CN104675104B - One operates advantageously building outrigger steel tube auxiliary butt joint mechanism - Google Patents

One operates advantageously building outrigger steel tube auxiliary butt joint mechanism Download PDF

Info

Publication number
CN104675104B
CN104675104B CN201510052879.9A CN201510052879A CN104675104B CN 104675104 B CN104675104 B CN 104675104B CN 201510052879 A CN201510052879 A CN 201510052879A CN 104675104 B CN104675104 B CN 104675104B
Authority
CN
China
Prior art keywords
sleeve
worm
support shaft
upper bush
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510052879.9A
Other languages
Chinese (zh)
Other versions
CN104675104A (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu dispatch Electric Technology Co., Ltd.
Original Assignee
胡妍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 胡妍 filed Critical 胡妍
Priority to CN201510052879.9A priority Critical patent/CN104675104B/en
Priority claimed from CN201210473604.9A external-priority patent/CN102953544B/en
Publication of CN104675104A publication Critical patent/CN104675104A/en
Application granted granted Critical
Publication of CN104675104B publication Critical patent/CN104675104B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The invention discloses one and operate advantageously building outrigger steel tube auxiliary butt joint mechanism, it is made up of following sections, upper bush, upper bush is consisted of the two of bolt-connection semi arches side hinge-coupled opposite side, each semi arch is respectively fixed with a rotating shaft, lower sleeve, lower sleeve cross section is the double sleeve of 8-shaped, including fixing sleeve and folding sleeve, one support shaft, described support shaft bottom is inserted in the fixing sleeve of lower sleeve, and in the support shaft coordinated with described trip bolt, it is provided with the deepest top-down wedge-shaped slot, one stabiliser bar, it is enclosed within rotating shaft, axial restraint is carried out by nut, rotatably, realize the connection with upper bush;Stabiliser bar lower ending opening, is fixed on lower sleeve by nut;One turbine and worm decelerator, described turbine and worm decelerator is fixed on the top of support shaft, and worm-wheel shaft is coaxially connected with another rotating shaft of upper bush, and worm shaft is manual operation unit.The present invention has preferable Social and economic benef@.

Description

One operates advantageously building outrigger steel tube auxiliary butt joint mechanism
Technical field
The application is Application No. 201210473604.9, filing date on November 20th, 2012, and invention and created name is The divisional application of the application for a patent for invention of " building outrigger steel tube auxiliary butt joint mechanism ".
Background technology
In Construction of highrise buildings, overlap joint steel pipe outrigger is requisite, is also highly important.But set up at it Process is by manually completing entirely, and when especially docking a vertical steel pipe on vertical steel pipe, difficulty is the biggest.Often must need Want that strength is big, skilled worker could be competent at this task.And danger is the highest, one has accidentally, will result in tight The consequence of weight.
At present, the most not can be used in overlapping outrigger steel pipe, alleviate workman's work and improve the device of security.
Summary of the invention
The purpose of the present invention, it is simply that for problem present in existing building practice, and provide a kind of for setting up vertically The technical scheme of steel pipe, it is simple that the program not only has mechanism structure, and it is easy to operate.
The present invention solves its technical problem and is adopted the technical scheme that: it is auxiliary that one operates advantageously construction exterior rack steel pipe Helping docking mechanism, be made up of following sections, upper bush, upper bush is passed through bolt-connection by side hinge-coupled opposite side Two semi arch compositions, each semi arch is respectively fixed with a rotating shaft, lower sleeve, lower sleeve cross section is that 8-shaped is double Sleeve, including fixing sleeve and folding sleeve, wherein folding sleeve is by the two and half of side hinge-coupled opposite side bolt-connection Circular arc composition, described fixing sleeve is provided with a trip bolt, a support shaft, and described support shaft bottom is inserted in lower sleeve In fixing sleeve, and being provided with the deepest top-down wedge-shaped slot in the support shaft coordinated with described trip bolt, one is stable Bar, there is circular port stabiliser bar upper end, is enclosed within rotating shaft, nut carry out axial restraint, rotatably, it is achieved with the company of upper bush Connect;Stabiliser bar lower ending opening, is fixed on lower sleeve by nut;One turbine and worm decelerator, described worm and gear slows down Mechanism is fixed on the top of support shaft, and worm-wheel shaft is coaxially connected with another rotating shaft of upper bush, and worm shaft is manual operation unit.
The invention has the beneficial effects as follows: for not having this engineering goods on building site, the present invention is that one simply assists work Part, can help builder to alleviate manual labor, have the highest Social and economic benef@.
Accompanying drawing explanation
Fig. 1 is the front view of the present invention;
Fig. 2 is the left view of the present invention;
Fig. 3 is the right view of the present invention;
Fig. 4 is worm-and-wheel gear;
Fig. 5 is rotating shaft and the side view of coupling head head construction schematic diagram;
Fig. 6 is rotating shaft and the top view of coupling head head construction schematic diagram;
Fig. 7 is the EE sectional view in Fig. 1;
Fig. 8 is the CC sectional view in Fig. 1;
Fig. 9 A-9E is this programme auxiliary docking steel pipe process schematic;
In figure: 1 upper bush, 2 rotating shafts, 21 coupling heads, 3 lower sleeves, 31 fix sleeve, 32 folding sleeves, 33 fastening spiral shells Nail, 4 support shafts, 41 wedge-shaped slots, 5 stabiliser bars, 6 turbine and worm decelerators, 61 worm-wheel shafts, 62 worm shafts, 71 the A piece steel pipe, 72 second steel pipes, 73 steel pipes couple fastener.
Detailed description of the invention
As shown in Fig. 1~Fig. 8,
For the technical characterstic of this programme can be clearly described, below by a detailed description of the invention, and combine its accompanying drawing, this programme is entered Row illustrates.
This kind of building outrigger steel tube auxiliary butt joint mechanism, is made up of following sections, upper bush 1, and upper bush 1 is by side Hinge-coupled opposite side is by two semi arch compositions of bolt-connection, and bolt hole is shoulder hole, and so cladding needs connection Outrigger rod member.Each semi arch is respectively fixed with a rotating shaft 2, this rotating shaft 2 head across arc body, form connection Joint 21, as shown in Figure 5, Figure 6, coupling head vertical direction is straight line, and straight line two head has two bolts hole, and horizontal direction becomes Semi arch, its radius is equal to upper bush external diameter, and coupling head two head has two bolts hole, and rotating shaft is fixed on institute by four bolts On the upper bush 1 stated.
Lower sleeve 3, lower sleeve 3 cross section is the double sleeve of 8-shaped, including fixing sleeve 31 and folding sleeve 32, Qi Zhongkai Trap cylinder is made up of two semi arches of side hinge-coupled opposite side bolt-connection, and bolt hole is shoulder hole, is so coated with Need the outrigger rod member connected.Fixing sleeve is provided with a trip bolt 33, is used for fixing support shaft 4.
Support shaft 4, support shaft 4 bottom is inserted in the fixing sleeve 31 of lower sleeve, and coordinating with described trip bolt Support shaft is provided with the deepest top-down wedge-shaped slot 41, and support shaft upper end becomes body structure to be used for installing worm and gear deceleration Mechanism 6.
Stabiliser bar 5, there is circular port stabiliser bar upper end, is enclosed within rotating shaft, nut carry out axial restraint, rotatably, it is achieved Connection with upper bush 1;Stabiliser bar lower ending opening, is fixed on lower sleeve 3 by nut.The most both can ensure that upper bush existed Smooth rotation in vertical plane.
Turbine and worm decelerator 6, turbine and worm decelerator is fixed on the top of support shaft 4, worm-wheel shaft 61 and upper set Another rotating shaft of cylinder is coaxially connected, and worm shaft 62 is manual operation unit, and operating portion is a hex nut shape, it is possible to use pull Hand operates.
As shown in Figs. 9 A-9 E, this programme auxiliary docking steel pipe process is as follows:
The first step, a people stands in be needed to erect steel pipe position, and the folding sleeve of lower sleeve 3 is fixed on second steel pipe of setting On 72, install stabiliser bar 5.Another people by flat for first steel pipe 71 to be erect close from flooring, stand in and needs to erect The people of steel pipe position is fixed on upper bush, as shown in Figure 9 A.
Second step, is slowly turned worm end D or F by spanner, drives upper bush to erect by turbine and worm decelerator Vertical, first steel pipe 71 to be erect slowly erects.And due to the self-locking performance of worm and gear, due to the weight of steel pipe Power, not enough in workman's strength or when stopping operation, can prevent steel pipe from falling.Steel pipe is coupled fastener 73 and puts into the second of setting Root steel pipe 72 head, as shown in Figure 9 B.
3rd step, turns at H, unclamps stabiliser bar 5, as shown in Figure 9 C.
4th step, slowly turns screw at G, allows support shaft 4, to be erect first steel pipe 71 slowly fall, to upper Steel pipe couples fastener, such as Fig. 9 D.
5th step, tightens steel pipe and couples fastener, unload this docking mechanism, both completed the docking of steel pipe, such as Fig. 9 E.
In addition to the technical characteristic described in specification, it is the known technology of those skilled in the art.

