CN104652447A CN201410642678.XA CN201410642678A CN104652447A CN 104652447 A CN104652447 A CN 104652447A CN 201410642678 A CN201410642678 A CN 201410642678A CN 104652447 A CN104652447 A CN 104652447A
Authority
CN
China
Prior art keywords
steel wire
waist rail
prestressing
force
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410642678.XA
Other languages
Chinese (zh)
Other versions
CN104652447B (en
Inventor
盧炅範
盧又鉉
安声镛
安善福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gui Technology (strain) Again
Beijing Di Sheng Kechuang Construction Engineering Corp Ltd
Original Assignee
Gui Technology (strain) Again
Beijing Di Sheng Kechuang Construction Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gui Technology (strain) Again, Beijing Di Sheng Kechuang Construction Engineering Corp Ltd filed Critical Gui Technology (strain) Again
Priority to CN201410642678.XA priority Critical patent/CN104652447B/en
Publication of CN104652447A publication Critical patent/CN104652447A/en
Application granted granted Critical
Publication of CN104652447B publication Critical patent/CN104652447B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a temporary waist beam and specifically a temporary prestressed waist beam capable of importing and adding counterforce for a surface plate. The temporary prestressed waist beam capable of importing and adding counterforce for the surface plate is that the quantity of all steel materials are less than that of the traditional supporting waist beam; the construction economy is increased; the waist beam is extended, and the safety of the waist beam is improved; ground construction and structure arrangement in later works are simple and convenient; the construction can be reduced; the construction efficiency can be increased. The temporary prestressed waist beam capable of importing and adding counterforce for the surface plate is characterized in that vertical plates with a certain spacing are arranged; the waist beam passes through the vertical piles; a supporting seat for fixing and supporting the waist beam is equipped with a horizontal beam in the temporary waist beam of the surface plate, and the horizontal beam passes through the waist beam; weight PS steel wire fixing brackets are fixedly arranged at two ends of the horizontal beam; a PS steel wire bracket arranged between the weight PS steel wire fixing branch is used as a prestressed importing device; a PS steel wire is lapped on the weight PS steel wire fixing bracket and the PS steel wire supporting seat which is used as the prestressed importing device.

Description

The cladding plate of sustainable applying counter-force uses prestressed wale temporarily
Technical field
The invention relates to the cladding plate of sustainable applying counter-force temporarily with the technological invention that prestressed wale is relevant.Particularly the positive moment that the waist rail used in cladding plate construction occurs, first time prestressing force is applied according to initial Buckling Loads, second time prestressing force is applied according to the main prestressing steel of stretch-draw, auxiliary prestressing steel according to stretch-draw applies third time prestressing force, and the cladding plate applying the 4th prestressed sustainable applying counter-force according to stressing equipment uses prestressed wale temporarily.
The present invention is that improvement is applicable on traditional interim cladding plate prestressed wale, increases fixed support and the prestressing steel bearing of prestressing steel, strengthens the prestress application dynamics of prestressing steel.Shi Hanzhang more easily in construction, and when importing prestressing force, prevent the flexing of prestressing steel support, the cladding plate of the sustainable applying counter-force improve efficiency of construction, increase safety, expand span scope, improving economy uses prestressed wale temporarily.
Background technology
Pillar construction, the construction of PS cladding plate etc. are had in the current construction method often used in building field.
Wherein the construction of PS cladding plate imports prestressing force with prestressing steel, omits the method for support span of waist rail, is the technology of generation nineteen ninety in Japan's exploitation, and according to field condition use widely at home and abroad, here is its look-ahead technique.
The new case Heisei 2-23036 (1990.2.15 is open) of practicality of Japan is as shown in Fig. 1 to Fig. 3, horizontally set waist rail steel inside retaining wall, waist rail steel are applied in the cladding plate construction method made by hoist cable of band beam, vertical steel are set inside the waist rail material that length is short, in the middle of vertical steel top and waist rail material, prestressing steel is set as firm truss-like cladding plate, the waist rail material that length is longer arranges one or more vertical steel between hoist cable with hoist cable, between this vertical steel top waist rail material and hoist cable intersection point, prestressing steel is set, become firmer truss cladding plate, as the cladding plate construction method of feature.
As mentioned above, the construction method mentioned imports prestressed method with prestressing steel in waist rail, draw from fixed part two ends and open, or above vertical steel upper end hydraulic jacking device shifts prestressing steel onto, with its counter-force Shi Hanzhang to waist rail, after first time importing prestressing force, sustainable importing prestressing force on prestressing steel after above shifting onto, but because of in limited waist rail span scope, the magnitude setting of prestressing steel is restricted, after shifting top importing prestressing force onto, fixing prestressing steel relevant issues cause sustainablely constructing.
Japan Patent Heisei 6-57741 (1994.03.01. is open) is as shown in Fig. 4 to Fig. 6, after the I beam head inserted in the main hot body of formation retaining wall links with waist rail, vertical material is inserted on the surface of outside steel wire mode prestressing steel, fix two ends after being barricaded as arch, stress application is as the feature of this patent for the first time.
This retaining wall, according to being barricaded as the tension force of arch tendon with the stress at the initial stage of importing, being free to the distortion beyond adjustment face, displacement range is maintained in tolerance band.Because utilize outward trunk mode binding prestress steel ratio to be easier to arrange tendon, use rear convenience except, connect the tendon of retaining wall head because waist rail of ining succession is arranged, so obstacle when not causing underground construction, compared with Support types form of construction work, more can raise the efficiency.
But can not prestressing force be continuously applied after Shi Hanzhang for the first time, and also have the problems such as some construction sequences complexity.
As shown in Figure 7 and Figure 8, the inner side of retaining wall arranges the cladding plate construction method of waist rail to Japan Patent Heisei 7-56136 (1955.06.04 work announcement), and corner support is fixed.It is while a kind of inner side at waist rail arranges prestressing steel, prestressing steel hydraulic jacking device is arranged at the central authorities of waist rail, with prestressing steel as counter-force, applying converse power to reduce at waist rail with hydraulic jacking device is the prestressing force cladding plate construction method of feature to the soil pressure of waist rail.
This construction method is the prestressing steel counter-force that application waist rail is arranged, converse power is added at waist rail center at hydraulic jacking device, reduce side pressure in the moment of flexure of waist rail and shearing force, what expand waist rail can omit pillar across footpath, thus reduces cladding plate and footing excavation expense.
Further, arrange the support of waist rail across footpath according to the size of soil pressure and the average size of excavated earth, can guarantee spacious inner space, improving underground construction energy rate is feature.
The shortcoming of above-mentioned construction method is, when first time imports prestressing force or continue to import prestressing force, retains hydraulic jacking device in vertical material upper end always.
the content of invention
1, a kind of interim prestressing force cladding plate waist rail facility (100) importing additional counter-force, it has: with the plumb pile of the setting of certain spacing (110), the waist rail (120) through described plumb pile (110) and the Shui Pingliang (140) through described waist rail (120); Be arranged in described cladding plate waist rail facility (100) for bearing (130) that is fixing and that support described waist rail (120); At the weight PS steel wire fixed support (150) that described water Ping Liang (140) two ends are fixedly installed; The PS steel wire support arranged in the middle of described weight PS steel wire fixed support (150) prestressing force of holding concurrently imports equipment (160); Ride over described weight PS steel wire fixed support and described PS steel wire bearing prestressing force of holding concurrently and import the PS steel wire (170) be fixedly installed on facility (160); Be formed in described at the two ends of Shui Pingliang (140), and PS steel wire fixed part (180) that position is higher than this water Ping Liang (140).
2, the waist rail facility according to technical scheme 1, is characterized in that: the global shape of described weight PS steel wire fixed support (150) is columnar steel work; And there is the base plate (151) of predetermined thickness; The position on the top of described base plate (151) is provided with seat supports plate (152); The vertical panel (153) that form as one vertical with described seat supports plate (152) with described base plate (151); Protruding plate (154) is protruding with the side of described vertical panel (153); The inner side of vertical panel (153) forms the space with predetermined shape;
Described waist rail facility also has gripper shoe (190), ground pressing plate (200), maintains management PS steel wire fixed part (220).
3, the waist rail facility according to technical scheme 1, it is characterized in that: above weld described water Ping Liang (140) or be fixed with high strength I beam (230) with high-strength bolt (300), high strength I beam (230) and water Ping Liang (140) import prestressing force.
4, the waist rail facility according to technical scheme 1, is characterized in that: described PS steel wire bearing is held concurrently, and to import equipment (160) be that intended orientation on Shui Pingliang (140) is set up the vertically disposed fixed part (240) by bolt to prestressing force; The precalculated position of this fixed part (240) arranges hydraulic jacking device (250); And PS steel wire (170) is set on this fixed position (240) top, up promote to the movable part (260) of PS steel wire (170) Shi Hanzhang by hydraulic jacking device (250), fixed part inserts the movable part (260) limited about it; Connect displacement adjustment bolt (270) of this fixed part (240) and this movable part (260) up and down; Formed by predetermined shape inside the upper end of movable part (260).
5, a kind of interim prestressing force cladding plate waist rail facility (100) importing additional counter-force, it has: with the plumb pile of the setting of certain spacing (110), the waist rail (120) through described plumb pile (110) and the Shui Pingliang (140) through described waist rail (120); Be arranged in described cladding plate waist rail facility (100) for bearing (130) that is fixing and that support described waist rail (120); At the light weight PS steel wire fixed support (150a) that described water Ping Liang (140) two ends are fixedly installed; The PS steel wire support arranged in the middle of described light weight PS steel wire fixed support (150a) prestressing force of holding concurrently imports equipment (160); Ride over described light weight PS steel wire fixed support and described PS steel wire bearing prestressing force of holding concurrently and import the PS steel wire (170) be fixedly installed on facility (160); Be formed in described at the two ends of Shui Pingliang (140), and PS steel wire fixed part (180) that position is higher than this water Ping Liang (140).
6, the waist rail facility according to technical scheme 5, is characterized in that: the global shape of described light weight PS steel wire fixed support (150a) is the steel work of lineal hexahedral; And have by the asymmetrical gripper shoe (190a) being set in side tilt; The ground pressing plate (200a) of level is formed with described gripper shoe (190a); The PS steel wire fixed part (210a) formed as one with ground pressing plate (200a) level.
7, the waist rail facility according to technical scheme 5, is characterized in that: above-mentioned light weight PS steel wire bearing is held concurrently, and to import equipment (160a) be by the vertically disposed fixed part of bolt (240) on precalculated position on Shui Pingliang (140) to prestressing force; The hydraulic jacking device (250) that the precalculated position of this fixed part (240) is arranged; This fixed part (240) top arranges PS steel wire (170), up promotes to the movable part (260) of PS steel wire (170) Shi Hanzhang by hydraulic jacking device (250); Connect displacement adjustment bolt (270) of this fixed part (240) and this movable part (260) up and down; Formed by predetermined shape inside the upper end of movable part (260).
8, a kind of interim prestressing force cladding plate waist rail facility (100) importing additional counter-force, it has: with the plumb pile of the setting of certain spacing (110), the waist rail (120) through described plumb pile (110) and the Shui Pingliang (140) through described waist rail (120); Be arranged in described cladding plate waist rail facility (100) for bearing (130) that is fixing and that support described waist rail (120); The bonding high strength I beam (230) in Shui Pingliang (140) top by after using and bearing a heavy burden and in the other direction import initial flexing, more in addition Hi-tensile bolt (300) welding or the bonding prestressing force that imports; Easy light weight PS steel wire fixed support (290) is fixedly installed at high strength I beam two ends;
PS steel wire (170) is fixedly installed between easy light weight PS steel wire fixed support (290).
9, the waist rail facility according to technical scheme 8, is characterized in that: the support bracket fastened global shape of easy light weight PS steel wire is triangle; There is the base plate (291) of predetermined thickness and amplitude; The ground pressing plate (292) at right angle is formed with base plate (291); Gripper shoe (293) is set obliquely with base plate (291) and ground pressing plate (292); The PS steel wire fixed part (294) be fixedly installed with ground pressing plate (292).
10, the waist rail facility according to technical scheme 8, is characterized in that: the top preposition of high strength I beam is fixedly installed PS and leads steel wire (295).
11, the waist rail facility according to technical scheme 8, it is characterized in that: be fixedly installed light weight PS steel wire fixed support (150a) at Shui Pingliang (140) two ends, the steel work of light weight PS steel wire fixed support (150a) to be global shape be lineal hexahedral, there is the asymmetrical gripper shoe (190a) being set in side tilt, the ground pressing plate (200a) of level is formed, the PS steel wire fixed part (210a) formed as one with ground pressing plate (200a) level with gripper shoe (190a).
the problem solved
The present invention carries out to solve the problem studying and improving, improve emphatically the efficiency of economy and construction, whole steel quantity is reduced than traditional support waist rail, can construct under the environment of increasing economic efficiency, extend the safety of waist rail, strengthening waist rail, carry out ground excavation more easily and arrange the successive projects such as structure, be shorten the engineering time, the cladding plate improving the sustainable applying counter-force of efficiency of construction has its object with prestressed wale temporarily.
And, the positive bending moment occurred in cladding plate construction is applied to prestressing steel fixed position, stretch-draw prestressing force steel on the prestressing steel that insertion is arranged, disposable be fixed on waist rail after, this waist rail is set on retaining wall body, after being mutually fixedly set with hoist cable, prestressing steel bearing is held concurrently and is inserted hydraulic jacking device in prestressing force gatherer and up promote.After the boot portion of device up moves, Shi Hanzhang on prestressing steel, makes to produce counter-force in retaining wall direction, improves the safety of retaining wall and provide the interim prestressed wale of the cladding plate of sustainable applying counter-force to be object of the present invention.
Improvement is used for traditional cladding plate, the fixed support of the prestressing steel on temporory structure prestressed wale, prestressing steel bearing are held concurrently prestressing force gatherer, vertical beam, increase the prestressing force import volume of prestressing steel, be easy to the prestressing force applying to add in construction, prevent the prestressing force of holding concurrently of steel bearing when importing prestressing force from importing the flexing of equipment to improve its safety, can guarantee span scope, improve economy, provide the cladding plate of sustainable applying counter-force to use prestressed wale temporarily, be purpose of the present invention.
the effect of invention
As foregoing, the cladding plate of the present invention's sustainable applying counter-force has following effect with prestressed wale temporarily.
The first, the present invention is widened to 6 ~ 30m the spacing of bearing, reduces by the bearing of 50% ~ 70%, can reduce construction cost.
The second, the present invention can reduce the quantity of bearing, improves the efficiency of construction excavating construction.
3rd, the waist rail displacement that the present invention brings according to the change of soil pressure in construction, continues to be applied to prestressing steel prestressing force and improves its efficiency.
4th, the present invention with lower waist rail height, also can be able to construct in city.
Accompanying drawing explanation
Fig. 1 to Fig. 3 illustrates the plan view of traditional falsework structure.
Fig. 4 to Fig. 6 illustrates the plan view of traditional interim retaining wall.
Fig. 7 to Fig. 8 illustrates the plan view of traditional prestressing force cladding plate construction method.
Fig. 9 illustrates the plan view that traditional waist rail arranges state.
Figure 10 illustrates the oblique view that the present invention can import interim cladding plate prestressed wale the 1st embodiment of additional counter-force.
Figure 11 illustrates the front view that the present invention can import interim cladding plate prestressed wale the 1st embodiment of additional counter-force.
Figure 12 illustrates the plan view that the present invention can import interim cladding plate prestressed wale the 1st embodiment of additional counter-force.
Figure 13 illustrates the exploded perspective view that the present invention can import interim cladding plate prestressed wale the 1st embodiment of additional counter-force.
Figure 14 illustrates the oblique view that the present invention can import interim cladding plate prestressed wale the 2nd embodiment of additional counter-force.
Figure 15 illustrates the front view that the present invention can import interim cladding plate prestressed wale the 2nd embodiment of additional counter-force.
Figure 16 illustrates the plan view that the present invention can import interim cladding plate prestressed wale the 2nd embodiment of additional counter-force.
Figure 17 illustrates the exploded perspective view that the present invention can import interim cladding plate prestressed wale the 2nd embodiment of additional counter-force.
Figure 18 illustrates the oblique view that the present invention can import interim cladding plate prestressed wale the 3rd embodiment of additional counter-force.
Figure 19 illustrates the front view that the present invention can import interim cladding plate prestressed wale the 3rd embodiment of additional counter-force.
Figure 20 illustrates the plan view that the present invention can import interim cladding plate prestressed wale the 3rd embodiment of additional counter-force.
Figure 21 illustrates the exploded perspective view that the present invention can import interim cladding plate prestressed wale the 3rd embodiment of additional counter-force.
Figure 22 illustrates the oblique view that the present invention can import interim cladding plate prestressed wale the 4th embodiment of additional counter-force.
Figure 23 illustrates the front view that the present invention can import interim cladding plate prestressed wale the 4th embodiment of additional counter-force.
Figure 24 illustrates the plan view that the present invention can import interim cladding plate prestressed wale the 4th embodiment of additional counter-force.
Figure 25 illustrates the exploded perspective view that the present invention can import interim cladding plate prestressed wale the 4th embodiment of additional counter-force.
Figure 26 illustrates the oblique view that the present invention can import interim cladding plate prestressed wale the 5th embodiment of additional counter-force.
Figure 27 illustrates the front view that the present invention can import interim cladding plate prestressed wale the 5th embodiment of additional counter-force.
Figure 28 illustrates the plan view that the present invention can import interim cladding plate prestressed wale the 5th embodiment of additional counter-force.
Figure 29 illustrates the exploded perspective view that the present invention can import interim cladding plate prestressed wale the 5th embodiment of additional counter-force.
Figure 30 illustrates the interim cladding plate prestressed wale that the present invention can import additional counter-force and arranges oblique drawing of the state.
Detailed description of the invention
Below additional indication drawing of the present invention, is described in detail.
Detailed description of the invention 1: the prestressed large-span weight waist rail that can import additional counter-force
Figure 10 is the oblique view that prestressed wale the 1st case study on implementation used by the cladding plate of the sustainable applying counter-force of the present invention temporarily, Figure 11 is the front view that prestressed wale the 1st case study on implementation used by the cladding plate of the sustainable applying counter-force of the present invention temporarily, Figure 12 is the plan view that prestressed wale the 1st case study on implementation used by the cladding plate of the sustainable applying counter-force of the present invention temporarily, and Figure 13 figure is the exploded perspective view that prestressed wale the 1st case study on implementation used by the cladding plate of the sustainable applying counter-force of the present invention temporarily.
As shown in the figure, the cladding plate of the present invention's sustainable applying counter-force uses prestressed wale (P) to be with the plumb pile of certain spacing (110) temporarily; Waist rail (120) through plumb pile (110) is set; On the bearing (130) of the cladding plate temporory structure waist rail (100) of fixing, support wale, the Shui Pingliang (140) through waist rail (120) is set; The weight prestressing steel fixed support (150) be fixedly installed at Shui Pingliang (140) two ends; The prestressing steel support arranged in the middle of the weight prestressing steel fixed support (150) prestressing force of holding concurrently imports equipment (160); Be fixedly installed on weight prestressing steel fixed support and prestressing steel bearing prestressing force of holding concurrently and import prestressing steel (170) on equipment (160); Feature is configured at the prestressing steel fixed part (180) of the bonding higher beam in the two ends of Shui Pingliang (140).
At this, all shapes of weight prestressing steel fixed support (150) are cylindrical shape steel work, by certain thickness base plate (151); From the certain position on base plate (151) top, seat supports plate (152) is set; Vertical with seat supports plate (152) with base plate (151), the vertical panel (153) formed as one; The protruding plate (154) protruded in the side of vertical panel (153); The inner side of vertical panel (153) forms the space of given shape, and by gripper shoe (190), pressing plate (200), prestressing steel fixed part (180), form for the fixed part (220) etc. maintaining the prestressing steel of management.
Further, above-mentioned prestressing steel bearing hold concurrently prestressing force import equipment (160) be by the ad-hoc location on Shui Pingliang (140) with high-strength bolt (300) vertically disposed fixed position (240); The ad-hoc location of fixed position (240) is arranged hydraulic jacking device (250); Fixed position (240) top arranges prestressing steel (170), the up promotion of hydraulic jacking device, to prestressing steel (170) Shi Hanzhang, inserts at fixed part the movable part (260) that more than 1/2 limits left and right; Displacement adjustment bolt (270) of upper and lower connecting portion (240) and movable part (260); The prestressing force forming given shape inside the upper end of movable part (260) leads the formations such as steel wire (280).
Above-mentioned water Ping Liang (140) does not import prestressed general waist rail, the weight prestressing steel fixed support (150) that Shui Pingliang (140) rational height at waist rail (120) two ends is equal, the weight prestressing steel bearing of the vertical bonding determining deviation in the upper end in whole intervals of waist rail (120) prestressing force of holding concurrently imports equipment (160), between weight prestressing steel fixed support (150) and weight prestressing steel support are held concurrently, prestressing force importing equipment (160) is inner inserts prestressing steel (170), PS steel wire (170) first time Shi Hanzhang is drawn at the two ends of weight prestressing steel fixed support (150) in order to load and the adjustable hydraulic jacking device of displacement (250), after being fixedly installed waist rail (120), on prestressing force importing equipment (160) held concurrently by weight prestressing steel bearing, hydraulic jacking device (250) is set, hydraulic jacking device (250) is up promoted after-applied second time prestressing force on prestressing steel (170).Continue the change of corresponding soil pressure in construction, continue at the two ends of weight prestressing steel fixed support (150) to draw and open or remove prestressing steel (170).Its weight prestressing steel bearing is held concurrently, and to import equipment (160) be continue up or down adjustable stressing equipment at any time to prestressing force, becomes the prestressed large-span weight waist rail of sustainable applying counter-force.
The inscape of above-mentioned waist rail (120) has weight prestressing steel fixed support (150), Shui Pingliang (140), weight prestressing steel bearing prestressing force of holding concurrently to import equipment (160), prestressing steel (170).
At this, weight prestressing steel fixed support (150) is by prestressing steel fixed part (180), ground pressing plate (200), gripper shoe (190), maintain the management compositions such as prestressing steel fixed part (220), wherein the strong point (130) of bearing is done in the top of weight prestressing steel fixed support (150).
Further, weight prestressing steel bearing prestressing force of holding concurrently imports equipment (160) and is made up of the fixed part (240) of fixing water Ping Liang (140), hydraulic jacking device (250), the movable part (260) up promoted by hydraulic jacking device (250), connecting portion (240) and movable part (260), the displacement adjusting bolt (270) of fixing movable part (260).
Also have, movable part (260) top has prestressing force to lead steel wire (280), fixed part (240) below optionally has aims at adjustment bearing (310), prestressing steel (170) and prestressing steel gland (320) etc.As mentioned above, the cladding plate of the sustainable applying counter-force of the present invention uses the inscape of prestressed wale (P) to be temporarily: weight prestressing steel fixed support (150); Horizontal beam (140); Weight prestressing steel bearing hold concurrently prestressing force import equipment (160); After prestressing steel (170) consists of one, traditional bracing frame (130) spacing is 2 ~ 3m, but utilize the cladding plate of the sustainable applying counter-force of the present invention to use prestressed wale (P) spacing can be widened to 10 ~ 25m temporarily, the steel demand of bracing frame (130) can reduce 70% than the interim waist rail of traditional cladding plate, can be described as the cladding plate temporary construction method of an innovation.
The construction of prestressed wale used by cladding plate the following detailed description of the sustainable applying counter-force formed as mentioned above temporarily.
As shown in Figure 10 to 13, the cladding plate of the sustainable applying counter-force of the present invention by the construction method of prestressed wale is temporarily, with the plumb pile of certain spacing (110); Waist rail (120) through plumb pile (110) is set; On the bearing (130) of the cladding plate temporory structure waist rail (120) of fixing, support wale, the Shui Pingliang (140) through waist rail (120) is set; Weight prestressing steel fixed support (150) is fixedly installed at vertical beam (140) two ends; The weight prestressing steel fixed support arranged in the middle of the weight prestressing steel fixed support (150) prestressing force of holding concurrently imports equipment (160); The prestressing steel (170) that equipment (160) is fixedly installed is imported with above-mentioned weight prestressing steel fixed support (150) and prestressing steel bearing prestressing force of holding concurrently; After the bonding prestressing steel fixed part (180) than water Ping Liang (140) more jowar in the two ends of Shui Pingliang (140), hold concurrently from prestressing steel fixed part (180) to the weight prestressing steel bearing top of prestressing force gatherer (160) is built PS and is led steel wire (280), prestressing steel fixed part (180) primary Shi Hanzhang is afterwards reinforced, fixed bonding prestressing steel (170) with hydraulic pressure bracing means.And above-mentioned weight prestressing steel bearing is held concurrently after prestressing force imports equipment (160) up promotes, stretch-draw prestressing force steel (170) after-applied prestressing force for the second time.
At this, weight prestressing steel fixed support (150) is all shapes is columnar steel work, by certain thickness base plate (151); At the certain position on the top of base plate (151), seat supports plate (152) is set; Base plate (151) vertical panel (153) that form as one vertical with seat supports plate (152); The protruding plate (154) protruded with the side of vertical panel (153); The inner side of vertical panel (153) forms the space of given shape, and by gripper shoe (190), pressing plate (200), prestressing steel fixed part (180), form for the fixed part (220) etc. maintaining the prestressing steel of management.
Further, above-mentioned prestressing steel bearing hold concurrently prestressing force import equipment (160) be by the ad-hoc location on Shui Pingliang (140) with high-strength bolt (300) vertically disposed fixed position (240); The ad-hoc location of fixed position (240) is arranged hydraulic jacking device (250); Fixed position (240) top arranges prestressing steel (170), the up promotion of hydraulic jacking device, to prestressing steel (170) Shi Hanzhang, inserts at fixed part the movable part (260) that more than 1/2 limits left and right; Displacement adjustment bolt (270) of upper and lower connecting portion (240) and movable part (260); The prestressing force forming given shape inside the upper end of movable part (260) leads the formations such as steel wire (280).
The cladding plate of the sustainable applying counter-force of the present invention by the construction method of prestressed wale is temporarily, arranges the plumb pile (110) of a multiple determining deviation; Waist rail (120) through plumb pile (110) is set; at a right anglely between waist rail be fixedly installed on the waist rail (100) of the interim cladding plate of bearing (130), water Ping Liang (140) does not import prestressed general waist rail, the weight prestressing steel fixed support (150) that Shui Pingliang (140) rational height at waist rail (120) two ends is equal, the weight prestressing steel bearing of the vertical bonding determining deviation in the upper end in whole intervals of waist rail (120) prestressing force of holding concurrently imports equipment (160), between weight prestressing steel fixed support (150) and weight prestressing steel support are held concurrently, prestressing force importing equipment (160) is inner inserts prestressing steel (170), PS steel wire (170) first time Shi Hanzhang is drawn at the two ends of weight prestressing steel fixed support (150) in order to load and the adjustable hydraulic jacking device of displacement (250), after being fixedly installed waist rail (120), on prestressing force importing equipment (160) held concurrently by weight prestressing steel bearing, hydraulic jacking device (250) is set, hydraulic jacking device (250) is up promoted after-applied second time prestressing force on prestressing steel (170).Continue the change of corresponding soil pressure in construction, continue at the two ends of weight prestressing steel fixed support (150) to draw and open or remove prestressing steel (170).Its weight prestressing steel bearing is held concurrently, and to import equipment (160) be continue up or down adjustable stressing equipment at any time to prestressing force, becomes the prestressed large-span weight waist rail of sustainable applying counter-force.
The inscape of above-mentioned waist rail (120) has weight prestressing steel fixed support (150), Shui Pingliang (140) and weight prestressing steel bearing prestressing force of holding concurrently to import equipment (160), prestressing steel (170); Weight prestressing steel fixed support (150) is by prestressing steel fixed part (180), ground pressing plate (200), gripper shoe (190), maintain the management compositions such as prestressing steel fixed part (220), wherein the strong point (130) of bearing is done in the top of weight prestressing steel fixed support (150).
Weight prestressing steel bearing hold concurrently prestressing force import equipment (160) be by the fixed part (240) of fixing water Ping Liang (140); Hydraulic jacking device (250); Displacement adjustment bolt (270) of the movable part (260) up promoted by hydraulic jacking device (250), connecting portion (240), movable part (260), fixing movable part (260) forms.
Above-mentioned movable part (260) upper end has PS to lead steel wire (280), fixed part (240) below is optionally formed aims at adjustment bearing (310), and forms prestressing steel (170) and prestressing steel gland (320).As above-mentioned, the cladding plate of the sustainable applying counter-force of the present invention is weight PS steel wire fixed support (150) by the construction method of prestressed wale temporarily, horizontal beam (140), weight prestressing steel bearing hold concurrently prestressing force import equipment (160), after the assembling such as PS steel wire (170) is set to one, tradition cladding plate temporory structure waist rail (100) bearing (130) spacing be 2 ~ 3m, but utilize the cladding plate of the sustainable applying counter-force of the present invention to use prestressed wale (P) spacing can be widened to 10 ~ 25m temporarily, the steel demand of bracing frame (130) can reduce 70% than the interim waist rail of traditional cladding plate, can be described as the cladding plate temporary construction method of an innovation.
Detailed description of the invention 2
The oblique view of prestressed wale the 2nd case study on implementation used by the cladding plate that Figure 14 illustrates the sustainable applying counter-force of the present invention temporarily, the front view of prestressed wale the 2nd case study on implementation used by the cladding plate that Figure 15 illustrates the sustainable applying counter-force of the present invention temporarily, the plan view of prestressed wale the 2nd case study on implementation used by the cladding plate that Figure 16 illustrates the sustainable applying counter-force of the present invention temporarily, and the exploded perspective view of prestressed wale the 2nd case study on implementation used by the cladding plate that Figure 17 illustrates the sustainable applying counter-force of the present invention temporarily.
As shown in the figure, the cladding plate of the present invention's sustainable applying counter-force uses prestressed wale (P) to be with the plumb pile of certain spacing (110) temporarily; Waist rail (120) through plumb pile (110) is set; On the bearing (130) of the cladding plate temporory structure waist rail (100) of fixing, support wale, the Shui Pingliang (140) through waist rail (120) is set; The weight prestressing steel fixed support (150) be fixedly installed at Shui Pingliang (140) two ends; The prestressing steel support arranged in the middle of the weight prestressing steel fixed support (150) prestressing force of holding concurrently imports equipment (160); Be fixedly installed on weight prestressing steel fixed support and prestressing steel bearing prestressing force of holding concurrently and import prestressing steel (170) on equipment (160); Formed at the prestressing steel fixed part (180) of the bonding higher beam in the two ends of Shui Pingliang (140).
At this, weight prestressing steel fixed support (150) is all shapes is columnar steel work, by certain thickness base plate (151); At the certain position on the top of base plate (151), seat supports plate (152) is set; Base plate (151) vertical panel (153) that form as one vertical with seat supports plate (152); The protruding plate (154) protruded with the side of vertical panel (153); The inner side of vertical panel (153) forms the space of given shape, and by gripper shoe (190), pressing plate (200), prestressing steel fixed part (180), form for the fixed part (220) etc. maintaining the prestressing steel of management.
And, water Ping Liang (140) top welding or with the bonding high strength I beam (230) of high-strength bolt (300), initial Buckling Loads is applied, at high strength I beam (230) and the upper Shi Hanzhang of water Ping Liang (140) with the opposite direction of high strength I beam (230) load.
Further, above-mentioned prestressing steel bearing hold concurrently prestressing force import equipment (160) be by the ad-hoc location on Shui Pingliang (140) with high-strength bolt (300) vertically disposed fixed position (240); The ad-hoc location of fixed position (240) is arranged hydraulic jacking device (250); Fixed position (240) top arranges prestressing steel (170), the up promotion of hydraulic jacking device, to prestressing steel (170) Shi Hanzhang, inserts at fixed part the movable part (260) that more than 1/2 limits left and right; Displacement adjustment bolt (270) of upper and lower connecting portion (240) and movable part (260); The prestressing force forming given shape inside the upper end of movable part (260) leads the formations such as steel wire (280).
Use prestressed wale (P) to be that the water level ground beam central authorities definite part of waist rail is configured to bonding general I beam and high strength I beam (230) according to the cladding plate of the present invention's sustainable applying counter-force temporarily, apply initial flexing and import prestressed waist rail.The two ends of waist rail (120) arrange weight prestressing steel fixed support (150) deeply similar to water Ping Liang (140) beam, the weight prestressing steel bearing of the vertical bonding determining deviation in the upper end between the whole district of waist rail (120) prestressing force of holding concurrently imports equipment (160), weight prestressing steel fixed support (150) and weight prestressing steel bearing are held concurrently, and prestressing force importing equipment (160) is inner inserts prestressing steel (170), PS steel wire (170) first time Shi Hanzhang is drawn at the two ends of weight prestressing steel fixed support (150) in order to load and the adjustable hydraulic jacking device of displacement (250), after being fixedly installed waist rail (120), on prestressing force importing equipment (160) held concurrently by weight prestressing steel bearing, hydraulic jacking device (250) is set, hydraulic jacking device (250) is up promoted after-applied second time prestressing force on prestressing steel (170).Continue the change of corresponding soil pressure in construction, continue at the two ends of weight prestressing steel fixed support (150) to draw and open or remove prestressing steel (170).Its weight prestressing steel bearing hold concurrently prestressing force import equipment (160) be continue up or down can adjust prestressed equipment at any time.
Become the long span footpath weight waist rail that can apply counter-force, the inscape of above-mentioned waist rail (120) has weight prestressing steel fixed support (150), Shui Pingliang (140), weight prestressing steel bearing prestressing force of holding concurrently to import equipment (160), prestressing steel (170) etc.
Wherein, weight prestressing steel fixed support (150) is by prestressing steel fixed part (180), ground pressing plate (200), gripper shoe (190), maintain the management compositions such as prestressing steel fixed part (220), wherein the strong point (130) of bearing is done in the top of weight prestressing steel fixed support (150).
Further, the upper bonding high-tenacity I beam (230) of above-mentioned water Ping Liang (140), the Shui Pingliang (140) applying the load of initial flexing with service load is in the other direction formed.
Further, weight prestressing steel bearing hold concurrently prestressing force import equipment (160) be by the fixed part (240) of fixing water Ping Liang (140); Hydraulic jacking device (250); The movable part (260) up promoted by hydraulic jacking device (250); Displacement adjustment bolt (270) composition of upper and lower connecting portion (240) and movable part (260), also has movable part (260) top to have prestressing force to lead below steel wire (280), fixed part (240) and optionally has formations such as aiming at adjustment bearing (310), prestressing steel (170) and prestressing steel gland (320).
As above-mentioned, the cladding plate of the sustainable applying counter-force of the present invention uses prestressed wale (P) by weight prestressing force steel wire fixed support (150) temporarily, horizontal beam (140), weight prestressing steel bearing hold concurrently prestressing force import equipment (160), after the assembling such as prestressing steel (170) is set to one, tradition cladding plate temporory structure waist rail (100) bearing (130) spacing be 2 ~ 3m, but utilize the cladding plate of the sustainable applying counter-force of the present invention to use prestressed wale (P) spacing can be widened to 15 ~ 30m temporarily, the steel demand of bracing frame (130) can reduce to 70% than the interim waist rail (100) of traditional cladding plate, can be described as the cladding plate temporary construction method of an innovation.And, the above-mentioned Shui Pingliang (140) applying the cladding plate temporory structure prestressing force long span footpath weight waist rail of counter-force is the prestressing force water Ping Liang that upper bonding high-tenacity I beam (230) formation of general water Ping Liang (140) imports initial Buckling Loads, use prestressing force water level ground beam the spacing between bearing (130) can be widened to 20 ~ 30m, be one Eco-power, and the interference of MIN minimizing bearing (130) in construction is excavated at load, can effectively construct, the cladding plate improving application property in many-side uses waist rail temporarily.
Above-mentioned water Ping Liang (140) uses general I beam, the top of water Ping Liang (140) uses high strength I beam (230), bonding water Ping Liang (140) and high strength I beam (230), toward service load with after applying initial flexing in the other direction, fix with Hi-tensile bolt (300), at the upper Shi Hanzhang of Shui Pingliang (140), add the weight waist rail of the hardness of Shui Pingliang (140).
Below illustrate that the construction of prestressed wale used by the cladding plate of the sustainable applying counter-force of the present invention having foregoing to form temporarily.
As shown in Figure 14 to Figure 17, the cladding plate of the present invention's sustainable applying counter-force by the construction method of prestressed wale is temporarily: with the plumb pile of certain spacing (110); Waist rail (120) through plumb pile (110) is set; On the bearing (130) of the cladding plate temporory structure waist rail (100) of fixing, support wale, the Shui Pingliang (140) through waist rail (120) is set; The weight prestressing steel fixed support (150) be fixedly installed at Shui Pingliang (140) two ends; The prestressing steel support arranged in the middle of the weight prestressing steel fixed support (150) prestressing force of holding concurrently imports equipment (160); Be fixedly installed on weight prestressing steel fixed support and prestressing steel bearing prestressing force of holding concurrently and import prestressing steel (170) on equipment (160); Formed at the prestressing steel fixed part (180) of the bonding higher beam in the two ends of Shui Pingliang (140).The prestressing force of the top of prestressing force of holding concurrently from prestressing steel fixed part (180) to weight prestressing steel bearing importing equipment (160) is led steel wire and is arranged prestressing steel (170), with the hydraulic jacking device of prestressing steel fixed part (180) first time Shi Hanzhang post-stress steel (170), weight prestressing steel bearing prestressing force of holding concurrently is imported equipment (160) and up promotes after-applied second time prestressing force on prestressing steel (170) with hydraulic jacking device (250).
At this, weight prestressing steel fixed support (150) is all shapes is columnar steel work, by certain thickness base plate (151); At the certain position on the top of base plate (151), seat supports plate (152) is set; Base plate (151) vertical panel (153) that form as one vertical with seat supports plate (152); The protruding plate (154) protruded with the side of vertical panel (153); The inner side of vertical panel (153) forms the space of given shape, and by gripper shoe (190), pressing plate (200), prestressing steel fixed part (180), form for the fixed part (220) etc. maintaining the prestressing steel of management.
And the top of water Ping Liang (140) uses high strength I beam (230), bonding water Ping Liang (140) and high strength I beam (230), after on high strength I beam (230), the opposite direction of the load of use applies initial flexing, at high strength I beam (230) and the upper Shi Hanzhang of water Ping Liang (140).
Further, above-mentioned prestressing steel bearing hold concurrently prestressing force import equipment (160) be by the ad-hoc location on Shui Pingliang (140) with high-strength bolt (300) for the vertically disposed fixed position of unit (240); The hydraulic jacking device (250) that the ad-hoc location of fixed position (240) is arranged; Fixed position (240) top arranges prestressing steel (170), the up promotion of hydraulic jacking device, to prestressing steel (170) Shi Hanzhang, is inserted fixed part more than 1/2 and is limited the movable part (260) moved left and right afterwards; Displacement adjustment bolt (270) of upper and lower connecting portion (240) and movable part (260); The PS that given shape inside the upper end of movable part (260) is formed leads the formations such as steel wire (280).
Cladding plate according to the sustainable applying counter-force of the present invention by the construction method of prestressed wale is temporarily, arranges the plumb pile (110) of a multiple determining deviation; Arrange and be fixedly installed multiple waist rails (120) through plumb pile (110); be fixedly installed in the interim waist rail of cladding plate (100) of bearing (130) at a right angle between waist rail (120), the Shui Pingliang center bonding high strength I beam (230) of waist rail (120) applies initial flexing, become and import prestressed waist rail, the both ends of waist rail (120) arrange the weight prestressing steel fixed support (150) similar with water Ping Liang (140) deck-molding, the weight prestressing steel bearing that between the whole district of waist rail (120), certain spacing is vertically pasted in upper end prestressing force of holding concurrently imports equipment (160), weight prestressing steel fixed support (150) and weight prestressing steel bearing are held concurrently, and prestressing force importing equipment (160) is inner inserts prestressing steel (170), PS steel wire (170) first time of drawing the two ends of Zhang Chongliang prestressing steel fixed support (150) by load and the hydraulic system conjugating the hydraulic jacking device (250) that can regulate imports prestressing force, after being fixedly installed waist rail (120) weight prestressing steel bearing hold concurrently prestressing force import equipment (160) hydraulic jacking device (250) is set, second time prestressing force is imported to prestressing steel (170) after hydraulic jacking device (250) is up promoted, the change of corresponding soil pressure is continued in construction, continue at the two ends of weight prestressing steel fixed support (150) to draw and open or remove prestressing steel (170), weight prestressing steel bearing hold concurrently prestressing force import equipment (160) continue up or down can adjust prestressed device at any time.
Become the prestressing force long span footpath waist rail of sustainable applying counter-force, the inscape of above-mentioned waist rail (120) has weight prestressing steel fixed support (150), applies the Shui Pingliang (140) of initial flexing, weight prestressing steel bearing is held concurrently, and prestressing force imports equipment (160), prestressing steel (170); Weight prestressing steel fixed support (150) is by prestressing steel fixed part (180), ground pressing plate (200), gripper shoe (190), maintain the management compositions such as prestressing steel fixed part (220), wherein the strong point (130) doing bearing above of weight prestressing steel fixed support (150).
Further, above-mentioned water Ping Liang (140) is the upper bonding high-tenacity I beam (230) of general water Ping Liang (140), forms the initial flexing water Ping Liang importing initial Buckling Loads with service load in the other direction.
Further, weight prestressing steel bearing hold concurrently prestressing force import equipment (160) be by the fixed part (240) of fixing water Ping Liang (140); Hydraulic jacking device (250); According to the movable part (260) that hydraulic jacking device (250) up promotes, connecting portion (240) and movable part (260), displacement adjustment bolt (270) composition of fixing movable part (260).And, movable part (260) upper end has PS to lead steel wire (280), fixed part (240) below is optionally formed aims at adjustment bearing (310), and forms prestressing steel (170) and prestressing steel gland (320).
The cladding plate of the sustainable applying counter-force of the present invention formed as above-mentioned is weight PS steel wire fixed support (150) by the construction method of prestressed wale temporarily, import the horizontal beam (140) of initial flexing, weight prestressing steel bearing hold concurrently prestressing force import equipment (160), after PS steel wire (170) consists of one, (100) of bracing frame (130) spacing of tradition cladding plate temporory structure waist rail are 2 ~ 3m, but utilize the cladding plate of the sustainable applying counter-force of the present invention to use prestressed wale (P) to be widened to 15 ~ 30m temporarily, can reduce by bracing frame (130) the steel demand of 70% than the interim waist rail of traditional cladding plate, can be described as the cladding plate temporary construction method of an innovation.
Above-mentioned water Ping Liang (140) is on the water Ping Liang of general I beam, use the bonding water Ping Liang (140) of high strength I beam (230) and high strength I beam (230), with service load with after applying initial flexing in the other direction, fix with Hi-tensile bolt (300), at Shui Pingliang (140) Shi Hanzhang, add the weight waist rail of the hardness of Shui Pingliang (140).
Detailed description of the invention 3: the prestressing force long span footpath light weight waist rail that can apply additional counter-force
The oblique view of prestressed wale the 3rd case study on implementation used by the cladding plate that Figure 18 illustrates the sustainable applying counter-force of the present invention temporarily, the front view of prestressed wale the 3rd case study on implementation used by the cladding plate that Figure 19 illustrates the sustainable applying counter-force of the present invention temporarily, the plan view of prestressed wale the 3rd case study on implementation used by the cladding plate that Figure 20 illustrates the sustainable applying counter-force of the present invention temporarily, and the exploded perspective view of prestressed wale the 3rd case study on implementation used by the cladding plate that Figure 21 illustrates the sustainable applying counter-force of the present invention temporarily.
As shown in the figure, the cladding plate of the present invention's sustainable applying counter-force uses prestressed wale (P) to be with the plumb pile of certain spacing (110) temporarily; Waist rail (120) through plumb pile (110) is set; On the bearing (130) of the cladding plate temporory structure waist rail (100) of fixing, support wale, the Shui Pingliang (140) through waist rail (120) is set; The light weight prestressing steel fixed support (150a) be fixedly installed at Shui Pingliang (140) two ends; The light weight prestressing steel bearing arranged in the middle of the light weight prestressing steel fixed support (150a) prestressing force of holding concurrently imports equipment (160a); Be fixedly installed on light weight prestressing steel fixed support (150a) and light weight prestressing steel bearing prestressing force of holding concurrently and import prestressing steel (170) on equipment (160a); The prestressing steel fixed part (180) of the bonding beam higher than water Ping Liang (140) at the two ends of Shui Pingliang (140).
At this, the steel work of light weight prestressing steel fixed support (150a) to be all shapes be lineal hexahedral, by the gripper shoe (190a) being set to slanted asymmetric in side; The ground pressing plate (200a) of level is formed with gripper shoe (190a); The formations such as the prestressing steel fixed part (210a) formed as one with ground pressing plate (200a) level.
Further, above-mentioned light weight prestressing steel bearing hold concurrently prestressing force import equipment (160a) be by the ad-hoc location on Shui Pingliang (140) with high-strength bolt (300) for the vertically disposed fixed part of unit (240); The hydraulic jacking device (250) that the ad-hoc location of fixed part (240) is arranged; Fixed part (240) top arranges prestressing steel (170), by the up promotion of hydraulic jacking device to the movable part (260) of prestressing steel (170) Shi Hanzhang; Connect up and down and fixing fixed part (240) and movable part (260) displacement adjustment bolt (270); The PS forming given shape inside the upper end of movable part (260) leads the formations such as steel wire (280).The strong point that can apply the prestressing force long span footpath weight waist rail of additional counter-force spacing can be expanded to 10 ~ 30m, but the weight of unit waist rail is very heavy, not easily uses at the scene.
So need the spacing between bearing (130) to be the light weight waist rail of 8 ~ 18m.
The prestressing force long span footpath light weight waist rail of sustainable applying counter-force is that bearing (130) spacing of traditional interim cladding plate (100) can be expanded to 8 ~ 18m from 2 ~ 3m.
The prestressing force long span footpath waist rail that can import additional counter-force has to be made up of prestressing force importing equipment (160a), prestressing steel (170) etc. between light weight prestressing steel fixed support (150a), Shui Pingliang (140), light weight prestressing steel bearing.
At this, light weight prestressing steel fixed support (150a) be by prestressing steel fixed part (210a), pressing plate (200a), gripper shoe (190a) etc. form, the strong point doing above bearing of light weight prestressing steel fixed support (150a).
Further, above-mentioned water Ping Liang (140) is made up of general I beam.
Further, light weight prestressing steel bearing hold concurrently prestressing force import equipment (160a) be by the fixed part (240) of fixing water Ping Liang (140); Hydraulic jacking device (250); The movable part (260) up promoted by hydraulic jacking device (250); Connecting portion (240) and movable part (260), displacement adjusting bolt (270) composition of fixing movable part (260), movable part (260) top has prestressing force to lead steel wire (280), fixed part (240) below optionally has aims at adjustment bearing (310), the formations such as prestressing steel (170) and prestressing steel gland (320).
The cladding plate that the present invention formed as above-mentioned can import additional counter-force uses prestressed wale (P) to be that between light weight prestressing steel fixed support (150a), Shui Pingliang (140), light weight prestressing steel bearing, prestressing force imports equipment (160a) composition temporarily.Prestressing steel (170) is assembled into one and bearing (130) spacing can be expanded to 8 ~ 18m, uses waist rail (100) to reduce by the bearing (130) of more than 50% than traditional cladding plate temporarily.Further, the interference that construction can reduce bearing (130) is to greatest extent excavated in bottom, in very large range can improve construction.
As above-mentioned, the 1st, 2 case study on implementation long span footpath weight waist rails and the 3rd case study on implementation long span footpath light weight waist rail are to import prestressing force, guarantee the eccentric distance of prestressing steel (170), need certain waist rail height.
The weight of waist rail or light weight prestressing steel bearing are held concurrently, and to import the height of equipment (160,160a) higher for prestressing force, more increasing the eccentric effect of prestressing steel, can the soil pressure displacement when expanding Long span and construction effectively substituting.
On the contrary, close on location when this illustrates ground excavation construction and need certain distance to by between the structure of setting.
Overhead boundary line isolation with waist rail height general 1.5 to 2.0m after structure is set.
Can expand the spacing of bearing (130) significantly, reduce by the steel quantity of more than 50%, but according to the structure of waist rail, ground boundary line needs to the place arranging structure the space of certain distance to be a restriction condition.
Below, the cladding plate of the sustainable applying counter-force of the present invention as above-mentioned Composition of contents is described with prestressed wale construction temporarily.
As shown in Figure 18 to Figure 21, the cladding plate of the present invention's sustainable applying counter-force is with the plumb pile of certain spacing (110) by the construction method of prestressed wale temporarily, arrange and the Shui Pingliang (140) through waist rail (120), on the bearing (130) of the cladding plate temporory structure waist rail (100) of fixing, support wale, the Shui Pingliang (140) through waist rail (120) is set, the light weight prestressing steel fixed support (150a) be fixedly installed at vertical beam (140) two ends, , be fixedly installed on light weight prestressing steel fixed support (150a) and light weight prestressing steel bearing prestressing force of holding concurrently and import prestressing steel (170) on equipment (160a), be formed in the prestressing steel fixed part (210a) at Shui Pingliang (140) two ends, from above-mentioned prestressing steel fixed part (210a) to light weight prestressing steel bearing, the prestressing force prestressing force imported above equipment (160a) is led steel wire (280) and is arranged prestressing steel (170), with hydraulic tensioning device first time stretch-draw prestressing force steel fixed part (210a) after-applied prestressing force, fixing prestressing steel (170), light weight prestressing steel bearing hold concurrently prestressing force import equipment (160a) up promote with hydraulic jacking device, secondary stretch-draw prestressing force steel Shi Hanzhang.
At this, all shapes of light weight prestressing steel fixed support (150a) are the steel work of lineal hexahedral, by the asymmetrical gripper shoe (190a) arranging inclination in side; The ground pressing plate (200a) of level is formed with gripper shoe; The formations such as the prestressing steel fixed part (210a) formed as one with ground pressing plate (200a) level.
Further, above-mentioned light weight prestressing steel bearing hold concurrently prestressing force import equipment (160a) be by the ad-hoc location on Shui Pingliang (140) with high-strength bolt (300) vertically disposed fixed part (240); The hydraulic jacking device (250) that the ad-hoc location of fixed part (240) is arranged; Arrange prestressing steel (170) on fixed part (240) top, the up promotion of hydraulic jacking device is to the movable part (260) of prestressing steel (170) Shi Hanzhang; Upper and lower Lian Hejie fixes displacement adjustment bolt (270) of fixed part (240) and movable part (260); The PS forming given shape inside the upper end of movable part (260) leads the formations such as steel wire (280).
The strong point of the prestressing force long span footpath weight waist rail of sustainable applying counter-force spacing can be expanded to 10 ~ 30m, but the weight of unit waist rail is very heavy, not easily uses at the scene.
So need the spacing of bearing (130) to be also operable light weight waist rail in 8 ~ 18m.
The prestressing force long span footpath light weight waist rail of sustainable applying counter-force is that bearing (130) spacing of traditional interim cladding plate (100) can be expanded to 8 ~ 18m from 2 ~ 3m.
At this, light weight prestressing steel fixed support (150a) be by prestressing steel fixed part (210a), pressing plate (200a), gripper shoe (190a) etc. form, the strong point doing above bearing of light weight prestressing steel fixed support (150a).
Further, above-mentioned water Ping Liang (140) is made up of general I beam.
Further, light weight prestressing steel bearing hold concurrently prestressing force import equipment (160a) be by the fixed part (240) of fixing water Ping Liang (140); Hydraulic jacking device (250); According to the movable part (260) that hydraulic jacking device (250) up promotes; Connecting portion (240) and movable part (260), displacement adjusting bolt (270) composition of fixing movable part (260), movable part (260) top has prestressing force to lead steel wire (280), fixed part (240) below optionally has aims at adjustment bearing (310), the formations such as prestressing steel (170) and prestressing steel gland (320).
The cladding plate of the sustainable applying counter-force of the present invention formed as above-mentioned is used prestressed wale (P) to import equipment (160a) etc. by prestressing force between light weight prestressing steel fixed support (150a), Shui Pingliang (140), light weight prestressing steel bearing to form temporarily.Bearing (130) spacing can be expanded to 8 ~ 18m after prestressing steel (170) is assembled into one, can reduce by the bearing (130) of more than 50% than traditional general construction method.
Further, the interference that construction can reduce bearing (130) is to greatest extent excavated in bottom, can improve construction very on a large scale.
As above-mentioned, the 1st case study on implementation long span footpath weight waist rail and the 3rd case study on implementation long span footpath light weight waist rail are to import prestressing force, guarantee the eccentric distance of prestressing steel (170), need certain waist rail height.Between the weight of waist rail or light weight prestressing steel bearing, to import the height of equipment (160,160a) higher for prestressing force, more can increase the eccentric effect of prestressing steel, effectively can substitute according to the displacement of soil pressure when expanding Long span and construction.
On the contrary, close on location when this illustrates ground excavation construction and need certain distance to by the structure of setting.
Need when structure is then set and the spacing of ground boundary line 1.5 to 2.0m waist rail height.
This can expand the spacing of bearing (130) to a great extent, reduces by the steel quantity of more than 50%, but according to the structure of waist rail, ground boundary line needs the space of certain distance to be a restriction condition to the place arranging structure.
Detailed description of the invention 4: the prestressing force bottom girder light weight waist rail that can import additional counter-force
Figure 22 represents that the oblique view of prestressed wale the 4th case study on implementation used by the cladding plate of the sustainable applying counter-force of the present invention temporarily, the front view of prestressed wale the 4th case study on implementation used by the cladding plate that Figure 23 illustrates the sustainable applying counter-force of the present invention temporarily, the plan view of prestressed wale the 4th case study on implementation used by the cladding plate that Figure 24 illustrates the sustainable applying counter-force of the present invention temporarily, and the exploded perspective view of prestressed wale the 4th case study on implementation used by the cladding plate that Figure 25 illustrates the sustainable applying counter-force of the present invention temporarily.
As shown in the figure, the cladding plate of the present invention's sustainable applying counter-force uses prestressed wale (P) to be by with the plumb pile of certain spacing (110) temporarily; Arrange and the Shui Pingliang (140) through waist rail (120); On the bearing (130) of the cladding plate temporory structure waist rail (100) of fixing, support wale, the Shui Pingliang (140) through waist rail (120) is set; At ad-hoc location Hi-tensile bolt (300) welding or the bonding high strength I beam (230) of Shui Pingliang (140); Simple light weight prestressing steel fixed support (290) is fixedly installed at high strength I beam two ends; And be fixedly installed the compositions such as prestressing steel (170) between simple light weight prestressing steel fixed support (290).At this, between simple light weight prestressing steel is fixing, all shapes of (290) are triangles, by the base plate (291) of certain thickness and amplitude; The ground pressing plate (292) at right angle is formed with base plate (291); The gripper shoe (293) be obliquely installed with base plate and ground pressing plate (292); The formations such as the prestressing steel fixed part (294) be fixedly installed with ground pressing plate (292).
And it is shorter than water Ping Liang (140) high strength I beam (230) length, with water Ping Liang (140) bonding high strength I beam (230) toward service load with after applying initial flexing in the other direction, with the after-applied prestressing force of Hi-tensile bolt (300) strong adherence.
Apply the Shui Pingliang (140) of initial flexing exactly.
Further, the top ad-hoc location of high strength I beam (230) is fixedly installed prestressing force and leads steel wire (295).When this uses prestressed wale, certain distance to be had with cladding plate breast boards position with by the structure of setting, the effect of ability useful prestressing steel (170) Shi Hanzhang.
Under there is no the ground condition of spacing between the structure of breast boards and setting, also likely produce the situation can not using prestressing steel (170) Shi Hanzhang.
So need the waist rail reducing Shi Hanzhang waist rail height with prestressing steel.
So the 4th case study on implementation is the scheme that significantly can reduce waist rail.
As shown in Figure 22 to Figure 25, the cladding plate that the present invention can import additional counter-force is made up of simple light weight prestressing steel fixed support (290), Shui Pingliang (140), prestressing steel with prestressed wale temporarily.Above-mentioned simple light weight prestressing steel fixed support (290) be by prestressing steel fixed part (294), gripper shoe (293), pressing plate (292) formed, the upper bonding high strength I beam (230) of above-mentioned water Ping Liang (140), form the initial flexing water Ping Liang of the opposite direction Shi Hanzhang toward service load, and be made up of prestressing steel and prestressing steel gland.
At this, after above-mentioned simple light weight prestressing steel fixed support (290), Shui Pingliang (140), prestressing steel are assembled into one, the spacing of bearing can be expanded to 10 ~ 15m, reduce bearing more than 50% than traditional construction method.
And, the prestressing force bottom girder light weight waist depth of beam importing additional counter-force of the initial Buckling Loads of above-mentioned importing is at about 1m, can minimize cladding plate retaining wall and by arrange structure between distance, land utilization ratio is improved in down town, and the weight of waist rail also gentlier can be widened to 6 ~ 16m the distance between bearing (130), is the waist rail that an efficiency is high.
Further, because the opposite direction of the service load with water Ping Liang (140) imports initial Buckling Loads, so very stronger than its rigidity of waist depth of beam.
And in geotechnique's construction, when the waist rail of soil pressure conjugates large overleaf, also simply can continue Shi Hanzhang with simple light weight prestressing steel support (290), reduce waist rail manufacturing cost than first, second and third case study on implementation.
Also have when producing becoming of waist rail according to the change of soil pressure in construction, also can add at prestressing steel (170) timely and import prestressing force, can the innovative waist rail of safe construction.
Be below as foregoing the cladding plate of the sustainable applying counter-force of the present invention that forms use the explanation of the construction of prestressed wale temporarily.
As shown in Figure 22 to Figure 25, the cladding plate of the present invention's sustainable applying counter-force uses prestressed wale (P) to be with the plumb pile of certain spacing (110) temporarily; Arrange and the Shui Pingliang (140) through waist rail (120); On the bearing (130) of the cladding plate temporory structure waist rail (100) of fixing, support wale, the Shui Pingliang (140) through waist rail (120) is set; At ad-hoc location Hi-tensile bolt (300) welding or the bonding high strength I beam (230) of Shui Pingliang (140); The simple light weight prestressing steel fixed support (290) be fixedly installed at high strength I beam two ends; And the prestressing steel (170) be fixedly installed between simple light weight prestressing steel fixed support (290) forms.Prestressing steel (170) is reinforced at Shui Pingliang (140) Shi Hanzhang at the upper hydraulic tensioning equipment of using of simple light weight prestressing steel fixed support (290).
At this, between simple light weight prestressing steel is fixing, all shapes of (290) are triangles, by the base plate (291) of certain thickness and amplitude; The ground pressing plate (292) at right angle is formed with base plate (291); Gripper shoe (293) is set obliquely with base plate and ground pressing plate (292); The formations such as the prestressing steel fixed part (294) be fixedly installed with ground pressing plate (292).
And, shorter than water Ping Liang (140) high strength I beam (230) length, with water Ping Liang (140) bonding high strength I beam (230) toward service load with after in the other direction importing initial flexing, with Hi-tensile bolt (300) strong adherence and Shi Hanzhang.
At this, when using prestressed wale, cladding plate breast boards position and after the structure of setting will be had certain distance, just can bring effect with Shi Hanzhang steel (170) Shi Hanzhang.
There is no the ground condition of spacing between the structure of breast boards and setting under, also likely produce the situation that can not use and import prestressed prestressing steel (170).
So need the waist rail being reduced Shi Hanzhang waist rail height by prestressing steel (170).
Can be described as the scheme significantly reducing waist rail height.
As shown in Figure 22 to Figure 25, the cladding plate that the present invention can import additional counter-force is by simple light weight prestressing steel fixed support (290) with prestressed wale temporarily, water Ping Liang (140), prestressing steel formed, above-mentioned simple light weight prestressing steel fixed support (290) is by prestressing steel fixed part (294), gripper shoe (293), ground pressing plate (292) formed, above-mentioned water Ping Liang (140) is made up of general I beam, the upper bonding high strength I beam (230) of above-mentioned water Ping Liang (140) is toward service load and opposite direction Shi Hanzhang, form the initial flexing water Ping Liang of load.
At this, after above-mentioned simple light weight prestressing steel fixed support (290), the Shui Pingliang (140) importing initial flexing, prestressing steel are assembled into one, the spacing of bearing (130) can be expanded to 6 ~ 16m, reduce by the bearing of more than (130) 50% than traditional construction method.
And the prestressing force bottom girder light weight waist depth of beam of the continued counter-force of the initial Buckling Loads of above-mentioned importing is at about 1m, can minimize cladding plate retaining wall and by arrange structure between distance, land utilization ratio is improved in down town, and the weight of waist rail also gentlier can be widened to 6 ~ 16m the distance between bearing (130), is a high efficiency waist rail.
Also have because applying initial Buckling Loads, so very stronger than its rigidity of waist depth of beam in the other direction with the service load of water Ping Liang (140).
When the waist rail of back side soil pressure conjugates large in geotechnique's construction, also can continue Shi Hanzhang with simple light weight prestressing steel support (290), than the 1st, 2,3 case study on implementation reduce the manufacturing cost of waist rails.Waist rail described above is on waist rail, use prestressing steel (170), reduce the quantity of bearing (130) to a great extent, improve economy, expand (130) distance between bearing, can allow and excavate the obstacle that construction does not have bearing (130), be easy to excavated earth and structure are set.
Further, when producing the displacement of waist rail according to the change of soil pressure in construction, also can continue Shi Hanzhang at prestressing steel (170) timely, be one can the innovative waist rail of safe construction.
Detailed description of the invention 5: the prestressing force bottom girder light weight waist rail that can import additional counter-force
The oblique view of prestressed wale the 5th case study on implementation used by the cladding plate that Figure 26 illustrates the sustainable applying counter-force of the present invention temporarily, the front view of prestressed wale the 5th case study on implementation used by the cladding plate that Figure 27 illustrates the sustainable applying counter-force of the present invention temporarily, the plan view of prestressed wale the 5th case study on implementation used by the cladding plate that Figure 28 illustrates the sustainable applying counter-force of the present invention temporarily, the exploded perspective view of prestressed wale the 5th case study on implementation used by the cladding plate that Figure 29 illustrates the sustainable applying counter-force of the present invention temporarily, the cladding plate that Figure 30 illustrates the sustainable applying counter-force of the present invention arranges oblique drawing of the state with prestressed wale temporarily.
As shown in the figure, the cladding plate of the present invention's sustainable applying counter-force uses prestressed wale (P) to be by with the plumb pile of certain spacing (110) temporarily; Arrange and the Shui Pingliang (140) through waist rail (120); On the bearing (130) of the cladding plate temporory structure waist rail (100) of fixing, support wale, the Shui Pingliang (140) through waist rail (120) is set; At ad-hoc location Hi-tensile bolt (300) welding or the bonding high strength I beam (230) of Shui Pingliang (140); Simple light weight prestressing steel fixed support (290) is fixedly installed at high strength I beam two ends; And the compositions such as the prestressing steel (170) be fixedly installed between simple light weight prestressing steel fixed support (290).
At this, between simple light weight prestressing steel is fixing, all shapes of (290) are triangles, by the base plate (291) of certain thickness and amplitude; The ground pressing plate (292) at right angle is formed with base plate (291); The gripper shoe (293) be obliquely installed with base plate and ground pressing plate (292); The formations such as the prestressing steel fixed part (294) be fixedly installed with ground pressing plate (292).
And it is shorter than water Ping Liang (140) high strength I beam (230) length, with water Ping Liang (140) bonding high strength I beam (230) toward service load with after importing initial flexing in the other direction, with the after-applied prestressing force of Hi-tensile bolt (300) strong adherence.
The top ad-hoc location of high strength I beam (230) is fixedly installed PS and leads steel wire (295).
At this, when using prestressed wale, certain distance to be had with cladding plate breast boards position with by the structure of setting, could be effective with prestressing steel (170) Shi Hanzhang.
Under there is no the ground condition of spacing between the structure of breast boards and setting, also likely produce the situation that can not use prestressing steel (170) Shi Hanzhang.
So need the waist rail reducing Shi Hanzhang waist rail height with prestressing steel.
This is the constructure scheme that significantly can reduce waist rail.
As shown in Figure 26 to Figure 30, the cladding plate that the present invention can import additional counter-force is by simple light weight prestressing steel fixed support (290a) with prestressed wale temporarily, form by prestressing steel fixed part (294) with the two ends of prestressing steel (170) and water Ping Liang (140), gripper shoe (293), the simple light weight prestressing steel fixed support (290) that ground pressing plate (292) is formed, form prestressing force with the center of the high strength I beam (230) of above-mentioned water Ping Liang (140) and lead steel wire (295), and form auxiliary prestressing steel (330), become the structure of the inscape of the 4th case study on implementation and the continued Shi Hanzhang of auxiliary prestressing steel (330).The waist rail of above 5th case study on implementation is, common is suitable for prestressing steel (170) on waist rail, significantly reduce the quantity of bearing (130), improve economy, bearing (130) spacing is widened to 8 ~ 18m, excavate the obstacle that construction can not have bearing (130), be convenient to excavated earth and structure are set.
Also have when producing the displacement of waist rail according to the change of soil pressure in construction and also can continue Shi Hanzhang at prestressing steel (170) timely, can the carrying out of the safety innovative waist rail of constructing.
Be below as foregoing the cladding plate of the sustainable applying counter-force of the present invention that forms use the explanation of the construction of prestressed wale temporarily.
As shown in Figure 26 to Figure 30, the cladding plate of the present invention's sustainable applying counter-force uses prestressed wale (P) to be by with the plumb pile of certain spacing (110) temporarily; Shui Pingliang (140) through waist rail (120) is set; On the bearing (130) of the cladding plate temporory structure waist rail (100) of fixing, support wale, the Shui Pingliang (140) through waist rail (120) is set; At ad-hoc location Hi-tensile bolt (300) welding or the bonding high strength I beam (230) of Shui Pingliang (140); Simple light weight prestressing steel fixed support (290) is fixedly installed at high strength I beam two ends; And be fixedly installed the compositions such as prestressing steel (170) between simple light weight prestressing steel fixed support (290).Upper with hydraulic tensioning equipment stretch-draw prestressing force steel (170) simple light weight prestressing steel fixed support (290), at the upper Shi Hanzhang of Shui Pingliang (140).
At this, all shapes of simple light weight prestressing steel fixed support (290) are triangles, by the base plate (291) of certain thickness and amplitude; The ground pressing plate (292) at right angle is formed with base plate (291); The gripper shoe (293) be obliquely installed with base plate and ground pressing plate (292); The formations such as the prestressing steel fixed part (294) be fixedly installed with ground pressing plate (292).
And it is shorter than water Ping Liang (140) high strength I beam (230) length, with water Ping Liang (140) bonding high strength I beam (230) toward service load with after applying initial flexing in the other direction, with the after-applied prestressing force of Hi-tensile bolt (300) strong adherence.
Further, the top ad-hoc location of high strength I beam (230) is fixedly installed PS and leads steel wire (295).When using prestressed wale, certain distance to be had with cladding plate breast boards position with by the structure of setting, the effect of the Shi Hanzhang of the useful prestressing steel of ability (170).
Under there is no the ground condition of spacing between the structure of breast boards and setting, also likely produce the situation that can not use prestressing steel (170) Shi Hanzhang.
So need the waist rail that can be reduced Shi Hanzhang waist rail height by prestressing steel (170).
This is the scheme that significantly can reduce waist rail height.
As shown in Figure 26 to Figure 30, by prestressing steel fixed support (290) by the construction method of prestressed wale according to the cladding plate of the sustainable applying counter-force of the present invention temporarily, water Ping Liang (140), prestressing steel (170), the prestressing steel fixed part (294) at water Ping Liang (140) two ends, ground pressing plate (292), the simple prestressing steel fixed support (150a) that gripper shoe (293) etc. are formed, form prestressing force with the center of the high strength I beam (230) of above-mentioned water Ping Liang (140) and lead steel wire (295), and form auxiliary prestressing steel (330), Shi Hanzhang can be continued according to the inscape of the 4th case study on implementation and auxiliary prestressing steel waist rail.
The waist rail of above 5th case study on implementation is common applicable prestressing steel (170) on waist rail, significantly reduce the quantity of bearing (130), improve economy, expand standoff distance 8 ~ 18m, excavate the obstacle that construction can not have bearing (130), be convenient to excavated earth and structure are set.
Further, when producing the displacement of waist rail according to the change of soil pressure in construction, also Shi Hanzhang can be continued at prestressing steel (170) timely, can the carrying out of the safety innovative waist rail of constructing.
symbol description
100: use cladding plate waist rail temporarily
110: plumb pile
120: waist rail
130: bearing
140: Shui Pingliang
150: weight PS steel wire fixed support
150a: light weight PS steel wire fixed support
151: base plate
152: seat supports plate
153: vertical panel
154: protruding plate
160: weight PS steel wire bearing hold concurrently prestressing force import equipment
160a: light weight PS steel wire bearing hold concurrently prestressing force import equipment
170:PS steel wire
180:PS steel wire fixed part
180a:PS steel wire fixed part
190: gripper shoe
190a: gripper shoe
200: ground pressing plate
200a: ground pressing plate
220: maintain management PS steel wire fixed part
230: high strength I beam
240: fixed part
250: hydraulic jacking device
260: movable part
270: displacement adjusting bolt
280:PS leads steel wire
290: easy light weight PS steel wire fixed support
291: base plate
292: ground pressing plate
293: gripper shoe
294:PS steel wire fixed part
300: Hi-tensile bolt
310: aim at adjustment bearing
320:PS steel wire gland
330: auxiliary PS steel wire
P: the interim cladding plate prestressed wale that can import additional counter-force.

Claims (11)

1. one kind can import interim prestressing force cladding plate waist rail facility (100) of additional counter-force, and it has:
With the plumb pile of the setting of certain spacing (110), the waist rail (120) through described plumb pile (110) and the Shui Pingliang (140) through described waist rail (120);
Be arranged in described cladding plate waist rail facility (100) for bearing (130) that is fixing and that support described waist rail (120);
At the weight PS steel wire fixed support (150) that described water Ping Liang (140) two ends are fixedly installed;
The PS steel wire support arranged in the middle of described weight PS steel wire fixed support (150) prestressing force of holding concurrently imports equipment (160);
Ride over described weight PS steel wire fixed support and described PS steel wire bearing prestressing force of holding concurrently and import the PS steel wire (170) be fixedly installed on facility (160);
Be formed in described at the two ends of Shui Pingliang (140), and PS steel wire fixed part (180) that position is higher than this water Ping Liang (140).
2. waist rail facility according to claim 1, is characterized in that:
The global shape of described weight PS steel wire fixed support (150) is columnar steel work; And there is the base plate (151) of predetermined thickness;
The position on the top of described base plate (151) is provided with seat supports plate (152);
The vertical panel (153) that form as one vertical with described seat supports plate (152) with described base plate (151); Protruding plate (154) is protruding with the side of described vertical panel (153);
The inner side of vertical panel (153) forms the space with predetermined shape;
Described waist rail facility also has gripper shoe (190), ground pressing plate (200), maintains management PS steel wire fixed part (220).
3. waist rail facility according to claim 1, is characterized in that:
Above weld described water Ping Liang (140) or be fixed with high strength I beam (230) with high-strength bolt (300), high strength I beam (230) and water Ping Liang (140) import prestressing force.
4. waist rail facility according to claim 1, is characterized in that:
Described PS steel wire bearing is held concurrently, and to import equipment (160) be that intended orientation on Shui Pingliang (140) is set up the vertically disposed fixed part (240) by bolt to prestressing force;
The precalculated position of this fixed part (240) arranges hydraulic jacking device (250); And PS steel wire (170) is set on this fixed position (240) top, up promote to the movable part (260) of PS steel wire (170) Shi Hanzhang by hydraulic jacking device (250), fixed part inserts the movable part (260) limited about it;
Connect displacement adjustment bolt (270) of this fixed part (240) and this movable part (260) up and down; Movable part (260)
Upper end inside formed by predetermined shape.
5. one kind can import interim prestressing force cladding plate waist rail facility (100) of additional counter-force, and it has:
With the plumb pile of the setting of certain spacing (110), the waist rail (120) through described plumb pile (110) and the Shui Pingliang (140) through described waist rail (120);
Be arranged in described cladding plate waist rail facility (100) for bearing (130) that is fixing and that support described waist rail (120);
At the light weight PS steel wire fixed support (150a) that described water Ping Liang (140) two ends are fixedly installed;
The PS steel wire support arranged in the middle of described light weight PS steel wire fixed support (150a) prestressing force of holding concurrently imports equipment (160);
Ride over described light weight PS steel wire fixed support and described PS steel wire bearing prestressing force of holding concurrently and import the PS steel wire (170) be fixedly installed on facility (160);
Be formed in described at the two ends of Shui Pingliang (140), and PS steel wire fixed part (180) that position is higher than this water Ping Liang (140).
6. waist rail facility according to claim 5, is characterized in that:
The global shape of described light weight PS steel wire fixed support (150a) is the steel work of lineal hexahedral; And have by the asymmetrical gripper shoe (190a) being set in side tilt; The ground pressing plate (200a) of level is formed with described gripper shoe (190a); The PS steel wire fixed part (210a) formed as one with ground pressing plate (200a) level.
7. waist rail facility according to claim 5, is characterized in that:
Above-mentioned light weight PS steel wire bearing is held concurrently, and to import equipment (160a) be by the vertically disposed fixed part of bolt (240) on precalculated position on Shui Pingliang (140) to prestressing force;
The hydraulic jacking device (250) that the precalculated position of this fixed part (240) is arranged;
This fixed part (240) top arranges PS steel wire (170), up promotes to the movable part (260) of PS steel wire (170) Shi Hanzhang by hydraulic jacking device (250);
Connect displacement adjustment bolt (270) of this fixed part (240) and this movable part (260) up and down; Movable part (260)
Upper end inside formed by predetermined shape.
8. one kind can import interim prestressing force cladding plate waist rail facility (100) of additional counter-force, and it has:
With the plumb pile of the setting of certain spacing (110), the waist rail (120) through described plumb pile (110) and the Shui Pingliang (140) through described waist rail (120);
Be arranged in described cladding plate waist rail facility (100) for bearing (130) that is fixing and that support described waist rail (120);
The bonding high strength I beam (230) in Shui Pingliang (140) top by after using and bearing a heavy burden and in the other direction import initial flexing, more in addition Hi-tensile bolt (300) welding or the bonding prestressing force that imports;
Easy light weight PS steel wire fixed support (290) is fixedly installed at high strength I beam two ends;
PS steel wire (170) is fixedly installed between easy light weight PS steel wire fixed support (290).
9. waist rail facility according to claim 8, is characterized in that:
The support bracket fastened global shape of easy light weight PS steel wire is triangle;
There is the base plate (291) of predetermined thickness and amplitude; The ground pressing plate (292) at right angle is formed with base plate (291); Gripper shoe (293) is set obliquely with base plate (291) and ground pressing plate (292); The PS steel wire fixed part (294) be fixedly installed with ground pressing plate (292).
10. waist rail facility according to claim 8, is characterized in that:
The top preposition of high strength I beam is fixedly installed PS and leads steel wire (295).
11. waist rail facilities according to claim 8, is characterized in that:
Light weight PS steel wire fixed support (150a) is fixedly installed at Shui Pingliang (140) two ends, the steel work of light weight PS steel wire fixed support (150a) to be global shape be lineal hexahedral, there is the asymmetrical gripper shoe (190a) being set in side tilt, the ground pressing plate (200a) of level is formed, the PS steel wire fixed part (210a) formed as one with ground pressing plate (200a) level with gripper shoe (190a).
CN201410642678.XA 2014-11-14 2014-11-14 The sustainable cladding plate that applies counter-force is used prestressed wale temporarily Expired - Fee Related CN104652447B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410642678.XA CN104652447B (en) 2014-11-14 2014-11-14 The sustainable cladding plate that applies counter-force is used prestressed wale temporarily

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410642678.XA CN104652447B (en) 2014-11-14 2014-11-14 The sustainable cladding plate that applies counter-force is used prestressed wale temporarily

Publications (2)

Publication Number Publication Date
CN104652447A true CN104652447A (en) 2015-05-27
CN104652447B CN104652447B (en) 2016-05-25

Family

ID=53244041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410642678.XA Expired - Fee Related CN104652447B (en) 2014-11-14 2014-11-14 The sustainable cladding plate that applies counter-force is used prestressed wale temporarily

Country Status (1)

Country Link
CN (1) CN104652447B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677191A (en) * 2017-02-16 2017-05-17 东北大学 Novel detachable foundation pit bracing system and construction mounting method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6319334A (en) * 1986-07-11 1988-01-27 Shimizu Constr Co Ltd Waling work in sheathing construction
JPH0657741A (en) * 1992-08-05 1994-03-01 Kajima Corp Earth retaining wall
CN1134489A (en) * 1996-01-23 1996-10-30 冶金工业部建筑研究总院 Anchoring method for prestressed anchor line wall-protecting pile without waist beam
CN101050632A (en) * 2007-05-18 2007-10-10 北京建工集团有限责任公司 Prestressed wale dismantling and replacing structure and method
CN201228356Y (en) * 2008-06-10 2009-04-29 北京六建集团公司 Pit anchored pile-anchor breast wall concrete middle beam structure
CN202787272U (en) * 2012-07-16 2013-03-13 中铁隧道集团有限公司 Foundation pit envelop enclosure with prestressed tendons matched on vertical retaining structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6319334A (en) * 1986-07-11 1988-01-27 Shimizu Constr Co Ltd Waling work in sheathing construction
JPH0657741A (en) * 1992-08-05 1994-03-01 Kajima Corp Earth retaining wall
CN1134489A (en) * 1996-01-23 1996-10-30 冶金工业部建筑研究总院 Anchoring method for prestressed anchor line wall-protecting pile without waist beam
CN101050632A (en) * 2007-05-18 2007-10-10 北京建工集团有限责任公司 Prestressed wale dismantling and replacing structure and method
CN201228356Y (en) * 2008-06-10 2009-04-29 北京六建集团公司 Pit anchored pile-anchor breast wall concrete middle beam structure
CN202787272U (en) * 2012-07-16 2013-03-13 中铁隧道集团有限公司 Foundation pit envelop enclosure with prestressed tendons matched on vertical retaining structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677191A (en) * 2017-02-16 2017-05-17 东北大学 Novel detachable foundation pit bracing system and construction mounting method thereof

Also Published As

Publication number Publication date
CN104652447B (en) 2016-05-25

Similar Documents

Publication Publication Date Title
CN103614969B (en) Steel truss girder assembling, erecting and construction process
CN204059395U (en) The pre-buried location structure of stone bolt
CN108104825B (en) A kind of shield tunnel tunnel bottom backfills assembly construction method
CN103614970A (en) Longitudinal-pulling and transverse-pushing sliding system used for assembly and erection construction of steel truss girder
CN105972313B (en) One kind is across base pit engineering conduit wiring suspension method and overhung construction
CN205806684U (en) A kind of across base pit engineering conduit wiring suspension structure
CN104847380A (en) Tunnel lining structure internal force reducing structure and construction method thereof
CN104532749A (en) Support used for construction of upper beam of main tower of suspension bridge
CN109322241A (en) Trestle work structure and construction method
CN210286436U (en) Rain sewage pipe hoist and mount system that slides
KR20150093523A (en) Joint Structure of Pile-to-Pile cap Connection for Concrete Structure
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN204001424U (en) Super large caliber assembled crotch post
CN107476810B (en) Back wall structure of pushing device
CN103233426A (en) Bailey beam support free of buttress in soft foundation and supporting method thereof
KR20160012352A (en) Top-Down method of underground structure using the CFT and the Composite Beam
CN104652447A (en) Temporary prestressed waist beam capable of continuously applying counterforce for surface plate
CN110656590B (en) Self-balancing stone arch bridge arch sheathing reinforcing method
CN105421477A (en) Construction method for tower crane foundation
CN205024719U (en) Pile foundation and integrated reverse construction vertical braces system of underground continuous wall
CN209412681U (en) Trestle work structure
CN204677212U (en) A kind of structure reducing tunnel lining structure internal force
CN204475536U (en) With the precast member for reinforcing bar concrete that rigid joint connects
CN203022409U (en) Iron tower support assembly
CN205530345U (en) Modular many storehouses utility tunnel structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160525

Termination date: 20171114