CN104674835B - The automatic rapid spiral thread form docking structure of foundation pile - Google Patents

The automatic rapid spiral thread form docking structure of foundation pile Download PDF

Info

Publication number
CN104674835B
CN104674835B CN201510099198.8A CN201510099198A CN104674835B CN 104674835 B CN104674835 B CN 104674835B CN 201510099198 A CN201510099198 A CN 201510099198A CN 104674835 B CN104674835 B CN 104674835B
Authority
CN
China
Prior art keywords
frustum
cone
foundation pile
thread
tooth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510099198.8A
Other languages
Chinese (zh)
Other versions
CN104674835A (en
Inventor
顾东东
李加坤
曹跃
蒋其刚
张海潮
潘品如
荆兰
韩永帅
潘丹
郭健
杨凡
周广鹏
任宇
李可
方勇
刘艳伟
张宏兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Shanhai Novel Construction Material Co Ltd
Original Assignee
Jiangsu Shanhai Novel Construction Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Shanhai Novel Construction Material Co Ltd filed Critical Jiangsu Shanhai Novel Construction Material Co Ltd
Priority to CN201510099198.8A priority Critical patent/CN104674835B/en
Publication of CN104674835A publication Critical patent/CN104674835A/en
Application granted granted Critical
Publication of CN104674835B publication Critical patent/CN104674835B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

<b>a kind of automatic rapid spiral thread form docking structure of foundation pile.The end of foundation pile lower end waiting on top, axially it is provided with the external screw thread frustum of a cone with raised thread stretching out prolongation, the frustum tooth at the interval that distribution has and thread rotary orientation on the external screw thread frustum of a cone is consistent evenly around of external screw thread frustum of a cone upper end and frustum alveolus, the end of foundation pile upper end waiting in bottom, axially it is provided with and mates the female thread frustum of a cone groove coincideing with the external screw thread frustum of a cone, the distribution evenly around of female thread frustum of a cone groove upper end has the cone wall alveolus docked with frustum tooth thread form, and cone wall alveolus staggers with cone wall tooth spacer;When docking, the outside of threaded circular frustum and frustum tooth and the inside of female thread frustum of a cone groove and cone wall alveolus are coated with quick-drying high-strength cement slurry outside.This foundation pile automatic rapid spiral thread form docking structure simple in construction, cost is low, save time and save trouble and solid and reliable, it may be achieved the automatic rapid spiral thread form docking of foundation pile.</b>

Description

The automatic rapid spiral thread form docking structure of foundation pile
Technical field
The present invention relates to a kind of foundation pile docking structure, especially can the automatic rapid spiral thread form docking structure of foundation pile of rapid abutting joint automatically
Background technology
Pile foundation is by the power transmission rod member with certain rigidity and bending resistance of incoming for superstructure load ground, is a kind of ancient and common deep foundation form.Pile foundation is compared with other base forms, there is bearing capacity height, deform little and uniform, materials and economize, mechanization of building operation degree high, almost going for all kinds of geological conditions and various types of engineering construction, therefore its application in all types of industries with civil building engineering is widely.At present, difference due to the reason of some geology and bearing capacity size, generally require several foundation stake docking and form pile foundation, and foundation pile docking method mostly at the two ends of foundation pile respectively equipped with steel plate, again two block plates are welded when two foundation stakes to be docked, thus complete docking, but this foundation pile docking calculation complex operation, time-consuming bothersome and cost is high
Summary of the invention
For the problem overcoming existing foundation pile docking calculation complex operation, time-consuming bothersome and cost is high, the invention provides a kind of automatic rapid spiral thread form docking structure of foundation pile, this foundation pile automatic rapid spiral thread form docking structure simple in construction, cost is low, save time and save trouble and solid and reliable, it may be achieved the automatic rapid spiral thread form docking of foundation pile.
The technical solution adopted for the present invention to solve the technical problems is: this foundation pile automatic rapid spiral thread form docking structure includes top foundation pile waiting, frustum tooth, the external screw thread frustum of a cone, female thread frustum of a cone groove, cone wall tooth and bottom foundation pile waiting;The end of foundation pile lower end waiting on top, axially it is provided with the external screw thread frustum of a cone with raised thread stretching out prolongation, the frustum tooth at the interval that distribution has and thread rotary orientation on the external screw thread frustum of a cone is consistent evenly around of external screw thread frustum of a cone upper end and frustum alveolus, the end of foundation pile upper end waiting in bottom, axially it is provided with and mates the female thread frustum of a cone groove coincideing with the external screw thread frustum of a cone, the distribution evenly around of female thread frustum of a cone groove upper end has the cone wall alveolus docked with frustum tooth thread form, and cone wall alveolus staggers with cone wall tooth spacer;After bottom foundation pile waiting squeezes into ground, when leaving the female thread frustum of a cone groove of exposed end on the ground, namely can carry out screw thread with top foundation pile waiting and spiral thread form is mutually butted, when docking, the outside of threaded circular frustum and frustum tooth and the inside of female thread frustum of a cone groove and cone wall alveolus are coated with quick-drying high-strength cement slurry outside, are so namely capable of the quickly firm docking between foundation pile.
The described external screw thread frustum of a cone is selected 2~30 protruding trapezoidal threads, in female thread frustum of a cone groove, has the thread groove of corresponding bar number;When beyond the selection of this thread pitch, threaded circular frustum inserts in female thread frustum of a cone groove, it is possible to the gravity automatic rotary against pile body self drops down onto female thread frustum of a cone bottom portion of groove and is as the criterion.
Concrete on the inside of the described external screw thread frustum of a cone and the wall of female thread frustum of a cone groove presets straight-through steel bar piece and peripheral members, to increase the external screw thread frustum of a cone and the intensity of female thread frustum of a cone groove, after making docking mutually, foundation pile ensures to become a bulk strength.
During the docking of described upper and lower foundation pile waiting, frustum tooth and cone wall alveolus rotate the docking that coincide, frustum alveolus and cone wall tooth and rotate the docking that coincide, thus the thread form docking formed between foundation pile, it is possible to very firmly upper and lower foundation pile waiting is butted into for an entirety.
The invention has the beneficial effects as follows: this foundation pile automatic rapid spiral thread form docking structure simple in construction, cost is low, save time and save trouble and solid and reliable, it may be achieved the automatic rapid spiral thread form docking of foundation pile.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described.
Accompanying drawing is that grafting principle circular arc of the present invention cuts open structural representation.
1. top foundation pile waiting in figure, 2. frustum tooth, 3. the external screw thread frustum of a cone, 4. female thread frustum of a cone groove, 5. cone wall tooth, 6. bottom foundation pile waiting.
Detailed description of the invention
In the drawings, this foundation pile automatic rapid spiral thread form docking structure includes top foundation pile waiting 1, frustum tooth 2, the external screw thread frustum of a cone 3, female thread frustum of a cone groove 4, cone wall tooth 5 and bottom foundation pile 6 waiting;The end of foundation pile 1 lower end waiting on top, axially it is provided with the external screw thread frustum of a cone 3 with raised thread stretching out prolongation, the frustum tooth 2 at the interval that distribution has and thread rotary orientation on the external screw thread frustum of a cone 3 is consistent evenly around of the external screw thread frustum of a cone 3 upper end and frustum alveolus, the end of foundation pile 6 upper end waiting in bottom, axially it is provided with and mates the female thread frustum of a cone groove 4 coincideing with the external screw thread frustum of a cone 3, the distribution evenly around of female thread frustum of a cone groove 4 upper end has the cone wall alveolus docked with frustum tooth 2 thread form, cone wall alveolus and cone wall tooth 5 interval to stagger;After bottom foundation pile 6 waiting squeezes into ground, when leaving the female thread frustum of a cone groove 4 of exposed end on the ground, namely can carry out screw thread with top foundation pile 1 waiting and spiral thread form is mutually butted, when docking, the outside of threaded circular frustum 3 and frustum tooth 2 and the inside of female thread frustum of a cone groove 4 and cone wall alveolus are coated with quick-drying high-strength cement slurry outside, are so namely capable of the quickly firm docking between foundation pile.
The described external screw thread frustum of a cone 3 is selected 2~30 protruding trapezoidal threads, in female thread frustum of a cone groove 4, has the thread groove of corresponding bar number;When beyond the selection of this thread pitch, threaded circular frustum 3 inserts in female thread frustum of a cone groove 4, it is possible to the gravity automatic rotary against pile body self drops down onto and is as the criterion bottom female thread frustum of a cone groove 4.
Concrete on the inside of the described external screw thread frustum of a cone 3 and the wall of female thread frustum of a cone groove 4 presets straight-through steel bar piece and peripheral members, to increase the external screw thread frustum of a cone 3 and the intensity of female thread frustum of a cone groove 4, after making docking mutually, foundation pile ensures to become a bulk strength.
During the docking of described upper and lower foundation pile waiting, frustum tooth 2 and cone wall alveolus rotate the docking that coincide, frustum alveolus and cone wall tooth 5 and rotate the docking that coincide, thus the thread form docking formed between foundation pile, it is possible to very firmly upper and lower foundation pile waiting is butted into for an entirety

Claims (4)

1.The automatic rapid spiral thread form docking structure of foundation pile, including top foundation pile waiting (1), frustum tooth (2), the external screw thread frustum of a cone (3), female thread frustum of a cone groove (4), cone wall tooth (5) and bottom foundation pile waiting (6);It is characterized in that: the end of foundation pile waiting (1) lower end on top, axially it is provided with the external screw thread frustum of a cone (3) with raised thread stretching out prolongation, the frustum tooth (2) at the interval that the distribution evenly around of the external screw thread frustum of a cone (3) upper end has and thread rotary orientation on the external screw thread frustum of a cone (3) is consistent and frustum alveolus, the end of foundation pile waiting (6) upper end in bottom, axially it is provided with and mates female thread frustum of a cone groove (4) coincideing with the external screw thread frustum of a cone (3), the distribution evenly around of female thread frustum of a cone groove (4) upper end has the cone wall alveolus docked with frustum tooth (2) thread form, stagger in cone wall alveolus and cone wall tooth (5) interval;After ground is squeezed in bottom foundation pile waiting (6), when leaving female thread frustum of a cone groove (4) of exposed end on the ground, namely can carry out screw thread with top foundation pile waiting (1) and spiral thread form is mutually butted, when docking, the outside of threaded circular frustum (3) and frustum tooth (2) and the inside of female thread frustum of a cone groove (4) and cone wall alveolus are coated with quick-drying high-strength cement slurry outside, are so namely capable of the quickly firm docking between foundation pile.
2.The automatic rapid spiral thread form docking structure of foundation pile according to claim 1, is characterized in that: upper 2~30 the protruding trapezoidal threads of selection of the described external screw thread frustum of a cone (3), has the thread groove of corresponding bar number in female thread frustum of a cone groove (4);When beyond the selection of this thread pitch, threaded circular frustum (3) inserts in female thread frustum of a cone groove (4), it is possible to the gravity automatic rotary against pile body self drops down onto female thread frustum of a cone groove (4) bottom and is as the criterion.
3.The automatic rapid spiral thread form docking structure of foundation pile according to claim 1, it is characterized in that: the inside of the external screw thread frustum of a cone (3) and preset straight-through steel bar piece and peripheral members in the concrete on the wall of female thread frustum of a cone groove (4), to increase the external screw thread frustum of a cone (3) and the intensity of female thread frustum of a cone groove (4), after making docking mutually, foundation pile ensures to become a bulk strength.
4.The automatic rapid spiral thread form docking structure of foundation pile according to claim 1, it is characterized in that: during the docking of upper and lower foundation pile waiting, frustum tooth (2) and cone wall alveolus rotate the docking that coincide, frustum alveolus and cone wall tooth (5) rotate the docking that coincide, thus the thread form docking formed between foundation pile, it is possible to very firmly upper and lower foundation pile waiting is butted into for an entirety
CN201510099198.8A 2015-03-06 2015-03-06 The automatic rapid spiral thread form docking structure of foundation pile Active CN104674835B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510099198.8A CN104674835B (en) 2015-03-06 2015-03-06 The automatic rapid spiral thread form docking structure of foundation pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510099198.8A CN104674835B (en) 2015-03-06 2015-03-06 The automatic rapid spiral thread form docking structure of foundation pile

Publications (2)

Publication Number Publication Date
CN104674835A CN104674835A (en) 2015-06-03
CN104674835B true CN104674835B (en) 2016-07-06

Family

ID=53310382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510099198.8A Active CN104674835B (en) 2015-03-06 2015-03-06 The automatic rapid spiral thread form docking structure of foundation pile

Country Status (1)

Country Link
CN (1) CN104674835B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040678B (en) * 2015-06-09 2019-06-28 周兆弟 Prefabricated pile with concave-convex chuck

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3206397B2 (en) * 1995-11-13 2001-09-10 日本鋼管株式会社 Screw joint structure such as steel pipe pile
CN102888841A (en) * 2012-10-25 2013-01-23 中国地质大学(武汉) End part thread five-pointed-star-shaped variable-section prefabricated pipe pile and construction method thereof
CN203514304U (en) * 2013-09-27 2014-04-02 浙江宝厦建设有限公司 Building pile
CN203855954U (en) * 2014-06-03 2014-10-01 金陵科技学院 Square pile with tooth-shaped joints

