CN104616068A - Method and system for optimizing emergency treatment process flow orientation of metro integrated control system - Google Patents

Method and system for optimizing emergency treatment process flow orientation of metro integrated control system Download PDF

Info

Publication number
CN104616068A
CN104616068A CN201410837598.XA CN201410837598A CN104616068A CN 104616068 A CN104616068 A CN 104616068A CN 201410837598 A CN201410837598 A CN 201410837598A CN 104616068 A CN104616068 A CN 104616068A
Authority
CN
China
Prior art keywords
prediction scheme
role
module
process flow
image conversion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410837598.XA
Other languages
Chinese (zh)
Inventor
傅彩利
曹辉
汪月林
王陈淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG SUPCON INFORMATION CO Ltd
Original Assignee
ZHEJIANG SUPCON INFORMATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG SUPCON INFORMATION CO Ltd filed Critical ZHEJIANG SUPCON INFORMATION CO Ltd
Priority to CN201410837598.XA priority Critical patent/CN104616068A/en
Publication of CN104616068A publication Critical patent/CN104616068A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/40Business processes related to the transportation industry

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a method and a system for optimizing emergency treatment process flow orientation of a metro integrated control system. The method and the system for optimizing emergency treatment process flow orientation of the metro integrated control system solve the problem that implementing dislocation is easy to be caused since the existing system is not visual in fault processing, and further the treatment process is influenced. The system includes a case library and a process flow orientation optimizing server, wherein the case library is connected with the process flow orientation optimizing server, and the process flow orientation optimizing server is respectively connected with a metro control center and an ISCS (integrated supervisory control system) control platform; the case library includes an image module and a storage module; the process flow orientation optimizing server comprises a configuration module and a running monitoring module. The system visualizes a plan and configures different plan executing steps according to the role right limit. The method and the system for optimizing emergency treatment process flow orientation of the metro integrated control system have the advantages of visualizing the plan, distributing corresponding role executing step according to the right limit, making operation more intuitional, greatly avoiding dislocation of every role in the executing step, and providing accuracy and processing efficiency in processing emergency accidents.

Description

Subway comprehensive monitoring system burst event handling flow guiding optimization system and method
Technical field
The present invention relates to track traffic field of information processing, especially relate to a kind of preventing and misplace, improve the subway comprehensive monitoring system burst event handling flow guiding optimization system and method that process accuracy and efficiency.
Background technology
In subway comprehensive monitoring system, process some customization degree higher, and when not needing overstaffed participation with regard to more manageable faults, the interlock instrument of subway, be enough to some basic demands meeting site disposal, if but in metro environment, there is certain fault, such as, the process framework of event of fire is: the detaining car operation of signal system (ATC) up-downgoing train, power monitoring (SCADA) pattern, the air draft pattern of ring control (BAS), video monitoring (CCTV) records the scene of the accident, trigger broadcast (PA) and passenger information system (PIS) display, crowd dredges the Cooperation controlling schemes such as route relevant device.Due to the complicacy of event itself, with the uncertainty such as the real-time status of event is variable, when cannot utilize simple customized logic to process this failure problems, just need the different role of Surveillance center this time, respectively according to the role-security of oneself, the accident that process occurs, and feed back in time according to the process of each role, the clear disposition understanding whole event timely.And the process wizard method utilizing the accident process of subway comprehensive monitoring system just can the so complicated emergency case of reasonable process.
In the process wizard method implementation process of the accident process of current subway comprehensive monitoring system, there is no corresponding flow processing software module instrument, more some specific accidents of prediction scheme card mode process, operator can only process according to the explanatory note in prediction scheme card, and in actual process, operator can not know the treatment step whether having taken turns to oneself at present clearly, when this does or should not do sometimes also to need others to notify, such flow processing is got off, often under efficiency comparison, and troubleshooting process is very not directly perceived, easily cause the dislocation on execution sequence, thus the treatment scheme of whole fault can be had a strong impact on.
Summary of the invention
It is not directly perceived for fault handling that the present invention mainly solves existing supervisory system, easily cause and perform dislocation, affect the problem of processing procedure, provide a kind of preventing and misplace, improve the subway comprehensive monitoring system burst event handling flow guiding optimization system processing accuracy and efficiency.
Present invention also offers a kind of preventing to misplace, improve the subway comprehensive monitoring system burst event handling flow guiding optimization method processing accuracy and efficiency.
Above-mentioned technical matters of the present invention is mainly solved by following technical proposals: a kind of subway comprehensive monitoring system burst event handling flow guiding optimization system, comprise case library, process wizard Optimized Service device, case library is connected with process wizard Optimized Service device, process wizard Optimized Service device is connected with Subway Control Center, ISCS parametric controller respectively, described case library comprises image conversion module and memory module, and process wizard Optimized Service device comprises configuration module and operation monitoring module; Total tune that the total activation that Subway Control Center comprises the row tune of responsible subway traffic dispatching command, the dimension tune of subway equipment failure maintenance process simulation scheduling is adjusted, is responsible for the ring of responsible Environmental Control System of Metro dispatch control, the electricity of responsible subway electric power system dispatching commander is adjusted and be responsible for Coordination Treatment between each system is commanded.ISCS parametric controller is the parametric controller of subway comprehensive monitoring system, comprehensive monitoring system has the communication interface with each subsystem, be integrated with all data of correlation subsystem, have the complete data acquisition of each subsystem and passage is assigned in order, possess whole resources that are relevant to operation, co-ordination between feasible system, possess and can realize variation, high-performance, complicated actor-oriented operation pilot function, ensure convenient, the efficient scheduling of subway and operation.
Image conversion module: the image according to the process step frame kind set, connection, state carries out image conversion to prediction scheme; Prediction scheme is arranged to flow chart of steps by image conversion module, the corresponding corresponding block diagram of each step, and also arranges the color of corresponding states in each block diagram.
Memory module: prediction scheme after image conversion is stored;
Configuration module: be configured prediction scheme, triggers corresponding prediction scheme when accident, carries out allocation manager to prediction scheme; Prediction scheme is distributed to corresponding operator, and limits the operation of operator according to authority.
Operation monitoring module: prediction scheme is performed, and record is carried out to prediction scheme.
As a kind of preferred version, described configuration module comprises triggering dispensing unit, program management unit, management information motor unit, configuration record unit,
Trigger dispensing unit: the trigger condition of definition prediction scheme; The trigger condition that can arrange this prediction scheme is that condition triggers, and when the state of system meets the trigger condition of this prediction scheme, will trigger this prediction scheme and enter executing state; The trigger condition that also can arrange this prediction scheme is manual triggers, operation monitoring module people for manually booting prediction scheme.
Program management unit: configuration prediction scheme, configures different prediction schemes according to different roles and performs step; The latching logic be associated can also be embodied between the step of different role, avoid the step between different role to perform dislocation.
Related information motor unit: when configuring prediction scheme and performing step, to the quick supervision of subscriber device running status on ISCS parametric controller with check and provide prompt operation; Also searching for related content after can opening efficiently other comprehensive monitoring management instruments and open, so just achieves and coordinates quick position process between each subsystem.
Configuration record unit: record is carried out to the layoutprocedure of prediction scheme.To understand the configuration modification history of prediction scheme.
A kind of subway comprehensive monitoring system burst event handling flow guiding optimization method, comprises the following steps:
A. in advance the prediction scheme in case library is carried out image conversion;
B. configuration module is configured the prediction scheme after image conversion, the trigger condition of definition prediction scheme, configures different prediction schemes perform step according to the authority of different role;
C. monitor the situation of subway, judge whether the trigger condition triggering prediction scheme, continue monitoring if not, if then notify each role, and corresponding prediction scheme image is sent to role's end;
D. judge whether role has permission the prediction scheme execution step of its operation of process, then returns step C if not, if then performed by the execution step of process wizard Optimized Service device to prediction scheme.After image conversion, each control role can check prediction scheme implementation status in the operation interface of oneself, and check whether the prediction scheme step oneself performed has locking to associate, whether role is clearly known the step oneself needing to perform, whether take turns to the step of oneself process at present, thus largely avoided the dislocation of each role in execution step, for process emergent accident improves accuracy and treatment effeciency.
As a kind of preferred version, in steps A, image conversion process is:
Prediction scheme process step kind is divided into four kinds, be respectively start terminate, step perform start after skip, step complete before not can skip, condition judgment, correspond to ellipse framework, rectangle framework, the rectangle framework of both sides vertical line, rhombus framework by after this four classes step separated image;
Connect kind between prediction scheme process step and be divided into two kinds, be respectively the logic connection between same role's intermediate step, connect across the logic of role's key step part, after this two class is connected image conversion, correspond to solid arrow, dotted arrow respectively;
Prediction scheme process step state is divided into four kinds, be respectively can not perform, pending, perform in, complete, will respectively corresponding four kinds of different colors after these four kinds of status image.
As a kind of preferred version, configure different prediction scheme execution steps according to the authority of different role in step B also to comprise: if the prediction scheme that active user role does not exist this role in the prediction scheme performed performs step, then all action box of prediction scheme are shown as the frames images of band shade by configuration module.
Therefore, advantage of the present invention is: prediction scheme is carried out image conversion, according to right assignment, corresponding role performs step, make operation more directly perceived, role clearly can know the step whether having and oneself need to perform, whether take turns to the step of oneself process at present, thus largely avoided the dislocation of each role in execution step, for process emergent accident improves accuracy and treatment effeciency.
Accompanying drawing explanation
Accompanying drawing 1 is a kind of frame diagram of the present invention;
Accompanying drawing 2 is a kind of schematic flow sheets of method in the present invention.
1-case library 2-process wizard Optimized Service device 3-image conversion module 4-memory module 5-Subway Control Center 6-ISCS parametric controller 7-configuration module 8-operation monitoring module 9-triggers dispensing unit 10-program management unit 11-related information motor unit 12-configuration record unit.
Embodiment
Below by embodiment, and by reference to the accompanying drawings, technical scheme of the present invention is described in further detail.
Embodiment:
A kind of subway comprehensive monitoring system burst of the present embodiment event handling flow guiding optimization system, as shown in Figure 1, include case library 1, process wizard Optimized Service device 2, Subway Control Center 5, ISCS parametric controller 6, process wizard Optimized Service device is connected with case library, and Subway Control Center and ISCS parametric controller are connected with process wizard Optimized Service device respectively.Total tune that the total activation that Subway Control Center comprises the row tune of responsible subway traffic dispatching command, the dimension tune of subway equipment failure maintenance process simulation scheduling is adjusted, is responsible for the ring of responsible Environmental Control System of Metro dispatch control, the electricity of responsible subway electric power system dispatching commander is adjusted and be responsible for Coordination Treatment between each system is commanded.ISCS parametric controller is the parametric controller of subway comprehensive monitoring system, is connected with subsystem above, as BSA, FAS, ACA, PIS etc.Case library comprises image conversion module 3 and memory module 4, and image conversion module carries out image conversion according to the image of the process step frame kind set, connection, state to prediction scheme, and memory module stores prediction scheme after image conversion.Process wizard Optimized Service device comprises configuration module 7 and operation monitoring module 8, and configuration module is configured prediction scheme, triggers corresponding prediction scheme when accident, carries out allocation manager to prediction scheme; Operation monitoring module performs prediction scheme, and carries out record to prediction scheme.Configuration module comprises triggering dispensing unit 9, program management unit 10, related information motor unit 11, configuration record unit 12, triggers the trigger condition of dispensing unit definition prediction scheme; Program management cell location prediction scheme, configures different prediction schemes according to different roles and performs step; Related information motor unit when configuring prediction scheme and performing step, to the quick supervision of subscriber device running status on ISCS parametric controller with check and provide prompt operation; Configuration record unit carries out record to the layoutprocedure of prediction scheme.
Subway comprehensive monitoring system burst event handling flow guiding optimization method, as shown in Figure 2, comprises the following steps:
A. in advance the prediction scheme in case library is carried out image conversion; Image conversion process is:
Prediction scheme process step kind is divided into four kinds, be respectively start terminate, step perform start after skip, step complete before not can skip, condition judgment, correspond to ellipse framework, rectangle framework, the rectangle framework of both sides vertical line, rhombus framework by after this four classes step separated image;
Connect kind between prediction scheme process step and be divided into two kinds, be respectively the logic connection between same role's intermediate step, connect across the logic of role's key step part, after this two class is connected image conversion, correspond to solid arrow, dotted arrow respectively;
Prediction scheme process step state is divided into four kinds, be respectively can not perform, pending, perform in, complete, will respectively corresponding four kinds of different colors after these four kinds of status image.
B. configuration module is configured the prediction scheme after image conversion, the trigger condition of definition prediction scheme, configures different prediction schemes perform step according to the authority of different role;
If the prediction scheme that active user role does not exist this role in the prediction scheme performed performs step, then all action box of prediction scheme are shown as the frames images of band shade by configuration module.
C. monitor the situation of subway, judge whether the trigger condition triggering prediction scheme, continue monitoring if not, if then notify each role, and corresponding prediction scheme image is sent to role's end;
D. judge whether role has permission the prediction scheme execution step of its operation of process, then returns step C if not, if then performed by the execution step of process wizard Optimized Service device to prediction scheme.
Specific embodiment described herein is only to the explanation for example of the present invention's spirit.Those skilled in the art can make various amendment or supplement or adopt similar mode to substitute to described specific embodiment, but can't depart from spirit of the present invention or surmount the scope that appended claims defines.
Although more employ the terms such as case library, process wizard Optimized Service device, image conversion module, memory module herein, do not get rid of the possibility using other term.These terms are used to be only used to describe and explain essence of the present invention more easily; The restriction that they are construed to any one additional is all contrary with spirit of the present invention.

Claims (5)

1. a subway comprehensive monitoring system burst event handling flow guiding optimization system, it is characterized in that: comprise case library (1), process wizard Optimized Service device (2), case library is connected with process wizard Optimized Service device, process wizard Optimized Service device is connected with Subway Control Center (5), ISCS parametric controller (6) respectively, described case library comprises image conversion module (3) and memory module (4), and process wizard Optimized Service device comprises configuration module (7) and operation monitoring module (8);
Image conversion module: the image according to the process step frame kind set, connection, state carries out image conversion to prediction scheme;
Memory module: prediction scheme after image conversion is stored;
Configuration module: be configured prediction scheme, triggers corresponding prediction scheme when accident, carries out allocation manager to prediction scheme;
Operation monitoring module: prediction scheme is performed, and record is carried out to prediction scheme.
2. subway comprehensive monitoring system burst event handling flow guiding optimization system according to claim 1, it is characterized in that described configuration module (7) comprises and trigger dispensing unit (9), program management unit (10), related information motor unit (11), configuration record unit (12)
Trigger dispensing unit: the trigger condition of definition prediction scheme;
Program management unit: configuration prediction scheme, configures different prediction schemes according to different roles and performs step;
Related information motor unit: when configuring prediction scheme and performing step, to the quick supervision of subscriber device running status on ISCS parametric controller with check and provide prompt operation;
Configuration record unit: record is carried out to the layoutprocedure of prediction scheme.
3. a subway comprehensive monitoring system burst event handling flow guiding optimization method, adopts the system in any one of power 1,2, it is characterized in that: comprise the following steps:
A. in advance the prediction scheme in case library is carried out image conversion;
B. configuration module is configured the prediction scheme after image conversion, the trigger condition of definition prediction scheme, configures different prediction schemes perform step according to the authority of different role;
C. monitor the situation of subway, judge whether the trigger condition triggering prediction scheme, continue monitoring if not, if then notify each role, and corresponding prediction scheme image is sent to role's end;
D. judge whether role has permission the prediction scheme execution step of its operation of process, then returns step C if not, if then performed by the execution step of process wizard Optimized Service device to prediction scheme.
4. subway comprehensive monitoring system burst event handling flow guiding optimization method according to claim 3, is characterized in that in steps A, image conversion process is:
Prediction scheme process step kind is divided into four kinds, be respectively start terminate, step perform start after skip, step complete before not can skip, condition judgment, correspond to ellipse framework, rectangle framework, the rectangle framework of both sides vertical line, rhombus framework by after this four classes step separated image;
Connect kind between prediction scheme process step and be divided into two kinds, be respectively the logic connection between same role's intermediate step, connect across the logic of role's key step part, after this two class is connected image conversion, correspond to solid arrow, dotted arrow respectively;
Prediction scheme process step state is divided into four kinds, be respectively can not perform, pending, perform in, complete, will respectively corresponding four kinds of different colors after these four kinds of status image.
5. subway comprehensive monitoring system burst event handling flow guiding optimization method according to claim 1, it is characterized in that configuring different prediction scheme execution steps according to the authority of different role in step B also comprises: if the prediction scheme that active user role does not exist this role in the prediction scheme performed performs step, then all action box of prediction scheme are shown as the frames images of band shade by configuration module.
CN201410837598.XA 2014-12-29 2014-12-29 Method and system for optimizing emergency treatment process flow orientation of metro integrated control system Pending CN104616068A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410837598.XA CN104616068A (en) 2014-12-29 2014-12-29 Method and system for optimizing emergency treatment process flow orientation of metro integrated control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410837598.XA CN104616068A (en) 2014-12-29 2014-12-29 Method and system for optimizing emergency treatment process flow orientation of metro integrated control system

Publications (1)

Publication Number Publication Date
CN104616068A true CN104616068A (en) 2015-05-13

Family

ID=53150504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410837598.XA Pending CN104616068A (en) 2014-12-29 2014-12-29 Method and system for optimizing emergency treatment process flow orientation of metro integrated control system

Country Status (1)

Country Link
CN (1) CN104616068A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101706897A (en) * 2009-11-24 2010-05-12 蒋伶丽 Emergency response management device and emergency command system
CN102609773A (en) * 2012-01-20 2012-07-25 华迪计算机集团有限公司 Digital pre-plan-based emergency dispatching processing system
CN102880933A (en) * 2012-09-04 2013-01-16 广东电子工业研究院有限公司 Cloud computing-oriented comprehensive emergency management platform architecture
CN102968101A (en) * 2012-11-08 2013-03-13 合肥工大高科信息科技股份有限公司 Mine multiple-system linkage control system based on imaging and control method thereof
CN103390212A (en) * 2013-06-27 2013-11-13 武汉数阵信息集成技术有限公司 Coal mine safety management system and method
WO2014017832A1 (en) * 2012-07-24 2014-01-30 주식회사 효성 Agent-based energy management system and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101706897A (en) * 2009-11-24 2010-05-12 蒋伶丽 Emergency response management device and emergency command system
CN102609773A (en) * 2012-01-20 2012-07-25 华迪计算机集团有限公司 Digital pre-plan-based emergency dispatching processing system
WO2014017832A1 (en) * 2012-07-24 2014-01-30 주식회사 효성 Agent-based energy management system and method
CN102880933A (en) * 2012-09-04 2013-01-16 广东电子工业研究院有限公司 Cloud computing-oriented comprehensive emergency management platform architecture
CN102968101A (en) * 2012-11-08 2013-03-13 合肥工大高科信息科技股份有限公司 Mine multiple-system linkage control system based on imaging and control method thereof
CN103390212A (en) * 2013-06-27 2013-11-13 武汉数阵信息集成技术有限公司 Coal mine safety management system and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
董存祥: "应急事件处置流程建模及其过程协同研究", 《中国博士学位论文全文数据库》 *

Similar Documents

Publication Publication Date Title
CN109747682B (en) Rail transit weak current integration system
CN109677449B (en) Vehicle-mounted ATP system compatible with C2ATO and CBTC
CN108171410A (en) A kind of railway freight wisdom station total management system and its application
CN103368760A (en) Railway electric service and communication signal integrated operation and maintenance system and method
CN111413892A (en) Cloud simulation device and method for rail transit full-automatic unmanned scene verification
CN104477216B (en) Vehicle fire linkage method and device based on track traffic full-automatic driving system
CN102819249B (en) Linkage control system and control method for power tunnel
CN105564465A (en) System and method for controlling maintenance operation of railway electrical service signal equipment
DE112010005812T5 (en) Method of controlling technical equipment
CN103745630B (en) trackside simulation method and system
CN104299475A (en) Simulator used for automatic monitoring system of train
CN112684715A (en) Full-automatic operation semi-physical simulation test system for subway
CN102556125A (en) Maintenance support system of automatic train control system
CN106371398B (en) A kind of motor-car based on tri-level logic interlocking is climbed to the top of a mountain operation safety control system
CN111123739A (en) Network control system semi-physical simulation experiment platform used in full-automatic unmanned driving mode
CN105480262B (en) Linkage control system and method for full automatic driving
CN204143487U (en) Prison intelligence meets with management system
CN202841162U (en) Integrated operation and maintenance system for railway electric service and communication signals
CN103400622A (en) Monitoring mode switching method and system for nuclear power plant master control room
CN104309652A (en) Intelligent tramcar signal system
CN103824241A (en) School safety monitoring system
CN106815018A (en) Tramcar comprehensive operation dispatches the integral design method of system man-machine interface
CN105376266A (en) Remote pump station monitoring system based on mobile terminal
CN104240137A (en) Intelligent management method for electrical equipment
CN109410013A (en) One kind obtaining VIN code based on mobile unit and identifies matched alarm method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150513

RJ01 Rejection of invention patent application after publication