CN104695316B - Beam lattice system lower bearing arch bridge - Google Patents

Beam lattice system lower bearing arch bridge Download PDF

Info

Publication number
CN104695316B
CN104695316B CN201510129554.6A CN201510129554A CN104695316B CN 104695316 B CN104695316 B CN 104695316B CN 201510129554 A CN201510129554 A CN 201510129554A CN 104695316 B CN104695316 B CN 104695316B
Authority
CN
China
Prior art keywords
limit
arch
bridge deck
gridiron
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510129554.6A
Other languages
Chinese (zh)
Other versions
CN104695316A (en
Inventor
刘孝辉
王丰华
刘亢
易辉
于长皓
王毅力
吴娇媚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Original Assignee
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Chongqing Communications Research and Design Institute Co Ltd filed Critical China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority to CN201510129554.6A priority Critical patent/CN104695316B/en
Publication of CN104695316A publication Critical patent/CN104695316A/en
Application granted granted Critical
Publication of CN104695316B publication Critical patent/CN104695316B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of beam lattice system lower bearing arch bridge, including arch springing, arch rib, suspension rod and bridge deck, described arch rib connects adjacent two arch springings, described bridge deck is supported on arch springing, described suspension rod top is hung under arch rib, bottom is hung in bridge deck, described bridge deck include gridiron and be positioned on gridiron and with its one moulding by casting floorings, described gridiron includes Liang Ge limit, limit crossbeam, two limit longerons, it is distributed in the multiple middle cross beams between two limit crossbeams and the multiple middle longeron being distributed between two limit longerons, the two ends of described limit crossbeam and middle cross beam are provided with the suspension centre of suspension rod to deserving to be called.Bridge system structure uses the gridiron that beam in length and breadth has just connect, and has rigidity longeron to be connected between suspension rod and each suspension centre of bridge deck, enables the common uniform stressed of each suspension centre, improve the anti-fatigue performance of structure, primary structure member is whole gridiron, makes structure stress uniform, and globality is good.

Description

Beam lattice system lower bearing arch bridge
Technical field
The present invention relates to a kind of arch bridge, particularly to a kind of beam lattice system lower bearing arch bridge.
Background technology
Beam lattice system lower bearing arch bridge bridge deck is divided into integral main girder form and floating form.Integral main girder form is main For Beam-Arch Combined Bridge for Its, bridge system structure is generally box girder;Floating form bridge deck, downrod lower end Hanging crossbeam, floorings freely-supported or be supported in continuously on crossbeam, is the main bridge deck shape of beam lattice system lower bearing arch bridge Formula.
Shortcoming: the bridge deck of floating system during long-term loading and unloading, suspension rod, bridge system structure etc. due to Fatigue effect, live loading reverse cyclic loadings, cause suspension rod fatigue rupture to ultimately cause Hangers failure.
Summary of the invention
In view of this, the technical problem to be solved in the present invention is to provide a kind of beam lattice system lower bearing arch bridge,.
The beam lattice system lower bearing arch bridge of the present invention, including arch springing, arch rib, suspension rod and bridge deck, described arch rib is even Connecing adjacent two arch springings, described bridge deck is supported on arch springing, and described suspension rod top is hung under arch rib, and bottom is hung In bridge deck, described bridge deck include gridiron and be positioned on gridiron and with its one moulding by casting Floorings, described gridiron includes Liang Ge limit, limit crossbeam, two limit longerons, is distributed between two limit crossbeams Multiple middle cross beams and the multiple middle longeron that is distributed between two limit longerons, described limit crossbeam and the two of middle cross beam End is to deserving to be called the suspension centre being provided with suspension rod.
Further, the two ends of wherein the middle cross beam extend out to the connection of the outside of floorings, described suspension rod and bridge deck Point is positioned at middle cross beam and extend out in the part outside floorings.
Further, in described limit crossbeam, limit longeron, middle cross beam and middle longeron, it is equipped with I-steel reinforcing bar, described It is bolted between limit crossbeam, limit longeron, middle cross beam and the I-steel reinforcing bar of middle longeron intersection.
Beneficial effects of the present invention: the beam lattice system lower bearing arch bridge of the present invention, including arch springing, arch rib, suspension rod and Bridge deck, described arch rib connects adjacent two arch springings, and described bridge deck is supported on arch springing, described suspension rod top Hanging under arch rib, bottom is hung in bridge deck, and described bridge deck includes gridiron and is positioned on gridiron also With the floorings of its one moulding by casting, described gridiron includes Liang Ge limit, limit crossbeam, two limit longerons, all It is distributed in the multiple middle cross beams between two limit crossbeams and the multiple middle longeron being distributed between two limit longerons, described The two ends of limit crossbeam and middle cross beam are provided with the suspension centre of suspension rod to deserving to be called.Bridge system structure uses the beam that beam in length and breadth has just connect Lattice structure, has rigidity longeron to be connected between suspension rod and each suspension centre of bridge deck, enable each suspension centre to be the most uniformly subject to Power, improves the anti-fatigue performance of structure, and primary structure member is whole gridiron, makes structure stress uniform, overall Property is good.
Accompanying drawing explanation
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
Fig. 1 is the elevation of the present invention;
Fig. 2 is the partial top view (omission floorings) of the present invention.
Detailed description of the invention
Below with reference to accompanying drawing, the present invention is described in detail, as shown in the figure: holds under the beam lattice system of the present embodiment Formula arch bridge, including arch springing 1, arch rib 2, suspension rod 3 and bridge deck 4, described arch rib 2 connects adjacent two arches Foot, described suspension rod 3 top hangs in arch rib 2 times, and bottom is hung in bridge deck 4, and described bridge deck includes beam lattice Structure 41 and be positioned on gridiron and with the floorings 42 of its one moulding by casting, described gridiron 41 Including 411, two limit longerons 412 of Liang Ge limit, limit crossbeam, multiple middle cross beams of being distributed between two limit crossbeams 413 and the multiple middle longeron 414 that is distributed between two limit longerons, the two ends of said two limit crossbeam 411 are propped up Support is on arch springing 1.Bridge system structure uses each suspension centre of the gridiron that beam in length and breadth has just connect, suspension rod and bridge deck Between have rigidity longeron (limit longeron and middle longeron) to connect, enable the common uniform stressed of each suspension centre, improve knot The anti-fatigue performance of structure, primary structure member is whole gridiron, makes structure stress uniform, and globality is good.
As the further improvement of technique scheme, the two ends of wherein the middle cross beam 413 extend out to floorings 42 Outside, described suspension rod 3 is positioned at, with the junction point 5 of bridge deck, the part that middle cross beam 413 extend out to outside floorings On.The bottom suspension centre of suspension rod 3 i.e. junction point 5 with bridge deck is positioned on middle cross beam 413 so that whole suspension rod 3 and bridge deck entirety stress more equalize, even if after the fracture of indivedual suspension rod 3, bridge deck entirety remains to by very well Pulling force control, other suspension rods also will not rupture because of the tilting moment by bridge deck.
Further, it is equipped with in described limit crossbeam 411, limit longeron 412, middle cross beam 413 and middle longeron 414 I-steel reinforcing bar 6, described limit crossbeam 411, limit longeron 412, middle cross beam 413 and middle longeron 414 intersection I-steel reinforcing bar between be bolted.First each I-steel reinforcing bar 6 is got up by bolt-connection, shape Become beam trellis, then with floorings in one concreting, easy construction, it is simple to pour, because I-steel Reinforcing bar can improve concrete formation efficiency.Meanwhile, I-steel reinforcing bar can improve the rigidity of gridiron, makes Structure stress is uniform.
Finally illustrating, above example is only in order to illustrate technical scheme and unrestricted, although ginseng According to preferred embodiment, the present invention is described in detail, it will be understood by those within the art that, permissible Technical scheme is modified or equivalent, without deviating from technical solution of the present invention objective and Scope, it all should be contained in the middle of scope of the presently claimed invention.

Claims (2)

1. a beam lattice system lower bearing arch bridge, including arch springing (1), arch rib (2), suspension rod (3) and bridge deck (4), described arch rib (2) connects adjacent two arch springings, and described bridge deck (4) is supported on arch springing (1), Described suspension rod (3) top is hung under arch rib (2), and bottom is hung in bridge deck (4), described bridge deck bag Include gridiron (41) and be positioned on gridiron and with the floorings (42) of one body concrete moulding by casting, Described gridiron (41) includes Liang Ge limit, limit crossbeam (411), two limit longerons (412), is distributed in two Multiple middle cross beams (413) between the crossbeam of limit and the multiple middle longeron (414) being distributed between two limit longerons, The two ends on said two limit crossbeam (411) are supported on arch springing (1), it is characterised in that: wherein the middle cross beam (413) Two ends extend out to the outside of floorings (42), described suspension rod (3) is positioned at the junction point (5) of bridge deck Middle cross beam (413) extend out in the part outside floorings.
Beam the most according to claim 1 lattice system lower bearing arch bridge, it is characterised in that: described limit crossbeam (411), I-steel reinforcing bar (6) it is equipped with in limit longeron (412), middle cross beam (413) and middle longeron (414), described Limit crossbeam (411), limit longeron (412), middle cross beam (413) and the I-steel of middle longeron (414) intersection It is bolted between reinforcing bar.
CN201510129554.6A 2015-03-24 2015-03-24 Beam lattice system lower bearing arch bridge Expired - Fee Related CN104695316B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510129554.6A CN104695316B (en) 2015-03-24 2015-03-24 Beam lattice system lower bearing arch bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510129554.6A CN104695316B (en) 2015-03-24 2015-03-24 Beam lattice system lower bearing arch bridge

Publications (2)

Publication Number Publication Date
CN104695316A CN104695316A (en) 2015-06-10
CN104695316B true CN104695316B (en) 2016-10-05

Family

ID=53342832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510129554.6A Expired - Fee Related CN104695316B (en) 2015-03-24 2015-03-24 Beam lattice system lower bearing arch bridge

Country Status (1)

Country Link
CN (1) CN104695316B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401513A (en) * 2015-10-22 2016-03-16 绍兴文理学院 Simply supported girder bridge structure formed by combining I-shaped steel girders and hybrid fiber concrete bridge decks
CN111560834B (en) * 2020-04-30 2022-03-15 中交路桥华南工程有限公司 Arch bridge steel longitudinal and transverse beam system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5713747B2 (en) * 2010-03-24 2015-05-07 戸田建設株式会社 Three-dimensional viaduct structure and its construction method
CN201671050U (en) * 2010-05-19 2010-12-15 中铁二十局集团有限公司 Through tie bar rigid frame arch bridge of inter-city express railway
CN202347430U (en) * 2011-10-18 2012-07-25 中铁大桥勘测设计院集团有限公司 Suspender anchoring structure for double-deck arch bridge
CN104358208B (en) * 2014-11-05 2016-05-11 中交第一公路勘察设计研究院有限公司 Without longeron half-through arch bridge safe early warning girder construction and method for early warning thereof
CN204509973U (en) * 2015-03-24 2015-07-29 招商局重庆交通科研设计院有限公司 Novel beam lattice system lower bearing arch bridge

Also Published As

Publication number Publication date
CN104695316A (en) 2015-06-10

Similar Documents

Publication Publication Date Title
WO2012123067A8 (en) Wall module for building a structure and associated structure
CN104746883B (en) A kind of arcuate space truss lifts construction method of installation with three machines
CN105951610A (en) Support structure assisting in cantilever beam construction and construction method
CN104695316B (en) Beam lattice system lower bearing arch bridge
CN104727222A (en) Separated steel and concrete combined cable tower anchorage zone structure
CN109736206A (en) Wavelike steel webplate continuous bridge end bay closes up cast-in-place support structure and construction method
CN104196152B (en) Connecting structure for steel coupling beam and concrete wall
CN206233600U (en) Overlength super large beams of concrete installs the apparatus capable of fluctuating of reinforcing bar
CN201802072U (en) Stress clamping device and system
CN204509973U (en) Novel beam lattice system lower bearing arch bridge
CN104695317A (en) Multi-span rigid frame bowstring arch bridge
CN206625215U (en) A kind of lowering device for reinforcing cage of drilled pile
CN203546625U (en) Replacing device of tied-arch bridge rigidity suspender
CN107806207A (en) The assembled architecture wall and building that steel construction is combined with concrete structure
CN107503555A (en) A kind of composite material electric pole and its assembly and disassembly method
CN202519589U (en) Rainproof shed for movable scaffolding system
CN205296017U (en) Anticollision barrier template moving as a whole device
CN202064359U (en) Crossbeam wet-joint overhanging construction device
CN204509972U (en) Multispan rigid framed arch
US1379625A (en) Reinforced concrete construction
CN105971270A (en) Sliding formwork of vertical grain storage silo
CN207619815U (en) A kind of deck type steel suspension bridge structure
CN205894422U (en) Fixed knot who fills case constructs
CN206591419U (en) A kind of large span stayed-cable bridge
JP5737578B2 (en) Construction method of suspended structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Liu Xiaohui

Inventor after: Wang Fenghua

Inventor after: Liu Kang

Inventor after: Yi Hui

Inventor after: Yu Changhao

Inventor after: Wang Yili

Inventor after: Wu Jiaomei

Inventor before: Liu Xiaohui

Inventor before: Zhang Changqing

Inventor before: Yi Hui

Inventor before: Li Jun

Inventor before: Su Jiannan

Inventor before: Gan Lu

Inventor before: Wang Yili

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161005

Termination date: 20190324