CN104652415A - 地下管道沉降修复高聚物膜袋注浆方法 - Google Patents

地下管道沉降修复高聚物膜袋注浆方法 Download PDF

Info

Publication number
CN104652415A
CN104652415A CN201510069861.XA CN201510069861A CN104652415A CN 104652415 A CN104652415 A CN 104652415A CN 201510069861 A CN201510069861 A CN 201510069861A CN 104652415 A CN104652415 A CN 104652415A
Authority
CN
China
Prior art keywords
sedimentation
pipeline
high polymer
film bag
polymer material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510069861.XA
Other languages
English (en)
Other versions
CN104652415B (zh
Inventor
王复明
钟燕辉
石明生
方宏远
王小亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Anyuan Engineering Technology Co Ltd
Original Assignee
Zhengzhou Anyuan Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Anyuan Engineering Technology Co Ltd filed Critical Zhengzhou Anyuan Engineering Technology Co Ltd
Priority to CN201510069861.XA priority Critical patent/CN104652415B/zh
Publication of CN104652415A publication Critical patent/CN104652415A/zh
Priority to US14/969,474 priority patent/US9353888B2/en
Application granted granted Critical
Publication of CN104652415B publication Critical patent/CN104652415B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/168Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe
    • F16L55/175Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe by using materials which fill a space around the pipe before hardening
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Pipe Accessories (AREA)
  • Sewage (AREA)

Abstract

本发明涉及一种地下管道沉降修复高聚物膜袋注浆方法,其包括以下步骤:(1)检测沉陷管段,确定注浆方案;(2)钻膜袋放置孔;(3)放置膜袋;(4)向膜袋内注射高聚物材料;(5)抬升管段;(6)填充脱空区域、加固软弱土层。所述高聚物材料为非水反应类双组份高聚物材料。本发明具有快捷、微创、轻质、高韧、经济、耐久等优点,可快速实现对地下沉降管段的抬升修复,为地下管道沉降修复提供了一种先进、高效、经济、实用的新方法。本发明已成功应用于多个地下管道抬升工程,具有巨大的经济、社会效益和广阔的发展应用前景。

