CN104695448A - 水刀拉森钢板桩施工方法 - Google Patents

水刀拉森钢板桩施工方法 Download PDF

Info

Publication number
CN104695448A
CN104695448A CN201510012698.3A CN201510012698A CN104695448A CN 104695448 A CN104695448 A CN 104695448A CN 201510012698 A CN201510012698 A CN 201510012698A CN 104695448 A CN104695448 A CN 104695448A
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
larsen
construction
larsen steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510012698.3A
Other languages
English (en)
Inventor
严周为
杨毅
陶述平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ASCG Co Ltd
Original Assignee
ASCG Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ASCG Co Ltd filed Critical ASCG Co Ltd
Priority to CN201510012698.3A priority Critical patent/CN104695448A/zh
Publication of CN104695448A publication Critical patent/CN104695448A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/26Placing by using several means simultaneously

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本发明公开了一种水刀拉森钢板桩施工方法,包括有以下施工步骤:1)、施工前,对用于拉森桩施工的全站仪及水准仪进行校核;并对测量放样基准点进行复核;2)、测量放线,根据复测报批的测量成果,用全站仪施测围堰平面位置和尺寸,并在插打钢板桩的过程中控制测量垂直度及时进行纠偏;3)、导向架安装,根据施工图纸,按设计位置安装导向架,导向架主要由双拼40b工字钢槽钢组拼焊接而成,用16号槽钢连接组成框架式的导向装置;4)、水刀拉森钢板桩制作。本发明采用水刀拉森钢板桩对原桩位的硬塑或坚硬土层进行扰动,先采用水刀拉森钢板桩把孔打入到设计高程,把水刀拉森钢板桩拔出,再打入常规拉森钢板桩,则能顺利实现钢板桩在硬塑或坚硬土层中的施工并且不损坏拉森钢板桩的锁口。

Description

水刀拉森钢板桩施工方法
技术领域
本发明涉及基坑支护领域,具体属于水刀拉森钢板桩施工方法。
背景技术
拉森钢板桩施工主要应用于河道中基坑支护,国内最早出现于上海等沿海地区工程,而上海属于长江入海口,其土层多为粘土及淤泥质土层,拉森钢板桩在上海地区只要通过加大振动锤的功率便可打入到设计深度。
    随着省内桥梁施工兴起,在内地使用拉森钢板桩作为支护的工程日益增多,拉森钢板桩的应用也逐渐推广。但是省内河道下地层以可塑性粘土为主,且在支护深度内多有硬塑性土层,甚至坚硬土层。特别硬塑性及坚硬土层用一般拉森钢板桩打入非常困难,若加大振动锤的功率,容易使拉森钢板桩的锁口拉坏,无法进行周转使用,大大增加工程成本。
发明内容
本发明的目的是提供一种水刀拉森钢板桩施工方法,可以顺利把一般拉森钢板桩打入到硬塑土层甚至坚硬土层而不损坏拉森钢板桩。
本发明的技术方案如下:
水刀拉森钢板桩施工方法,包括有以下施工步骤:
1)、施工前,对用于拉森桩施工的全站仪及水准仪进行校核;并对测量放样基准点进行复核;
2)、测量放线,根据复测报批的测量成果,用全站仪施测围堰平面位置和尺寸,并在插打钢板桩的过程中控制测量垂直度及时进行纠偏;
3)、导向架安装,根据施工图纸,按设计位置安装导向架,导向架主要由双拼40b工字钢槽钢组拼焊接而成,用16号槽钢连接组成框架式的导向装置;
4)、水刀拉森钢板桩制作:
a.准备一根长度与基坑设计深度相同常规拉森钢板桩和直径2.5cm的无缝钢管;
b.在常规拉森钢板桩凹侧居中放线,确保改线与拉森钢板桩边线平行;
c.在放好的线上摆好无缝钢管,并把无缝钢管牢固焊接于常规拉森钢板桩上;
d.距离常规拉森钢板桩的底部约20cm处,将无缝钢管一端焊接两个喷嘴,喷嘴呈尖形,且嘴口直径大小为1cm;
e.在常规拉森钢板桩的另一端用高压水管与高压水泵连接成型;
5)、把水刀拉森钢板桩与高压水泵连接好并试运行调试,检查整个装置是否运行正常;
6)、检查整个装置运行正常后,关闭高压水泵,用起重机把水刀拉森钢板桩吊装到施打位置;
7)、用振动锤把水刀拉森钢板桩打入土层1~2m,然后打开高压水泵,继续往下施工,直到打至设计高程,并在设计高程处停放5~10s;
8)、拔出水刀拉森钢板桩时应根据地层情况控制拔出速度,在地层坚硬处速度应适度放慢;
9)、常规拉森钢板桩施工,把常规拉森钢板桩放置在水刀拉森钢板桩打设位置,用振动锤进行打入,施打过程中,应严格控制测量垂直度及时进行纠偏,直至打至设计高程;
10)、围堰合拢,按照上述方法反复施工,直至拉森钢板桩围堰合拢。
本发明采用水刀拉森钢板桩对原桩位的硬塑或坚硬土层进行扰动,先采用水刀拉森钢板桩把孔打入到设计高程,把水刀拉森钢板桩拔出,再打入常规拉森钢板桩,则能顺利实现钢板桩在硬塑或坚硬土层中的施工并且不损坏拉森钢板桩的锁口。先采用水刀拉森钢板桩进行引孔,由于高压水的冲击,导致钢板桩底部土扰动,水刀拉森钢板桩能顺利打至设计高程。到设计高程后,水刀拉森钢板桩拔出,后再插打常规拉森钢板桩,能直接打入设计高程,并实现承台基坑合拢。
附图说明
图1为本发明的水刀拉森钢板桩结构示意图。
具体实施方式
参见附图,水刀拉森钢板桩施工方法,包括有以下施工步骤:
1)、施工前,对用于拉森桩施工的全站仪及水准仪进行校核;并对测量放样基准点进行复核;
2)、测量放线,根据复测报批的测量成果,用全站仪施测围堰平面位置和尺寸,并在插打钢板桩的过程中控制测量垂直度及时进行纠偏;
3)、导向架安装,根据施工图纸,按设计位置安装导向架,导向架主要由双拼40b工字钢槽钢组拼焊接而成,用16号槽钢连接组成框架式的导向装置;
4)、水刀拉森钢板桩制作:
a.准备一根长度与基坑设计深度相同常规拉森钢板桩1和直径2.5cm的无缝钢管2;
b.在常规拉森钢板桩1凹侧居中放线,确保改线与拉森钢板桩1边线平行;
c.在放好的线上摆好无缝钢管2,并把无缝钢管2用固定卡6牢固焊接于常规拉森钢板桩1上;
d.距离常规拉森钢板桩1的底部约20cm处,将无缝钢管2一端焊接两个喷嘴3,喷嘴3呈尖形,且嘴口直径大小为1cm;
e.在常规拉森钢板桩1的另一端用高压水管4与高压水泵5连接成型;
5)、把水刀拉森钢板桩1与高压水泵5连接好并试运行调试,检查整个装置是否运行正常;
6)、检查整个装置运行正常后,关闭高压水泵,用起重机把水刀拉森钢板桩吊装到施打位置;
7)、用振动锤把水刀拉森钢板桩打入土层1~2m,然后打开高压水泵,继续往下施工,直到打至设计高程,并在设计高程处停放5~10s;
8)、拔出水刀拉森钢板桩时应根据地层情况控制拔出速度,在地层坚硬处速度应适度放慢;
9)、常规拉森钢板桩施工,把常规拉森钢板桩放置在水刀拉森钢板桩打设位置,用振动锤进行打入,施打过程中,应严格控制测量垂直度及时进行纠偏,直至打至设计高程;
10)、围堰合拢,按照上述方法反复施工,直至拉森钢板桩围堰合拢。

Claims (1)

1.水刀拉森钢板桩施工方法,其特征在于,包括有以下施工步骤:
1)、施工前,对用于拉森桩施工的全站仪及水准仪进行校核;并对测量放样基准点进行复核;
2)、测量放线,根据复测报批的测量成果,用全站仪施测围堰平面位置和尺寸,并在插打钢板桩的过程中控制测量垂直度及时进行纠偏;
3)、导向架安装,根据施工图纸,按设计位置安装导向架,导向架主要由双拼40b工字钢槽钢组拼焊接而成,用16号槽钢连接组成框架式的导向装置;
4)、水刀拉森钢板桩制作:
a.准备一根长度与基坑设计深度相同常规拉森钢板桩和直径2.5cm的无缝钢管;
b.在常规拉森钢板桩凹侧居中放线,确保改线与拉森钢板桩边线平行;
c.在放好的线上摆好无缝钢管,并把无缝钢管牢固焊接于常规拉森钢板桩上;
d.距离常规拉森钢板桩的底部约20cm处,将无缝钢管一端焊接两个喷嘴,喷嘴呈尖形,且嘴口直径大小为1cm;
e.在常规拉森钢板桩的另一端用高压水管与高压水泵连接成型;
5)、把水刀拉森钢板桩与高压水泵连接好并试运行调试,检查整个装置是否运行正常;
6)、检查整个装置运行正常后,关闭高压水泵,用起重机把水刀拉森钢板桩吊装到施打位置;
7)、用振动锤把水刀拉森钢板桩打入土层1~2m,然后打开高压水泵,继续往下施工,直到打至设计高程,并在设计高程处停放5~10s;
8)、拔出水刀拉森钢板桩时应根据地层情况控制拔出速度,在地层坚硬处速度应适度放慢;
9)、常规拉森钢板桩施工,把常规拉森钢板桩放置在水刀拉森钢板桩打设位置,用振动锤进行打入,施打过程中,应严格控制测量垂直度及时进行纠偏,直至打至设计高程;
10)、围堰合拢,按照上述方法反复施工,直至拉森钢板桩围堰合拢。
CN201510012698.3A 2015-01-09 2015-01-09 水刀拉森钢板桩施工方法 Pending CN104695448A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510012698.3A CN104695448A (zh) 2015-01-09 2015-01-09 水刀拉森钢板桩施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510012698.3A CN104695448A (zh) 2015-01-09 2015-01-09 水刀拉森钢板桩施工方法

Publications (1)

Publication Number Publication Date
CN104695448A true CN104695448A (zh) 2015-06-10

Family

ID=53342963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510012698.3A Pending CN104695448A (zh) 2015-01-09 2015-01-09 水刀拉森钢板桩施工方法

Country Status (1)

Country Link
CN (1) CN104695448A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360520A (zh) * 2018-02-02 2018-08-03 中国十七冶集团有限公司 高压冲击水式拉森钢板桩的施工装置
CN108612111A (zh) * 2018-05-22 2018-10-02 张利均 一种钢管桩和基坑围护结构及基坑围护结构的施工方法
CN108643194A (zh) * 2018-06-26 2018-10-12 中国建筑局(集团)有限公司 线性拉森支护施工垂直度调整钢板桩及方法
CN108978633A (zh) * 2018-06-28 2018-12-11 中交上海航道局有限公司 一种钢板桩插打辅助结构
CN112177015A (zh) * 2020-10-14 2021-01-05 河北建设集团股份有限公司 一种砂质土层环境下钢板桩基坑支护施工方法
CN113047322A (zh) * 2021-04-06 2021-06-29 中铁大桥局第九工程有限公司 一种在硬质地层中应用水刀辅助下沉钢板桩施工方法
CN113494092A (zh) * 2021-07-19 2021-10-12 福州市建筑设计院有限责任公司 一种基坑边坡支护结构及其施工方法
CN115679956A (zh) * 2022-11-04 2023-02-03 广东佰业泰建设工程有限公司 一种富砂地层搅拌桩施工方法
CN116065612A (zh) * 2023-02-24 2023-05-05 广东省源天工程有限公司 一种深水超长钢板桩围堰施工装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001011859A (ja) * 1999-06-29 2001-01-16 Ybm Co Ltd 噴射ノズルを備えた杭打機
CN102271284A (zh) * 2010-06-01 2011-12-07 纳格拉影像股份有限公司 用于对加密内容进行解密的方法和设备
CN202227332U (zh) * 2011-09-15 2012-05-23 中国建筑土木建设有限公司路桥分公司 引孔钢板桩
CN202865845U (zh) * 2012-09-13 2013-04-10 中交三公局第二工程有限公司 一种辅助插打钢板桩的“水刀”结构
CN103628482A (zh) * 2012-08-27 2014-03-12 上海中技桩业股份有限公司 一种高压射流引桩施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001011859A (ja) * 1999-06-29 2001-01-16 Ybm Co Ltd 噴射ノズルを備えた杭打機
CN102271284A (zh) * 2010-06-01 2011-12-07 纳格拉影像股份有限公司 用于对加密内容进行解密的方法和设备
CN202227332U (zh) * 2011-09-15 2012-05-23 中国建筑土木建设有限公司路桥分公司 引孔钢板桩
CN103628482A (zh) * 2012-08-27 2014-03-12 上海中技桩业股份有限公司 一种高压射流引桩施工方法
CN202865845U (zh) * 2012-09-13 2013-04-10 中交三公局第二工程有限公司 一种辅助插打钢板桩的“水刀”结构

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360520A (zh) * 2018-02-02 2018-08-03 中国十七冶集团有限公司 高压冲击水式拉森钢板桩的施工装置
CN108612111A (zh) * 2018-05-22 2018-10-02 张利均 一种钢管桩和基坑围护结构及基坑围护结构的施工方法
CN108612111B (zh) * 2018-05-22 2021-04-06 张利均 一种钢管桩和基坑围护结构及基坑围护结构的施工方法
CN108643194A (zh) * 2018-06-26 2018-10-12 中国建筑局(集团)有限公司 线性拉森支护施工垂直度调整钢板桩及方法
CN108978633A (zh) * 2018-06-28 2018-12-11 中交上海航道局有限公司 一种钢板桩插打辅助结构
CN112177015A (zh) * 2020-10-14 2021-01-05 河北建设集团股份有限公司 一种砂质土层环境下钢板桩基坑支护施工方法
CN113047322A (zh) * 2021-04-06 2021-06-29 中铁大桥局第九工程有限公司 一种在硬质地层中应用水刀辅助下沉钢板桩施工方法
CN113494092A (zh) * 2021-07-19 2021-10-12 福州市建筑设计院有限责任公司 一种基坑边坡支护结构及其施工方法
CN115679956A (zh) * 2022-11-04 2023-02-03 广东佰业泰建设工程有限公司 一种富砂地层搅拌桩施工方法
CN116065612A (zh) * 2023-02-24 2023-05-05 广东省源天工程有限公司 一种深水超长钢板桩围堰施工装置

Similar Documents

Publication Publication Date Title
CN104695448A (zh) 水刀拉森钢板桩施工方法
CN100516384C (zh) 水下真空预压加固软基技术方法
CN102383431B (zh) 中掘预应力离心管桩沉桩装置及其沉桩法
CN104652496B (zh) 一种地下连续墙渗漏水探测方法
CN102644293B (zh) 桩基桶形基础的施工方法
CN204199335U (zh) 一种减小phc管桩施工挤土效应的泄压井
CN105040715B (zh) 使用钢板桩做桥梁施工围堰方法
CN104929133B (zh) 一种深基坑拉森钢板桩桩底放坡支护的施工方法
CN110499772A (zh) 一种岩质河床双层钢板桩围堰施工方法
CN104563119A (zh) 旋转式水上打桩导架
CN107514006A (zh) 一种用于浅海或浅河桥梁基础的筑岛作业施工方法
CN109797749A (zh) 一种水下基坑施工装置及施工方法
CN105672316A (zh) 钢桩下沉减阻装置及施工方法
CN102021901B (zh) 陡坡裸岩钢管桩平台搭设方法
CN102296588B (zh) 水下挤密砂桩施工工艺
CN110344335A (zh) 一种桥梁施工过程中钢栈桥、初始平台和围堰施工的方法
CN106120791B (zh) 无预作竖向支撑体系地下结构盖挖逆作施工方法
CN203188224U (zh) 土工膜袋吹砂围堰
CN109235474B (zh) 基于海洋环境下的超大围堰的结构及其施工工艺
CN111485567A (zh) 水域光板岩低桩承台的钢板桩围堰的施工方法
CN204551500U (zh) 一种超厚软弱地基中新型围堰
CN104695433A (zh) 一种砂性地基中沥青涂层桩的施工方法
CN209669900U (zh) 水底强透水砂性土层中隧道建设围堰结构
CN104120699B (zh) 钢板桩桶基人工岛护壁结构
CN111749247A (zh) 管道深基坑支护施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150610

RJ01 Rejection of invention patent application after publication