CN104625447A - Technology for mounting fan-shaped guide tube - Google Patents

Technology for mounting fan-shaped guide tube Download PDF

Info

Publication number
CN104625447A
CN104625447A CN201410792451.3A CN201410792451A CN104625447A CN 104625447 A CN104625447 A CN 104625447A CN 201410792451 A CN201410792451 A CN 201410792451A CN 104625447 A CN104625447 A CN 104625447A
Authority
CN
China
Prior art keywords
conduit
welding
fan
casting
segmentation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410792451.3A
Other languages
Chinese (zh)
Other versions
CN104625447B (en
Inventor
严勇
黄永强
包梦安
隋立东
屈正民
孙鑫祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Huachuan transportation equipment Co., Ltd
Original Assignee
Safe Heavy Industry (nantong) Co Ltd Of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Safe Heavy Industry (nantong) Co Ltd Of China filed Critical Safe Heavy Industry (nantong) Co Ltd Of China
Priority to CN201410792451.3A priority Critical patent/CN104625447B/en
Publication of CN104625447A publication Critical patent/CN104625447A/en
Application granted granted Critical
Publication of CN104625447B publication Critical patent/CN104625447B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups

Abstract

The invention relates to a technology for mounting a fan-shaped guide tube. After subsections of the fan-shaped guide tube are manufactured, erection welding is conducted, then the subsections are coated together, and the subsections are carried on a slipway ultimately. The technology for mounting the fan-shaped guide tube specifically comprises the five steps of platform erecting, criterion setting, hoisting, welding and detecting. The technology for mounting the fan-shaped guide tube has the advantages that it is pointed out that erection welding can be conducted after the subsections are manufactured according to the mounting stage of the guide tube, the subsections are coated together, and the subsections are carried on the slipway ultimately, so that the process antedisplacement is achieved, the production efficiency is greatly improved, the construction period is shortened, and the purpose of quick shipbuilding is achieved.

Description

A kind of fan-shaped conduit mounting process
Technical field
The present invention relates to a kind of fan-shaped conduit mounting process, be that operation moves forward by one specifically, improve production efficiency greatly, and shortening production cycle, reach the fan-shaped conduit mounting process of the object of quick shipbuilding.
Background technology
Fan-shaped conduit is the one of Ship Energy Saving Device, and current environmental protection type ship all generally uses.Effectively can improve the overall performance of boats and ships, play a role in energy saving.Because the installation accuracy of fan-shaped conduit requires high, shipyard is all just install fan-shaped conduit after boat segmental lift-launch terminates mostly at present.Make berth period lengthen like this, and installation workload is very large again after lift-launch terminates, and does not meet the pattern of Modern Shipbuilding, does not reach the object of quick shipbuilding.
Therefore, research and development are a kind of to move forward operation, improves production efficiency greatly, and shortening production cycle, and the fan-shaped conduit mounting process reaching the object of quick shipbuilding is imperative.Through retrieval related documents, do not find the same or analogous technical scheme with the present invention.
Summary of the invention
The erection stage that the technical problem to be solved in the present invention is to provide a kind of fan-shaped conduit gets final product erecting and welding after sectional making completion, to complete application together with segmentation, finally carry at building berth, operation is moved forward, improve production efficiency greatly, and shortening production cycle, reach the fan-shaped conduit mounting process of the object of quick shipbuilding.
For solving the problems of the technologies described above, technical scheme of the present invention is: a kind of fan-shaped conduit mounting process, and its innovative point is: described fan-shaped conduit carries out erecting and welding after sectional making completion, then to complete application together with segmentation, finally carries at building berth.
Further, described fan-shaped conduit mounting process concrete steps are as follows:
(1) set for this platform: set for this platform, ensure platform unevenness≤4mm, then segmentation to be winched to above platform and to keep level;
(2) benchmark is determined: day-mark bar on platform, with the axis of stern tube shaft in segmentation for benchmark draws catheter center's line on the ground, and draw conduit end diameter with this catheter center's line on the ground for benchmark and then determine the radial level position of conduit small end, mark for benchmark is drawn on mark post the distance that conduit small end protrudes upward the end face of stern tube shaft steel-casting with the end face of stern tube shaft steel-casting, and then determine the height and position of conduit small end;
(3) lift: adopt lifting appliance lifting conduit, the large end of conduit is made at lower small end upper during lifting, the conduit small end that the catheter center's line drawn on the ground in step 2, conduit end diameter and mark post mark protrudes upward the distance of the end face of stern tube shaft steel-casting as benchmark, adopt laser ranging, conduit is lifted put in place, and support with angle steel fixing; After conduit support is fixing, the distance of detected catheter each stator blade root and segmentation stern tube shaft steel-casting junction and the distance of conduit large end end face upper hull welding support and hull junction also carry out surplus cutting;
(4) weld: the weld seam that mutually pass through of the Hull Welding support on conduit large end face with hull junction and each stator blade root of conduit and segmentation stern tube shaft steel-casting junction is welded and fixed;
(5) detect: carry out ultrasonic inspection detection and withstand voltage pressure testing to the weld of conduit, the pressure of withstand voltage test is set to 0.2bar, keeps 30 minutes.
Further, when welding in described step 4, first carry out parcel preheating to conduit each stator blade root and the distance of segmentation stern tube shaft steel-casting junction and the weld seam band of conduit large end end face upper hull welding support and hull junction, preheat temperature is 200 DEG C-250 DEG C; Then multi-pass welding, interlayer temperature is not less than 200 DEG C, and by two welder's symmetrical weldings during welding, welding line joint interlocks, and two ends cornerite welds, and then it is concentrated to reduce stress; After finally having welded, local heat is carried out to steel-casting weld seam region flame, reaches local stress believing, clear up and splashing of polishing.
Further, the number of plies of described multi-layer multi-pass welding reaches 14-18 layer.
The invention has the advantages that:
(1) fan-shaped conduit mounting process of the present invention, point out that the erection stage of fan-shaped conduit gets final product erecting and welding after sectional making completion, to complete application together with segmentation, finally carry at building berth, operation not only moves forward by this, improve production efficiency greatly, and shortening production cycle, reach the object of quick shipbuilding;
(2) fan-shaped conduit mounting process of the present invention be specifically divided into set for this platform, determine benchmark, lifting, welding and detect five steps, when wherein determining benchmark, the end face being accurately benchmark and stern tube shaft steel-casting by the axis of stern tube shaft in segmentation is benchmark, determine that catheter center's line, conduit end diameter and conduit small end stretch out the distance of the end face of stern tube shaft steel-casting, this process is simple, ensure that the precision that conduit lifts, improve the lifting efficiency of conduit.;
(3), when welding in fan-shaped conduit mounting process of the present invention, first butt welded seam band carries out parcel preheating, and carries out multi-layer multi-pass welding, improves quality and the welding precision of welding.
Accompanying drawing explanation
Fig. 1 is the structural representation that the fan-shaped conduit of the present invention is arranged in segmentation.
Fig. 2 is the structural representation that the fan-shaped conduit of the present invention is connected with stern tube shaft steel-casting end face.
Detailed description of the invention
As depicted in figs. 1 and 2, as depicted in figs. 1 and 2, the invention discloses a kind of fan-shaped conduit 1 mounting process, this fan-shaped conduit 1 carries out erecting and welding after segmentation 2 makes completion, then to complete application together with segmentation 2, finally carries at building berth.
Above-mentioned fan-shaped conduit 1 mounting process concrete steps are as follows:
The first step, sets for this platform 3: set for this platform 3, ensures platform 3 unevenness≤4mm, then segmentation 2 to be winched to above platform 3 and to keep level;
Second step, determine benchmark: day-mark bar on platen 3, catheter center's line 5 is drawn on the ground for benchmark with the axis 4 of stern tube shaft in segmentation 2, and be that benchmark draws conduit small end a radius r on the ground and then determines the radial level position of conduit small end a with this catheter center's line 5, for benchmark is drawn in, mark post marks conduit small end a with the end face c of stern tube shaft steel-casting 6 and protrude upward the distance h of the end face c of stern tube shaft steel-casting 6 and then determine the height and position of conduit small end a;
3rd step, lifting: adopt lifting appliance lifting conduit 1, the small end a of conduit 1 is made at upper large end b upper during lifting, the conduit small end a that the radius r of the catheter center's line 5 drawn on the ground in second step, conduit small end a and mark post mark protrudes upward the distance h of the end face c of stern tube shaft steel-casting 6 as benchmark, adopt laser ranging, conduit 1 is lifted put in place, and support with angle steel fixing; After conduit 1 supports and fixes, the distance of detected catheter 1 each stator 8 blade root and segmentation 2 stern tube shaft steel-casting 6 junction and conduit 1 are held the distance of b end face upper hull welding support 7 and hull junction greatly and are carried out surplus cutting;
4th step, welding: the weld seam that mutually pass through of the Hull Welding support 7 on conduit 1 large end face with hull junction and conduit 1 each stator 8 blade root and segmentation 2 stern tube shaft steel-casting 6 junction is welded and fixed; First hold the weld seam band of end face upper hull welding support 7 and hull junction to carry out parcel preheating greatly to the distance of conduit 1 each stator 8 blade root and segmentation 2 stern tube shaft steel-casting 6 junction and conduit 1 during welding, preheat temperature is 200 DEG C-250 DEG C; Then multi-pass welding, the number of plies reaches 14-18 layer, and interlayer temperature is not less than 200 DEG C, and by two welder's symmetrical weldings during welding, welding line joint interlocks, and two ends cornerite welds, and then it is concentrated to reduce stress; After finally having welded, butt welded seam region flame carries out local heat, reaches local stress believing, clears up and splashing of polishing;
5th step, detects: carry out ultrasonic inspection detection and withstand voltage pressure testing to the weld of conduit 1, the pressure of withstand voltage test is set to 0.2bar, keeps 30 minutes.
More than show and describe general principle of the present invention and principal character and advantage of the present invention.The technical staff of the industry should understand; the present invention is not restricted to the described embodiments; what describe in above-described embodiment and description just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.Application claims protection domain is defined by appending claims and equivalent thereof.

Claims (4)

1. a fan-shaped conduit mounting process, is characterized in that: described fan-shaped conduit carries out erecting and welding after sectional making completion, then to complete application together with segmentation, finally carries at building berth.
2. fan-shaped conduit mounting process according to claim 1, is characterized in that: described fan-shaped conduit mounting process concrete steps are as follows:
Set for this platform: set for this platform, ensure platform unevenness≤4mm, then segmentation to be winched to above platform and to keep level;
Determine benchmark: day-mark bar on platform, with the axis of stern tube shaft in segmentation for benchmark draws catheter center's line on the ground, and draw conduit end diameter with this catheter center's line on the ground for benchmark and then determine the radial level position of conduit small end, mark for benchmark is drawn on mark post the distance that conduit small end protrudes upward the end face of stern tube shaft steel-casting with the end face of stern tube shaft steel-casting, and then determine the height and position of conduit small end;
Lifting: adopt lifting appliance lifting conduit, the large end of conduit is made at lower small end upper during lifting, the conduit small end that the catheter center's line drawn on the ground in step 2, conduit end diameter and mark post mark protrudes upward the distance of the end face of stern tube shaft steel-casting as benchmark, adopt laser ranging, conduit is lifted put in place, and support with angle steel fixing; After conduit support is fixing, the distance of detected catheter each stator blade root and segmentation stern tube shaft steel-casting junction and the distance of conduit large end end face upper hull welding support and hull junction also carry out surplus cutting;
Welding: the weld seam that mutually pass through of the Hull Welding support on conduit large end face with hull junction and each stator blade root of conduit and segmentation stern tube shaft steel-casting junction is welded and fixed;
Detect: carry out ultrasonic inspection detection and withstand voltage pressure testing to the weld of conduit, the pressure of withstand voltage test is set to 0.2bar, keeps 30 minutes.
3. fan-shaped conduit mounting process according to claim 2, it is characterized in that: when welding in described step 4, first carry out parcel preheating to conduit each stator blade root and the distance of segmentation stern tube shaft steel-casting junction and the weld seam band of conduit large end end face upper hull welding support and hull junction, preheat temperature is 200 DEG C-250 DEG C; Then multi-pass welding, interlayer temperature is not less than 200 DEG C, and by two welder's symmetrical weldings during welding, welding line joint interlocks, and two ends cornerite welds, and then it is concentrated to reduce stress; After finally having welded, local heat is carried out to steel-casting weld seam region flame, reaches local stress believing, clear up and splashing of polishing.
4. shape conduit mounting process according to claim 3, is characterized in that: the number of plies of described multi-layer multi-pass welding reaches 14-18 layer.
CN201410792451.3A 2014-12-19 2014-12-19 A kind of fan-shaped conduit mounting process Active CN104625447B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410792451.3A CN104625447B (en) 2014-12-19 2014-12-19 A kind of fan-shaped conduit mounting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410792451.3A CN104625447B (en) 2014-12-19 2014-12-19 A kind of fan-shaped conduit mounting process

Publications (2)

Publication Number Publication Date
CN104625447A true CN104625447A (en) 2015-05-20
CN104625447B CN104625447B (en) 2016-08-24

Family

ID=53204929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410792451.3A Active CN104625447B (en) 2014-12-19 2014-12-19 A kind of fan-shaped conduit mounting process

Country Status (1)

Country Link
CN (1) CN104625447B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110877686A (en) * 2019-11-15 2020-03-13 沪东中华造船(集团)有限公司 Preassembling and mounting method for ship energy-saving guide pipe
CN111268056A (en) * 2020-03-09 2020-06-12 招商局重工(江苏)有限公司 Method for installing guide cover of large ore carrier
CN111805116A (en) * 2020-07-28 2020-10-23 中国二十二冶集团有限公司 Method for controlling welding deviation of double-shaft electric furnace cradle assembly

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0540868A1 (en) * 1991-11-02 1993-05-12 Herbert Prof. Dr.-Ing. Schneekluth Flow guiding device
CN101108648A (en) * 2007-08-16 2008-01-23 沪东中华造船(集团)有限公司 Method for manufacturing watercraft commutation tube
CN101214848A (en) * 2007-12-27 2008-07-09 广州文冲船厂有限责任公司 Method for mounting air guide sleeve
CN102009322A (en) * 2010-06-04 2011-04-13 沪东中华造船(集团)有限公司 Method for manufacturing connecting type rudder arm flow guide device
CN103129701A (en) * 2011-11-22 2013-06-05 上海船厂船舶有限公司 Positioning method of stream guidance cover on segmentation
CN103741657A (en) * 2013-12-27 2014-04-23 中铁大桥局集团第一工程有限公司 Construction method of large multifunctional over-water construction platform
CN203610881U (en) * 2013-11-21 2014-05-28 中船桂江造船有限公司 Diversion pipe connecting ring tool

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0540868A1 (en) * 1991-11-02 1993-05-12 Herbert Prof. Dr.-Ing. Schneekluth Flow guiding device
CN101108648A (en) * 2007-08-16 2008-01-23 沪东中华造船(集团)有限公司 Method for manufacturing watercraft commutation tube
CN101214848A (en) * 2007-12-27 2008-07-09 广州文冲船厂有限责任公司 Method for mounting air guide sleeve
CN102009322A (en) * 2010-06-04 2011-04-13 沪东中华造船(集团)有限公司 Method for manufacturing connecting type rudder arm flow guide device
CN103129701A (en) * 2011-11-22 2013-06-05 上海船厂船舶有限公司 Positioning method of stream guidance cover on segmentation
CN203610881U (en) * 2013-11-21 2014-05-28 中船桂江造船有限公司 Diversion pipe connecting ring tool
CN103741657A (en) * 2013-12-27 2014-04-23 中铁大桥局集团第一工程有限公司 Construction method of large multifunctional over-water construction platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110877686A (en) * 2019-11-15 2020-03-13 沪东中华造船(集团)有限公司 Preassembling and mounting method for ship energy-saving guide pipe
CN111268056A (en) * 2020-03-09 2020-06-12 招商局重工(江苏)有限公司 Method for installing guide cover of large ore carrier
CN111805116A (en) * 2020-07-28 2020-10-23 中国二十二冶集团有限公司 Method for controlling welding deviation of double-shaft electric furnace cradle assembly

Also Published As

Publication number Publication date
CN104625447B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN109590744B (en) A kind of welding procedure of offshore wind power foundation steel-pipe pile
CN107825077B (en) It is a kind of to rise self-propulsion type platform leg building technology certainly
CN107401175B (en) A kind of method of construction of the upper guide pipe support of six pile leaders frame
CN102357783B (en) Manufacturing process of pile shoe of wind power installation vessel
CN104625447A (en) Technology for mounting fan-shaped guide tube
CN102728980B (en) Method for limiting and positioning octagonal spud leg in folding process
CN102416554A (en) Technology for making pile legs of wind power installation ship
CN104526282B (en) Method for establishing large floating type wind power station tower drum
CN104929097B (en) 300-foot self-elevating drilling platform spud leg and shoe segmented carrying method
WO2018218834A1 (en) Propeller flow-guiding pipe mounting device
CN109079437A (en) Large size liquefied gas storage multilayer limb end socket arrangement and method for construction peculiar to vessel
CN104590521B (en) Installation process for fairing of bulk cargo ship
CN103523168A (en) Cross structure area segmentation manufacturing process of CSS platform and special-purpose inclined cutting jig frame
CN107717346A (en) A kind of 1600T masts hang on mast building technology
CN204803886U (en) Device for connecting marine spud leg and shoe
CN105643048A (en) Manufacturing technology for long large-diameter LSAW (longitudinal submerged arc welding) pile pipe for ocean platform
CN103692095B (en) Large-scale single disc-type External floating roof tank construction method of installation
CN113814676B (en) Manufacturing method of large-diameter tower equipment
CN105040662B (en) Drilling platform leg and the folding method of shoe
CN204803867U (en) Device for connecting marine spud leg
CN204353702U (en) A kind of frock moulding bed of ship honeycomb duct
CN204139162U (en) Concrete tubular pile pile splicing structure
CN203487525U (en) High-strength steel pile leg
CN206382777U (en) A kind of cylinder and flange quickly positioning group to device
CN103406732A (en) Sectional manufacturing process for pile leg flat pallet

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200609

Address after: 226500 No.2 Binjiang Road, Changjiang Town, Rugao City, Nantong City, Jiangsu Province

Patentee after: Nantong Huachuan transportation equipment Co., Ltd

Address before: 226500 petrochemical industry zone, Rugao Port Economic Development Zone, Nantong, Jiangsu, Rugao

Patentee before: HUATAI HEAVY INDUSTRY (NANTONG) Co.,Ltd.

TR01 Transfer of patent right