CN104695387B - A kind of flood control gate arm stagewise attachment structure - Google Patents

A kind of flood control gate arm stagewise attachment structure Download PDF

Info

Publication number
CN104695387B
CN104695387B CN201310663215.7A CN201310663215A CN104695387B CN 104695387 B CN104695387 B CN 104695387B CN 201310663215 A CN201310663215 A CN 201310663215A CN 104695387 B CN104695387 B CN 104695387B
Authority
CN
China
Prior art keywords
gate
support arm
box beam
attachment structure
stagewise
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310663215.7A
Other languages
Chinese (zh)
Other versions
CN104695387A (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Le Aowei Electric Applicance Co Ltd
Original Assignee
Nanjing Le Aowei Electric Applicance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Le Aowei Electric Applicance Co Ltd filed Critical Nanjing Le Aowei Electric Applicance Co Ltd
Priority to CN201310663215.7A priority Critical patent/CN104695387B/en
Publication of CN104695387A publication Critical patent/CN104695387A/en
Application granted granted Critical
Publication of CN104695387B publication Critical patent/CN104695387B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Barrages (AREA)

Abstract

The invention discloses a kind of flood control gate arm stagewise attachment structure, attachment structure is used for connecting gate and support arm, support arm rotates around a fixed pivot, thus driving gate opening/closing, the gate of attachment structure is box typed structure, body structure is internally provided with some outer box beams being parallel to each other and interior box beam, attachment structure is arranged in the end of the outer box beam one group parallel near gate the top and interior box beam at support arm with gate link position, end position is by the outer box beam of fastener for connection and interior box beam, support arm inserts in steel pipe, thus fixing support arm, this invention ensures that the stable and reliable of force transfer system, solve and manufacture the difficult problem installed, ensure that the accuracy of motility that gate and support arm can individually manufacture in factory and building-site assembly location, accelerate the project progress of check gate gate.

Description

A kind of flood control gate arm stagewise attachment structure
Technical field
The present invention relates to flood control check gate gate technical field, particularly relate to a kind of flood control gate arm stagewise attachment structure.
Background technology
The support arm of the gate of existing check gate and the connection of gate are that through mode connects, namely support arm is through a certain position of the door body of gate, thus support arm being fixed in gate door body, this attachment structure needs to destroy the door body of gate, and in the door body of gate, reserve the position of fluting, the intensity of gate door body fluting late gate door body will reduce accordingly, and support arm and the gate door body of applying this kind of structure must complete in a factory, to guarantee that the gate door body after installing has good harmony and integrity, but so strongly limit the progress of check gate gate, in order to accelerate the manufacturing schedule of check gate gate, and improve the intensity of the door body of gate, our unit proposes following solution.
Summary of the invention
In order to overcome above-mentioned the deficiencies in the prior art, the invention provides a kind of flood control gate arm stagewise attachment structure, its object is to accelerate the manufacturing schedule of check gate gate, and improve the intensity of the door body of gate.
The technical solution adopted in the present invention is: a kind of flood control gate arm stagewise attachment structure, attachment structure is used for connecting gate and support arm, support arm rotates around a fixed pivot, thus driving gate opening/closing, the gate of attachment structure is box typed structure, body structure is internally provided with some outer box beams being parallel to each other and interior box beam, attachment structure is arranged on the end of a certain outer box beam one group parallel being positioned at the top and box beam at support arm with gate link position, end position is by the outer box beam of fastener for connection and interior box beam, support arm inserts in steel pipe, thus fixing support arm, the present invention is the intensity of integrity and the high gate door body thereof ensureing gate door body, the end of door body is entered at support arm, take unconventional segmentation bind mode, namely support arm is not passed through door body, but connect with the reinforcement box beam in door body, connect by steel pipe between the box beam of front and back, so namely ensure that the stable and reliable of force transfer system, solve and manufacture the difficult problem installed, ensure that the accuracy of motility that gate and support arm can individually manufacture in factory and building-site assembly location, accelerate the project progress of check gate gate.
Further improvement of the present invention is in that: steel pipe and support arm connecting portion are provided with reinforced support, thus strengthening fixing bonding strength between support arm and gate door body.
Further improvement of the present invention is in that: in order to strengthen the fastness of the attachment structure between support arm and inside and outside box beam, outer box beam, between interior box beam and steel pipe, it is provided with filling concrete, it is additionally provided with reinforced support between the outer box beam of end, interior box beam, and on reinforced support, is filled with filling concrete.
Compared with prior art, the invention has the beneficial effects as follows: the present invention is the intensity of integrity and the high gate door body thereof ensureing gate door body, the end of door body is entered at support arm, take unconventional segmentation bind mode, namely support arm is not passed through door body, but connect with the reinforcement box beam in door body, connect by steel pipe between the box beam of front and back.So namely ensure that the stable and reliable of force transfer system, also largely solve and manufacture the difficult problem installed, ensure that the accuracy of motility that gate and support arm can individually manufacture in factory and building-site assembly location, ensureing on the functional requirement basis of intensity of gate door body, accelerate the manufacturing schedule of check gate gate, save the manufacturing cost of gate door body.
The stagewise attachment structure of the present invention, namely ensure that the stable and reliable of force transfer system, also largely solve and manufacture the difficult problem installed, ensure that the accuracy of motility that gate and support arm can individually manufacture in factory and building-site assembly location, ensureing on the functional requirement basis of intensity of gate door body, accelerate the manufacturing schedule of check gate gate, save the manufacturing cost of gate door body.
Accompanying drawing explanation
Fig. 1 is a kind of flood control with the top view of stagewise connecting support arm.
Detailed description of the invention
In order to deepen the understanding of the present invention, below in conjunction with drawings and Examples, the present invention is further described, and this embodiment is only used for explaining the present invention, protection scope of the present invention is not constituted and limits.
As shown in Figure 1, a kind of flood control gate arm stagewise attachment structure, attachment structure is used for connecting gate and support arm, support arm rotates around a fixed pivot, thus driving gate opening/closing, the gate of attachment structure is box typed structure, body structure is internally provided with some outer box beams being parallel to each other and interior box beam, attachment structure is arranged on the end of a certain outer box beam one group parallel being positioned at the top and box beam at support arm with gate link position, end position is by the outer box beam of fastener for connection and interior box beam, support arm inserts in steel pipe, thus fixing support arm, the present invention is the intensity of integrity and the high gate door body thereof ensureing gate door body, the end of door body is entered at support arm, take unconventional segmentation bind mode, namely support arm is not passed through door body, but connect with the reinforcement box beam in door body, connect by steel pipe between the box beam of front and back, so namely ensure that the stable and reliable of force transfer system, solve and manufacture the difficult problem installed, ensure that the accuracy of motility that gate and support arm can individually manufacture in factory and building-site assembly location, accelerate the project progress of check gate gate.
A kind of flood control gate arm stagewise attachment structure, steel pipe 2 and support arm 6 connecting portion are provided with reinforced support 5, thus strengthening fixing bonding strength between support arm and gate door body.
A kind of flood control gate arm stagewise attachment structure, in order to strengthen the fastness of the attachment structure between support arm and inside and outside box beam, filling concrete 3 it is provided with between outer box beam 1, interior box beam 4 and steel pipe 2, it is additionally provided with reinforced support 7 between the outer box beam 1 at end 8 place, interior box beam 4, and on reinforced support 7, is filled with filling concrete.
The stagewise attachment structure of the present invention, namely ensure that the stable and reliable of force transfer system, also largely solve and manufacture the difficult problem installed, ensure that the accuracy of motility that gate and support arm can individually manufacture in factory and building-site assembly location, ensureing on the functional requirement basis of intensity of gate door body, accelerate the manufacturing schedule of check gate gate, save the manufacturing cost of gate door body.
What embodiments of the invention were announced is preferred embodiment, but is not limited thereto, those of ordinary skill in the art; very easily according to above-described embodiment, understand the spirit of the present invention, and make different amplifications and change; but as long as without departing from the spirit of the present invention, all in protection scope of the present invention.

Claims (3)

1. a flood control gate arm stagewise attachment structure, described attachment structure is used for connecting gate and support arm (6), described support arm (6) rotates around a fixed pivot, thus driving gate opening/closing, described gate is box typed structure, described body structure is internally provided with some outer box beams (1) being parallel to each other and interior box beam (4), it is characterized in that: described attachment structure is arranged in end (8) place of the outer box beam (1) a group parallel near gate the top and interior box beam (4) at support arm (6) with gate link position, described end (8) position connects outer box beam (1) and interior box beam (4) by steel pipe (2), described support arm (6) inserts in steel pipe (2), thus fixing support arm (6);Described steel pipe (2) and support arm (6) connecting portion are provided with reinforced support (5);Filling concrete (3) it is provided with between described outer box beam (1), interior box beam (4) and steel pipe (2).
2. a kind of flood control gate arm stagewise attachment structure according to claim 1, it is characterised in that: it is additionally provided with reinforced support (7) between the outer box beam (1) at described end (8) place, interior box beam (4).
3. a kind of flood control gate arm stagewise attachment structure according to claim 2, it is characterised in that: described reinforced support is filled with filling concrete on (7).
CN201310663215.7A 2013-12-10 2013-12-10 A kind of flood control gate arm stagewise attachment structure Active CN104695387B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310663215.7A CN104695387B (en) 2013-12-10 2013-12-10 A kind of flood control gate arm stagewise attachment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310663215.7A CN104695387B (en) 2013-12-10 2013-12-10 A kind of flood control gate arm stagewise attachment structure

Publications (2)

Publication Number Publication Date
CN104695387A CN104695387A (en) 2015-06-10
CN104695387B true CN104695387B (en) 2016-06-29

Family

ID=53342903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310663215.7A Active CN104695387B (en) 2013-12-10 2013-12-10 A kind of flood control gate arm stagewise attachment structure

Country Status (1)

Country Link
CN (1) CN104695387B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1006583A1 (en) * 1981-08-07 1983-03-23 Ленинградское Отделение Всесоюзного Ордена Ленина Проектно-Изыскательного И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука Method for increasing height of span structure of gate at operating water engineering structures
NL8702047A (en) * 1987-08-31 1989-03-16 Ballast Nedam Beton Water River mouth flood barrier - has two cylinder segment shaped doors, pivoting on vertical shafts anchored in concrete foundation
CN101962945A (en) * 2010-09-15 2011-02-02 中国水利水电第二工程局有限公司 Method for invertedly machining gate flap panel of steel arch-gate
CN202380448U (en) * 2011-12-20 2012-08-15 中国水电顾问集团成都勘测设计研究院 Cambered service gate
CN202730722U (en) * 2012-08-02 2013-02-13 中国水电顾问集团贵阳勘测设计研究院 Main longitudinal beam type support arm frame structure for radial gate
CN203625850U (en) * 2013-12-10 2014-06-04 南京乐奥威电气有限公司 Sectional type connection structure of support arms of flood proof control gate

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1006583A1 (en) * 1981-08-07 1983-03-23 Ленинградское Отделение Всесоюзного Ордена Ленина Проектно-Изыскательного И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука Method for increasing height of span structure of gate at operating water engineering structures
NL8702047A (en) * 1987-08-31 1989-03-16 Ballast Nedam Beton Water River mouth flood barrier - has two cylinder segment shaped doors, pivoting on vertical shafts anchored in concrete foundation
CN101962945A (en) * 2010-09-15 2011-02-02 中国水利水电第二工程局有限公司 Method for invertedly machining gate flap panel of steel arch-gate
CN202380448U (en) * 2011-12-20 2012-08-15 中国水电顾问集团成都勘测设计研究院 Cambered service gate
CN202730722U (en) * 2012-08-02 2013-02-13 中国水电顾问集团贵阳勘测设计研究院 Main longitudinal beam type support arm frame structure for radial gate
CN203625850U (en) * 2013-12-10 2014-06-04 南京乐奥威电气有限公司 Sectional type connection structure of support arms of flood proof control gate

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
京杭运河特种闸-钟楼闸的工程特色;孙永明;《水利规划与设计》;20130731(第7期);第35-38页 *

Also Published As

Publication number Publication date
CN104695387A (en) 2015-06-10

Similar Documents

Publication Publication Date Title
CN204627213U (en) Rear door lock stiffener
CN104695387B (en) A kind of flood control gate arm stagewise attachment structure
CN203625850U (en) Sectional type connection structure of support arms of flood proof control gate
CN202765346U (en) Longitudinal sealing mechanism of continuous packaging machine
CN201834061U (en) A pole for automobile
CN201254928Y (en) Conner reinforcement for door and window
CN207775697U (en) A kind of lattice-type steel truss pylon cable-stayed bridge steel cable anchor system
CN202656836U (en) Novel reinforcing plate for automobile door lock
CN204659406U (en) A kind of side door hinge stiffening plate
CN204184344U (en) ABS electromagnetic valve fixed support and ABS electromagnetic valve mounting structure
CN203032707U (en) Inversion dumper
CN203832201U (en) Hinge reinforcement plate structure for side door
CN203306125U (en) Guide plate structure
CN205768550U (en) Hinge stiffening plate, car door and automobile on a kind of automobile front door
CN202689736U (en) Oil filling port door lock pin, oil filling port door assembly structure and vehicle
CN205936022U (en) Car and automobile door lock reinforcing plate
CN203345048U (en) Dent resisting structure of automobile outside door panel
CN206446419U (en) A kind of skylight reinforcing plate structure
CN209603676U (en) A kind of vehicle door bonnet lock stiffening plate
CN204368155U (en) Railway truck variable section side wall
CN204252774U (en) The labeled door that a kind of door closer is in-built
CN204236467U (en) For the funnel spinal branches support structure of hopper car
CN206171071U (en) Articulated assembly behind left front triangle arm
CN203891719U (en) Sliding plug door of motor train unit
CN203429841U (en) Double-layer vacuum glass plate curtain wall fixing structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant