CN104674834A - Rapid tooth shape abutting structure of foundation pile - Google Patents

Rapid tooth shape abutting structure of foundation pile Download PDF

Info

Publication number
CN104674834A
CN104674834A CN201510098661.7A CN201510098661A CN104674834A CN 104674834 A CN104674834 A CN 104674834A CN 201510098661 A CN201510098661 A CN 201510098661A CN 104674834 A CN104674834 A CN 104674834A
Authority
CN
China
Prior art keywords
frustum
cone
groove
foundation pile
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510098661.7A
Other languages
Chinese (zh)
Other versions
CN104674834B (en
Inventor
顾东东
梁龙亚
李加坤
曹跃
张子同
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Mountain And Sea Construction Engineering Corp Ltd
Original Assignee
Jiangsu Mountain And Sea Construction Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Mountain And Sea Construction Engineering Corp Ltd filed Critical Jiangsu Mountain And Sea Construction Engineering Corp Ltd
Priority to CN201510098661.7A priority Critical patent/CN104674834B/en
Publication of CN104674834A publication Critical patent/CN104674834A/en
Application granted granted Critical
Publication of CN104674834B publication Critical patent/CN104674834B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1692Shapes conical or convex
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a rapid tooth shape abutting structure of a foundation pile. A circular truncated cone is axially arranged on the lower end of an upper to-be-abutted foundation pile, a frustum annular groove is transversely formed in the wall of the circular truncated cone, a frustum grouting channel is axially formed in the wall of the circular truncated cone, a frustum grouting opening is formed in the upper part of the frustum grouting channel which penetrates through the frustum annular groove, spaced trapezoidal frustum teeth and frustum tooth sockets are uniformly distributed around the upper end of the circular truncated cone, a circular truncated cone groove which is matched and coincides with the circular truncated cone is axially formed, a conical wall annular groove which is matched and coincides with the frustum annular groove is transversely formed in the inner side wall of the circular truncated cone groove, a conical wall grouting channel which is matched and coincides with the frustum grouting channel is axially formed in the inner side wall of the circular truncated cone groove, a conical groove grouting opening which is matched and coincides with the frustum grouting opening is formed in the upper part of the conical wall grouting channel, and conical wall tooth sockets which are in tooth shape abutting with the frustum teeth are uniformly distributed around the upper end of the outer side of the circular truncated cone groove. The rapid tooth shape abutting structure of the foundation pile has the advantages of simplicity in operation, time saving, labor saving and low cost, and the rapid and stable abutting of the foundation pile can be realized.

Description

The quick thread form docking structure of foundation pile
Technical field
the present invention relates to a kind of foundation pile docking structure, the quick thread form docking structure of the foundation pile that especially can firmly dock fast.
Background technology
pile foundation is the power transmission rod member with certain rigidity and bending resistance superstructure load being imported into ground, is a kind of ancient and common deep foundation form.Pile foundation is compared with other base forms, have bearing capacity high, be out of shape little and evenly, materials economize, mechanization of building operation degree high, almost go for all kinds of geological conditions and various types of engineering construction, therefore its application in all types of industries and civil building engineering widely.At present, due to the reason of some geology and the difference of bearing capacity size, often need several foundation stake to dock and form pile foundation, and the method for foundation pile docking is mostly respectively equipped with steel plate at the two ends of foundation pile, again two block plates are welded when two foundation stakes will be docked, thus complete docking, but this foundation pile docking calculation complex operation, time-consuming bothersome and cost is high.
Summary of the invention
in order to overcome existing foundation pile docking calculation complex operation, the time-consuming bothersome and problem that cost is high, the invention provides the quick thread form docking structure of a kind of foundation pile, this foundation pile quick thread form docking structure is simple to operate, time saving and energy saving, cost is low, can realize foundation pile and firmly dock fast.
the technical solution adopted for the present invention to solve the technical problems is: this foundation pile quick thread form docking structure comprises the frustum of a cone, frustum annular groove, frustum grouting channel, frustum tooth, frustum grouting mouth, top foundation pile waiting, cone groove grouting mouth, cone wall alveolus, cone wall grouting channel, cone wall circular groove, frustum of a cone groove and bottom foundation pile waiting, the end of foundation pile lower end waiting on top, axially be provided with the frustum of a cone stretching out prolongation, frustum of a cone wall laterally has frustum annular groove, axially have frustum grouting channel, the through frustum annular groove of this passage, frustum grouting channel top is provided with semicircular frustum grouting mouth, the surrounding of frustum of a cone upper end is uniformly distributed spaced trapezoidal frustum tooth and frustum alveolus, the end of foundation pile upper end waiting in bottom, axially be provided with the frustum of a cone groove mating with the frustum of a cone and coincide, the inside wall of frustum of a cone groove laterally has the cone wall circular groove mating with frustum annular groove and coincide, axially have the cone wall grouting channel of mating with frustum grouting channel and coincideing, the top of cone wall grouting channel is provided with the mouth that be in the milk with frustum and mates identical cone groove and to be in the milk mouth, the surrounding of frustum of a cone groove outer upper end is evenly distributed with the cone wall alveolus docked with frustum tooth thread form, cone wall alveolus staggers with cone wall tooth spacer, after bottom foundation pile waiting squeezes into ground, when leaving the frustum of a cone groove of exposed end on the ground, namely can carry out thread form with top foundation pile waiting to dock, when docking, quick-drying high-strength cement slurry is coated with in the inside of the outside of the frustum of a cone and frustum tooth and frustum of a cone groove and cone wall alveolus, complete rapidly and insert docking, after having docked, by the grouting mouth that frustum grouting mouth and cone groove grouting tone conjunction docking are formed, quick-drying high-strength cement slurry is poured in frustum of a cone groove, the annular wall groove that slurries are formed by frustum annular groove and the docking of cone wall circular groove, and the grouting channel of frustum grouting channel and cone wall grouting channel docking formation, fill up rapidly the position, space in docking foundation pile, so namely, the firm fast docking between foundation pile can be realized.
preset straight-through steel bar piece and peripheral members in concrete on the inside of the described frustum of a cone and the wall of frustum of a cone groove, to increase the intensity of the frustum of a cone and frustum of a cone groove, after making docking, foundation pile ensures to become a bulk strength.
the described frustum of a cone inserts in frustum of a cone groove, after frustum annular groove and cone wall circular groove being aligned coincide, quick-drying high-strength cement slurry is poured into by grouting mouth to be filled in annular wall groove, after quick-drying high-strength cement slurry solidifies, namely the fixing ring body of an annular is generated, this ring body half is set in the frustum of a cone of top foundation pile waiting, and second half is set in the threaded circular frustum groove of bottom foundation pile waiting, therefore, it is possible to very firmly upper and lower foundation pile waiting is butted in order to an entirety.
when the described frustum of a cone and the docking of frustum of a cone groove, grouting channel together with frustum grouting channel and cone wall grouting channel become after aligning and coincideing, by this road grouting channel, namely quick-drying high-strength cement slurry can be poured into frustum annular groove and bores wall circular groove aligns in the annular wall groove of formation, thus formation firmly closes pin, complete the object of upper and lower foundation pile docking waiting.
the effect of described frustum grouting mouth and cone groove grouting mouth is, when after upper and lower foundation pile docking waiting, frustum grouting mouth and cone groove grouting mouth align to coincide and form grouting mouth, make grouting channel define the passage run through from top to bottom, namely this passage can lead directly to annular wall groove, could be in the milk and form fixing ring body.
