CN104679541A - Train network control system and application downloading method - Google Patents
Train network control system and application downloading method Download PDFInfo
- Publication number
- CN104679541A CN104679541A CN201310629406.1A CN201310629406A CN104679541A CN 104679541 A CN104679541 A CN 104679541A CN 201310629406 A CN201310629406 A CN 201310629406A CN 104679541 A CN104679541 A CN 104679541A
- Authority
- CN
- China
- Prior art keywords
- download
- electrical control
- equipment
- control unit
- download command
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention provides a train network control system and an application downloading method. The application downloading method comprises that a loading device transmits a downloading instruction to a central control unit; then the central control unit transmits the downloading instruction to an electric control device indicated by the downloading instruction; when receiving the transmitted downloading instruction, the electric control device downloads a first application from a downloading device via the central control unit. Therefore, all electric control devices can download from the downloading device through the central control unit, and debugging maintenance personnel can save a process of preparing downloading cables applicable to various application downloading interfaces and downloading applications in positions where the electric control devices are located, and further the application downloading efficiency can be improved.
Description
Technical field
The present invention relates to the communication technology, particularly relate to a kind of train network control system and application program method for down loading.
Background technology
Train network control system (Train Control And Monitor System, TCMS) is often applied in the trains such as locomotive, subway, light rail, motor train unit.Train network control system comprises electrical control equipment, and central control unit (Central Control Unit, CCU).
In prior art, although above-mentioned electrical control equipment often has application program download interface, but because each electrical control equipment is distributed in the different parts of train, have at roof, have in Electric cabinet, have below train floor, and the application program download interface of each electrical control equipment is also different, therefore, when above-mentioned electrical control equipment needs down load application program, not only need debugging maintenance personnel download equipment to be moved to each electrical control equipment position and carry out application program download, but also need each to be adapted to the download cable of different application download interface, by download equipment with electrical control equipment to being connected, therefore, the efficiency that application program is downloaded is lower.
Summary of the invention
The invention provides a kind of train network control system and application program method for down loading, for improving the efficiency that application program is downloaded.
One aspect of the present invention is to provide a kind of train network control system, and described train network control system comprises central control unit and at least one electrical control equipment, and described train network control system, also comprises:
Download equipment, is connected with described central control unit, and for sending download command to described central control unit, described download command is used to indicate the first application software that the storage of described download equipment this locality downloaded by electrical control equipment;
Described central control unit, is connected by bus, for forwarding described download command to the electrical control equipment indicated by described download command between each described electrical control equipment in described central control unit and at least one electrical control equipment described;
Described electrical control equipment, for when receiving described download command, downloads described first application software by described central control unit from described download equipment.
Another aspect of the present invention is to provide a kind of application program method for down loading, comprising:
Download equipment sends download command to central control unit, and described download command is used to indicate the first application software that the storage of described download equipment this locality downloaded by electrical control equipment;
Described central control unit forwards described download command to the electrical control equipment indicated by described download command;
Described electrical control equipment, when receiving described download command, downloads described first application software by described central control unit from described download equipment.
Train network control system provided by the invention and application program method for down loading, download command is sent to central control unit by download equipment, and then central control unit forwards this download command to the electrical control equipment indicated by download command, electrical control equipment is when receiving the download command of this forwarding, the first application software is downloaded from download equipment by central control unit, thus achieve each electrical control equipment and all downloaded from download equipment by central control unit, avoid in prior art need debugging maintenance personnel to prepare download cable that each is adapted to different application download interface, the process of application program download is carried out to each electrical control equipment position, improve application program download efficiency.
Accompanying drawing explanation
The structural representation of the train network control system that Fig. 1 provides for one embodiment of the invention;
The structural representation of the central control unit that Fig. 2 provides for another embodiment of the present invention;
The structural representation of the electrical control equipment that Fig. 3 provides for another embodiment of the present invention;
The schematic flow sheet of the application program method for down loading that Fig. 4 provides for one embodiment of the invention.
Embodiment
The structural representation of the train network control system that Fig. 1 provides for one embodiment of the invention, as shown in Figure 1, comprise: central control unit 11, at least one electrical control equipment 12 and download equipment 13, central control unit 11 is connected with download equipment 13, is connected between central control unit 11 and each electrical control equipment 12 by bus.
Download equipment 13, for sending download command to described central control unit 11, described download command is used to indicate the first application software that the storage of described download equipment 13 this locality downloaded by electrical control equipment 12.
Wherein, download equipment 13 can be portable notebook computer.
Central control unit 11, for forwarding described download command to the electrical control equipment 12 indicated by download command.
Concrete, described download command resolved by central control unit 11, obtains the physical address of the described electrical control equipment entrained by download command, according to the physical address of described electrical control equipment, forwards described download command to described electrical control equipment.
Electrical control equipment 12, for when receiving described download command, downloads described first application software by described central control unit 11 from described download equipment 13.
Electrical control equipment 12 specifically can be traction control unit (Traction Control Unit, TCU), brak control unit (Brake Control Unit, BCU), train data recorder (Event Record Module, ERM), Auxiliary converter control unit (Auxiliary Control Unit, ACU), train broadcasting system (Public Address, PA), pyrotechnics warning system (Fire Alarm System, FAS), heating and ventilation and air-conditioning system (Heating Ventilating And Air Conditioning, HVAC), train automatic controlling system (Automatic Train Control, ATC), door control unit (Door Control Unit, DCU), man-machine interaction (Human Machine Interface, and/or remote input output module (Remote Input Output Module HMI), RIOM).
Further, connected by bus between central control unit 11 and electrical control equipment 12, this bus comprises: Ethernet, controller area network, wired train bus (Wire Train Bus, WTB) at least one, in (World Factory Instrumentation Protocol, WorldFIP) and double-unit traction controller.Be connected by download cable between download equipment 13 with central control unit 11, the interface at these download cable two ends respectively with the interface of download equipment 13 and central control unit 11 to mating.
In the present embodiment, download command is sent to central control unit by download equipment, and then central control unit forwards this download command to the electrical control equipment indicated by download command, electrical control equipment is when receiving the download command of this forwarding, the first application software is downloaded from download equipment by central control unit, thus achieve each electrical control equipment and all downloaded from download equipment by central control unit, avoid in prior art need debugging maintenance personnel to prepare download cable that each is adapted to different application download interface, the process of application program download is carried out to each electrical control equipment position, improve application program download efficiency.
The structural representation of the central control unit that Fig. 2 provides for another embodiment of the present invention, as shown in Figure 2, on the basis of a upper embodiment, the central control unit 11 in the present embodiment, comprises further: interface module 211 and forwarding module 212.
Interface module 211, for receiving described download command.
Forwarding module 212, is connected with described interface module 211, for forwarding described download command to the electrical control equipment indicated by described download command, downloads described first application software to make the electrical control equipment indicated by described download command.
Further, the forwarding module 212 in central control unit 11, comprising: analyzing sub-module 2121 and transmission submodule 2122.
Analyzing sub-module 2121, for resolving described download command, obtains the physical address of the described electrical control equipment entrained by described download command.
Send submodule 2122, be connected with described analyzing sub-module 2121, according to the physical address of described electrical control equipment 12, forward described download command to described electrical control equipment 12.
Further, the structural representation of the electrical control equipment that Fig. 3 provides for another embodiment of the present invention, as shown in Figure 3, electrical control equipment 12 comprises:
Receiver module 321, for receiving the download command that described central control unit 11 forwards;
Download module 322, is connected with described receiver module 321, after receiving described download command, downloads described first application software by central control unit 11 for receiver module 321.
Further, electrical control equipment 12, also comprises: memory module 323, installation module 324 and Unload module 325.
Memory module 323, is connected with described download module 322, for storing described first application software that described download module 322 is downloaded;
Installation module 324, is connected with described memory module 323, for installing the first application software stored in described memory module 323.
Unload module 325, is connected with described installation module 324, before installing described first application software, unloads mounted second application software for described installation module 324.
In the present embodiment, download command is sent to central control unit by download equipment, and then central control unit forwards this download command to the electrical control equipment indicated by download command, electrical control equipment is when receiving the download command of this forwarding, the first application software is downloaded from download equipment by central control unit, thus achieve each electrical control equipment and all downloaded from download equipment by central control unit, avoid in prior art need debugging maintenance personnel to prepare download cable that each is adapted to different application download interface, the process of application program download is carried out to each electrical control equipment position, improve application program download efficiency.
The schematic flow sheet of the application program method for down loading that Fig. 4 provides for one embodiment of the invention, as shown in Figure 4, comprising:
401, download equipment sends download command to central control unit.
Wherein, download command is used to indicate the first application software that the storage of described download equipment this locality downloaded by electrical control equipment.
402, central control unit forwards download command to the electrical control equipment indicated by download command.
Optionally, download command resolved by central control unit, obtains the physical address of the electrical control equipment entrained by download command, according to the physical address of described electrical control equipment, forwards described download command to described electrical control equipment.
403, electrical control equipment is when receiving described download command, downloads the first application software by described central control unit from download equipment.
Further, electrical control equipment, when receiving described download command, is downloaded after described first application software from download equipment by described central control unit, is also comprised: electrical control equipment stores described first application software downloaded; Described first application software stored is installed.
Further, before described first application software stored installed by electrical control equipment, mounted second application software of electrical control equipment unloading.
In the present embodiment, download command is sent to central control unit by download equipment, and then central control unit forwards this download command to the electrical control equipment indicated by download command, electrical control equipment is when receiving the download command of this forwarding, the first application software is downloaded from download equipment by central control unit, thus achieve each electrical control equipment and all downloaded from download equipment by central control unit, avoid in prior art need debugging maintenance personnel to prepare download cable that each is adapted to different application download interface, the process of application program download is carried out to each electrical control equipment position, improve application program download efficiency.
One of ordinary skill in the art will appreciate that: all or part of step realizing above-mentioned each embodiment of the method can have been come by the hardware that programmed instruction is relevant.Aforesaid program can be stored in a computer read/write memory medium.This program, when performing, performs the step comprising above-mentioned each embodiment of the method; And aforesaid storage medium comprises: ROM, RAM, magnetic disc or CD etc. various can be program code stored medium.
Last it is noted that above each embodiment is only in order to illustrate technical scheme of the present invention, be not intended to limit; Although with reference to foregoing embodiments to invention has been detailed description, those of ordinary skill in the art is to be understood that: it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein some or all of technical characteristic; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the scope of various embodiments of the present invention technical scheme.
Claims (10)
1. a train network control system, described train network control system comprises central control unit and at least one electrical control equipment, and it is characterized in that, described train network control system, also comprises:
Download equipment, is connected with described central control unit, and for sending download command to described central control unit, described download command is used to indicate the first application software that the storage of described download equipment this locality downloaded by electrical control equipment;
Described central control unit, and connected by bus between each described electrical control equipment, for forwarding described download command to the electrical control equipment indicated by described download command;
Described electrical control equipment, for when receiving described download command, downloads described first application software by described central control unit from described download equipment.
2. train network control system according to claim 1, is characterized in that, described central control unit, comprising:
Interface module, for receiving described download command;
Forwarding module, is connected with described interface module, for forwarding described download command to the electrical control equipment indicated by described download command, downloads described first application software to make the electrical control equipment indicated by described download command.
3. train network control system according to claim 2, is characterized in that, described forwarding module, comprising:
Analyzing sub-module, for resolving described download command, obtains the physical address of the described electrical control equipment entrained by described download command;
Send submodule, be connected with described analyzing sub-module, according to the physical address of described electrical control equipment, forward described download command to described electrical control equipment.
4. train network control system according to claim 1, is characterized in that, described electrical control equipment, comprising:
Receiver module, for receiving the download command that described central control unit forwards;
Download module, is connected with described receiver module, after receiving described download command, downloads described first application software by described central control unit from described download equipment for described receiver module.
5. train network control system according to claim 4, is characterized in that, described electrical control equipment, also comprises:
Memory module, is connected with described download module, for storing described first application software that described download module is downloaded;
Installation module, is connected with described memory module, for installing the first application software stored in described memory module.
Unload module, is connected with described installation module, before installing described first application software, unloads mounted second application software for described installation module.
6. the train network control system according to any one of claim 1-5, it is characterized in that described bus, comprising: at least one in Ethernet, controller area network, wired train bus WTB, world's factory industrial protocol WorldFIP and double-unit traction controller.
7. an application program method for down loading, is characterized in that, comprising:
Download equipment sends download command to central control unit, and described download command is used to indicate the first application software that the storage of described download equipment this locality downloaded by electrical control equipment;
Described central control unit forwards described download command to the electrical control equipment indicated by described download command;
Described electrical control equipment, when receiving described download command, downloads described first application software by described central control unit from described download equipment.
8. application program method for down loading according to claim 7, is characterized in that, described central control unit forwards described download command to the electrical control equipment indicated by described download command, comprising:
Described download command resolved by described central control unit, obtains the physical address of the described electrical control equipment entrained by described download command;
Described central control unit, according to the physical address of described electrical control equipment, forwards described download command to described electrical control equipment.
9. application program method for down loading according to claim 7, is characterized in that, described electrical control equipment, when receiving described download command, by described central control unit from after described download equipment downloads described first application software, also comprises:
Described electrical control equipment stores described first application software downloaded;
Described first application software stored installed by described electrical control equipment.
10. application program method for down loading according to claim 9, is characterized in that, described electrical control equipment also comprises before installing described first application software stored:
Mounted second application software of described electrical control equipment unloading.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310629406.1A CN104679541B (en) | 2013-11-28 | 2013-11-28 | Train network control system and application program method for down loading |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310629406.1A CN104679541B (en) | 2013-11-28 | 2013-11-28 | Train network control system and application program method for down loading |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104679541A true CN104679541A (en) | 2015-06-03 |
CN104679541B CN104679541B (en) | 2018-05-29 |
Family
ID=53314646
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310629406.1A Active CN104679541B (en) | 2013-11-28 | 2013-11-28 | Train network control system and application program method for down loading |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104679541B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070118617A1 (en) * | 2005-11-23 | 2007-05-24 | Jangwon Lee | Method for delivery of software upgrade notification to devices in communication systems |
CN101094165A (en) * | 2006-06-19 | 2007-12-26 | 大唐移动通信设备有限公司 | Method, system, and device for controlling implementation of data transmission in local area network |
CN101193010A (en) * | 2006-11-22 | 2008-06-04 | 乐金电子(昆山)电脑有限公司 | Simulated board firmware upgrade method for home intelligent network system |
CN201919157U (en) * | 2010-11-19 | 2011-08-03 | 广东必达保安系统有限公司 | Remote upgrade device for vehicle |
CN103136001A (en) * | 2011-11-25 | 2013-06-05 | 中国北车股份有限公司大连电力牵引研发中心 | Vehicle-mounted device program updating device and program updating method |
-
2013
- 2013-11-28 CN CN201310629406.1A patent/CN104679541B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070118617A1 (en) * | 2005-11-23 | 2007-05-24 | Jangwon Lee | Method for delivery of software upgrade notification to devices in communication systems |
CN101094165A (en) * | 2006-06-19 | 2007-12-26 | 大唐移动通信设备有限公司 | Method, system, and device for controlling implementation of data transmission in local area network |
CN101193010A (en) * | 2006-11-22 | 2008-06-04 | 乐金电子(昆山)电脑有限公司 | Simulated board firmware upgrade method for home intelligent network system |
CN201919157U (en) * | 2010-11-19 | 2011-08-03 | 广东必达保安系统有限公司 | Remote upgrade device for vehicle |
CN103136001A (en) * | 2011-11-25 | 2013-06-05 | 中国北车股份有限公司大连电力牵引研发中心 | Vehicle-mounted device program updating device and program updating method |
Also Published As
Publication number | Publication date |
---|---|
CN104679541B (en) | 2018-05-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104676822A (en) | Method and device for controlling multi-split air-conditioning system | |
WO2007121098A1 (en) | Method, system, and computer software code for automated establishment of a distributed power train | |
JP5598491B2 (en) | Vehicle data output device | |
CN110225123A (en) | A kind of Vehicular data recording method and apparatus | |
CN103112459B (en) | Locomotive control device, system and method | |
CN104613588B (en) | A kind of air conditioner wireless network-building method and device | |
CN104613590A (en) | Air-conditioning wireless networking method | |
CN104477216A (en) | Vehicle fire linkage method and device based on track traffic full-automatic driving system | |
CN104613591B (en) | A kind of air conditioner wireless network-building method | |
CN104354725A (en) | Rail transit vehicle scheduling system | |
CN102407856A (en) | Hot backup redundancy method and hot backup redundancy system of train central control unit | |
CN102991536B (en) | Speed per hour 250km/h motor train unit train network control system | |
CN103781691A (en) | Centralized control station computer | |
CN109305192A (en) | The operation method of train grade control unit VCU-M, train network control system and VCU-M | |
CN203204333U (en) | Train network monitoring system-based auxiliary power supply simulation debugging system | |
CN203739890U (en) | Train network control system | |
CN105444333A (en) | Central air conditioner control system | |
CN104679541A (en) | Train network control system and application downloading method | |
CN104670247A (en) | Train network control system | |
KR101649659B1 (en) | Facility control apparatus, building automation system comprising the same and method for controlling facilities | |
CN104848472A (en) | Air conditioner monitoring system, OPC server for air conditioner and OPC connecting method | |
JP6513444B2 (en) | Communication network repeater, controller with LON communication function, and communication network relay method | |
KR102637189B1 (en) | Solar panel monitoring system, inverter including the same, and solar panel with solar panel monitoring device and monitoring method | |
CN204460610U (en) | The tele-control system of air energy air conditioner central air-conditioning | |
CN105323273A (en) | Method, apparatus and system for controlling energy consumption monitoring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 116045 Liaoning province Dalian City Lushun Economic Development Zone No. 1 North Street, Hao Yang Applicant after: CRRC DALIAN ELECTRIC TRACTION R & D CENTER CO., LTD. Address before: 116045 Liaoning province Dalian City Lushun Economic Development Zone No. 1 North Street, Hao Yang Applicant before: Co., Ltd of Bei Che Dalian Electric Traction R & D Center |
|
COR | Change of bibliographic data | ||
GR01 | Patent grant | ||
GR01 | Patent grant |