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3206397B2 (en) * 1995-11-13 2001-09-10 日本鋼管株式会社 Screw joint structure such as steel pipe pile
CN102888841A (en) * 2012-10-25 2013-01-23 中国地质大学(武汉) End part thread five-pointed-star-shaped variable-section prefabricated pipe pile and construction method thereof
CN203514304U (en) * 2013-09-27 2014-04-02 浙江宝厦建设有限公司 Building pile
CN203855954U (en) * 2014-06-03 2014-10-01 金陵科技学院 Square pile with tooth-shaped joints

Also Published As

Publication number Publication date
CN104674835A (en) 2015-06-03

Similar Documents

Publication Publication Date Title
WO2017049809A1 (en) Cement-soil mixing pile having stiffening core pile with variable diameter
CN102808413B (en) Reinforcement-replacing sectional-grouting pipe with inner piston and construction method thereof
CN104695430B (en) Foundation pile the most quickly rotates docking structure
CN104674835B (en) The automatic rapid spiral thread form docking structure of foundation pile
CN203229943U (en) Steel reinforcement laying structure of squeezed bearing plate of pile foundation well
CN110805207B (en) Assembled concrete member inverted cone-shaped steel bar frame, steel bar cage structure and construction method
CN201962672U (en) Spiral ground pile
CN205036077U (en) Shear force wall formwork support suitable for narrow and small space usage
CN204475360U (en) Foundation pile automatic rapid spiral thread form docking structure
CN104196023A (en) Precast concrete tubular pile tip with mechanical connection device and using method of precast concrete tubular pile tip
CN208363295U (en) Prefabricated concrete structure ball bolt grouting connector
CN204009336U (en) A kind of hard ball curtain
CN208201865U (en) Column hammer and rammed bulb pile equipment
CN206752460U (en) A kind of pile end board
CN204185847U (en) The stake of a kind of novel building piecewise combination
CN204456087U (en) Foundation pile fast rotational docking structure
CN204475358U (en) Foundation pile rapid abutting joint structure
CN204510203U (en) The automatic fast rotational docking structure of foundation pile
CN214995249U (en) A grout sleeve for steel bar connection
CN204475359U (en) The quick thread form docking structure of foundation pile
CN204715349U (en) Tenon joint type resistance to plucking connector
CN210216405U (en) Spiral stiffening rib steel pipe concrete pile
CN203823346U (en) Plugging device for high-strength steel penstock hole
CN204475320U (en) A kind of screw pile
CN104153461A (en) Precast concrete structural member and method for building construction longitudinal connection between structural members

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Gu Dongdong

Inventor after: Guo Jian

Inventor after: Yang Fan

Inventor after: Zhou Guangpeng

Inventor after: Ren Yu

Inventor after: Li Ke

Inventor after: Fang Yong

Inventor after: Liu Yanwei

Inventor after: Zhang Hongbing

Inventor after: Li Jiakun

Inventor after: Cao Yue

Inventor after: Jiang Qigang

Inventor after: Zhang Haichao

Inventor after: Pan Pinru

Inventor after: Jing Lan

Inventor after: Han Yongshuai

Inventor after: Pan Dan

Inventor before: Gu Dongdong

Inventor before: Liang Longya

Inventor before: Li Jiakun

Inventor before: Cao Yue

Inventor before: Zhang Zitong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: GU DONGDONG LIANG LONGYA LI JIAKUN CAO YUE ZHANG ZITONG TO: GU DONGDONG LIJIAKUN CAO YUE JIANG QIGANG ZHANG HAICHAO PAN PINRU JING LAN HAN YONGSHUAI PAN DAN GUO JIAN YANG FAN ZHOU GUANGPENG REN YU LI KE FANG YONG LIU YANWEI ZHANG HONGBING

CB02 Change of applicant information

Address after: 221300, No. 1, garlic Road, Su Yang Town, Xuzhou, Jiangsu, Pizhou

Applicant after: JIANGSU SHANHAI NOVEL CONSTRUCTION MATERIAL CO., LTD.

Address before: 221300, No. 1, garlic Road, Su Yang Town, Xuzhou, Jiangsu, Pizhou

Applicant before: Jiangsu mountain and sea construction engineering corporation, Ltd

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant