CN104695444A - Pile core concrete forming process and special concrete pouring device for pile core concrete forming process - Google Patents
Pile core concrete forming process and special concrete pouring device for pile core concrete forming process Download PDFInfo
- Publication number
- CN104695444A CN104695444A CN201510023607.6A CN201510023607A CN104695444A CN 104695444 A CN104695444 A CN 104695444A CN 201510023607 A CN201510023607 A CN 201510023607A CN 104695444 A CN104695444 A CN 104695444A
- Authority
- CN
- China
- Prior art keywords
- concrete
- special
- plates
- ring flat
- half ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention provides a pile core concrete forming process. The process comprises steps as follows: (1), guaranteeing that a steel reinforcement cage is free of pollution before concrete pouring and clearing away slags and accumulated water at the bottom and on a protective wall of a pile core; (2), calculating the usage amount of concrete according to the size of the pile core; (3), mounting a special concrete pouring device, and extending a pump pipe of a concrete pump into the special concrete pouring device for concrete pouring; (4), vibrating and leveling the concrete; (5), pouring and curing are performed within 8-24 h after concrete pouring until permanent setting. The invention further provides the special concrete pouring device. The special concrete pouring device comprises a funnel-shaped enclosure and a necking assembly arranged below the enclosure, and the necking assembly comprises a pair of semi-ring plates which are arranged horizontally to form a ring. With the adoption of the process, the concrete can enter the pile core completely and smoothly by the aid of the special concrete pouring device, so that air is prevented from being generated in the concrete, the concrete is vibrated to be compact, the forming quality is improved, and waste of the concrete is avoided.
Description
Technical field
The present invention relates to the construction field such as castinplace pile, prefabricated tubular pile, relate in particular to a kind of stake core concrete moulding process and special filling concrete device thereof.
Background technology
The step of existing grout pile core concrete moulding process comprises: before filling concrete, guarantee that reinforcing cage is not contaminated, and to dispose bottom a core and sediment on retaining wall and ponding; According to stake core volume, calculate the use amount of concrete; Directly to build or artificial spades is filled with concrete and entered a core; Concrete is vibrated and flattens; Carry out building maintenance, until final set after filling with concrete.
The shortcoming of above-mentioned technique is: water and smash leakiness, affects piling quality, and waste concrete, and long construction period, affects a large amount of duration, causes a large amount of artificial waste.
Summary of the invention
The stake core concrete moulding process that technical problem to be solved by this invention is to provide that a kind of technique is simple, Forming Quality is high, short construction period, saving are artificial.
In order to solve the problems of the technologies described above, the present invention adopts following technical scheme: stake core concrete moulding process, comprises the following steps:
(1) before filling concrete, guarantee that reinforcing cage is not contaminated, and to dispose bottom a core and sediment on retaining wall and ponding;
(2) according to stake core volume, the use amount of concrete is calculated;
(3) install special filling concrete device, the pump line of concrete pump is stretched in special filling concrete device and carry out filling concrete;
(4) concrete vibrated and flatten;
(5) carry out building maintenance, until final set in 8-24 hours after filling with concrete.
This core concrete moulding process can make concrete all by special filling concrete device and enter in a core swimmingly, so not only shorten construction period, save artificial, and filling concrete is even, avoid concrete generates gas inside, order pours dense, thus improve Forming Quality, and avoid the waste of concrete.
Another technical problem to be solved by this invention is to provide the special filling concrete device that a kind of structure is simple, filling concrete quality is high, concrete can be avoided to waste.
In order to solve the problems of the technologies described above, the present invention adopts following technical scheme: special filling concrete device, it comprises funnelform enclosing and is located at the closing in assembly below enclosing, the lower end of enclosing outer wall is provided with a circle flange, half ring flat-plate that closing in assembly encloses ring by a pair horizontal positioned forms, one end of these a pair half ring flat-plates is hinged on the corresponding position of flange respectively, and these a pair half ring flat-plates have the rotational freedom in horizontal plane, the locking mechanism making to fix is provided with between the two between the other end of these a pair half ring flat-plates, the annular distance size that these a pair half ring flat-plates enclose institute Cheng Huan is less than the size of enclosing lower port.
Further, described locking mechanism comprises two docking blocks being separately fixed at the other end of these a pair half ring flat-plates and two ends bearing pin with limited step, docking block to be connected with vertical plate by level board and to form, two vertical plate positions are corresponding, the upper end of two vertical plates has a notch, two notch positions are corresponding, and bearing pin is connected in two notches.
Further, the upper end of enclosing is provided with some handles.
The beneficial effect of this special filling concrete device is: directly can be stretched into by concrete pump pump line in special filling concrete device provided by the invention and carry out filling concrete, concrete can all enter in a core swimmingly, so almost without the phenomenon of concrete waste, and filling concrete is even, short construction period, workman's using appliance is facilitated manually to vibrate, make to pour dense, improve and fill with concrete quality, and saved artificial and material.This special filling concrete device has structure simply in addition, Available templates waste material easy making, and assembling is simple, the advantage turned waste into wealth.
Accompanying drawing explanation
Fig. 1 is the stereogram of special filling concrete device used in the stake core concrete moulding process that provides of one embodiment of the invention.
Fig. 2 is the A place enlarged drawing of Fig. 1.
Fig. 3 is the front view of special filling concrete device used in the stake core concrete moulding process that provides of one embodiment of the invention.
Fig. 4 is the top view of Fig. 3.
Fig. 5 is the upward view of Fig. 3.
Fig. 6 is the using state figure of special filling concrete device used in the stake core concrete moulding process that provides of one embodiment of the invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described:
The stake core concrete moulding process that one embodiment of the invention provides, comprises the following steps:
(1) before filling concrete, guarantee that reinforcing cage is not contaminated, and to dispose bottom a core and sediment on retaining wall and ponding;
(2) according to stake core volume, the use amount of concrete is calculated;
(3) install special filling concrete device, the pump line of concrete pump is stretched in special filling concrete device and carry out filling concrete;
(4) concrete vibrated and flatten;
(5) carry out building maintenance, until final set in 8-24 hours after filling with concrete.
See Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5.
Special filling concrete device used in the stake core concrete moulding process that one embodiment of the invention provides, the closing in assembly that it comprises funnelform enclosing 1 and is located at below enclosing 1, enclosing 1 upper port is square, lower port is rounded, certainly can also be other any suitable shapes, enclosing 1 upper end is provided with some handles 11, handle 11 is for this device of auxiliary operation, the lower end of enclosing 1 outer wall is provided with a circle flange 12, half ring flat-plate 21 that closing in assembly encloses ring by a pair horizontal positioned forms, the upper surface laminating flange 12 of these a pair half ring flat-plates 21, one end of these a pair half ring flat-plates 21 is hinged on the corresponding position of flange 12 respectively by jointed shaft 22, and these a pair half ring flat-plates 21 have the rotational freedom in horizontal plane, the locking mechanism making to fix is provided with between the two between the other end of these a pair half ring flat-plates 21, it is annular that these a pair half ring flat-plates 21 enclose formed ring, and with enclosing 1 lower port coaxial line, its annular distance diameter is less than the diameter of enclosing 1 lower port.
Described locking mechanism comprises two docking blocks 31 being separately fixed at the other end of these a pair half ring flat-plates 21 and two ends bearing pin 32 with limited step 321, docking block 31 to be connected with vertical plate 312 upwards by level board 311 and to form, two vertical plate 312 positions are corresponding, under the state that these a pair half ring flat-plates 21 are closed, two vertical plates 312 fit, the upper end of two vertical plates 312 has a notch 313, two notch 313 positions are corresponding, bearing pin 32 is connected in two notches 313, the limited step 321 at such bearing pin 32 two ends can limit this pair half rotations of ring flat-plate 21 in horizontal plane, thus maintain these a pair half ring flat-plates 21 at closure state.Certain described locking mechanism can also be other any suitable structures, as fastening piece, the hasp cooperatively interacted, bolt etc.
Whole device should adopt the large on-deformable material of intensity.