during described upper and lower foundation pile docking waiting, frustum tooth and the identical docking of cone wall alveolus, frustum alveolus and cone wall tooth coincide and dock, thus form the thread form docking between foundation pile, can very firmly upper and lower foundation pile waiting be butted in order to an entirety.
the invention has the beneficial effects as follows: this foundation pile quick thread form docking structure is simple to operate, time saving and energy saving, and cost is low, foundation pile can be realized and firmly dock fast.
Accompanying drawing explanation
below in conjunction with drawings and Examples, the present invention is further described.
fig. 1 is the bottom cross-sectional view of foundation pile of the present invention.
fig. 2 is the upper end cross-sectional view of foundation pile of the present invention.
1. frustums of a cone in figure, 2. frustum annular groove, 3. frustum grouting channel, 4. frustum tooth, 5. frustum grouting mouth, 6. top foundation pile waiting, 7. bores groove grouting mouth, 8. bores wall alveolus, 9. bore wall grouting channel, 10. bore wall circular groove, 11. frustum of a cone grooves, 12. bottom foundation piles waiting.
Detailed description of the invention
in the drawings, this foundation pile quick thread form docking structure comprises the frustum of a cone 1, frustum annular groove 2, frustum grouting channel 3, frustum tooth 4, frustum grouting mouth 5, top foundation pile waiting 6, cone groove grouting mouth 7, cone wall alveolus 8, cone wall grouting channel 9, cone wall circular groove 10, frustum of a cone groove 11 and bottom foundation pile 12 waiting, the end of foundation pile 6 lower end waiting on top, axially be provided with the frustum of a cone 1 stretching out prolongation, the frustum of a cone 1 wall laterally has frustum annular groove 2, axially have frustum grouting channel 3, frustum grouting channel 3 top is provided with semicircular frustum grouting mouth 5, the through frustum annular groove 2 of this passage, the surrounding of the frustum of a cone 1 upper end is uniformly distributed spaced trapezoidal frustum tooth 4 and frustum alveolus, the end of foundation pile 12 upper end waiting in bottom, axially be provided with the frustum of a cone groove 11 mating with the frustum of a cone 1 and coincide, the inside wall of frustum of a cone groove 11 laterally has the cone wall circular groove 10 mating with frustum annular groove 2 and coincide, axially have the cone wall grouting channel 9 of mating with frustum grouting channel 3 and coincideing, the top of cone wall grouting channel 9 is provided with the mouth 5 that be in the milk with frustum and mates identical cone groove and to be in the milk mouth 7, the surrounding of frustum of a cone groove 11 outer upper end is evenly distributed with the cone wall alveolus 8 docked with frustum tooth 4 thread form, cone wall alveolus 8 staggers with cone wall tooth spacer, after bottom foundation pile 12 waiting squeezes into ground, when leaving the frustum of a cone groove 11 of exposed end on the ground, namely can carry out thread form with top foundation pile 6 waiting to dock, when docking, quick-drying high-strength cement slurry is coated with in the inside of the outside of the frustum of a cone 1 and frustum tooth 4 and frustum of a cone groove 11 and cone wall alveolus 8, complete rapidly and insert docking, after having docked, by the grouting mouth that frustum grouting mouth 5 and the identical docking of cone groove grouting mouth 7 are formed, quick-drying high-strength cement slurry is poured in frustum of a cone groove 11, slurries dock by frustum annular groove 2 and cone wall circular groove 10 the annular wall groove formed, and the grouting channel of frustum grouting channel 3 and cone wall grouting channel 9 docking formation, fill up rapidly the position, space in docking foundation pile, so namely, the firm fast docking between foundation pile can be realized.
in the drawings, preset straight-through steel bar piece and peripheral members in the concrete on the inside of the described frustum of a cone 1 and the wall of frustum of a cone groove 11, to increase the intensity of the frustum of a cone 1 and frustum of a cone groove 11, after making docking, foundation pile ensures to become a bulk strength.
in the drawings, the described frustum of a cone 1 inserts in frustum of a cone groove 11, after frustum annular groove 2 and cone wall circular groove 10 being aligned coincide, quick-drying high-strength cement slurry is poured into by grouting mouth to be filled in annular wall groove, after quick-drying high-strength cement slurry solidifies, namely the fixing ring body of an annular is generated, this ring body half is set in the frustum of a cone 1 of top foundation pile 6 waiting, second half is set in the threaded circular frustum groove 11 of bottom foundation pile 12 waiting, therefore, it is possible to very firmly upper and lower foundation pile waiting is butted in order to an entirety.
in the drawings, when the described frustum of a cone 1 and frustum of a cone groove 11 dock, grouting channel together with frustum grouting channel 3 and cone wall grouting channel 9 become after aligning and coincideing, by this road grouting channel, namely quick-drying high-strength cement slurry can be poured into frustum annular groove 2 and bores wall circular groove 10 aligns in the annular wall groove of formation, thus formation firmly closes pin, complete the object of upper and lower foundation pile docking waiting.
in the drawings, the effect of described frustum grouting mouth 5 and cone groove grouting mouth 7 is, when after upper and lower foundation pile docking waiting, frustum grouting mouth 5 and cone groove grouting mouth 7 align to coincide and form grouting mouth, grouting channel is made to define the passage run through from top to bottom, namely this passage can lead directly to annular wall groove, could be in the milk and form fixing ring body.
in the drawings, during described upper and lower foundation pile docking waiting, frustum tooth 4 and the identical docking of cone wall alveolus 8, frustum alveolus and cone wall tooth coincide and dock, thus form the thread form docking between foundation pile, can very firmly upper and lower foundation pile waiting be butted in order to an entirety.

Claims (6)

1. the quick thread form docking structure of foundation pile, comprises the frustum of a cone (1), frustum annular groove (2), frustum grouting channel (3), frustum tooth (4), frustum grouting mouth (5), top foundation pile waiting (6), cone groove grouting mouth (7), cone wall alveolus (8), cone wall grouting channel (9), cone wall circular groove (10), frustum of a cone groove (11) and bottom foundation pile waiting (12), it is characterized in that: the end of foundation pile waiting (6) lower end on top, axially be provided with the frustum of a cone (1) stretching out prolongation, the frustum of a cone (1) wall laterally has frustum annular groove (2), axially have frustum grouting channel (3), frustum grouting channel (3) top is provided with semicircular frustum grouting mouth (5), the through frustum annular groove (2) of this passage, the surrounding of the frustum of a cone (1) upper end is uniformly distributed spaced trapezoidal frustum tooth (4) and frustum alveolus, the end of foundation pile waiting (12) upper end in bottom, axially be provided with the frustum of a cone groove (11) mating with the frustum of a cone (1) and coincide, the inside wall of frustum of a cone groove (11) laterally has the cone wall circular groove (10) mating with frustum annular groove (2) and coincide, axially have the cone wall grouting channel (9) of mating with frustum grouting channel (3) and coincideing, the top of cone wall grouting channel (9) is provided with the mouth (5) that be in the milk with frustum and mates identical cone groove and to be in the milk mouth (7), the surrounding of frustum of a cone groove (11) outer upper end is evenly distributed with the cone wall alveolus (8) docked with frustum tooth (4) thread form, cone wall alveolus (8) staggers with cone wall tooth spacer, after ground is squeezed in bottom foundation pile waiting (12), when leaving frustum of a cone groove (11) of exposed end on the ground, namely can carry out thread form with top foundation pile waiting (6) to dock, when docking, quick-drying high-strength cement slurry is coated with in the inside of the outside of the frustum of a cone (1) and frustum tooth (4) and frustum of a cone groove (11) and cone wall alveolus (8), complete rapidly and insert docking, after having docked, by frustum be in the milk mouth (5) and cone groove grouting mouth (7) coincide docking formed grouting mouth, quick-drying high-strength cement slurry is poured in frustum of a cone groove (11), the annular wall groove that slurries are formed by frustum annular groove (2) and cone wall circular groove (10) docking, and the grouting channel of frustum grouting channel (3) and cone wall grouting channel (9) docking formation, fill up rapidly the position, space in docking foundation pile, so namely, the firm fast docking between foundation pile can be realized.
2. the quick thread form docking structure of foundation pile according to claim 1, it is characterized in that: in the concrete on the inside of the frustum of a cone (1) and the wall of frustum of a cone groove (11), preset straight-through steel bar piece and peripheral members, to increase the intensity of the frustum of a cone (1) and frustum of a cone groove (11), after making docking, foundation pile ensures to become a bulk strength.
3. the quick thread form docking structure of foundation pile according to claim 1, it is characterized in that: the frustum of a cone (1) inserts in frustum of a cone groove (11), make frustum annular groove (2) and cone wall circular groove (10) align coincide after, quick-drying high-strength cement slurry is poured into by grouting mouth to be filled in annular wall groove, after quick-drying high-strength cement slurry solidifies, namely the fixing ring body of an annular is generated, this ring body half is set in the frustum of a cone (1) on top foundation pile waiting (6), second half is set in the threaded circular frustum groove (11) of bottom foundation pile waiting (12), therefore, it is possible to very firmly upper and lower foundation pile waiting is butted in order to an entirety.
4. the quick thread form docking structure of foundation pile according to claim 1, it is characterized in that: when the frustum of a cone (1) and frustum of a cone groove (11) docking, frustum grouting channel (3) and cone wall grouting channel (9) become one grouting channel after aligning and coincideing, by this road grouting channel, namely quick-drying high-strength cement slurry can be poured into frustum annular groove (2) and bores wall circular groove (10) aligns in the annular wall groove of formation, thus formation firmly closes pin, complete the object of upper and lower foundation pile docking waiting.
5. the quick thread form docking structure of foundation pile according to claim 1, it is characterized in that: the effect of frustum grouting mouth (5) and cone groove grouting mouth (7) is, when after upper and lower foundation pile docking waiting, frustum grouting mouth (5) and cone groove grouting mouth (7) align to coincide and form grouting mouth, grouting channel is made to define the passage run through from top to bottom, namely this passage can lead directly to annular wall groove, could be in the milk and form fixing ring body.
6. the quick thread form docking structure of foundation pile according to claim 1, it is characterized in that: during upper and lower foundation pile docking waiting, frustum tooth (4) and cone wall alveolus (8) coincide and dock, frustum alveolus and cone wall tooth coincide and dock, thus the thread form docking between formation foundation pile, can very firmly upper and lower foundation pile waiting be butted in order to an entirety.
CN201510098661.7A 2015-03-06 2015-03-06 Foundation pile quick thread form docking structure Active CN104674834B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510098661.7A CN104674834B (en) 2015-03-06 2015-03-06 Foundation pile quick thread form docking structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510098661.7A CN104674834B (en) 2015-03-06 2015-03-06 Foundation pile quick thread form docking structure

Publications (2)

Publication Number Publication Date
CN104674834A true CN104674834A (en) 2015-06-03
CN104674834B CN104674834B (en) 2016-09-07

Family

ID=53310381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510098661.7A Active CN104674834B (en) 2015-03-06 2015-03-06 Foundation pile quick thread form docking structure

Country Status (1)

Country Link
CN (1) CN104674834B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3206397B2 (en) * 1995-11-13 2001-09-10 日本鋼管株式会社 Screw joint structure such as steel pipe pile
CN2795290Y (en) * 2005-05-17 2006-07-12 周兆弟 Double insert type spring engaged body pile extension end plate and prefabricated member
CN203855954U (en) * 2014-06-03 2014-10-01 金陵科技学院 Square pile with tooth-shaped joints
CN203924050U (en) * 2014-04-13 2014-11-05 北京工业大学 A kind of compound antislide pile of supporting that is applicable to high height above sea level and high earthquake intensity area
CN104358254A (en) * 2014-10-14 2015-02-18 周兆弟 Variable-section hollow square pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3206397B2 (en) * 1995-11-13 2001-09-10 日本鋼管株式会社 Screw joint structure such as steel pipe pile
CN2795290Y (en) * 2005-05-17 2006-07-12 周兆弟 Double insert type spring engaged body pile extension end plate and prefabricated member
CN203924050U (en) * 2014-04-13 2014-11-05 北京工业大学 A kind of compound antislide pile of supporting that is applicable to high height above sea level and high earthquake intensity area
CN203855954U (en) * 2014-06-03 2014-10-01 金陵科技学院 Square pile with tooth-shaped joints
CN104358254A (en) * 2014-10-14 2015-02-18 周兆弟 Variable-section hollow square pile

Also Published As

Publication number Publication date
CN104674834B (en) 2016-09-07

Similar Documents

Publication Publication Date Title
CN103452246B (en) The grouting deformed steel pipe box cylinder that the slurry anchor docking of a kind of reinforcing bar connects
CN103161154B (en) Distribution and application of pile foundation well squeezed bearing disk steel bars
CN104695430B (en) Foundation pile the most quickly rotates docking structure
CN103485333A (en) Corrugated hollow steel pipe friction pile and construction method thereof
CN204185856U (en) Novel anti-floating anchor cable device
CN204475359U (en) The quick thread form docking structure of foundation pile
CN104196023A (en) Precast concrete tubular pile tip with mechanical connection device and using method of precast concrete tubular pile tip
CN104594343A (en) Fabricated pile and construction method thereof
CN104674834B (en) Foundation pile quick thread form docking structure
CN204456670U (en) Fabricated construction straight screw sleeve connection joint
CN208219638U (en) A kind of deep foundation pit precast stake
CN104674835B (en) The automatic rapid spiral thread form docking structure of foundation pile
CN204510203U (en) The automatic fast rotational docking structure of foundation pile
CN204456087U (en) Foundation pile fast rotational docking structure
CN204919542U (en) Cusp high pressure slip casting stock
CN204475360U (en) Foundation pile automatic rapid spiral thread form docking structure
CN203823346U (en) Plugging device for high-strength steel penstock hole
CN104153461A (en) Precast concrete structural member and method for building construction longitudinal connection between structural members
CN206607586U (en) A kind of self-balancing grouting under pressure steel tube for soil-nail structure
CN203307798U (en) Steel pipe pile connecting base
CN204475358U (en) Foundation pile rapid abutting joint structure
CN207794066U (en) A kind of concrete precast pile docking connector
CN203247697U (en) Pre-cast concrete structural member capable of being longitudinally connected
CN104099950B (en) Rail-variable underground connects the prefabricated reinforced concrete guide groove skeleton of piling wall
CN206245301U (en) A kind of inclinometer pipe with Grouting Pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Gu Dongdong

Inventor after: Guo Jian

Inventor after: Yang Fan

Inventor after: Zhou Guangpeng

Inventor after: Ren Yu

Inventor after: Li Ke

Inventor after: Fang Yong

Inventor after: Liu Yanwei

Inventor after: Zhang Hongbing

Inventor after: Li Jiakun

Inventor after: Cao Yue

Inventor after: Jiang Qigang

Inventor after: Zhang Haichao

Inventor after: Pan Pinru

Inventor after: Jing Lan

Inventor after: Han Yongshuai

Inventor after: Pan Dan

Inventor before: Gu Dongdong

Inventor before: Liang Longya

Inventor before: Li Jiakun

Inventor before: Cao Yue

Inventor before: Zhang Zitong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: GU DONGDONG LIANG LONGYA LI JIAKUN CAO YUE ZHANG ZITONG TO: GU DONGDONG LIJIAKUN CAO YUE JIANG QIGANG ZHANG HAICHAO PAN PINRU JING LAN HAN YONGSHUAI PAN DAN GUO JIAN YANG FAN ZHOU GUANGPENG REN YU LI KE FANG YONG LIU YANWEI ZHANG HONGBING

CB02 Change of applicant information

Address after: 221300, No. 1, garlic Road, Su Yang Town, Xuzhou, Jiangsu, Pizhou

Applicant after: JIANGSU SHANHAI NOVEL CONSTRUCTION MATERIAL CO., LTD.

Address before: 221300, No. 1, garlic Road, Su Yang Town, Xuzhou, Jiangsu, Pizhou

Applicant before: Jiangsu mountain and sea construction engineering corporation, Ltd

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant