CN104675404A - 地铁暗挖隧道横通道进入正线施工方法 - Google Patents

地铁暗挖隧道横通道进入正线施工方法 Download PDF

Info

Publication number
CN104675404A
CN104675404A CN201410804598.XA CN201410804598A CN104675404A CN 104675404 A CN104675404 A CN 104675404A CN 201410804598 A CN201410804598 A CN 201410804598A CN 104675404 A CN104675404 A CN 104675404A
Authority
CN
China
Prior art keywords
main track
way
transverse passage
portal
steel frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410804598.XA
Other languages
English (en)
Inventor
周帅
唐勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201410804598.XA priority Critical patent/CN104675404A/zh
Publication of CN104675404A publication Critical patent/CN104675404A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明公开了一种地铁暗挖隧道横通道进入正线施工方法,涉及地铁隧道施工领域,由以下顺次步骤组成:①测量放线,在横通道侧墙上放处正线洞门位置。②在正线洞门位置安装格栅钢架,在格栅钢架内拱部打设超前小导管。③在正线洞门外的侧墙上布置锚管和双层钢筋网。④将超前小导管及锚管注浆,并与双层钢筋网片焊接为一体。⑤喷射混凝土,形成支撑墙。与现有的相比,本发明保护的地铁暗挖隧道横通道进入正线施工方法可以充分合理的利用现有的成熟施工手段,方便快速施工。

Description

地铁暗挖隧道横通道进入正线施工方法
技术领域
本发明涉及地铁隧道施工领域,特别涉及一种地铁暗挖隧道横通道进入正线施工方法。
背景技术
地铁矿山法暗挖隧道通过竖井开挖横通道,再在已经施做初期支护的横通道内开挖正线隧道,因此横通道内面临多次开挖,应力转换复杂,影响施工安全。
发明内容
本发明的目的就在于提供一种地铁暗挖隧道横通道进入正线施工方法,该地铁暗挖隧道横通道进入正线施工方法可以充分合理的利用现有的成熟施工手段,方便快速施工。
本发明的技术方案是:一种地铁暗挖隧道横通道进入正线施工方法,由以下顺次步骤组成:
①测量放线,在横通道侧墙上放处正线洞门位置;
②在正线洞门位置安装格栅钢架,在格栅钢架内拱部打设超前小导管;
③在正线洞门外的侧墙上布置锚管和双层钢筋网;
④将超前小导管及锚管注浆,并与双层钢筋网片焊接为一体;
⑤喷射混凝土,形成支撑墙。
与现有技术相比,本发明的有益效果在于:
本发明通过套拱及超前小导管注浆,有效确保正线马头门开挖安全,通过锚管钢筋网喷射混凝土支撑墙,可以更好的代替临时钢架支撑,通过边墙锚管及注浆可有效抑制横通道内净空收敛。
本发明由锚管钢筋网喷射混凝土支撑墙后可以充分合理的利用现有的成熟施工手段,方便快速施工。
本发明采用钢筋网喷射混凝土则可以保证和横通道初期支护结构全面接触受力,受力非常合理。
本发明有效抑制围岩变形,打入横通道与正线隧道外侧围岩内的锚管可以起到土钉作用,提高围岩自稳能力,有效抑制围岩变形。
附图说明
图1是本发明施工方法施工后形成的横道通支撑构件示意图。
具体实施方式
下面将结合附图对本发明作进一步说明。
一种地铁暗挖隧道横通道进入正线施工方法,由以下顺次步骤组成:
①测量放线,在横通道侧墙上正线洞门位置测放出正线洞门开挖轮廓线。
②在正线洞门位置安装格栅钢架,在格栅钢架内拱部打设超前小导管。
③在正线洞门外的侧墙上布置锚管和双层钢筋网。
④将超前小导管及锚管注浆,并与双层钢筋网片焊接为一体。
⑤喷射混凝土,形成支撑墙。
图1为上述施工方法施工后形成的横道通支撑构件,该横道通支撑构件由上横通道洞门初期支护结构1、下横通道洞门初期支护结构2、后上洞门型钢钢架3、前上洞门型钢钢架4、后横通道初期支护结构7、前横通道初期支护结构8、后支撑墙9、前支撑墙10、后下洞门型钢钢架5和前下洞门型钢钢架6组成。
后支撑墙9与后横通道初期支护结构7相连,前支撑墙10与前横通道初期支护结构8相连,上横通道洞门初期支护结构1和下横通道洞门初期支护结构2分别设置在后横通道初期支护结构7和前横通道初期支护结构8上方和下方,后上洞门型钢钢架3设置在上横通道洞门初期支护结构1和后横通道初期支护结构7中间,前上洞门型钢钢架4设置在4上横通道洞门初期支护结构1和前横通道初期支护结构8中间,后下洞门型钢钢架5设置在下横通道洞门初期支护结构2和后横通道初期支护结构7中间,前下洞门型钢钢架6设置在下横通道洞门初期支护结构2和前横通道初期支护结构8中间。
后支撑墙9为混凝土后支撑墙,前支撑墙为混凝土前支撑墙。
临时支撑构件还包括后上格栅钢架套拱11、前上格栅钢架套拱12、后下格栅钢架套拱13和前下格栅钢架套拱14。后上格栅钢架套拱11设置在上横通道洞门初期支护结构1与后支撑墙9之间,前上格栅钢架套拱12设置在上横通道洞门初期支护结构1与前支撑墙10之间,后下格栅钢架套拱13设置在下横通道洞门初期支护结构2与后支撑墙9之间,前下格栅钢架套拱14设置在下横通道洞门初期支护结构2与前支撑墙10之间。
后横通道初期支护结构7和前横通道初期支护结构8内分别设置有锚管15。

Claims (2)

1.一种地铁暗挖隧道横通道进入正线施工方法,由以下顺次步骤组成:
①测量放线,在横通道侧墙上放处正线洞门位置;
②在正线洞门位置安装格栅钢架,在格栅钢架内拱部打设超前小导管;
③在正线洞门外的侧墙上布置锚管和双层钢筋网;
④将超前小导管及锚管注浆,并与双层钢筋网片焊接为一体;
⑤喷射混凝土,形成支撑墙。
2.根据权利要求1所述的地铁暗挖隧道横通道进入正线施工方法,其特征在于:所述锚管打入横通道与正线隧道外侧围岩内。
CN201410804598.XA 2014-12-19 2014-12-19 地铁暗挖隧道横通道进入正线施工方法 Pending CN104675404A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410804598.XA CN104675404A (zh) 2014-12-19 2014-12-19 地铁暗挖隧道横通道进入正线施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410804598.XA CN104675404A (zh) 2014-12-19 2014-12-19 地铁暗挖隧道横通道进入正线施工方法

Publications (1)

Publication Number Publication Date
CN104675404A true CN104675404A (zh) 2015-06-03

Family

ID=53310932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410804598.XA Pending CN104675404A (zh) 2014-12-19 2014-12-19 地铁暗挖隧道横通道进入正线施工方法

Country Status (1)

Country Link
CN (1) CN104675404A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108425678A (zh) * 2018-04-12 2018-08-21 中铁四局集团有限公司 一种大断面地铁渡线隧道的施工方法
CN109695453A (zh) * 2018-12-07 2019-04-30 中铁四局集团第一工程有限公司 一种竖井正洞立体交叉处辅助开挖施工方法
CN113914866A (zh) * 2021-09-10 2022-01-11 中隧隧盾国际建设工程有限公司 一种管廊暗挖用支撑结构及施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1920254A (zh) * 2006-07-27 2007-02-28 董淑练 隧道施工中两洞交叉小洞进入大洞时的小导洞穿入施工法
CN101086209A (zh) * 2007-07-23 2007-12-12 北京交通大学 盾构法与浅埋暗挖法结合建造地铁车站的施工方法
JP2010217017A (ja) * 2009-03-17 2010-09-30 Sooki:Kk 3次元レーザスキャナを用いたトンネル掘削工事の施工方法
CN101967984A (zh) * 2010-09-03 2011-02-09 安徽理工大学 深井巷道锚网索刚柔耦合支护及围岩整体加固支护方法
CN102996133A (zh) * 2012-07-02 2013-03-27 中铁二十三局集团第四工程有限公司 适用于软弱围岩隧道斜井与正洞交汇处的施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1920254A (zh) * 2006-07-27 2007-02-28 董淑练 隧道施工中两洞交叉小洞进入大洞时的小导洞穿入施工法
CN101086209A (zh) * 2007-07-23 2007-12-12 北京交通大学 盾构法与浅埋暗挖法结合建造地铁车站的施工方法
JP2010217017A (ja) * 2009-03-17 2010-09-30 Sooki:Kk 3次元レーザスキャナを用いたトンネル掘削工事の施工方法
CN101967984A (zh) * 2010-09-03 2011-02-09 安徽理工大学 深井巷道锚网索刚柔耦合支护及围岩整体加固支护方法
CN102996133A (zh) * 2012-07-02 2013-03-27 中铁二十三局集团第四工程有限公司 适用于软弱围岩隧道斜井与正洞交汇处的施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱成杰: "城市地铁暗挖隧道特殊地段施工技术", 《隧道建设》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108425678A (zh) * 2018-04-12 2018-08-21 中铁四局集团有限公司 一种大断面地铁渡线隧道的施工方法
CN108425678B (zh) * 2018-04-12 2019-07-30 中铁四局集团有限公司 一种大断面地铁渡线隧道的施工方法
CN109695453A (zh) * 2018-12-07 2019-04-30 中铁四局集团第一工程有限公司 一种竖井正洞立体交叉处辅助开挖施工方法
CN113914866A (zh) * 2021-09-10 2022-01-11 中隧隧盾国际建设工程有限公司 一种管廊暗挖用支撑结构及施工方法
CN113914866B (zh) * 2021-09-10 2024-02-23 中隧隧盾国际建设工程有限公司 一种管廊暗挖用支撑结构及施工方法

Similar Documents

Publication Publication Date Title
CN103603679B (zh) 用于支护隧道拱部的拱顶钢架与隧道施工方法
CN104047623B (zh) 一种大跨洞室开挖施工方法
CN103032078B (zh) 一种盾构接收洞门环梁与盾构过站平行施工方法
CN103195432A (zh) 一种软弱围岩隧道交叉口弧形导坑施工方法
CN203080430U (zh) 一种装配现浇组合式钢筋混凝土管型涵洞
CN103375170A (zh) 三孔小净距隧洞下穿铁路干线的暗挖施工变形控制方法
CN104294769B (zh) 一种补桩与增大台帽组合加固已建桥台结构的施工方法
CN107989620B (zh) 一种三洞小间距隧道的施工方法
CN101539021B (zh) 公路隧道开挖方法
CN103362523B (zh) 软弱围岩隧道洞口外套拱吊模衬砌方法
CN202900283U (zh) 钢管混凝土支护结构
CN203559904U (zh) 一种倒挂井壁竖井侧墙开马头门的加强支护结构
CN104632228A (zh) 横通道进入正线施工方法及横通道
CN104453930A (zh) 一种隧道预衬砌施工设备及施工方法
CN103953361A (zh) 既有隧道拱部衬砌严重开裂有净空加固体系
CN104632227A (zh) 单层梁拱结构的地铁车站开挖工艺
CN104675404A (zh) 地铁暗挖隧道横通道进入正线施工方法
CN102913254B (zh) 钢管混凝土支护结构、制备安装方法和应用
CN103244143B (zh) 一种地下工程暗挖施工方法及地下车站
CN104612722B (zh) 一种环形盾构或环形顶管始发及到达的洞门加固方法
CN204492831U (zh) 地铁暗挖隧道横通道施工构件
CN106481347B (zh) 一种抗内水压力复合式盾构管片
CN204097889U (zh) 一种补桩与增大台帽组合加固已建桥台结构
CN203835403U (zh) 一种既有隧道拱部衬砌严重开裂有净空加固体系
CN202012045U (zh) 一种顶进地道桥的组合式框架钢构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150603

RJ01 Rejection of invention patent application after publication