CN104612711B CN201510066597.4A CN201510066597A CN104612711B CN 104612711 B CN104612711 B CN 104612711B CN 201510066597 A CN201510066597 A CN 201510066597A CN 104612711 B CN104612711 B CN 104612711B
Authority
CN
China
Prior art keywords
block
hole
tunnel
segment structure
hoist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510066597.4A
Other languages
Chinese (zh)
Other versions
CN104612711A (en
Inventor
叶建忠
李围
项小强
丁赛华
胡茜
俞帆
杜飞天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Science and Technology ZUST
Zhejiang Shuzhijiaoyuan Technology Co Ltd
Original Assignee
Ningbo Institute of Technology of ZJU
Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Institute of Technology of ZJU, Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd filed Critical Ningbo Institute of Technology of ZJU
Priority to CN201510066597.4A priority Critical patent/CN104612711B/en
Publication of CN104612711A publication Critical patent/CN104612711A/en
Application granted granted Critical
Publication of CN104612711B publication Critical patent/CN104612711B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a lining segment structure of city subway up-down section overlapping shield tunnels. The structure can satisfy construction loads such as the weight of a shield tunneling machine, the pressure supplied by the shield tunneling machine and stratum excavation stress relief under construction and structure safety and deformation under the effect of water and soil pressure and subway train loads during operation, satisfy construction performance of secondary slip casting on the back of a lining segment structure wall and synchronous and uniform slip casting of interlayers between the up-down overlapping tunnels, and at last satisfy the waterproofness and durability of tunnel use. The lining segment structure can be applied to V-level and VI-level strata in a city subway, the separation distance of the up-down overlapping section tunnels is 2 m-3 m, the shield excavation order of down first and then up is used for supplying technical assurance to the segment structure of the city subway up-down section overlapping shield tunnels under the conditions of up-down overlapping complex lines, and the section overlapping tunnels can better solve the problems of limit of surrounding environment, narrow boundary lines of roads and requirements for a net operation transfer function and is applied widely.

Description

A kind of lining segment structure of the upper and lower interval overlapping shield tunnel of city underground
Technical field
The present invention relates to technical field of civil engineering, and in particular to a kind of upper and lower interval overlapping shield tunnel of city underground Lining segment structure.
Background technology
Since 21 century, China has welcome the unprecedented upsurge in construction of subway, ends for the end of the year 2011, what inland of China had been passed through City has 14, altogether 1688km.Through constantly improving over more than 100 years, shield method with its effect on environment it is little, construction account for The advantages of ground is less, few earth clearance, good economy performance, working security are good, ground adaptability is good, becomes subway sectional tunnel construction Middle first-selected engineering method.
The subway construction of early stage, left and right line running tunnel are more than 1 Bei Dong footpaths, work progress according to separate layout, clear distance And both operation stages influences each other less, special engineering measure need not be taken.With the continuous dilatation of Network scale and existing The restriction of surrounding enviroment, running tunnel occur in that decussation and the running tunnel of the upper and lower parallel overlap of left and right line go out in succession Existing, such as Hangzhou Subway is gone out using 90.495 meters of long overlapping tunnels in Line 1 West Lake Cultural Plaza station~Yin Shanmen station shield interval Cultural Square station, No. 7 lines of Shenzhen Metro magnificent new website~Cladrastis kentukea Rudd hilllock is interval, Radix Crotalariae szemoensis hilllock station~Honghu station is interval and red ridge north~Radix Crotalariae szemoensis Hilllock interval is avoided to construction of structures or is adapted to station pattern using overlapping shield tunnel form.
Therefore, carry out the research work that interval overlapping shield tunnel builds correlation technique up and down significant, especially It is the particular design for solving the problems, such as tunnel segment structure itself.Tunnel segment structure is used for city underground V levels and VI levels stratum, upper and lower overlay region Between tunnel spacing 2m~3m, and using the shield driving order for getting on, get off, be to overlap city ground under complicated alignment condition up and down Ferrum Shield lining segment structure ensures there is provided technology, and overlapping interval tunnel can preferably solve surrounding enviroment system About, the problems such as boundary lines of roads is narrow, functional requirement is changed in gauze operation.
According to patent search result, the at present relevant overlapping shield tunnel of interval up and down build and tunnel segment structure designing technique according to So extremely limit to, only in shield driving order, lower tunnel, movable wheel type trolley supporting system and shield duct piece are noted behind Sizing process.In order to solve, city underground running tunnel is restricted by surrounding enviroment, boundary lines of roads is narrow, gauze operation transfer function is needed Running tunnel overlap problem up and down caused by asking etc., with regard to city underground interval overlapping shield tunnel lining segment structure up and down Design and research are very necessary.
The content of the invention
Restricted by surrounding enviroment for current China's city underground running tunnel, boundary lines of roads is narrow, gauze operation transfer Upper and lower running tunnel overlap problem caused by functional requirement etc., the invention provides a kind of upper and lower interval overlapping shield of city underground The lining segment structure in tunnel, structure safety and deformation and slip casting under various load actions during disclosure satisfy that construction and runing Water resistance and durability that synchronous uniformity, tunnel are used.
A kind of lining segment structure of the upper and lower interval overlapping shield tunnel of city underground, including:By multi-ring section of jurisdiction along longitudinal direction Assembled up shield tunnel chip architecture and descending shield tunnel chip architecture;
Each endless tube piece is circumferentially assemblied to form by three calibrated bolcks, two adjacent blocks and the block that binds;Wherein, lower half Ring is assembled by three calibrated bolcks, and the described block that binds is between two adjacent blocks and by two adjacent blocks and lower semi-ring Calibrated bolck correspondence linking constituting upper semi-ring;
For up shield tunnel chip architecture, on the calibrated bolck of its section of jurisdiction, adjacent block and the block that binds, one is provided only with Hole for hoist;
For descending shield tunnel chip architecture, the calibrated bolck of its section of jurisdiction are provided with three holes for hoist, adjacent block is provided with One hole for hoist and two injected holes, the block that binds are provided with a hole for hoist;
Described up shield tunnel chip architecture and descending shield tunnel chip architecture are using the fissure of displacement of one group of two ring Erection method.
On described calibrated bolck, between the hole of hole for hoist, angle is 22.5 °;Hole for hoist in described adjacent block is set by centre Put, two injected holes are respectively arranged on adjacent block two ends.
A diameter of 50mm of described hole for hoist, a diameter of 100mm of injected hole.
Described hole for hoist doubles as injected hole.
For arbitrary endless tube piece, the wherein central angle of calibrated bolck is 67.5 °, and the central angle of adjacent block is 68.75 °, is bound The central angle of block is 20 °.
For arbitrary endless tube piece, its ring and longitudinal direction are with bolts.
The each seam crossing of described section of jurisdiction ring arranges two bolts, and longitudinal direction arranges 16 bolts altogether, wherein the block that binds sets One, each adjacent block and calibrated bolck are all provided with three.
Preferably, the section of jurisdiction of described descending shield tunnel chip architecture adopts and strengthens Reinforcement Design and wherein bolt employing M36 types, the section of jurisdiction of up shield tunnel chip architecture adopt the bolt of M30 types;To meet in uplink tunnel shield tunneling process It is middle because under the load actions such as shield machine weight, downlink tunnel tunnel segment structure stress safety problem.
Preferably, with regard to the staggered joint erection mode of one group of two ring, wherein the block that binds of an endless tube piece is left from directly over vault 11.25 ° of deflection, then from directly over vault, right avertence turns 11.25 ° to the block that binds of another endless tube piece, it is possible to increase downlink tunnel section of jurisdiction The overall bending rigidity of structure.
For upper and lower interval overlapping shield tunnel, middle stratum only 2~3m, by the driving disturbance of upper and lower tunneling shield it is big, hold Loading capability is low, and particularly when uplink tunnel shield driving, its body gravity load is obvious to its compression, so as to be delivered to On lower Structural Test of Tunnel Segments, cause safety problem, intermediate course grouting and reinforcing process need to be carried out from leading tunnel, thus it is necessary Particular design is carried out to downlink tunnel tunnel segment structure.The important feature of the present invention is to get on, get off shield-tunneling construction sequentially for employing City underground up and down interval overlapping tunnel downlink tunnel tunnel segment structure has carried out particular design, be mainly manifested in following four side Face:
(1) in order to meet downlink tunnel lining cutting in uplink tunnel shield tunneling process because of load actions such as shield machine weight Lower structure stress safety problem, downlink tunnel tunnel segment structure improve 30% using Reinforcement Design, rebar ratio is strengthened, bolt Improve a grade and use M36 types instead.
(2) from erection method improving the overall bending rigidity of downlink tunnel tunnel segment structure, employ one group of two ring Staggered joint erection mode, i.e. the first endless tube piece bind block from directly over vault left avertence turn 11.25 °, the second endless tube piece bind block then from Directly over vault, right avertence turns 11.25 °.
(3) downlink tunnel tunnel segment structure injected hole increases to 16 by 6, meets tunnel surrounding formation slip casting spacing longitudinal direction 1.2m, ring 1.217m, so as to realize downlink tunnel surrounding formation longitudinal direction and the uniform slip casting of ring, reach reinforcing and stablize descending tunnel Road effect.
(4) each adjacent block two ends of downlink tunnel lining segment structure are all provided with the injected hole of 1 diameter 100mm, because The increase of bore dia, can carry out the grouting and reinforcing of interlayer different directions between upper and lower tunnel, so as to realize interlayer between upper and lower tunnel Effective reinforcing.
Therefore, during tunnel segment structure of the present invention disclosure satisfy that construction, shield machine weight, the pressure of shield machine applying and stratum are opened Structure safety and deformation under Water And Earth Pressures and subway train load action during digging the construction loads such as Stress Release and runing, together When meet the synchronous uniform mortar depositing construction performance of interlayer between secondary grouting and upper and lower overlapping tunnel after tunnel segment structure wall, finally meet Water resistance and durability that tunnel is used.The tunnel segment structure can be used for city underground V levels and VI levels stratum, upper and lower overlapping interval Tunnel spacing 2m~3m, and using the shield driving order for getting on, get off, be to overlap city underground under complicated alignment condition up and down Shield lining segment structure ensures there is provided technology, and overlapping interval tunnel can preferably solve surrounding enviroment system About, boundary lines of roads is narrow, gauze operation transfer functional requirement the problems such as and be widely used.
Description of the drawings
Fig. 1 is the piecemeal schematic diagram of tunnel segment structure of the present invention.
Fig. 2 (a) is the first endless tube piece staggered joint erection schematic diagram of tunnel segment structure of the present invention.
Fig. 2 (b) is the second endless tube piece staggered joint erection schematic diagram of tunnel segment structure of the present invention.
Fig. 3 (a) is up shield tunnel chip architecture injected hole of the invention and hole for hoist arrangement schematic diagram.
Fig. 3 (b) is descending shield tunnel chip architecture injected hole of the invention and hole for hoist arrangement schematic diagram.
Specific embodiment
In order to more specifically describe the present invention, below in conjunction with the accompanying drawings and specific embodiment is to technical scheme It is described in detail.
The track clearance required diameter of the Shield of the present embodiment is 5200mm, additionally, it is contemplated that shield tunnel is applied Construction error, malformation, tunnel subsidence and measurement error that man-hour will occur etc., reserve 150mm in tunnel perimeter, i.e., In tunnel duct piece, headroom is 5500mm.
Present embodiment adopts the plate tunnel segment structure of prefabricated reinforced concrete, and fabric width 1200mm, thickness are 350mm;Such as Shown in Fig. 1, each endless tube piece is divided into piece calibrated bolck of 6 pieces, i.e., 3 (67.5 ° of central angle), 2 pieces of adjacent blocks (68.75 ° of central angle), and one Block binds block (20 ° of central angle).
Curved bolt connection, ring is adopted there are totally 12,2 bolts per seam between section of jurisdiction, longitudinal direction sets 16 bolts (envelope altogether Jacking block 1, calibrated bolck and adjacent block are per block 3).
In order to meet downlink tunnel lining cutting in uplink tunnel shield tunneling process because under the load actions such as shield machine weight Structure safety problem, downlink tunnel tunnel segment structure improve a grade using Reinforcement Design, bolt is strengthened.
Present embodiment improves the overall bending rigidity of downlink tunnel tunnel segment structure from erection method, using two rings one The staggered joint erection mode of group, i.e. the first endless tube piece block left avertence from directly over vault that binds turn 11.25 °, shown in such as Fig. 2 (a);Second Endless tube piece binds, and then from directly over vault, right avertence turns 11.25 ° to block, such as shown in Fig. 2 (b), is just met for central angle between longitudinal bolt 22.5°。
Present embodiment due between interval overlapping shield tunnel thickness be only 2~3m;For up duct pieces of shield tunnel, As shown in Fig. 3 (a), the hole for hoist of 1 diameter 50mm is only set per block, and doubles as injected hole, totally 6.For descending shield tunnel Shown in road section of jurisdiction, such as Fig. 3 (b), every piece of calibrated bolck arranges the hole of 3 diameter 50mm as hole for hoist and injected hole, angle between hole For 22.5 °;Every piece of adjacent block arranges the hole of 1 diameter 50mm near centre and is used as hole for hoist and injected hole, and two ends arrange straight Injected hole of the footpath for 100mm;The block that binds arranges the hole of 1 diameter 50mm and is used as hole for hoist and injected hole;Totally 16.
In present embodiment, the allowable error that monolithic section of jurisdiction makes:Width ± 0.3mm;Arc, chord length ± 1.0mm;Thickness ± 1.0mm;Inside radius ± 1.0mm;Ring bolt hole and hole position ± 1.0mm.The allowable error of erecting ring in whole:Section of jurisdiction processed finished products go out Lining Ring preassembling should be carried out before factory;0.6~the 0.8mm of anchor ring gap of adjacent ring;The adjacent block gap of longitudinal joint is 1.5~2.5mm; Longitudinal bolt aperture, hole position are respectively ± 1mm, Lining Ring external diameter ± 3.0mm;Axis based error≤50mm during propulsion.
Additionally, the tunnel segment structure of present embodiment need to meet following technical standard:
(1) structure design service life is 100 years;
(2) safe class of structure is one-level, and important coefficient is 1.1;
(3) structure is provided fortification against earthquakes by 7 degree, seismic behavior three-level;
(4) structure design is by 6 grades of people's air defense checking computations;
(5) liner structure deformation analysis:Calculated diameter deforms≤2 ‰ D (D is tunnel external diameter);
(6) tunnel segment structure crack allowance is carried out but is not allowed insertion, but fracture width≤0.2mm;
(7) when structural anti-buoyancy safety coefficient does not consider side friction power >=1.05, it is considered to during side friction power >=1.1;
(8) shield running tunnel classification of waterproof is two grades;
The tunnel segment structure material of present embodiment is by chosen below:
(1) strength grade of concrete C50, seepage-resistant grade are not less than P10;
(2) reinforcing bar grade:Regular reinforcement preferably adopts HPB300 levels and HRB400 levels, welding rod E4303, E5003.Reinforcing bar it is anti- Tensile strength measured value is no less than 1.25 with the ratio of yield strength measured value;The yield strength measured value of reinforcing bar and yield strength mark The ratio of quasi- value not should be greater than 1.3, and percentage of total elongation measured value of the reinforcing bar under maximum pull is no less than 9%;
(3) the bolt 5.8 grades of plain bolts that adopt performance rate made by Q235 steel, and make preservative treatment.
The tunnel segment structure design life of present embodiment is 100 years, and its durability concrete material should meet as follows Require:
(1) concrete of large volume pouring is avoided using high aquation Hot Cement, and concrete is preferentially adopted mixes high efficiency water reducing agent Plus the dual mixing technology of high-quality fly ash, top, base plate, side wall preferably adopt high-performance compensation to shrink water-proof concrete;
(2) Binder Materials, minimum amount 360kg/m are strictly controlled3, research on maximum utilized quantity 480kg/m3
(3) limit water-cement ratio:Maximum water-cement ratio 0.36;
(4) the maximum chloride ion content in concrete is 0.06%;
(5) preferably use non-alkali active aggregate;When using alkali active aggregate, the maximum alkalinity in concrete is 3.0kg/ m3.And less than the 0.6% of cement weight;
(6) molding temperature≤30 ° are strictly controlled.
The tunnel segment structure of present embodiment includes technical standard, structural material, durability Design requirement, structure design, note Slurry hole and hole for hoist design, waterproofing design, section of jurisdiction manufacture and splicing accuracy and erection method;After the tunnel segment structure is suitable for first descending Upper sequence of construction, V levels and VI levels stratum, up and down interval overlapping tunnel spacing 2m~3m conditions, it is each during meeting construction and runing Plant structure safety and deformation and slip casting synchronization uniformity, tunnel are used under load action water resistance and durability.
The above-mentioned description to embodiment is to be understood that for ease of those skilled in the art and apply this It is bright.Person skilled in the art obviously easily can make various modifications to above-described embodiment, and described herein General Principle is applied in other embodiment without through performing creative labour.Therefore, the invention is not restricted to above-described embodiment, Those skilled in the art's announcement of the invention, the improvement made for the present invention and modification all should be in the protections of the present invention Within the scope of.

Claims (3)

1. the lining segment structure of the upper and lower interval overlapping shield tunnel of a kind of city underground, including:By multi-ring section of jurisdiction along longitudinal direction spelling The up shield tunnel chip architecture and descending shield tunnel chip architecture of dress;It is characterized in that:
Each endless tube piece is circumferentially assemblied to form by three calibrated bolcks, two adjacent blocks and the block that binds;Wherein, lower semi-ring by Three calibrated bolcks are assembled, described to bind block between two adjacent blocks and the mark by two adjacent blocks and lower semi-ring Quasi- block correspondence is connected to constitute upper semi-ring;
For up shield tunnel chip architecture, it is provided only with each calibrated bolck of its section of jurisdiction, each adjacent block and the block that binds One hole for hoist;
For descending shield tunnel chip architecture, three holes for hoist, each adjacent block on each calibrated bolck of its section of jurisdiction, are equipped with On be equipped with a hole for hoist and two injected holes, the block that binds is provided with a hole for hoist;
Described up shield tunnel chip architecture and descending shield tunnel chip architecture are using the staggered joint erection of one group of two ring Mode;
For descending shield tunnel chip architecture, on described calibrated bolck, between the hole of hole for hoist, angle is 22.5 °;Described is adjacent Hole for hoist on block leans on middle setting, two injected holes to be respectively arranged on adjacent block two ends;
A diameter of 50mm of described hole for hoist, a diameter of 100mm of injected hole;
For arbitrary endless tube piece, the wherein central angle of calibrated bolck is 67.5 °, and the central angle of adjacent block is 68.75 °, and bind block Central angle is 20 °;
For arbitrary endless tube piece, its ring and longitudinal direction are with bolts;Described descending shield tunnel chip architecture Section of jurisdiction adopts M30 types using Reinforcement Design and wherein bolt is strengthened using M36 types in the section of jurisdiction of up shield tunnel chip architecture Bolt;
With regard to two rings, one group of staggered joint erection mode, wherein the block left avertence from directly over vault that binds of an endless tube piece turns 11.25 °, Then from directly over vault, right avertence turns 11.25 ° to the block that binds of another endless tube piece.
2. lining segment structure according to claim 1, it is characterised in that:Described hole for hoist doubles as injected hole.
3. lining segment structure according to claim 1, it is characterised in that:The each seam crossing arrangement of described section of jurisdiction ring Two bolts, longitudinal direction arrange 16 bolts altogether, wherein the block that binds sets one, each adjacent block and calibrated bolck are all provided with three.
CN201510066597.4A 2015-02-09 2015-02-09 Lining segment structure of city subway up-down section overlapping shield tunnels Active CN104612711B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510066597.4A CN104612711B (en) 2015-02-09 2015-02-09 Lining segment structure of city subway up-down section overlapping shield tunnels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510066597.4A CN104612711B (en) 2015-02-09 2015-02-09 Lining segment structure of city subway up-down section overlapping shield tunnels

Publications (2)

Publication Number Publication Date
CN104612711A CN104612711A (en) 2015-05-13
CN104612711B true CN104612711B (en) 2017-04-19

Family

ID=53147336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510066597.4A Active CN104612711B (en) 2015-02-09 2015-02-09 Lining segment structure of city subway up-down section overlapping shield tunnels

Country Status (1)

Country Link
CN (1) CN104612711B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649648B (en) * 2015-12-29 2017-10-31 宁波市轨道交通集团有限公司 The section of jurisdiction attachment structure and its construction method of class rectangle shield tunnel
CN105781576A (en) * 2016-03-24 2016-07-20 黄河勘测规划设计有限公司 Parallelogram segment body structure for shield tunneling machine
CN105909271B (en) * 2016-05-31 2017-12-22 中国科学院武汉岩土力学研究所 TBM tunnels are light, weigh pipe-plate lining combining structure and its design method
CN105909275B (en) * 2016-06-27 2018-06-15 中国电建集团成都勘测设计研究院有限公司 Only starch antiseepage section of jurisdiction and tunnel pipe sheet built structure
CN106640122A (en) * 2016-07-11 2017-05-10 铁道第三勘察设计院集团有限公司 Multi-centered round shield tunnel lining
CN107435544A (en) * 2017-05-25 2017-12-05 中铁十四局集团有限公司 A kind of construction method of one-tunnel two-tracks composite lining shield tunnel internal structure
CN107762530B (en) * 2017-11-08 2019-05-21 西南交通大学 A kind of method of partition of shield tunnel liner ring
CN108286445A (en) * 2018-01-05 2018-07-17 徐州新通预制构件制造有限公司 A kind of shield tunnel liner ring
CN108225757A (en) * 2018-01-09 2018-06-29 上海应用技术大学 A kind of superimposing thread tunnel influences each other tunnel segment structure mechanical stae field testing procedure
CN108590679A (en) * 2018-04-18 2018-09-28 重庆建工第七建筑工程有限责任公司 Utilize the construction method for walking support truck jumbo overlapping tunnel
CN108361045A (en) * 2018-04-23 2018-08-03 同济大学 A kind of duct pieces of shield tunnel being adapted to soft soil layer
CN109458185B (en) * 2018-11-22 2020-09-01 重庆大学 Construction method for vertically overlapped crossed parallel tunnel shield
CN109779655B (en) * 2019-01-03 2020-10-23 中铁隧道集团二处有限公司 Construction method for assembling staggered joints of shield segments
CN109723463B (en) * 2019-03-01 2024-03-22 中铁工程服务有限公司 Selection instrument suitable for six piecemeal section of jurisdictions
CN110295921A (en) * 2019-06-26 2019-10-01 广州穗岩土木科技股份有限公司 A kind of construction method of shield section grouting and reinforcing
CN111594199A (en) * 2020-05-20 2020-08-28 中铁二局集团有限公司 Construction method for wall back backfilling of double-shield TBM

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4497590A (en) * 1982-03-08 1985-02-05 Crs Group, Inc. Tunnel lining
CN101881172B (en) * 2010-06-22 2012-02-08 中铁第四勘察设计院集团有限公司 Shield tunnel pipe segment adopting complete non-axial blocking surface
CN202866818U (en) * 2012-08-29 2013-04-10 中铁二院工程集团有限责任公司 Shield method tunnel circular prefabricated reinforced concrete lining structure
CN203271763U (en) * 2013-02-07 2013-11-06 广东省水利电力勘测设计研究院 Lining segment for sea-crossing shield tunnel
CN103277110A (en) * 2013-05-13 2013-09-04 中铁十四局集团有限公司 Construction method of overlapped shield tunnel
CN203335090U (en) * 2013-07-10 2013-12-11 广州地铁设计研究院有限公司 Shield segment
CN103643966B (en) * 2013-12-31 2015-08-19 西南交通大学 A kind of assembling tunnel lining segment
CN204511458U (en) * 2015-02-09 2015-07-29 浙江省交通规划设计研究院 The lining segment structure of overlapping shield tunnel between a kind of city underground upper and lower region

Also Published As

Publication number Publication date
CN104612711A (en) 2015-05-13

Similar Documents

Publication Publication Date Title
CN104612711B (en) Lining segment structure of city subway up-down section overlapping shield tunnels
CN101864959B (en) Method for tunneling construction of main structure of underground station
CN106337686B (en) Three layers of subway station canopy structure of rocky stratum tunneling and construction method
CN106930777B (en) The construction method that Bored Section of Metro main track assembled two serves as a contrast
CN106150519B (en) A kind of tunneling boring prefbricated tunnel lining structure and construction method for drill+blast tunnel
CN206942764U (en) The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole
CN106014449B (en) The construction method of two-wire small interval big cross section jointed rock mass subway tunnel
RU2510444C2 (en) Three-arched underground station of column type and its erection methods (yurkevich device and methods)
CN109083682A (en) A kind of construction method of mine working antiseepage high intensity fire dam
CN104612696B (en) Overpass column hole method construction method is passed through in big cross section tunneling subway station in fine sand layer
CN205205857U (en) Integral concrete utility tunnel of prefabricated assembly
CN104260199B (en) A kind of Wavelike steel webplate prestressed concrete I-beam prefabricating and constructing
CN105649653B (en) Circle special cross section Tunneling by mining method structure and its construction method are not waited up and down
CN105332710A (en) Construction method suitable for up-down overlapped tunnel with small clear space and long distance under weak geological condition
CN204457792U (en) A kind ofly dig large diameter shield tunnel with many pilot tunnel methods and the subway station of building
CN106436592A (en) Bridge widening structure using Z-shaped steel plate connectors and construction method thereof
CN205895242U (en) Low -angle crossing tunnel structure
CN201407054Y (en) Segment connecting structure of subway shield tunnel
CN113202173A (en) Construction method for temporarily replacing cross-foundation-pit concrete pipe with steel pipe in deep foundation pit construction
CN204511458U (en) The lining segment structure of overlapping shield tunnel between a kind of city underground upper and lower region
CN106284085B (en) It is close to both wired deep water foundation Large-Span Continuous beam construction methods
CN108361045A (en) A kind of duct pieces of shield tunnel being adapted to soft soil layer
CN208702421U (en) The tunnel support structure of existing pile foundation building is worn under a kind of
CN107339109A (en) The construction method of existing road is worn under super Shallow tunnel with large cross-section
CN204080643U (en) The prefabricated constructing structure of a kind of Wavelike steel webplate prestressed concrete i beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 89 round City West Road, Xihu District, Hangzhou, Zhejiang

Co-patentee after: Ningbo Institute of Technology, Zhejiang University

Patentee after: Zhejiang transportation planning and Design Research Institute Co., Ltd.

Address before: No. 89 round City West Road, Xihu District, Hangzhou, Zhejiang

Co-patentee before: Ningbo Institute of Technology, Zhejiang University

Patentee before: Zhejiang Provincial Plan Design&Research Institute of Communications

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 928, yuhangtang Road, Xihu District, Hangzhou City, Zhejiang Province 310011

Patentee after: Zhejiang shuzhijiaoyuan Technology Co.,Ltd.

Patentee after: Zhejiang University of science and engineering Ningbo

Address before: 310006 No. 89 West Ring Road, Hangzhou, Zhejiang, Xihu District

Patentee before: ZHEJIANG PROVINCIAL INSTITUTE OF COMMUNICATIONS PLANNING DESIGN & RESEARCH Co.,Ltd.