CN104653223B - 一种高强复合冰袋及其临时填充方法 - Google Patents
一种高强复合冰袋及其临时填充方法 Download PDFInfo
- Publication number
- CN104653223B CN104653223B CN201510063691.4A CN201510063691A CN104653223B CN 104653223 B CN104653223 B CN 104653223B CN 201510063691 A CN201510063691 A CN 201510063691A CN 104653223 B CN104653223 B CN 104653223B
- Authority
- CN
- China
- Prior art keywords
- ice bag
- strength compound
- goaf
- interim
- fill method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/005—Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
Abstract
本发明公开了一种高强复合冰袋及其临时填充方法,所述冰袋与快速冷冻机连接,所述冰袋包括隔温层、高强度丝化纤维层、纤维强化塑料层、注水孔及排水孔,所述的隔温层为冰袋的最外层,所述高强度丝化纤维层为冰袋的中间层,所述纤维强化塑料层为冰袋的内部填充物,所述冰袋的顶端留有注水孔,所述冰袋的底端留有排水孔。其临时填充方法,包括如下步骤:(1)在回采工作面支架后方按一定的间排距布置冰袋;(2)采用矿井水将冰袋注满;(3)开启快速冷冻机将冰袋内的水快速冷冻;(4)将冷冻完成的冰袋以合理的间排距支撑采空区顶板,实现采空区充填。该高强复合冰袋造价低,其填充工艺简单,降低采煤成本,整体劳动效率高。
Description
技术领域
本发明涉及矿井采空区填充技术,具体为一种高强复合冰袋及其临时填充方法。
背景技术
矿井在采空煤层需要对采空区进行充填,充填采矿法是矿井顶板管理和“三下一上”采煤的常用方法,充填采矿法依据充填动力可分为人力充填、风力充填、干粉充填、水力充填等。其中水力充填应用最为广泛,在水力充填中,最初为不含胶结剂的水砂充填,以后发展了胶结充填,并使充填体的浓度逐步提高,逐步发展到高浓度的似膏体充填、膏体充填。而现有的填充技术,工艺环节过多,过程复杂,设备要求较高,生产中需要耗费大量的填充材料;在填充作业时影响工作面采煤作业;整体劳动效率低,每吨煤产量的成本升高。
发明内容
本发明的目的在于提供一种高强复合冰袋及其临时填充方法,以解决上述背景技术中提出的问题。
为实现上述目的,本发明提供如下技术方案:
一种高强复合冰袋,包括冰袋,所述冰袋与快速冷冻机连接,所述冰袋包括隔温层、高强度丝化纤维层、纤维强化塑料层、注水孔及排水孔,所述的隔温层为冰袋的最外层,所述高强度丝化纤维层为冰袋的中间层,所述纤维强化塑料层为冰袋的内部填充物,所述冰袋的顶端留有注水孔,所述冰袋的底端留有排水孔。
一种高强复合冰袋的临时填充方法,包括如下步骤:
(1)在回采工作面支架后方按一定的间排距布置冰袋;
(2)采用矿井水通过冰袋顶端的注水孔注入冰袋,直至将冰袋注满后停止注水;
(3)开启快速冷冻机将冰袋内的水快速冷冻;
(4)将冷冻完成的冰袋以合理的间排距支撑采空区顶板,实现采空区充填,并留有足够的空间,为永久填充法与控制填充法提供有效的运输通道。
作为本发明进一步的方案,临时填充方法为在规定时间内承担填充任务,不需要填充时溶解冰袋内冰即可。
作为本发明进一步的方案,所述控制填充法为控制顶板的下沉量,且不会引起地面建筑物倾斜或地表断续下沉即可。
作为本发明进一步的方案,所述永久填充法为将顶板控制,致使顶板不会下沉并形成永久支护材料运输通道,在冰袋的间距间安置胶带运输机运输永久填充材料沙、黄土、水泥及石膏完成永久填充。
与现有技术相比,本发明的优点:该高强复合冰袋造价低,其填充工艺简单,仅需要快速冷冻机即可,采用矿井内水为充填材料、充填工艺整体成本低,充填作业不影响工作面采煤作业,降低采煤成本,整体劳动效率高。
附图说明
图1为本发明的高强复合冰袋示意图;
图2为本发明的高强复合冰袋横剖面示意图。
具体实施方式
下面结合附图及实施例对本发明作进一步阐述。
如图1-2所示,一种高强复合冰袋,包括冰袋1,所述冰袋1与快速冷冻机连接,所述冰袋1包括隔温层11、高强度丝化纤维层12、纤维强化塑料层13、注水孔14及排水孔15,所述的隔温层11为冰袋1的外层,所述高强度丝化纤维层12为冰袋1的中间层,所述纤维强化塑料层13为冰袋1的内部填充物,所述冰袋1的顶端留有注水孔14,所述冰袋1的底端留有排水孔15。
一种高强复合冰袋的临时填充方法,包括如下步骤:
(1)在回采工作面支架后方按一定的间排距布置冰袋;
(2)采用矿井水通过冰袋顶端的注水孔注入冰袋,直至将冰袋注满后停止注水;
(3)开启快速冷冻机将冰袋内的水快速冷冻;
(4)将冷冻完成的冰袋以合理的间排距支撑采空区顶板,实现采空区充填,并留有足够的空间,为永久填充法与控制填充法提供有效的运输通道。合理的间排距不但形成足够的支撑力使顶板不垮落,而且节省了冰袋的使用数量,相对于其他临时填充方法是将填充材料全部填充满整个采空区,节省了材料,成本低。
临时填充方法为在规定时间内承担填充任务,不需要填充时溶解冰袋内冰即可。所述控制填充法为控制顶板的下沉量,且不会引起地面建筑物倾斜或地表断续下沉即可。所述永久填充法为将顶板控制,致使顶板不会下沉并形成永久支护材料运输通道,在冰袋的间距间安置胶带运输机运输永久填充材料沙、黄土、水泥及石膏完成永久填充。
通过实践证明对矿井采空区利用矿进内的废水快速冷冻,采用冰袋填充,填充体抗压强度高,可达到220Mpa以上,达到安全生产要求,降低了了生产成本。
以上实施例仅用于说明本发明,而并非对本发明的限制,有关技术领域的普通技术人员,在不脱离本发明的精神和范围的情况下,还可以做出各种变化和变型,因此所有等同的技术方案也属于本发明的范畴,本发明的专利保护范围应由权利要求限定。
Claims (4)
1.一种高强复合冰袋用于矿井采空区临时填充方法,其特征在于,包括冰袋,所述冰袋与快速冷冻机连接,所述冰袋包括隔温层、高强度丝化纤维层、纤维强化塑料层、注水孔及排水孔,所述的隔温层为冰袋的外层,所述高强度丝化纤维层为冰袋的中间层,所述纤维强化塑料层为冰袋的内部填充物,所述冰袋的顶端留有注水孔,所述冰袋的底端留有排水孔;
利用高强复合冰袋用于矿井采空区的临时填充方法,包括如下步骤:
(1)在回采工作面支架后方按一定的间排距布置冰袋;
(2)采用矿井水通过冰袋顶端的注水孔注入冰袋,直至将冰袋注满后停止注水;
(3)开启快速冷冻机将冰袋内的水快速冷冻;
(4)将冷冻完成的冰袋以合理的间排距支撑采空区顶板,实现采空区充填,并留有足够的空间,为永久填充法与控制填充法提供有效的运输通道。
2.如权利要求1所述的一种高强复合冰袋用于矿井采空区临时填充方法,其特征在于,临时填充方法为在规定时间内承担填充任务,不需要填充时溶解冰袋内冰即可。
3.如权利要求1所述的一种高强复合冰袋用于矿井采空区临时填充方法,其特征在于,所述控制填充法为控制顶板的下沉量,且不会引起地面建筑物倾斜或地表断续下沉即可。
4.如权利要求1所述的一种高强复合冰袋用于矿井采空区临时填充方法,其特征在于,所述永久填充法为将顶板控制,致使顶板不会下沉并形成永久支护材料运输通道,在冰袋的间距间安置胶带运输机运输永久填充材料沙、黄土、水泥及石膏完成永久填充。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510063691.4A CN104653223B (zh) | 2015-02-06 | 2015-02-06 | 一种高强复合冰袋及其临时填充方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510063691.4A CN104653223B (zh) | 2015-02-06 | 2015-02-06 | 一种高强复合冰袋及其临时填充方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104653223A CN104653223A (zh) | 2015-05-27 |
CN104653223B true CN104653223B (zh) | 2017-03-29 |
Family
ID=53244794
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510063691.4A Expired - Fee Related CN104653223B (zh) | 2015-02-06 | 2015-02-06 | 一种高强复合冰袋及其临时填充方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104653223B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106979033B (zh) * | 2017-05-09 | 2018-09-14 | 山东科技大学 | 一种厚煤层大采高采空区膏体充填施工方法 |
CN108518241B (zh) * | 2018-03-27 | 2019-05-21 | 东北大学 | 一种水岩联合注浆填充采场控沉治水方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1207569A (en) * | 1913-03-11 | 1916-12-05 | Arthur Langerfeld | Mining and surface support. |
US4315410A (en) * | 1980-05-12 | 1982-02-16 | Stal Refrigeration Ab | Method and apparatus for making ice blocks |
CN2422951Y (zh) * | 2000-04-14 | 2001-03-14 | 王建勋 | 冰袋 |
CN202637240U (zh) * | 2012-06-07 | 2013-01-02 | 姜海容 | 一种冷循环式人体降温装置 |
CN204436462U (zh) * | 2015-02-06 | 2015-07-01 | 西安科技大学 | 一种高强复合冰袋 |
-
2015
- 2015-02-06 CN CN201510063691.4A patent/CN104653223B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1207569A (en) * | 1913-03-11 | 1916-12-05 | Arthur Langerfeld | Mining and surface support. |
US4315410A (en) * | 1980-05-12 | 1982-02-16 | Stal Refrigeration Ab | Method and apparatus for making ice blocks |
CN2422951Y (zh) * | 2000-04-14 | 2001-03-14 | 王建勋 | 冰袋 |
CN202637240U (zh) * | 2012-06-07 | 2013-01-02 | 姜海容 | 一种冷循环式人体降温装置 |
CN204436462U (zh) * | 2015-02-06 | 2015-07-01 | 西安科技大学 | 一种高强复合冰袋 |
Also Published As
Publication number | Publication date |
---|---|
CN104653223A (zh) | 2015-05-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103615250B (zh) | 分条间柱全空场开采嗣后充填协同采矿法 | |
CN103016053B (zh) | 一种采空区局部充填控制地表沉陷的方法 | |
CN103670420B (zh) | 全断面竖井钻机 | |
CN102425427B (zh) | 盾构空推过矿山法隧道施工方法 | |
CN102155259B (zh) | 一种利用掘进废石构筑充填挡墙及其构筑方法 | |
CN104453930B (zh) | 一种隧道预衬砌施工设备及施工方法 | |
US20190301283A1 (en) | Method for recovering room-mining coal pillars by solid filling in synergy with artificial pillars | |
CN103628911B (zh) | 一种综采/放工作面分段式沿空留巷方法 | |
CN102182471B (zh) | 煤矿巷道高冒区超前支护方法 | |
CN105240048B (zh) | 一种基于膏体充填的气体充填方法 | |
CN106382118A (zh) | 无隔离墙主动接顶壁式充填采矿法 | |
CN110410076B (zh) | 一种用于老房柱采空区遗留煤柱回收的充填开采方法 | |
CN109882239B (zh) | 一种露天端帮压煤放射式充填开采方法 | |
CN104500070B (zh) | 一种连续采煤机膏体充填开采方法 | |
CN103883350A (zh) | 一种间隔跳采的充填采煤方法 | |
CN109869152B (zh) | 煤与瓦斯突出煤层预留巷道开采方法 | |
CN104088638B (zh) | 大倾角煤层长壁大采高工作面煤壁片帮及冒顶控制技术 | |
CN103388488A (zh) | 薄煤层沿空留巷充填方法 | |
CN105756702A (zh) | 一种巷旁网笼充填支护沿空留巷方法 | |
CN204691803U (zh) | 一种煤体柔性加固全长锚固锚杆 | |
CN103161498B (zh) | 急倾斜煤层区段煤柱巷旁充填方法 | |
CN104653223B (zh) | 一种高强复合冰袋及其临时填充方法 | |
CN104074542A (zh) | 一种煤矿co2砼式充填方法 | |
CN105240012A (zh) | 一种实现煤柱同采的f型区段采煤方法 | |
CN105604552B (zh) | 一种固体材料充填采煤沿空留巷方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170329 Termination date: 20210206 |