- CN104647583A CN104647583A CN201510086117.0A CN201510086117A CN104647583A CN 104647583 A CN104647583 A CN 104647583A CN 201510086117 A CN201510086117 A CN 201510086117A CN 104647583 A CN104647583 A CN 104647583A
- Authority
- CN
- China
- Prior art keywords
- reaction frame
- wall
- immersed tube
- supports
- movable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/022—Means for inserting reinforcing members into the mould or for supporting them in the mould
- B28B23/024—Supporting means
Abstract
本发明涉及土木建筑施工技术领域,公开了一种沉管预制外墙支撑,其包括混凝土反力墙,固定反力架、活动反力架、驱动装置和外墙模板,所述固定反力架的一端垂直安装在所述混凝土反力墙的竖直墙面上,所述固定反力架的另一端与所述活动反力架的一端可转动连接,所述活动反力架的另一端用于顶紧所述外墙模板的内侧,所述驱动装置用于驱动所述活动反力架伸缩。本发明结构稳定、可靠,能够保证外墙模板无变形及涨模风险,且不需使用对拉螺杆,不存在螺杆孔道渗水风险。
Description
技术领域
本发明涉及土木建筑施工技术领域,特别是涉及一种沉管预制外墙支撑。
背景技术
伴随着世界范围内特大桥建设的快速发展趋势,其建设范围由传统江河向海上,尤其是外海发展。为解决外海施工中恶劣气象条件对施工安全、质量带来的巨大风险,加快建设速度,大型化、装配化、工厂化施工理念得到越来越广泛的推广,大型沉管预制构件日趋普及。现有的桥梁施工预制,其使用的钢模板主要是通过对拉螺杆将外模与内模固定,从而达到固定外墙模的作用。
现有的钢外模板安装技术简单、方便且使用广泛,即通过内模与外模间对拉螺杆固定,从而达到模板的安装,目前绝大多数桥梁的预制梁场均采用该方法,但对于预制如港珠澳大桥沉管隧道这样的深海大体积混凝土构件,现有的方法难以满足条件。一方面港珠澳大桥沉管单节段外侧墙厚1.5m、高7.78m、长22.5m,如此大的外墙,仅单靠对拉螺杆与内模连接无法达到固定效果,易造成涨模及位置偏移情况;另一方面,港珠澳大桥沉管在预制完成后将沉放至深海下,其深度将超过40m,若采用对拉螺杆连接固定,其对拉螺杆孔即便在后期进行封堵,但沉放后螺杆孔道存在质量风险,易成为海水渗入通道。
发明内容
(一)要解决的技术问题
本发明要解决的技术问题是如何保证外墙模板无变形及涨模风险,且不需使用对拉螺杆,不存在螺杆孔道渗水风险。
(二)技术方案
为了解决上述技术问题,本发明提供一种沉管预制外墙支撑,其包括混凝土反力墙,固定反力架、活动反力架、驱动装置和外墙模板,所述固定反力架的一端垂直安装在所述混凝土反力墙的竖直墙面上,所述固定反力架的另一端与所述活动反力架的一端可转动连接,所述活动反力架的另一端用于顶紧所述外墙模板的内侧,所述驱动装置用于驱动所述活动反力架伸缩。
其中,所述固定反力架与所述活动反力架通过销轴连接。
其中,所述活动反力架沿所述固定反力架在水平面内可转动连接。
其中,预制沉管沿所述外墙模板的外侧浇筑。
其中,所述驱动装置为液压油缸。
其中,所述固定反力架包括有多组,所述多组固定反力架从上至下间隔设置在所述混凝土反力墙的竖直墙面上。
其中,还包括预埋钢板,每组所述固定反力架对应一块所述预埋钢板,所述固定反力架通过所述预埋钢板与所述混凝土反力墙连接。
其中,还包括支撑螺杆,所述支撑螺杆用于所述固定反力架与活动反力架之间的固定。
(三)有益效果
与现有技术相比,本发明具有以下优点:
本发明提供的一种沉管预制外墙支撑,其包括混凝土反力墙,固定反力架、活动反力架、驱动装置和外墙模板,所述固定反力架的一端垂直安装在所述混凝土反力墙的竖直墙面上,所述固定反力架的另一端与所述活动反力架的一端可转动连接,所述活动反力架的另一端用于顶紧所述外墙模板的内侧,所述驱动装置用于驱动所述活动反力架伸缩;利用活动反力架的伸缩控制外墙模板支撑,当预制沉管浇筑时,外墙模板所承受的作用力将通过反力架作用于混凝土反力墙,由混凝土反力墙承受预制沉管施加的作用力,同时混凝土反力墙对反力架施加反作用力并传导至外墙模板,保证外墙模板无涨模或位置偏移现象。
附图说明
图1为本发明一种沉管预制外墙支撑的结构示意图;
图2为本发明一种沉管预制外墙支撑的立体示意图。
图中:1:混凝土反力墙;2:预制沉管;3:外墙模板;4:固定反力架;5:预埋钢板;6:活动反力架;7:支撑螺杆;8:液压油缸。
具体实施方式
下面结合附图和实施例,对本发明的具体实施方式作进一步详细描述。以下实例用于说明本发明,但不用来限制本发明的范围。
在本发明的描述中,需要说明的是,术语“中心”、“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。
在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。
此外,在本发明的描述中,除非另有说明,“多个”、“多根”、“多组”的含义是两个或两个以上。
如图1和图2所示,为本发明提供的一种沉管预制外墙支撑,其包括混凝土反力墙1,固定反力架4、活动反力架6、驱动装置和外墙模板3,所述固定反力架4的一端垂直安装在所述混凝土反力墙1的竖直墙面上,所述固定反力架4的另一端与所述活动反力架6的一端可转动连接,具体地,所述活动反力架6沿所述固定反力架4在水平面内可转动连接,以保证所述活动反力架6也始终与所述混凝土反力墙1垂直,所述活动反力架6的另一端用于顶紧所述外墙模板3的内侧,所述驱动装置例如液压油缸8与所述活动反力架6连接,用于驱动所述活动反力架6伸缩。当预制沉管2沿所述外墙模板3的外侧浇筑时,混凝土对外墙模板3施加一个作用力,由于外墙模板3与固定反力架4和活动反力架6垂直贴紧,外墙模板3所承受的作用力将通过固定反力架4和活动反力架6作用于混凝土反力墙1,由混凝土反力墙1承受预制沉管2施加的作用力,同时混凝土反力墙1对固定反力架4和活动反力架6施加反作用力并传导至外墙模板3,保证外墙模板3无涨模或位置偏移现象。有效地避免了使用对拉螺杆造成的螺杆孔道,减小了预制沉管2深海下螺杆孔道位置的质量隐患。
为了连接的可靠性,所述固定反力架4和活动反力架6还通过竖直支架连接,构成整体框架,从而提高整体强度。
具体地,所述固定反力架4与所述活动反力架6可以通过销轴连接,以方便实现两者的转动连接。
其中,所述固定反力架4包括有多组,所述多组固定反力架4从上至下间隔设置在所述混凝土反力墙1的竖直墙面上,而且每组固定反力架4还包括多个水平排列的固定反力架4;所述沉管预制外墙支撑还可以包括预埋钢板5,每组所述固定反力架4对应一块所述预埋钢板5,所述预埋钢板5预先利用螺栓等紧固件固定在混凝土反力墙1上,所述固定反力架4通过所述预埋钢板5与所述混凝土反力墙1连接。
另外,还可以包括支撑螺杆7,待固定反力架4与活动反力架6支撑到位后,所述支撑螺杆7用于所述固定反力架4与活动反力架6之间的固定。
由以上实施例可以看出,本发明结构设置巧妙,能够保证混凝土浇筑过程外墙模板3无涨模、位置偏移,在外墙模板3受到混凝土的作用力时,能够反作用力于混凝土反力墙1,从而达到固定预制沉管的钢筋笼及混凝土的作用。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (8)
1.一种沉管预制外墙支撑,其特征在于,包括混凝土反力墙,固定反力架、活动反力架、驱动装置和外墙模板,所述固定反力架的一端垂直安装在所述混凝土反力墙的竖直墙面上,所述固定反力架的另一端与所述活动反力架的一端可转动连接,所述活动反力架的另一端用于顶紧所述外墙模板的内侧,所述驱动装置用于驱动所述活动反力架伸缩。
2.如权利要求1所述的沉管预制外墙支撑,其特征在于,所述固定反力架与所述活动反力架通过销轴连接。
3.如权利要求1所述的沉管预制外墙支撑,其特征在于,所述活动反力架沿所述固定反力架在水平面内可转动连接。
4.如权利要求1所述的沉管预制外墙支撑,其特征在于,预制沉管沿所述外墙模板的外侧浇筑。
5.如权利要求1所述的沉管预制外墙支撑,其特征在于,所述驱动装置为液压油缸。
6.如权利要求1所述的沉管预制外墙支撑,其特征在于,所述固定反力架包括有多组,所述多组固定反力架从上至下间隔设置在所述混凝土反力墙的竖直墙面上。
7.如权利要求6所述的沉管预制外墙支撑,其特征在于,还包括预埋钢板,每组所述固定反力架对应一块所述预埋钢板,所述固定反力架通过所述预埋钢板与所述混凝土反力墙连接。
8.如权利要求1所述的沉管预制外墙支撑,其特征在于,还包括支撑螺杆,所述支撑螺杆用于所述固定反力架与活动反力架之间的固定。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510086117.0A CN104647583A (zh) | 2015-02-16 | 2015-02-16 | 一种沉管预制外墙支撑 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510086117.0A CN104647583A (zh) | 2015-02-16 | 2015-02-16 | 一种沉管预制外墙支撑 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104647583A true CN104647583A (zh) | 2015-05-27 |
Family
ID=53239465
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510086117.0A Pending CN104647583A (zh) | 2015-02-16 | 2015-02-16 | 一种沉管预制外墙支撑 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104647583A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105799054A (zh) * | 2016-04-25 | 2016-07-27 | 中铁隧道集团二处有限公司 | 自行式液压定位脱模隧道沉管管节预制模板 |
CN110524691A (zh) * | 2019-08-13 | 2019-12-03 | 中交第四航务工程局有限公司 | 沉管隧道外侧模板体系及施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101914925A (zh) * | 2008-11-19 | 2010-12-15 | 兰州南特数码科技股份有限公司 | 利用优化复合预制拱墙作外墙的地下室 |
CN103669365A (zh) * | 2012-08-29 | 2014-03-26 | 张绍球 | 一种外斜拉内斜撑人字型基坑支护桩及其施工方法 |
CN103692550A (zh) * | 2013-11-29 | 2014-04-02 | 中交第四航务工程局有限公司 | 一种海底隧道沉管的浇筑方法 |
CN103696441A (zh) * | 2013-11-29 | 2014-04-02 | 中交第四航务工程局有限公司 | 自动液压钢模板组及沉管管节浇筑的方法 |
CN103696440A (zh) * | 2013-11-29 | 2014-04-02 | 中交第二航务工程局有限公司 | 可移动式钢筋笼绑扎胎架 |
CN204525751U (zh) * | 2015-02-16 | 2015-08-05 | 中交第二航务工程局有限公司 | 一种沉管预制外墙支撑 |
-
2015
- 2015-02-16 CN CN201510086117.0A patent/CN104647583A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101914925A (zh) * | 2008-11-19 | 2010-12-15 | 兰州南特数码科技股份有限公司 | 利用优化复合预制拱墙作外墙的地下室 |
CN103669365A (zh) * | 2012-08-29 | 2014-03-26 | 张绍球 | 一种外斜拉内斜撑人字型基坑支护桩及其施工方法 |
CN103692550A (zh) * | 2013-11-29 | 2014-04-02 | 中交第四航务工程局有限公司 | 一种海底隧道沉管的浇筑方法 |
CN103696441A (zh) * | 2013-11-29 | 2014-04-02 | 中交第四航务工程局有限公司 | 自动液压钢模板组及沉管管节浇筑的方法 |
CN103696440A (zh) * | 2013-11-29 | 2014-04-02 | 中交第二航务工程局有限公司 | 可移动式钢筋笼绑扎胎架 |
CN204525751U (zh) * | 2015-02-16 | 2015-08-05 | 中交第二航务工程局有限公司 | 一种沉管预制外墙支撑 |
Non-Patent Citations (1)
Title |
---|
张国防等: "大型沉管预制钢模板制造及安装技术", 《2012年现场技术交流会议论文集》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105799054A (zh) * | 2016-04-25 | 2016-07-27 | 中铁隧道集团二处有限公司 | 自行式液压定位脱模隧道沉管管节预制模板 |
CN110524691A (zh) * | 2019-08-13 | 2019-12-03 | 中交第四航务工程局有限公司 | 沉管隧道外侧模板体系及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103510640B (zh) | 一种装配式剪力墙及其装配方法 | |
CN204585497U (zh) | 一种现浇梁成型模具 | |
CN104060617B (zh) | 基坑支护系统的预制装配式内支撑体系及施工方法 | |
CN109403347B (zh) | 一种框架式双排桩水泥土墙基坑围护结构及其施工方法 | |
CN102888814B (zh) | 连续刚构桥顶推合龙的施工方法 | |
CN102296812A (zh) | 建筑模板成型结构、紧固件及建筑模板施工方法 | |
CN104647583A (zh) | 一种沉管预制外墙支撑 | |
CN206053328U (zh) | 一种中埋式止水带固定装置 | |
CN204525751U (zh) | 一种沉管预制外墙支撑 | |
CN103132465B (zh) | 一种紧贴桩基承台的地下箱涵建造方法 | |
CN103132494B (zh) | 预埋锚锥精确定位方法 | |
CN103334584B (zh) | 一种滑模系统的模板调节系统 | |
CN104481163B (zh) | 一种用于房屋结构加固的l梁施工装置和方法 | |
CN213653513U (zh) | 一种水利施工用挡土墙快速施工模板 | |
CN201972271U (zh) | 新型预制钢筋混凝土剪力墙 | |
Chen et al. | Installation of integral prefabricated bridge abutment and pier with flexible water stop curtain | |
CN103089007A (zh) | 一种现浇砼楼板穿孔管道封口模板装置及使用方法 | |
CN208455656U (zh) | 一种抱箍支撑装置 | |
CN203334678U (zh) | 混凝土浇筑用外墙模板加固系统 | |
CN202689242U (zh) | 门垛墙砌体 | |
CN101845822A (zh) | 重力式格形地下连续墙施工方法 | |
CN107100146B (zh) | 一种抽水蓄能电站尾闸洞底板及其混凝土浇筑工艺 | |
CN208763403U (zh) | 一种异形墙柱节点可调节钢管箍式支模装置 | |
CN201217642Y (zh) | 环形曝气池整体支模结构 | |
CN203905463U (zh) | 剪力墙模板加固装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150527 |