedded in inside retaining wall, is routed to concordant with the retaining wall of both sides always; Then one reinforced concrete circle beam is built at retaining wall top.
4. method according to claim 3, is characterized in that: when backfill construction is carried out in described layering, every layer of backfill should roll compacting, and compacting degree is more than or equal to 93%; The spacing of reinforcing bar drawknot net is not more than 0.4 meter.
5. the decomposition ramp used soil-baffling structure that either method is formed according to claim 1-4, it is characterized in that: described ramp with height 8 meters of for boundary, be provided with multistory reinforced drawknot net (2) between the retaining wall (1) of ramp height higher than 8 meters of section both sides, reinforcing bar drawknot net (2) both sides are welded with the tension rib (3) be embedded in retaining wall (1); Backfill (4) is provided with between multistory reinforced drawknot net (2).
6. soil-baffling structure according to claim 5, is characterized in that: the interlamellar spacing of described reinforcing bar drawknot net (2) is 0.4 meter.
7. soil-baffling structure according to claim 5, is characterized in that: described retaining wall (1) bottom is provided with reinforced concrete foundation (5), the strip that reinforced concrete foundation (5) is cross section 1000 × 400mm.
8. soil-baffling structure according to claim 5, is characterized in that: described retaining wall (1) top is provided with C25 reinforced concrete circle beam (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310640320.9A CN104695476A (en) | 2013-12-04 | 2013-12-04 | Strengthening method and structure of ramp retaining walls for grading decomposition |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310640320.9A CN104695476A (en) | 2013-12-04 | 2013-12-04 | Strengthening method and structure of ramp retaining walls for grading decomposition |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104695476A true CN104695476A (en) | 2015-06-10 |
Family
ID=53342991
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310640320.9A Pending CN104695476A (en) | 2013-12-04 | 2013-12-04 | Strengthening method and structure of ramp retaining walls for grading decomposition |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104695476A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4643618A (en) * | 1985-02-11 | 1987-02-17 | Hilfiker Pipe Co. | Soil reinforced cantilever wall |
CN1490468A (en) * | 2003-08-29 | 2004-04-21 | 中国地质大学(武汉) | Inter-anchored thin retaining wall |
KR20040072586A (en) * | 2004-07-23 | 2004-08-18 | 박성언 | Reinforced earth construction method for tree-planting and stabilization of slope, making use of front and underground geo-grids |
KR20070073434A (en) * | 2006-01-05 | 2007-07-10 | 박성언 | Environment green wall |
CN201321618Y (en) * | 2008-12-23 | 2009-10-07 | 中铁二院工程集团有限责任公司 | Cantilever retaining wall reinforcing compound structure |
-
2013
- 2013-12-04 CN CN201310640320.9A patent/CN104695476A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4643618A (en) * | 1985-02-11 | 1987-02-17 | Hilfiker Pipe Co. | Soil reinforced cantilever wall |
CN1490468A (en) * | 2003-08-29 | 2004-04-21 | 中国地质大学(武汉) | Inter-anchored thin retaining wall |
KR20040072586A (en) * | 2004-07-23 | 2004-08-18 | 박성언 | Reinforced earth construction method for tree-planting and stabilization of slope, making use of front and underground geo-grids |
KR20070073434A (en) * | 2006-01-05 | 2007-07-10 | 박성언 | Environment green wall |
CN201321618Y (en) * | 2008-12-23 | 2009-10-07 | 中铁二院工程集团有限责任公司 | Cantilever retaining wall reinforcing compound structure |
Non-Patent Citations (1)
Title |
---|
吴彬彬等: "加筋土路肩挡土墙施工工艺", 《西铁科技》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103952986B (en) | A kind of off-load formula rigid culvert structure | |
CN203923924U (en) | No. 0 section bracket prepressing device | |
CN104294769B (en) | A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement | |
CN202787271U (en) | Stacked inner supporting structure for foundation pit supporting | |
CN203782684U (en) | Anti-skid pile provided with crossbeam | |
CN202969393U (en) | Ribbing load reduction structure of road high hill culvert | |
CN203113352U (en) | Pre-stressed beam for retaining and protection of foundation pit | |
CN105696546A (en) | Low-consumption underground diaphragm wall and construction method thereof | |
CN203614107U (en) | Composite retaining structure for horsehead | |
CN103244129B (en) | Construction method for three-dimensional intersection concave-convex fulcrums | |
CN103161169A (en) | Prestressed girder for foundation pit supporting | |
CN103334778A (en) | Construction technology of step temporary support and partial double side walls | |
CN104594297A (en) | Double-deck concrete faced rock-fill dam and construction method thereof | |
CN204097889U (en) | A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement | |
CN204151798U (en) | A kind of steel reinforced concrete anti-slide pile structure | |
CN110953005B (en) | Large-deep-buried high-stress coal bunker supporting structure and construction method thereof | |
CN203035204U (en) | Large-section tunnel second lining grouping formwork trolley | |
CN103397668B (en) | The regulation method of each sections uneven settlement of foundation of a kind of railway tunnels | |
CN204311457U (en) | A kind of Metro station excavation excavation construction composite retaining structure system | |
CN103233447B (en) | High concrete face rockfill dam seismic strengthening structure and construction method thereof | |
CN203361163U (en) | Prestress steel support used for controlling differential displacement inside and outside foundation ditch enclosure wall | |
CN102852150B (en) | Superposed inner support structure for foundation pit support | |
CN104695476A (en) | Strengthening method and structure of ramp retaining walls for grading decomposition | |
CN104846856B (en) | Horizontal inclined independent bent frame column pushing correction method | |
CN211227885U (en) | Rock foundation existing high-speed railway dyke force balance side width structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150610 |