CN104614245B - The pulling test device and pulling test method of reinforcing bar grout sleeve overlap joint connection test specimen - Google Patents

The pulling test device and pulling test method of reinforcing bar grout sleeve overlap joint connection test specimen Download PDF

Info

Publication number
CN104614245B
CN104614245B CN201510081378.3A CN201510081378A CN104614245B CN 104614245 B CN104614245 B CN 104614245B CN 201510081378 A CN201510081378 A CN 201510081378A CN 104614245 B CN104614245 B CN 104614245B
Authority
CN
China
Prior art keywords
chuck
locating piece
reinforcing bar
test specimen
templin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510081378.3A
Other languages
Chinese (zh)
Other versions
CN104614245A (en
Inventor
徐国强
苏幼坡
王硕
任宏伟
韩玉涛
于庆坤
杨小杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei United University
Original Assignee
Hebei United University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei United University filed Critical Hebei United University
Priority to CN201510081378.3A priority Critical patent/CN104614245B/en
Publication of CN104614245A publication Critical patent/CN104614245A/en
Application granted granted Critical
Publication of CN104614245B publication Critical patent/CN104614245B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The present invention relates to the pulling test device and pulling test method of a kind of reinforcing bar grout sleeve overlap joint connection test specimen.Including upper fixture component, lower clamp component, positioning component, actuator, pedestal, upper fixture component includes the upper locating piece being connected with actuator, the upper templin chuck of clamping reinforcing bar, templin chuck moves horizontally the upper grip control assembly with folding in control;Lower clamp component includes the lower locating piece being connected with pedestal, the lower templin chuck of clamping reinforcing bar, the lower chuck control assembly for controlling lower templin chuck folding;Positioning component includes fixing steel plate and the floor being welded and fixed with lower locating piece, it is equipped with fixing steel plate and bar splicing connection test specimen is fixed on into the U-bolt on fixing steel plate, the upper and lower overlap joint reinforcing bar of bar splicing connection test specimen is clamped by upper and lower templin chuck respectively.The present invention has a versatility to all kinds of overlap joints connection test specimen, measured test data is accurately, reliable, it is to avoid the drawbacks of other pulling test devices.

Description

The pulling test device and pulling test method of reinforcing bar grout sleeve overlap joint connection test specimen
Technical field
The present invention relates to steel bar connector test for tensile strength, specifically a kind of reinforcing bar grout sleeve overlap joint connection test specimen Pulling test device and pulling test method.
Background technology
Rebar connecting technology is widely used in building construction process, and is required to butt joint quality and is carried out quality inspection. Existing bar splicing connects the pulling test of test specimen, and what experimental apparatus were provided is coaxial pulling force, and such as CN103698213A is public A kind of tension and compression testing device and pull pressure test method of the bar connecting test specimen opened, the device can only provide coaxial pulling force.It is coaxial Pulling force can simulate the stress characteristic of overlap joint connection test specimen to a certain extent, approximate to carry out experiment to its mechanical property and grind Study carefully, but the actual loading of overlap joint connection test specimen is non co axial pulling force, this results in experimental results and deposits compared with practical situation In certain error, the experimental data for being provided can not provide the design considerationss of science for engineering design.
The content of the invention
Present invention seek to address that the problem that the pulling test device of existing overlap joint connection test specimen is present, there is provided a kind of energy is more preferably Reflection overlap joint connection test specimen stress characteristic, it is ensured that experimental data it is accurate, reliable, simple structure is easy to operate, takes to all kinds of Test specimen being connect in succession there is versatility, the reinforcing bar grout sleeve overlap joint for providing scientific design foundation for engineering design connects opening for test specimen Draw assay device.
The present invention solves the technical scheme of the problem employing:
A kind of pulling test device of reinforcing bar grout sleeve overlap joint connection test specimen, including upper fixture component, lower clamp component, Positioning component, actuator, pedestal, bar splicing connection test specimen, the upper fixture component include:The upper positioning being connected with actuator Block, the upper templin chuck of clamping reinforcing bar, in control, templin chuck moves horizontally the upper grip control assembly with folding;It is described fixed A upper grip wedge that Open Side Down, inserts templin chuck and is oriented to upper templin chuck and is clamped is provided with the block of position Shape elongated slot;The lower clamp component includes:The lower locating piece being connected with pedestal, the lower templin chuck of clamping reinforcing bar control hyposphene The lower chuck control assembly of clevis head folding;An opening upwards are provided with the lower locating piece, lower templin chuck is inserted simultaneously The lower chuck wedge shape elongated slot for lower templin chuck being oriented to and being clamped;The positioning component includes fixing steel plate, the positioning Steel plate is welded with floor, and fixing steel plate and floor lower end are welded and fixed with lower locating piece, and U-bolt is equipped with fixing steel plate; The bar splicing connection test specimen is fixed on the fixing steel plate of positioning component by the U-bolt, bar splicing connection examination The upper reinforcement termination of part is clamped by upper templin chuck, and the lower rebar termination of bar splicing connection test specimen is pressed from both sides by lower templin chuck Hold.
The pulling test method of the reinforcing bar grout sleeve overlap joint connection test specimen pulling test device, enters in the steps below OK:
A. the bonding strength requirement of test specimen, design the upper and lower clamp assembly of processing and fabricating and positioning are connected by bar splicing Shaped steel, steel plate needed for component, bolt, and assemble upper and lower clamp assembly and positioning component;
B. upper and lower clamp assembly is fixed on pedestal and actuator by respective bolt hole;
C. the handle in lower chuck control assembly is lifted upwards, and lower templin chuck is moved down, and jaws is opened, and reinforcing bar is taken Connect in the jaws of the lower templin chuck of test piece lower part reinforcing bar insertion in succession, release handle is moved on lower templin chuck and clamps test piece lower part Reinforcing bar;
D. by U-bolt by bar splicing connect specimen holder on the fixing steel plate of positioning component, in blending bolt Tightly, clamping action is played to test specimen;
E. the pull-up rod bearing in upper grip control assembly is moved, upper templin chuck is moved horizontally to correct position, makes examination The jaws of the upper templin chuck of part upper reinforcement alignment, downward handle will be moved on upper templin chuck, and jaws is opened, and is moved down Actuator, in making the jaws of the upper templin chuck of test piece upper part reinforcing bar insertion, release handle, upper templin chuck are moved down on clamping test specimen Portion's reinforcing bar;
F. move up actuator so as to which a less pulling force is applied to test specimen, it is ensured that upper and lower templin chuck clamps steel Muscle;
G. the power of actuator is adjusted to dead-center position, moved up by control actuator and bar splicing connection test specimen is applied Plus pulling force, carry out tension test.
Using the present invention of above-mentioned technical proposal, compared with prior art, the characteristics of its protrusion it is:
More realistically reflect that bar splicing connects the mechanical characteristic of test specimen, it is simple to operate, testing crew technical merit is not had There is excessive demand, connect measure safety, easy to process, resulting test data is more accurate, reliable, provides for engineering design The design considerationss of science, it is to avoid the drawbacks of other pulling test devices, have a wide range of applications space and good practical effect Really.
Preferably, the present invention further technical scheme is:
The upper grip control assembly includes pulling up rod bearing, upper connecting rod, top in the upper grip wedge shape elongated slot of upper locating piece Portion is provided with dovetail groove, and pull-up rod bearing is slided by the dovetail groove and is lifted in the upper grip wedge shape elongated slot of upper locating piece, Upper connecting rod is hinged on pull-up rod bearing, and upper connecting rod one end is connected with upper templin chuck by upper articulated joint, the upper connecting rod other end For handle end, upper connecting rod handle is stretched out outside upper grip wedge shape elongated slot, is connected with tension bullet between upper connecting rod and pull-up rod bearing Spring.
The lower chuck control assembly includes lower drag link bearing, lower pull bar, and lower drag link bearing is fixed under lower locating piece Chuck wedge shape elongated slot inner bottom part, lower pull bar are hinged on lower drag link bearing, and lower pull bar one end is by lower articulated joint and lower wedge grip Head connection, the lower pull bar other end is handle end, and lower pull bar handle stretched out outside lower chuck wedge shape elongated slot, lower pull bar and lower locating piece it Between be connected with lower back-moving spring.
The upper locating piece is connected with actuator by four bolts hole that top board is arranged, and provides drawing to test piece upper part reinforcing bar Power.
The lower locating piece is connected with pedestal by four bolts hole that base plate is arranged, and provides drawing to test piece lower part reinforcing bar Power.
Clamping is respectively arranged with the upper templin chuck, two of the lower templin chuck inner side concave surfaces for stepping up block to take Connect the sawtooth of reinforcing bar.
The lower templin chuck has the overhanging edge of a wing, matches with the wedge shape elongated slot in lower locating piece.
Description of the drawings
Positive facade structural representations of the Fig. 1 for the embodiment of the present invention;
Side elevation structural representations of the Fig. 2 for the embodiment of the present invention;
Fig. 3 is A-A profiles in Fig. 1;
Fig. 4 is B-B profiles in Fig. 1;
Fig. 5 is C-C profiles in Fig. 1;
Longitudinal sectional drawings of the Fig. 6 for upper grip control assembly;
Longitudinal sectional drawings of the Fig. 7 for lower chuck control assembly;
Fig. 8 is upper templin chuck overlooking structure figure;
Fig. 9 is upper templin chuck front view structure figure;
Figure 10 is that the single of upper templin chuck steps up concave surface expanded view on the inside of block;
Figure 11 is lower templin chuck overlooking structure figure;
Figure 12 is lower templin chuck front view structure figure;
Figure 13 is that the single of lower templin chuck steps up concave surface expanded view on the inside of block.
In figure:Actuator 1, upper locating piece 2, upper grip control assembly 3, upper templin chuck 4, positioning component 5, bar splicing Connection test specimen 6, lower locating piece 7, lower templin chuck 8, lower chuck control assembly 9, pedestal 10;Upper grip wedge shape elongated slot 21, dovetail Groove 22;Pull-up rod bearing 31, upper connecting rod 32, upper connecting rod handle 33, upper back-moving spring 34, upper articulated joint 35;On step up block 41, on The jaws 42 of templin chuck, above steps up concave surface sawtooth 43 on the inside of block;Fixing steel plate 51, floor 52, U-bolt 53;Upper overlap joint steel Muscle 61, lower overlap joint reinforcing bar 62;Lower chuck wedge shape elongated slot 71;Under step up block 81, the jaws 82 of lower templin chuck, the overhanging edge of a wing 83, Under step up concave surface sawtooth 84 on the inside of block;Lower drag link bearing 91, lower pull bar 92, lower pull bar handle 93, lower back-moving spring 94, under be hinged 95.
Specific embodiment
The present invention is further elaborated for the embodiment for being given below in conjunction with the accompanying drawings, but embodiment is not constituted to the present invention and appointed What limits.
Referring to Fig. 1, Fig. 2 and Fig. 5, the pulling test device of the reinforcing bar grout sleeve overlap joint connection test specimen that embodiment is given, It is made up of actuator 1, positioning component 5, pedestal 10 and upper fixture component and lower clamp component, wherein, upper fixture component includes:With The upper locating piece 2 of the connection of actuator 1, the upper templin chuck 4 of clamping reinforcing bar, in control, templin chuck 4 is moved horizontally and folding Upper grip control assembly 3;Lower clamp component includes:The lower locating piece 7 being connected with pedestal 10, the lower templin chuck 8 of clamping reinforcing bar, The lower chuck control assembly 9 of lower 8 folding of templin chuck of control;Positioning component 5 includes:Fixing steel plate 51, floor 52, U-bolt 53;Fixing steel plate 51 and 52 lower end of floor are welded and fixed with the lower locating piece 7 in lower clamp component, and U-bolt 53 is two secondary, is used It is fixed on fixing steel plate 51 in bar splicing is connected test specimen 6.
Referring to Fig. 1, Fig. 2, Fig. 3 and Fig. 7, lower locating piece 7 is connected solid by four bolts hole that base plate is arranged with pedestal 10 Fixed, the lower overlap joint reinforcing bar 62 for connecting test specimen 6 to bar splicing provides pulling force;An opening upwards are provided with lower locating piece 7, are put The lower chuck wedge shape elongated slot 71 for entering lower templin chuck 8 and lower templin chuck 8 being oriented to and is clamped;Lower chuck wedge shape elongated slot 71 Lower chuck control assembly 9 is provided with inside, lower chuck control assembly 9 includes lower drag link bearing 91, lower pull bar 92, lower drag link bearing 91 71 inner bottom part of lower chuck wedge shape elongated slot is fixed on, lower pull bar 92 is hinged on lower drag link bearing 91, under lower 92 one end of pull bar passes through Articulated joint 95 is connected with lower templin chuck 8, and lower 92 other end of pull bar is handle end, and it is long that lower pull bar handle 93 stretches out lower chuck wedge shape Outside groove 71, between lower pull bar 92 and lower locating piece 7, lower back-moving spring 94 is connected with.
Referring to Fig. 1, Fig. 2, Fig. 4 and Fig. 6, upper locating piece 2 is connected solid by four bolts hole that top board is arranged with actuator 1 Fixed, the upper overlap joint reinforcing bar 61 for connecting test specimen 6 to bar splicing provides pulling force;It is provided with one on upper locating piece 2 Open Side Down, puts The upper grip wedge shape elongated slot 21 for entering upper templin chuck 4 and upper templin chuck 4 being oriented to and is clamped;Upper grip wedge shape elongated slot 21 Upper grip control assembly 3 is provided with inside, upper grip control assembly 3 includes pulling up rod bearing 31, upper connecting rod 32, upper locating piece 2 21 inner top of upper grip wedge shape elongated slot is provided with dovetail groove 22, and pull-up rod bearing 31 is slided by the dovetail groove 22 and is lifted on In chuck wedge shape elongated slot 21, upper connecting rod 32 be hinged on pull-up rod bearing 31 on, 32 one end of upper connecting rod by upper articulated joint 35 with it is upper Templin chuck 4 connects, and 32 other end of upper connecting rod is handle end, and upper connecting rod handle 33 stretched out outside upper grip wedge shape elongated slot 21, pulls up Back-moving spring 34 is connected between bar 32 and pull-up rod bearing 31.
Referring to Fig. 8 to Figure 13, on two of upper templin chuck 4, step up the jaws 42 that block 41 forms upper templin chuck, hyposphene Step up the jaws 82 that block 81 forms lower templin chuck under two of clevis head 8, on the inner side concave surface of the jaws 42 of upper templin chuck It is provided with and steps up concave surface sawtooth 43 on the inside of block, is provided with down on the inner side concave surface of the jaws 82 of lower templin chuck and steps up on the inside of block Concave surface sawtooth 84;Stepping up block 81 under two of lower templin chuck 8 has the overhanging edge of a wing, matches with lower chuck wedge shape elongated slot 71.
The pulling test method of bar connecting test specimen 6 is carried out using above-mentioned pulling test device, is carried out in the steps below:
(1)Connect the bonding strength requirement of test specimen 6 by bar splicing, design the simultaneously upper and lower clamp assembly of processing and fabricating and determine Shaped steel, steel plate needed for hyte part 5, bolt, and assemble upper and lower clamp assembly and positioning component 5.
(2)Upper and lower clamp assembly is fixed on pedestal 10 and actuator 1 by respective bolt hole.
(3)Lower pull bar handle 93 is lifted upwards, and lower templin chuck 8 is moved down, and the jaws 82 of lower templin chuck is opened, will In the jaws 82 of the lower templin chuck of the lower insertion of overlap joint reinforcing bar 62 of bar splicing connection test specimen 6, lower pull bar handle 93 is unclamped, under In the presence of back-moving spring 94, move on lower templin chuck 8 and clamp lower overlap joint reinforcing bar 62.
(4)Bar splicing connection test specimen 6 is clamped on the fixing steel plate 51 of positioning component 5 by U-bolt 53, is used in combination Bolt is tightened, and plays clamping action to bar splicing connection test specimen 6.
(5)Mobile pull-up rod bearing 31, upper templin chuck 4 are moved horizontally to correct position, make bar splicing connect test specimen 6 The upper templin chuck of upper overlap joint reinforcing bar 61 alignment jaws 42, pull down upper connecting rod handle 33, will move on upper templin chuck 4, on The jaws 42 of templin chuck is opened, and moves down actuator 1, in making the jaws 42 for overlap the upper templin chuck of the insertion of reinforcing bar 61, Upper connecting rod handle 33 is unclamped, in the presence of upper back-moving spring 34, upper templin chuck 4 is moved down.
(6)Move up actuator 1 so as to a less pulling force is applied to bar splicing connection test specimen 6, it is ensured that upper wedge Clevis head 4, lower templin chuck 8 clamp overlap joint reinforcing bar 61 and lower overlap joint reinforcing bar 62 respectively.
(7)The power of adjustment actuator 1 is moved up to dead-center position by controlling actuator 1, and bar splicing connection is tried Part 6 applies pulling force, carries out tension test.
Preferably feasible embodiment of the invention is the foregoing is only, not thereby limits to the interest field of the present invention, The equivalent structure change made by all utilization description of the invention and accompanying drawing content, is both contained within the interest field of the present invention.

Claims (3)

1. it is a kind of pulling test device of reinforcing bar grout sleeve overlap joint connection test specimen, including upper fixture component, lower clamp component, fixed Hyte part, actuator, pedestal, bar splicing connection test specimen, it is characterised in that:
The upper fixture component includes:The upper locating piece being connected with actuator, the upper templin chuck of clamping reinforcing bar, wedge shape in control Chuck moves horizontally the upper grip control assembly with folding;One is provided with the upper locating piece, and Open Side Down, inserts wedge Clevis head the upper grip wedge shape elongated slot for upper templin chuck being oriented to and being clamped;
The lower clamp component includes:The lower locating piece being connected with pedestal, the lower templin chuck of clamping reinforcing bar, the lower wedge grip of control The lower chuck control assembly of head folding;An opening upwards are provided with the lower locating piece, lower templin chuck is inserted and under The lower chuck wedge shape elongated slot that templin chuck is oriented to and is clamped;
The positioning component includes fixing steel plate, and the fixing steel plate is welded with floor, and fixing steel plate and floor lower end are fixed with lower Position block welding is fixed, and U-bolt is equipped with fixing steel plate;The bar splicing connection test specimen is fixed by the U-bolt On the fixing steel plate of positioning component, the upper reinforcement termination of bar splicing connection test specimen is clamped by upper templin chuck, and reinforcing bar is taken The lower rebar termination for connecing test specimen in succession is clamped by lower templin chuck;
The upper grip control assembly includes pulling up rod bearing, upper connecting rod, and the upper grip wedge shape elongated slot inner top of upper locating piece sets Dovetail groove is equipped with, pull-up rod bearing is slided by the dovetail groove and is lifted in the upper grip wedge shape elongated slot of upper locating piece, is pulled up Bar is hinged on pull-up rod bearing, and upper connecting rod one end is connected with upper templin chuck by upper articulated joint, and the upper connecting rod other end is handss Pommel, upper connecting rod handle are stretched out outside upper grip wedge shape elongated slot, are connected with back-moving spring between upper connecting rod and pull-up rod bearing;
The lower chuck control assembly includes lower drag link bearing, lower pull bar, and lower drag link bearing is fixed on the lower chuck of lower locating piece Wedge shape elongated slot inner bottom part, lower pull bar are hinged on lower drag link bearing, and lower pull bar one end is connected with lower templin chuck by lower articulated joint Connect, the lower pull bar other end is handle end, and lower pull bar handle stretches out outside lower chuck wedge shape elongated slot, connect between lower pull bar and lower locating piece It is connected to lower back-moving spring;
Clamping overlap joint steel is respectively arranged with the upper templin chuck, two of the lower templin chuck inner side concave surfaces for stepping up block The sawtooth of muscle;The lower templin chuck has the overhanging edge of a wing, matches with the wedge shape elongated slot in lower locating piece.
2. reinforcing bar grout sleeve overlap joint according to claim 1 connects the pulling test device of test specimen, it is characterised in that institute State locating piece to be connected with actuator by four bolts hole that top board is arranged, pulling force is provided to test piece upper part reinforcing bar.
3. reinforcing bar grout sleeve overlap joint according to claim 1 connects the pulling test device of test specimen, it is characterised in that institute State lower locating piece to be connected with pedestal by four bolts hole that base plate is arranged, pulling force is provided to test piece lower part reinforcing bar.
CN201510081378.3A 2015-02-15 2015-02-15 The pulling test device and pulling test method of reinforcing bar grout sleeve overlap joint connection test specimen Expired - Fee Related CN104614245B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510081378.3A CN104614245B (en) 2015-02-15 2015-02-15 The pulling test device and pulling test method of reinforcing bar grout sleeve overlap joint connection test specimen

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510081378.3A CN104614245B (en) 2015-02-15 2015-02-15 The pulling test device and pulling test method of reinforcing bar grout sleeve overlap joint connection test specimen

Publications (2)

Publication Number Publication Date
CN104614245A CN104614245A (en) 2015-05-13
CN104614245B true CN104614245B (en) 2017-04-05

Family

ID=53148792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510081378.3A Expired - Fee Related CN104614245B (en) 2015-02-15 2015-02-15 The pulling test device and pulling test method of reinforcing bar grout sleeve overlap joint connection test specimen

Country Status (1)

Country Link
CN (1) CN104614245B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108548713B (en) * 2018-03-29 2022-10-04 合肥工业大学 Correctable mobile test device and test method thereof
CN108387514A (en) * 2018-05-30 2018-08-10 金杯电工电磁线有限公司 The test device and test method of bonding lacquered wires intensity under a kind of condition of high temperature
CN109958874B (en) * 2019-03-25 2022-03-25 汤始建华建材(南通)有限公司 Steel pipe sleeve and method for simultaneously measuring strength and strength of prestressed tendon thereof
CN114688948B (en) * 2022-03-03 2023-12-29 四川高速公路建设开发集团有限公司 Reinforcing bar connecting sleeve detection device

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3723475C2 (en) * 1987-07-16 1995-11-30 Schenck Ag Carl Device for clamping material samples in testing machines
US5297441A (en) * 1992-08-14 1994-03-29 The Boeing Company Apparatus for supporting a test specimen for compression testing
CN200972439Y (en) * 2006-11-15 2007-11-07 济南试金集团有限公司 Wedge lever-type stretch chuck
CN201138318Y (en) * 2007-10-22 2008-10-22 济南试金集团有限公司 Multifunctional connecting structure of clamp for test machine
CN202631357U (en) * 2012-06-13 2012-12-26 宁波康氏塑料科技有限公司 Plastic tensile property testing machine
JP6004113B2 (en) * 2013-08-07 2016-10-05 株式会社島津製作所 Jig mounting device for material testing machine
CN103698213B (en) * 2013-12-29 2015-10-14 河北联合大学 The tension and compression testing device of bar connecting test specimen and pull pressure test method
CN204389304U (en) * 2015-02-15 2015-06-10 河北联合大学 Reinforcing bar grout sleeve overlap joint connects the pulling test device of test specimen

Also Published As

Publication number Publication date
CN104614245A (en) 2015-05-13

Similar Documents

Publication Publication Date Title
CN104614245B (en) The pulling test device and pulling test method of reinforcing bar grout sleeve overlap joint connection test specimen
US11719621B2 (en) Debonding test apparatus for measuring bond strength to concrete
CN103698213B (en) The tension and compression testing device of bar connecting test specimen and pull pressure test method
CN104458446B (en) Device and method for testing shearing characteristics of non-metallic materials
CN107036901A (en) A kind of monofilament pull-out test device for applying lateral pressure
CN107389440A (en) A kind of biaxial fatigue test fixture
CN104280293B (en) A kind of material tensile test fixture
CN108120826B (en) Comprehensive sleeve grouting test device and test method
CN103175733B (en) Direct tensile test jag of incompressible material
CN102928287B (en) Tensile clamp for tensile property test of non-metal materials
CN108169124A (en) Armored concrete pull device and method
CN106289977B (en) Bolt concrete tensile test device and test method
CN204389304U (en) Reinforcing bar grout sleeve overlap joint connects the pulling test device of test specimen
CN102346115A (en) Axial tension test hinge mechanism capable of eliminating eccentric bending moment
CN211784758U (en) Clamp for universal testing machine pipe tensile sample
CN103926325A (en) Multi-probe flexible clamping device applied to ultrasonic testing
CN207408219U (en) A kind of test for tensile strength auxiliary device
CN207066863U (en) A kind of biaxial fatigue test fixture
CN215574561U (en) Anti-crack mortar bonding clamp
CN206235520U (en) One kind is used for cross or T-shaped welding point bend test device
CN204536134U (en) A kind of guided wave mechanism for the acoustic emission monitor(ing) of uniaxial tension high-temerature creep
CN108896404A (en) A kind of prefabricated components are glued the experimental rig and its test method of seam tensile strength
CN210833954U (en) Workpiece tension test board
CN211206207U (en) A pull head subassembly for testing tensile strength between multilayer combined material layer
CN203616205U (en) Tension and compression testing device for reinforcement connection test piece

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170405

CF01 Termination of patent right due to non-payment of annual fee