Description

地下管道沉降修复高聚物膜袋注浆方法
技术领域
本发明属于地下管道修复技术,尤其涉及软弱土层等不良地质引起的管道沉降抬升非开挖修复的高聚物注浆方法。
背景技术
地下管道属隐蔽性工程,由于我国地质条件复杂多变,地下管道在修建过程中经常遇到软弱土层等不良地质环境,如果处理不当,地下管道建成后易出现沉降,造成管段连接处产生错位、渗漏等病害。在地下水压力作用下,周围土体由错缝进入管道,造成地下管道淤堵,影响其使用功能,导致居民生活不便。更为严重的是,渗漏点周围土体不断进入污水管道,将造成管外脱空,随着时间的累积将导致地面开裂塌陷,造成交通堵塞、人员伤亡,并严重威胁附近建(构)筑物的安全。因此,修复地下管道沉降病害对于保证沿线人民群众正常生活以及生命财产安全具有重要作用。
现有地下管道维修方法主要有两类:一类是开挖修复、更换管道,另一类是非开挖修复方法。开挖修复方法指开挖破损管道位置上方土层,对破损管道进行局部修复或者整体更换新管道的方法。虽然该方法可以有效解决管段沉降问题,但是这类方法施工成本高,工期长,施工区居民生活及交通受到严重干扰,并且很多情况下城市密集的地下基础设施、地面的绿化面积和建筑楼群以及繁忙的交通,留给开挖施工的余地很小,使得地下管道的修复更换根本不能实现。非开挖修复方法目前主要有原位固化法、穿插法、爆管法、折叠内衬法和喷涂法等。原位固化法是将浸有树脂的软管一端翻转并用夹具固定在待修复管道的入口处,然后利用水压或气压使软衬管浸有树脂的内层翻转到外面并与旧管的内壁紧贴,然后使树脂固化,形成一层紧贴旧管内壁的具有防腐防渗功能的坚硬衬里。其缺点是需要特殊的施工设备,对工人的技术水平和经验有较高要求。穿插法指在旧管道中直接拖入新管,并在新旧管的环向空隙中注浆稳固的方法。其缺点在于对原有管道过流而积的减少较大,施工完成后需要灌浆。爆管法主要依靠前端的钢制锥形头在气动锤或牵引机的作用下击碎旧管道,内衬塑料管跟着锥形头前进,最后完成替换旧管的施工。其局限主要是需要开挖地面进行直观连接,对于严重错位的原有管道,新管道也将产生严重错位现象,需要开挖起始工作坑和接收工作坑等。折叠内衬法原理是使用PE或PVC作为管道材料,施工前先在工厂或工地改变管道几何形状减少其断面,然后将断面缩小的管道拉入原有管道,当管道就位后利用加热或加压的方法使折叠后的管道膨胀恢复原来的大小和形状,形成与原有管道紧密贴合的内衬管。其缺点是施工时可能引起结构性的破坏(破裂或走向偏离)。喷涂法是利用水泥砂浆或有机化学浆材在管道内部喷涂一层膜对旧管道进行修复的方法。其缺点是对管道清洗和堵漏的要求很高,修复的时间较长,对管道缺陷修复能力有限,费时费力,质量不稳定。
综上所述,这些方法虽然可以在一定程度上解决地下管道结构病害以及渗漏水问题,但都或多或少存在造价高、工期长、施工难度大、施工质量不易控制、施工时需开挖工作坑等问题,且这些方法都不能实现对沉降管段的抬升修复以及软弱地基的加固,修复后的管段仍然可能出现二次沉降,导致管段接缝处再次发生错位,造成渗漏、涌沙。由于现行方法都无法根治地下管道因沉降造成的管段间错缝、渗漏等病害,因此,迫切需要研发一种施工快捷、环境影响小、成本低、实用可靠的地下管道沉降抬升修复新技术。
高聚物注浆技术是上世纪70年代发展起来的地基快速加固技术。该技术通过向地基中注射双组份高聚物材料,利用两种材料混合后迅速反应膨胀并固化的特性,达到加固地基、填充脱空或提升地板的目的。高聚物材料具有质量轻,反应快,耐久性好,防渗性能优良等特点。目前,高聚物注浆技术主要应用于道路、隧道、堤坝、等大型基础设施防渗、加固和修复工程中。本发明人针对我国地下管道养护工程的发展需求与目前地下管道维修技术的不足,将高聚物膜袋注浆技术与高聚物导管注浆技术相结合,发明一种地下管道沉降修复高聚物膜袋注浆方法。这一创新目前国内还未见相关报道。
发明内容
本发明目的在于针对地下管道由于软弱土层等不良地质引起沉降问题,开发一种新的地下管道沉降修复高聚物膜袋注浆方法,为沉降地下管道的抬升修复提供先进、高效、经济、实用的技术措施。
本发明是通过以下技术方案实现的:
首先,利用成孔装置,沿沉降管段管径方向以一定间距钻孔,在孔内布置膜袋,并向膜袋内注射高聚物材料,高聚物材料在膜袋内发生化学反应后体积迅速膨胀,产生的膨胀力将沉降管段抬升修复;然后向管道下方土体中注射非高聚物材料,材料发生反应后体积迅速膨胀,填充沉降管段抬升后产生的脱空区域以及加固软弱土层。