See Fig. 6, the using method of this special filling concrete device is: first exited by bearing pin 32, these a pair half ring flat-plates 21 are opened, then this special filling concrete device is placed on a round platform of core port 5 through reinforcing cage 4, for ease of penetrating of reinforcing cage 4, it is large that the size of the lower port of enclosing 1 will design, exactly because also this reason, the lower port of enclosing 1 is easy to produce gap with stake core mouth in rocking, thus cause spilling and the waste of concrete, the assembly that closes up then can address this problem, now, as long as these a pair half ring flat-plates 21 are closed into ring, then bearing pin 32 is installed, just be equivalent to by the size of enclosing 1 lower port become little as much as possible, not only gap can be eliminated, and can rock by anti-locking apparatus, thus ensure when filling with concrete, concrete can all enter in a core swimmingly, thus shorten construction period, artificial and material are saved, order pours dense, and avoid the waste of concrete.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any amendments done within the spirit and principles in the present invention, equivalent replacement and improvement etc., all should be included within protection scope of the present invention.The annular distance shape enclosing institute Cheng Huan as these a pair half ring flat-plates is not restricted to annular, and in concrete enforcement, annular distance shape should be corresponding to the cross sectional shape of reinforcing cage.
Claims (4)
1. a core concrete moulding process, comprises the following steps:
(1) before filling concrete, guarantee that reinforcing cage is not contaminated, and to dispose bottom a core and sediment on retaining wall and ponding;
(2) according to stake core volume, the use amount of concrete is calculated;
(3) install special filling concrete device, the pump line of concrete pump is stretched in special filling concrete device and carry out filling concrete;
(4) concrete vibrated and flatten;
(5) carry out building maintenance, until final set in 8-24 hours after filling with concrete.
2. special filling concrete device used in claim 1, it is characterized in that: it comprises funnelform enclosing and is located at the closing in assembly below enclosing, the lower end of enclosing outer wall is provided with a circle flange, half ring flat-plate that closing in assembly encloses ring by a pair horizontal positioned forms, one end of these a pair half ring flat-plates is hinged on the corresponding position of flange respectively, and these a pair half ring flat-plates have the rotational freedom in horizontal plane, the locking mechanism making to fix is provided with between the two between the other end of these a pair half ring flat-plates, the annular distance size that these a pair half ring flat-plates enclose institute Cheng Huan is less than the size of enclosing lower port.
3. special filling concrete device as claimed in claim 2, it is characterized in that: described locking mechanism comprises two docking blocks being separately fixed at the other end of these a pair half ring flat-plates and two ends bearing pin with limited step, docking block to be connected with vertical plate by level board and to form, two vertical plate positions are corresponding, the upper end of two vertical plates has a notch, two notch positions are corresponding, and bearing pin is connected in two notches.
4. special filling concrete device as claimed in claim 2 or claim 3, is characterized in that: the upper end of enclosing is provided with some handles.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510023607.6A CN104695444B (en) | 2015-01-17 | 2015-01-17 | Stake core fills concrete device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510023607.6A CN104695444B (en) | 2015-01-17 | 2015-01-17 | Stake core fills concrete device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104695444A true CN104695444A (en) | 2015-06-10 |
CN104695444B CN104695444B (en) | 2016-06-22 |
Family
ID=53342959
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510023607.6A Expired - Fee Related CN104695444B (en) | 2015-01-17 | 2015-01-17 | Stake core fills concrete device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104695444B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007239200A (en) * | 2006-03-06 | 2007-09-20 | Tekken Constr Co Ltd | Erecting construction method of reinforcing cage or steel pipe, float device used for this construction method and removal method of this device |
CN101545259A (en) * | 2009-04-21 | 2009-09-30 | 广州工程总承包集团有限公司 | Device and method for non-underwater concreting by using drilled pile |
CN102134852A (en) * | 2010-01-25 | 2011-07-27 | 宏利国际投资有限公司 | Concrete pouring device and method |
CN202626977U (en) * | 2012-05-04 | 2012-12-26 | 中交第一公路工程局有限公司 | Fixing device for steel bar cage of pile foundation and concrete pouring hopper |
CN102852141A (en) * | 2012-09-05 | 2013-01-02 | 广州市建筑科学研究院有限公司 | Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation |
CN203285064U (en) * | 2013-05-31 | 2013-11-13 | 山东电力建设第二工程公司 | Drilling impeller type concrete funnel |
CN103541352A (en) * | 2013-08-02 | 2014-01-29 | 中冶集团武汉勘察研究院有限公司 | Underground and overground continuous construction method for major-diameter high flat bed pile in sandy soil stratum |
CN204435385U (en) * | 2015-01-17 | 2015-07-01 | 中建五局蚌埠建筑工程有限公司 | Concrete device filled with by stake core |
-
2015
- 2015-01-17 CN CN201510023607.6A patent/CN104695444B/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007239200A (en) * | 2006-03-06 | 2007-09-20 | Tekken Constr Co Ltd | Erecting construction method of reinforcing cage or steel pipe, float device used for this construction method and removal method of this device |
CN101545259A (en) * | 2009-04-21 | 2009-09-30 | 广州工程总承包集团有限公司 | Device and method for non-underwater concreting by using drilled pile |
CN102134852A (en) * | 2010-01-25 | 2011-07-27 | 宏利国际投资有限公司 | Concrete pouring device and method |
CN202626977U (en) * | 2012-05-04 | 2012-12-26 | 中交第一公路工程局有限公司 | Fixing device for steel bar cage of pile foundation and concrete pouring hopper |
CN102852141A (en) * | 2012-09-05 | 2013-01-02 | 广州市建筑科学研究院有限公司 | Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation |
CN203285064U (en) * | 2013-05-31 | 2013-11-13 | 山东电力建设第二工程公司 | Drilling impeller type concrete funnel |
CN103541352A (en) * | 2013-08-02 | 2014-01-29 | 中冶集团武汉勘察研究院有限公司 | Underground and overground continuous construction method for major-diameter high flat bed pile in sandy soil stratum |
CN204435385U (en) * | 2015-01-17 | 2015-07-01 | 中建五局蚌埠建筑工程有限公司 | Concrete device filled with by stake core |
Non-Patent Citations (1)
Title |
---|
陈寿明: "某商住楼人工挖孔灌注桩的施工技术", 《科技创新与应用》 * |
Also Published As
Publication number | Publication date |
---|---|
CN104695444B (en) | 2016-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104018507B (en) | A kind of underwater concrete filling pile elevation control device and using method thereof | |
CN101824814B (en) | Method for plugging diversion tunnel without cutoff by using cast-in-place reinforced concrete gate and the gate | |
CN102943489B (en) | System for tube push bench to go out of starting well and unkenneling construction method of tube push bench | |
CN108086326B (en) | Underwater concrete pouring construction method and device | |
CN105545003B (en) | Concrete blocks up hole device | |
CN103031848B (en) | Concrete grouting construction method and device for implementing same | |
CN110965473A (en) | Construction method of bridge bearing platform | |
CN104695444A (en) | Pile core concrete forming process and special concrete pouring device for pile core concrete forming process | |
CN204435385U (en) | Concrete device filled with by stake core | |
CN101545259A (en) | Device and method for non-underwater concreting by using drilled pile | |
CN208201856U (en) | A kind of concrete filling pile head laitance concrete collection device | |
CN111236237A (en) | Pile breakage prevention grouting device | |
CN201459734U (en) | Dry bored pile tamper | |
CN102296593A (en) | Cylindrical compound bored concrete pile of concrete gravels and construction process thereof | |
CN108678377A (en) | Constructional column concrete pouring construction method | |
CN201645624U (en) | Integrated building component processing mold for exposing reinforcing steel bars | |
CN202108039U (en) | Cylindrical compound concrete macadam placepile | |
CN211250563U (en) | Pouring die for bearing wall board | |
CN205400050U (en) | Hollow superstructure mandrel of thin wall square chest | |
CN207813015U (en) | Floor slab preformed hole tool-typed formwork support construction | |
CN203879011U (en) | Concrete pouring device | |
CN206273893U (en) | A kind of vibro-replacement stone column machine | |
CN207874560U (en) | A kind of garden landscape engineering construction water mud transport device | |
CN103967282B (en) | A kind of concrete casting dispensing device and construction method thereof | |
CN216238869U (en) | Core filling template for masonry inspection well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170417 Address after: 410116 Changsha Yuhua District, Hunan Zhongyi Road, No. 158 Patentee after: China Construction Fifth Engineering Division Co., Ltd. Address before: Anhui city of Bengbu Province on the 233099 century iron building homes six four unit 10 Patentee before: In build Bangbu construction work Co., Ltd five innings |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160622 Termination date: 20170117 |
|
CF01 | Termination of patent right due to non-payment of annual fee |