CN104625443A - 锅炉汽包封头与下降管管接头组装和焊接方法 - Google Patents
锅炉汽包封头与下降管管接头组装和焊接方法 Download PDFInfo
- Publication number
- CN104625443A CN104625443A CN201310559018.0A CN201310559018A CN104625443A CN 104625443 A CN104625443 A CN 104625443A CN 201310559018 A CN201310559018 A CN 201310559018A CN 104625443 A CN104625443 A CN 104625443A
- Authority
- CN
- China
- Prior art keywords
- end socket
- welding
- comer
- pipe connector
- descending pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K31/00—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
- B23K31/02—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Butt Welding And Welding Of Specific Article (AREA)
- Arc Welding In General (AREA)
Abstract
本发明公开了一种锅炉汽包封头与下降管管接头组装和焊接方法,首先,把下降管接头的内垫板组装于封头下降管管孔的封头内壁并焊妥,然后把封头组装于工装上,把下降管接头用起吊夹具吊在封头的下降管管孔内,用角尺弧形样板找正管接头垂直度,并用检查圆检查管接头对中性,合格后用四块拉筋板固定妥,预热150℃~200℃,然后手工打底焊至约30mm高,拆除拉筋板,继续手工焊,焊后立即在300℃~400℃保温4小时消氢处理,然后批除内垫板,批焊根,若用碳弧气铇,铇后磨去深碳层,并进行磁粉探伤,合格后在内壁封底焊。操作方便,工作效率高。
Description
技术领域
本发明属于封头与下降管管接头组装和焊接方法,具体涉及一种锅炉汽包封头与下降管管接头组装和焊接方法。
背景技术
大型的气包封头上的下降管管接头,一般设置在偏离球心45°方向,封头与下降管组装是放在专用工装上进行,坡口形式一般采用插入管坡口。目前锅炉汽包封头与下降管管接头组装和焊接方法操作复杂,工作效率低。
发明内容
为了克服现有技术领域存在的上述缺陷,本发明的目的在于,提供一种锅炉汽包封头与下降管管接头组装和焊接方法,操作方便。
本发明提供的锅炉汽包封头与下降管管接头组装和焊接方法,首先,把下降管接头的内垫板组装于封头下降管管孔的封头内壁并焊妥,然后把封头组装于工装上,把下降管接头用起吊夹具吊在封头的下降管管孔内,用角尺弧形样板找正管接头垂直度,并用检查圆检查管接头对中性,合格后用四块拉筋板固定妥,预热150℃~200℃,然后手工打底焊至约30mm高,拆除拉筋板,继续手工焊,焊后立即在300℃~400℃保温4小时消氢处理,然后批除内垫板,批焊根,若用碳弧气铇,铇后磨去深碳层,并进行磁粉探伤,合格后在内壁封底焊。批磨焊疤后要进行磁粉探伤检查,焊缝打磨后需100%超探合格。
本发明提供的锅炉汽包封头与下降管管接头组装和焊接方法,其有益效果在于,由于焊接工作量大,一个管接头允许上四个合格焊工,两个一组对着焊,中途交换,但不停焊,要求连续焊完,层间温度,不低于200℃,操作方便,工作效率高。
具体实施方式
下面结合一个实施例,对本发明提供的锅炉汽包封头与下降管管接头组装和焊接方法进行详细的说明。
实施例
首先,把下降管接头的内垫板组装于封头下降管管孔的封头内壁并焊妥,然后把封头组装于工装上,把下降管接头用起吊夹具吊在封头的下降管管孔内,用角尺弧形样板找正管接头垂直度,并用检查圆检查管接头对中性,合格后用四块拉筋板固定妥,预热150℃~200℃,然后手工打底焊至约30mm高,拆除拉筋板,继续手工焊,由于焊接工作量大,一个管接头允许上四个合格焊工,两个一组对着焊,中途交换,但不停焊,要求连续焊完,层间温度,不低于200℃,焊后立即在300℃~400℃保温4小时消氢处理,然后批除内垫板,批焊根,若用碳弧气铇,铇后磨去深碳层,并进行磁粉探伤,合格后在内壁封底焊。批磨焊疤后要进行磁粉探伤检查,焊缝打磨后需100%超探合格。
Claims (1)
1.一种锅炉汽包封头与下降管管接头组装和焊接方法,其特征在于:首先,把下降管接头的内垫板组装于封头下降管管孔的封头内壁并焊妥,然后把封头组装于工装上,把下降管接头用起吊夹具吊在封头的下降管管孔内,用角尺弧形样板找正管接头垂直度,并用检查圆检查管接头对中性,合格后用四块拉筋板固定妥,预热150℃~200℃,然后手工打底焊至约30mm高,拆除拉筋板,继续手工焊,焊后立即在300℃~400℃保温4小时消氢处理,然后批除内垫板,批焊根,若用碳弧气铇,铇后磨去深碳层,并进行磁粉探伤,合格后在内壁封底焊,批磨焊疤后要进行磁粉探伤检查,焊缝打磨后需100%超探合格。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310559018.0A CN104625443A (zh) | 2013-11-12 | 2013-11-12 | 锅炉汽包封头与下降管管接头组装和焊接方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310559018.0A CN104625443A (zh) | 2013-11-12 | 2013-11-12 | 锅炉汽包封头与下降管管接头组装和焊接方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104625443A true CN104625443A (zh) | 2015-05-20 |
Family
ID=53204925
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310559018.0A Pending CN104625443A (zh) | 2013-11-12 | 2013-11-12 | 锅炉汽包封头与下降管管接头组装和焊接方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104625443A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106624411A (zh) * | 2016-12-16 | 2017-05-10 | 东方电气集团东方锅炉股份有限公司 | 在热处理温差大的两工件之间焊拉筋板的方法 |
CN108907403B (zh) * | 2018-08-08 | 2023-08-22 | 电子科技大学中山学院 | 长管全自动智能焊接设备的使用方法 |
-
2013
- 2013-11-12 CN CN201310559018.0A patent/CN104625443A/zh active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106624411A (zh) * | 2016-12-16 | 2017-05-10 | 东方电气集团东方锅炉股份有限公司 | 在热处理温差大的两工件之间焊拉筋板的方法 |
CN108907403B (zh) * | 2018-08-08 | 2023-08-22 | 电子科技大学中山学院 | 长管全自动智能焊接设备的使用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104625443A (zh) | 锅炉汽包封头与下降管管接头组装和焊接方法 | |
CN210818141U (zh) | 一种高效、质量可靠的涡轮叶片焊前定位工装 | |
CN202291766U (zh) | 悬挂式自动管板氩弧焊机快速定位装置 | |
CN102284772B (zh) | 第三代核电汽轮机低压给水加热器壳体氩弧封底焊接方法 | |
CN101767236B (zh) | 一种直径大于300mm的陶瓷真空管钎焊工艺及装置 | |
CN104439616A (zh) | 一种0Cr18Ni9不锈钢板的焊接工艺 | |
CN201940772U (zh) | 一种压力容器焊接纵缝组对装置 | |
CN203437797U (zh) | 一种用于炉管焊接的背氩保护装置 | |
CN202655838U (zh) | 一种多孔端板组焊定位装置 | |
CN204818585U (zh) | 一种焊接组合工具 | |
CN204504641U (zh) | 一种用于管管对接焊接双持夹紧的侧开式夹具 | |
CN204248325U (zh) | 一种薄壁管道组装工具 | |
CN204053527U (zh) | 一种节温器盖车床夹具 | |
CN203695661U (zh) | 管道管口千斤顶矫正工装 | |
CN105436815A (zh) | 履带式起重机吊臂桁架的修复方法 | |
CN205218409U (zh) | 一种用于大口径管道间连接的定位装置 | |
CN206248295U (zh) | 一种下节装配的气密性试验工装 | |
CN106001958B (zh) | 一种锻焊滑轮的制作方法 | |
CN104259626A (zh) | 管件焊接旋转工作台 | |
CN203526875U (zh) | 自动焊接装置 | |
CN104439655A (zh) | 一种16Mn工字钢的焊接工艺 | |
CN204122981U (zh) | 一种自动焊接夹具 | |
CN203370859U (zh) | 直缝埋弧焊管精整线 | |
CN203621782U (zh) | 适合不同直径的接管马鞍焊用安放式埋弧焊机过渡装置 | |
CN203863279U (zh) | 沉没辊轴套焊接固定架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150520 |
|
WD01 | Invention patent application deemed withdrawn after publication |