Claims (1)

1. one kind operates advantageously building outrigger steel tube auxiliary butt joint mechanism, it is characterised in that be made up of following sections, on Sleeve, upper bush is consisted of the two of bolt-connection semi arches side hinge-coupled opposite side, on each semi arch Being respectively fixed with a rotating shaft, lower sleeve, lower sleeve cross section is the double sleeve of 8-shaped, including fixing sleeve and folding sleeve, its Middle folding sleeve is made up of two semi arches of side hinge-coupled opposite side bolt-connection, and described fixing sleeve is provided with one Individual trip bolt, a support shaft, described support shaft bottom is inserted in the fixing sleeve of lower sleeve, and is joining with described trip bolt The support shaft closed is provided with the deepest top-down wedge-shaped slot, a stabiliser bar, and there is circular port stabiliser bar upper end, is enclosed within rotating shaft On, nut carry out axial restraint, rotatably, it is achieved with the connection of upper bush;Stabiliser bar lower ending opening, is fixed by nut On lower sleeve;One turbine and worm decelerator, described turbine and worm decelerator is fixed on the top of support shaft, worm-wheel shaft with Another rotating shaft of upper bush is coaxially connected, and worm shaft is manual operation unit.
CN201510052879.9A 2012-11-20 2012-11-20 One operates advantageously building outrigger steel tube auxiliary butt joint mechanism Active CN104675104B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510052879.9A CN104675104B (en) 2012-11-20 2012-11-20 One operates advantageously building outrigger steel tube auxiliary butt joint mechanism

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201210473604.9A CN102953544B (en) 2012-11-20 2012-11-20 Building outrigger steel tube auxiliary butt joint mechanism
CN201510052879.9A CN104675104B (en) 2012-11-20 2012-11-20 One operates advantageously building outrigger steel tube auxiliary butt joint mechanism

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201210473604.9A Division CN102953544B (en) 2012-11-20 2012-11-20 Building outrigger steel tube auxiliary butt joint mechanism

Publications (2)

Publication Number Publication Date
CN104675104A CN104675104A (en) 2015-06-03
CN104675104B true CN104675104B (en) 2016-09-07

Family

ID=53310648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510052879.9A Active CN104675104B (en) 2012-11-20 2012-11-20 One operates advantageously building outrigger steel tube auxiliary butt joint mechanism

Country Status (1)

Country Link
CN (1) CN104675104B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0513489A1 (en) * 1991-05-15 1992-11-19 Österreichische DOKA Schalungstechnik Gesellschaft m.b.H. Stackable scaffolding frames
CN201728497U (en) * 2010-04-15 2011-02-02 青岛东方铁塔股份有限公司 Automatic butt device of flange and steel pipe
CN201776589U (en) * 2010-08-12 2011-03-30 中冶成工上海五冶建设有限公司 Steel tube joint butting device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0513489A1 (en) * 1991-05-15 1992-11-19 Österreichische DOKA Schalungstechnik Gesellschaft m.b.H. Stackable scaffolding frames
CN201728497U (en) * 2010-04-15 2011-02-02 青岛东方铁塔股份有限公司 Automatic butt device of flange and steel pipe
CN201776589U (en) * 2010-08-12 2011-03-30 中冶成工上海五冶建设有限公司 Steel tube joint butting device

Also Published As

Publication number Publication date
CN104675104A (en) 2015-06-03

Similar Documents

Publication Publication Date Title
CN206859722U (en) A kind of moving type security band stationary fixture
CN205063313U (en) Novel retractable scaffold is stereotyped and is linked wall spare
CN202266182U (en) Bidirectional collapsible type multifunctional ladder
CN205063308U (en) Outer hanging protection frame and outer hanging protective structure
CN104563484B (en) A kind of building outrigger steel tube auxiliary butt joint mechanism
CN104675104B (en) One operates advantageously building outrigger steel tube auxiliary butt joint mechanism
CN104746867B (en) Operate advantageously building outrigger steel tube auxiliary butt joint mechanism
CN205531248U (en) Construction scaffolding component
CN203022335U (en) Auxiliary butt joint mechanism of construction outer frame steel pipes
CN206737386U (en) Scaffold
CN206128391U (en) Large -span glass curtain wall
CN204454206U (en) Turning detachable protective door for elevator shaft
CN204748523U (en) High -order fastener
CN206646845U (en) The safe blanket net tool-type support of external wall
CN205617778U (en) Outer wall scaffold frame is wall structure even
CN214884381U (en) Connecting part is assembled fast to house steel construction
CN203451012U (en) Double-cage elevator safety protective door spindle device
CN105804417A (en) Sway brace for installation of assembly type building wallboard and using method thereof
CN205875657U (en) Plug -in type steel pipe scaffold frame
CN201539090U (en) Movable and adjustable operation frame
CN204920249U (en) A simple and easy quick erector for installation of floor jib
CN108729643A (en) A kind of overhanging type discharging platform steel wire rope drawknot tool
CN204299166U (en) One vertically docks pipe box
CN205743047U (en) Twisting type dry wall installs vertical adjustment diagonal brace
CN219387136U (en) Connection structure for building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180726

Address after: 226300 Liu Lu, Liu Qiao Town, Tongzhou District, Nantong, Jiangsu

Patentee after: Jiangsu dispatch Electric Technology Co., Ltd.

Address before: 325600 Niu Dong village, Le Cheng town, Yueqing City, Wenzhou, Zhejiang

Patentee before: Hu Yan

TR01 Transfer of patent right