具体实施步骤为:
(1)确定地下管道沉降部位以及沉降量
利用探地雷达或管道闭路电视内窥检测技术(CCTV)对地下管道进行全面探测,确定沉降管段位置以及沉降量。
(2)钻膜袋放置孔
对于需要抬升的管段,沿管道下沉端管径方向,以0.3-0.4m的间距钻膜袋布置孔,孔径约为5-12cm,孔深约为20-40cm。
(3)放置膜袋
将注浆管放入膜袋开口端,并用环箍将膜袋开口端固定在注浆管上,膜袋长度应大于孔深,一般选取直径10-40cm,长度30-60cm,将捆扎好的膜袋放入孔内。
(4)向膜袋内注射高聚物材料
依次通过注浆管向每一个膜袋内注射双组份膨胀性高聚物材料。
(5)抬升沉降管段
高聚物材料在膜袋内迅速膨胀并固化,产生的巨大膨胀力将沉降管段向上抬起。
(6)钻注浆孔
在膜袋布置孔之间中心处钻注浆小孔,注浆小孔的直径为1.6cm,深度为能够钻穿管壁;将注浆管插入注浆小孔。
(7)填充脱空区域、加固软弱土层
通过注浆管向管道外土层的脱空区域注射高聚物材料,高聚物材料反应后迅速膨胀并固化,填充沉降管段抬升后形成的脱空区域,并实现对周围软弱土层的有效加固。
以上步骤所述高聚物材料均为非水反应类双组份高聚物材料。
本发明开发的地下管道沉降修复高聚物膜袋注浆方法,适用于由软弱土层等不良地质引起的地下管道沉降抬升修复以及软弱土层加固,与传统的维修技术相比具有下列特点:
(1)抬升效果好。非水反应类双组份高聚物材料在膜袋内发生化学反应后体积迅速膨胀,实现对沉降管段的抬升修复,并且该专利方法还可对周围软弱土层进行加固,防止修复后出现二次沉降,从根本上治理地下管道沉降病害。 (2)造价低。相比于传统维修方案,该方法可节省60%以上的造价。 (3)对周围环境无影响。利用本专利方法对沉降管段进行非开挖修复,对周围及管道上方基础设施,如光缆、燃气管道等,无需移动,更不产生扰动,对周围环境无影响。 (4)施工快捷、不需养生。钻孔、注浆、抬升连续作业,施工快,材料反应后15分钟即形成90%左右的强度,不需养生,可节约70%以上的工期。 (5)施工方便。高聚物注浆系列化装备适应于不同场地,进场方便。 (6)耐久性好。高聚物注浆材料性能稳定,长期埋入地下具有良好的抵抗化学溶剂腐蚀性能。
综上所述,本发明开发的地下管道抬升修复非开挖高聚物复合注浆方法,在技术原理及施工方法等方面都具有明显创新。这一独特的地下管道抬升修复非开挖高聚物复合注浆方法,具有施工快捷、抬升效果好、成本低、对地面设施无扰动等特点,并成功应用于多个地下管道抬升修复工程,显示出巨大的经济、社会效益和广阔的发展应用前景。
附图说明
图1为膜袋布置孔纵剖面示意图
图2膜袋布置孔平面布置示意图
图3为膜袋放置图
图4为沉降管段抬升示意图
图5为填充脱空区注浆管平面布置示意图
图6为高聚物注浆填充脱空、加固软弱土层示意图。
具体实施方式
实施例:
结合附图,对本发明做进一步说明。
(1)利用管道闭路电视内窥检测技术(CCTV)对地下管道进行全面探测,确定沉降管段位置以及沉降量。
(2)钻膜袋放置孔
对于需要抬升的管段1,沿管道下沉段端管径方向,以0.3-0.4m的间距钻膜袋布置孔2,如图1和图2所示,孔径约为5-12cm,孔深约为20-40cm。
(3)放置膜袋
将注浆管4放入膜袋3开口端,并用环箍将膜袋3开口端固定在注浆管4上,膜袋长度应大于孔深,一般选取直径10-40cm,长度30-60cm,将捆扎好的膜袋3放入孔2内,如图3所示。
(4)向膜袋内注射高聚物材料
依次通过注浆管4向每一个膜袋3内注射双组份膨胀性高聚物材料,如图4所示。
(5)抬升管段
高聚物材料在膜袋3内迅速膨胀并固化,产生的巨大膨胀力将沉降管段1向上抬起,沉降管段1抬升后形成脱空区域5,如图4所示。
(6)钻注浆孔
在膜袋放置孔2两侧钻注浆小孔,钻孔直径1.6cm,深度为钻穿管壁;然后将注浆管6插入注浆小孔,如图5所示。
(7)填充脱空区域、加固软弱土层
通过注浆管6向脱空区域5注射高聚物材料,高聚物材料反应后迅速膨胀并固化,填充沉降管段1抬升后产生的脱空区5,加固周围软弱土层。
显然,上述实施例仅仅是为清楚地说明所作的举例,而并非对实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其他不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。而由此所引伸出的显而易见的变化或变动仍处于本发明创造的保护范围之中。

Claims (4)

1.一种地下管道沉降修复高聚物膜袋注浆方法,其特征在于,当修复地下管道沉降时,采用高聚物膜袋注浆方法将沉降管段抬升,然后再向管道下方土体中注射高聚物材料,填充沉降管段抬升后产生的脱空区域,并加固周围软弱土层;
其具体实施步骤为:
(1)利用探地雷达或管道闭路电视内窥检测技术对地下管道进行全面探测,确定沉降管段位置以及沉降量;
(2)对于已探测到沉降需要抬升的管段,在管道下部沿管道下沉端管径方向钻膜袋布置孔;
(3)将注浆管放入膜袋开口端,并用环箍将膜袋开口端固定在注浆管上,将捆扎好的膜袋放入孔内;
(4)依次通过注浆管向每一个膜袋内注射双组份膨胀性高聚物材料;
(5)高聚物材料在膜袋内迅速膨胀并固化,产生的巨大膨胀力将沉降管段向上抬升;
(6)在膜袋布置孔之间中心处钻注浆小孔,注浆小孔的直径为1.6cm,深度为能够钻穿管壁;将注浆管插入注浆小孔;
(7)通过注浆管向管道外土层的脱空区域注射高聚物材料,高聚物材料反应后迅速膨胀并固化,填充沉降管段抬升后形成的脱空区域,并实现对周围软弱土层的有效加固。
2. 如权利要求1所述的地下管道沉降修复高聚物膜袋注浆方法,其特征在于:所述膜袋布置孔的间距为0.3-0.4m,孔径为5-12cm,孔深为20-40cm。
3. 如权利要求1所述的一种地下管道沉降修复高聚物膜袋注浆方法,其特征在于:所述膜袋的长度大于所述膜袋布置孔的孔深,所述膜袋的直径为10-40cm,长度为30-60cm。
4. 如权利要求1-3任一项所述的一种地下管道沉降修复高聚物膜袋注浆方法,其特征在于:所述高聚物材料为非水反应类双组份高聚物材料。
CN201510069861.XA 2015-02-09 2015-02-09 地下管道沉降修复高聚物膜袋注浆方法 Active CN104652415B (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510069861.XA CN104652415B (zh) 2015-02-09 2015-02-09 地下管道沉降修复高聚物膜袋注浆方法
US14/969,474 US9353888B2 (en) 2015-02-09 2015-12-15 Polymer bag grouting method for repairing settlement of underground pipelines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510069861.XA CN104652415B (zh) 2015-02-09 2015-02-09 地下管道沉降修复高聚物膜袋注浆方法

Publications (2)

Publication Number Publication Date
CN104652415A true CN104652415A (zh) 2015-05-27
CN104652415B CN104652415B (zh) 2016-08-24

Family

ID=53244009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510069861.XA Active CN104652415B (zh) 2015-02-09 2015-02-09 地下管道沉降修复高聚物膜袋注浆方法

Country Status (2)

Country Link
US (1) US9353888B2 (zh)
CN (1) CN104652415B (zh)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421175A (zh) * 2015-12-18 2016-03-23 安徽优特公路养护科技有限公司 一种采用高聚物治理道路基层病害的前序处理方法及系统
CN105672327A (zh) * 2016-02-04 2016-06-15 郑州安源工程技术有限公司 一种小直径竖井高聚物注浆开挖支护结构的设计施工方法
CN105735322A (zh) * 2016-02-04 2016-07-06 郑州安源工程技术有限公司 一种刚柔复合防渗可回收支护结构的设计施工方法
CN105803891A (zh) * 2016-04-07 2016-07-27 郑州市市政维护工程有限公司 一种城市道路管道爆裂冲刷空洞快速抢险非开挖施工工艺
CN106088175A (zh) * 2016-06-12 2016-11-09 岩土科技股份有限公司 建筑物纠偏装置及方法
CN108679359A (zh) * 2018-07-06 2018-10-19 郑州大学 一种地下管道内壁腐蚀的修复方法
CN108797759A (zh) * 2018-06-15 2018-11-13 中国冶集团有限公司 沉管下方悬空软基水下抛石压浆加固方法
CN109056698A (zh) * 2018-09-19 2018-12-21 南方工程检测修复技术研究院 采用高聚物修复风机混凝土基础空洞的方法
CN109752255A (zh) * 2019-01-30 2019-05-14 郑州大学 一种交通荷载作用下埋地管道力学响应试验装置
CN109798121A (zh) * 2019-03-22 2019-05-24 中建八局轨道交通建设有限公司 暗挖隧道密贴下穿既有结构底板的施工方法
CN111779919A (zh) * 2020-06-30 2020-10-16 厦门安越非开挖工程技术股份有限公司 注浆止水方法
CN112323853A (zh) * 2019-08-05 2021-02-05 张继红 一种自适应线状地下工程结构及其横向变形控制方法
CN112594556A (zh) * 2020-12-11 2021-04-02 郑州铁路职业技术学院 一种软弱土层管道渗漏处治方法
CN113700060A (zh) * 2021-10-09 2021-11-26 北京恒祥宏业基础加固技术有限公司 一种用于保护地下管道的注浆调平抬升方法
CN114032750A (zh) * 2021-11-12 2022-02-11 高肖肖 一种水泥路面修复方法
CN114382986A (zh) * 2020-10-16 2022-04-22 苏州市吴都市政工程有限公司 一种污水管道检修方法
CN114508015A (zh) * 2022-03-08 2022-05-17 河南城建学院 一种桥头跳车路面增强修补方法
CN115492178A (zh) * 2022-11-18 2022-12-20 山东建筑大学 一种基于后扩张囊袋的地下结构沉降变形病害修复工艺

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10520111B2 (en) * 2018-06-04 2019-12-31 Airlift Concrete Experts, LLC System and method for straightening underground pipes
CN110630847A (zh) * 2019-09-25 2019-12-31 南方工程检测修复技术研究院 一种含多种病害混凝土排水管道的非开挖整体修复方法
CN111650584B (zh) * 2020-05-14 2023-09-15 中国科学院武汉岩土力学研究所 一种盾构隧道壁后注浆加固效果检测方法及设备
CN114323934A (zh) * 2021-11-25 2022-04-12 广东粤海水务投资有限公司 基于高聚物与混凝土管道接触面的膨胀力测试系统
CN115262530B (zh) * 2022-09-29 2022-12-16 北京城建设计发展集团股份有限公司 用于地下结构不均匀沉降治理的注浆方法和系统
CN117721683A (zh) * 2024-01-11 2024-03-19 天津大学 一种路堤自主抬升调控装置及方法
CN117685416B (zh) * 2024-01-25 2024-04-23 安徽水安建设集团股份有限公司 一种适用于矩形顶管膜袋堵水结构及堵水方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007284875A (ja) * 2006-04-12 2007-11-01 Tekken Constr Co Ltd 高圧噴射攪拌による地盤改良工法
CN103741678A (zh) * 2014-01-28 2014-04-23 上海申元岩土工程有限公司 带有桩袋的聚氨酯注浆微型桩及其施工方法和应用方法
CN104047307A (zh) * 2014-07-03 2014-09-17 上海申元岩土工程有限公司 采用联合注浆对建筑物基础进行加固和纠偏的方法
CN104328782A (zh) * 2014-11-27 2015-02-04 北京中铁润海科技有限公司 一种可膨胀性灌注装置及其治理铁路路基沉降变形的方法

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2917085A (en) * 1959-01-20 1959-12-15 Arthur T Douse Method of sealing leaks in sub-surface sewer pipe
US3718978A (en) * 1970-10-16 1973-03-06 Koevering B Van Pipeline survey vehicle
US4309128A (en) * 1979-11-26 1982-01-05 Williams Richard Lee Method and apparatus for removing deflection from plastic pipes
US4657436A (en) * 1982-06-18 1987-04-14 I.P.D. Systems Limited Device and method for removing irregularities in or enlarging an underground duct
US4921374A (en) * 1988-08-17 1990-05-01 Stutzman Henry G Method for repairing underground sewer lines
US7135087B2 (en) * 2001-02-02 2006-11-14 Verline Inc. Apparatus and method for the repair and stabilization of underground pipes
US7371031B1 (en) * 2005-06-08 2008-05-13 Grimmett James G Sag correction system
US20070258773A1 (en) * 2006-05-08 2007-11-08 Bennett Roger M Method and system for repairing subterranean structures
US8939680B2 (en) * 2013-05-23 2015-01-27 Hamman Ip Llc Method and structure for in situ field repair of severed drain tile
US9303794B2 (en) * 2013-11-11 2016-04-05 James Pirtle Buried pipeline repair system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007284875A (ja) * 2006-04-12 2007-11-01 Tekken Constr Co Ltd 高圧噴射攪拌による地盤改良工法
CN103741678A (zh) * 2014-01-28 2014-04-23 上海申元岩土工程有限公司 带有桩袋的聚氨酯注浆微型桩及其施工方法和应用方法
CN104047307A (zh) * 2014-07-03 2014-09-17 上海申元岩土工程有限公司 采用联合注浆对建筑物基础进行加固和纠偏的方法
CN104328782A (zh) * 2014-11-27 2015-02-04 北京中铁润海科技有限公司 一种可膨胀性灌注装置及其治理铁路路基沉降变形的方法

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421175A (zh) * 2015-12-18 2016-03-23 安徽优特公路养护科技有限公司 一种采用高聚物治理道路基层病害的前序处理方法及系统
CN105672327A (zh) * 2016-02-04 2016-06-15 郑州安源工程技术有限公司 一种小直径竖井高聚物注浆开挖支护结构的设计施工方法
CN105735322A (zh) * 2016-02-04 2016-07-06 郑州安源工程技术有限公司 一种刚柔复合防渗可回收支护结构的设计施工方法
CN105803891A (zh) * 2016-04-07 2016-07-27 郑州市市政维护工程有限公司 一种城市道路管道爆裂冲刷空洞快速抢险非开挖施工工艺
CN106088175A (zh) * 2016-06-12 2016-11-09 岩土科技股份有限公司 建筑物纠偏装置及方法
CN108797759A (zh) * 2018-06-15 2018-11-13 中国冶集团有限公司 沉管下方悬空软基水下抛石压浆加固方法
CN108679359A (zh) * 2018-07-06 2018-10-19 郑州大学 一种地下管道内壁腐蚀的修复方法
CN109056698A (zh) * 2018-09-19 2018-12-21 南方工程检测修复技术研究院 采用高聚物修复风机混凝土基础空洞的方法
CN109752255A (zh) * 2019-01-30 2019-05-14 郑州大学 一种交通荷载作用下埋地管道力学响应试验装置
CN109798121A (zh) * 2019-03-22 2019-05-24 中建八局轨道交通建设有限公司 暗挖隧道密贴下穿既有结构底板的施工方法
CN112323853A (zh) * 2019-08-05 2021-02-05 张继红 一种自适应线状地下工程结构及其横向变形控制方法
CN111779919A (zh) * 2020-06-30 2020-10-16 厦门安越非开挖工程技术股份有限公司 注浆止水方法
CN114382986A (zh) * 2020-10-16 2022-04-22 苏州市吴都市政工程有限公司 一种污水管道检修方法
CN112594556A (zh) * 2020-12-11 2021-04-02 郑州铁路职业技术学院 一种软弱土层管道渗漏处治方法
CN113700060A (zh) * 2021-10-09 2021-11-26 北京恒祥宏业基础加固技术有限公司 一种用于保护地下管道的注浆调平抬升方法
CN114032750A (zh) * 2021-11-12 2022-02-11 高肖肖 一种水泥路面修复方法
CN114508015A (zh) * 2022-03-08 2022-05-17 河南城建学院 一种桥头跳车路面增强修补方法
CN114508015B (zh) * 2022-03-08 2023-05-02 河南城建学院 一种桥头跳车路面增强修补方法
CN115492178A (zh) * 2022-11-18 2022-12-20 山东建筑大学 一种基于后扩张囊袋的地下结构沉降变形病害修复工艺
CN115492178B (zh) * 2022-11-18 2023-03-10 山东建筑大学 一种基于后扩张囊袋的地下结构沉降变形病害修复工艺

Also Published As

Publication number Publication date
CN104652415B (zh) 2016-08-24
US20160102782A1 (en) 2016-04-14
US9353888B2 (en) 2016-05-31

Similar Documents

Publication Publication Date Title
CN104652415B (zh) 地下管道沉降修复高聚物膜袋注浆方法
CN104696664B (zh) 地下管道渗漏涌沙封堵高聚物复合注浆方法
CN101429764B (zh) 地下连续墙槽段接缝处渗漏水检测及封堵修复装置及其方法
CN107989079B (zh) 保护城市市政管线的结构
CN105673935A (zh) 裂插法地下管线更换方法
CN105464074B (zh) 一种人工挖孔桩高聚物注浆防护结构及其施工方法
CN101666394B (zh) 一种地铁旁通道水平冻结孔的气动夯管施工方法
CN104746519A (zh) 一种清障施工方法
CN104762955A (zh) 一种基于冻结法的人工挖孔扩底桩施工方法
CN112252973A (zh) 一种用于管道埋设通道的非开挖定向钻进施工方法
CN105064335A (zh) 适用于砂卵石地层盾构端头井加固的超高压旋喷注浆方法
Damvergis Sewer systems: Failures and rehabilitation
CN103572764A (zh) 超深人工挖孔桩护壁止水结构及其施工方法
CN105605335A (zh) 一种用于顶进施工的大口径预应力钢筒混凝土管
US11585467B2 (en) Trenchless methods for forming curved hole channel with steel sleeve and pipeline lifting
CN109594574A (zh) 基于有限空间的大型顶管沉井逆作施工方法
CN102864833A (zh) 成品塑料检查井在室外排水系统中的应用
CN104695478B (zh) 一种超深地下连续墙内置地埋管结构及其施工方法
CN105804203A (zh) 深埋大直径废弃污水管道的封堵方法
CN110512594A (zh) 旋挖钻机遇空洞成孔成桩的简易方法
CN102296618A (zh) 一种锚杆穿越地下连续墙的套管
CN112594556A (zh) 一种软弱土层管道渗漏处治方法
CN208668190U (zh) 一种市政道路快速修复设备
CN102677724B (zh) 一种机械式钢套管安装装置及其安装方法
CN205100223U (zh) 一种溶洞区套管咬合桩

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant