CN203335090U - Shield segment - Google Patents
Shield segment Download PDFInfo
- Publication number
- CN203335090U CN203335090U CN2013204106595U CN201320410659U CN203335090U CN 203335090 U CN203335090 U CN 203335090U CN 2013204106595 U CN2013204106595 U CN 2013204106595U CN 201320410659 U CN201320410659 U CN 201320410659U CN 203335090 U CN203335090 U CN 203335090U
- Authority
- CN
- China
- Prior art keywords
- lining ring
- shield duct
- adjacent block
- duct piece
- calibrated bolck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model provides a shield segment which comprises at least one lining ring, the lining rings are connected through longitudinal bolts, each lining ring comprises a top sealing block, at least one adjoined block and at least one standard block, and the top sealing block, the adjoined block and the standard block are connected through annular bolts. The shield segment can be used for a tunnel which is low in headroom requirement, like an electricity power tunnel or various municipal administration pipelines, and can be used for construction deviation correction or curve simulation.
Description
Technical field
The utility model relates to a kind of shield duct piece, by the piece that binds, adjacent block and calibrated bolck, is spliced.
Background technology
Shield method has become the main construction of domestic subterranean tunnel, has been widely used in the construction of underground railway, river-crossing tunnel.Domestic subway tunnel track clearance is diameter 5.2m, and the shield duct piece internal diameter mostly is 5.4m or 5.5m.And for Clearance requirement less tunnel, as electric power pipe trench etc., how its shield duct piece designs not yet report.
The utility model content
The technical problems to be solved in the utility model is to provide a kind of shield duct piece, tunnel that can be less for Clearance requirement, and as electric power tunnel and various municipal pipeline, and can construct correction or curve simulation, there is versatility.
For solving above technical problem, the utility model has adopted following technical scheme:
A kind of shield duct piece, comprise at least one Lining Ring, between described Lining Ring, with at least one longitudinal bolt, connect, described Lining Ring comprises the piece that binds, at least one adjacent block and at least one calibrated bolck, between the described piece that binds, adjacent block and calibrated bolck, with at least one hoop bolt, connects.
Described Lining Ring is standard Lining Ring, left-hand bend Lining Ring or right-hand bend Lining Ring.
The wedge shape amount of described left-hand bend Lining Ring and right-hand bend Lining Ring is 41mm.
Described longitudinal bolt is arranged on calibrated bolck and adjacent block.
The described piece that binds is set to one, and described adjacent block is set to two, and described calibrated bolck is set to three.
Described calibrated bolck is positioned at the bottom of shield machine, and connects successively, and described adjacent block is positioned at the two ends of calibrated bolck, and the described piece that binds is between adjacent block.
The described piece that binds is wedge.
Described hoop bolt is bent bolt.
The internal diameter of described Lining Ring is that 3.6m, thickness are that 250mm, width are 0.8~1.0m.
Adopt above technical scheme, the obtained beneficial effect of the utility model is: the utility model provides a kind of shield duct piece, tunnel that can be less for Clearance requirement, as electric power tunnel and various municipal pipeline, and can construct correction or curve simulation.
The accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, technology of the present utility model is described in further detail:
The structure chart of the Lining Ring that Fig. 1 is the utility model shield duct piece;
The A that Fig. 2 is Fig. 1 is to view;
The B that Fig. 3 is Fig. 1 is to view;
The unfolding assumption diagram of the Lining Ring that Fig. 4 is the utility model shield duct piece;
The sectional drawing at the A-A place that Fig. 5 is Fig. 4.
The specific embodiment
As Fig. 1, Fig. 2, shown in Fig. 3 and Fig. 4, shield duct piece described in the utility model, comprise at least one Lining Ring, described Lining Ring comprises the piece 1 that binds, at least one adjacent block 2 and at least one calibrated bolck 3, the present embodiment is the piece 1 that binds, two adjacent block 2 and three calibrated bolcks 3, thickness is 250mm, width is 0.8~1.0m, bind piece 1 for wedge shape, calibrated bolck 3 is arc, piece 1 binds, adjacent block 2 and calibrated bolck 3 are spliced into sealing and Lining Ring that end face is level and smooth by shield machine, the internal diameter of Lining Ring is 3.6m, three calibrated bolcks 3 are positioned at the Lining Ring bottom and connect successively, two adjacent block 2 are connected to calibrated bolck 3 two ends, bind piece 1 between adjacent block 2, piece 1 binds, be provided with circumferential weld bolt hand hole 4 on adjacent block 2 and calibrated bolck 3, circumferential weld bolt hand hole 4 is arranged on the both sides of each piece, and arrange in pairs, be used for erection loop to bolt, longitudinal joint bolt hand hole 5 is set on adjacent block 2 and calibrated bolck 3, longitudinal joint bolt hand hole 5 is arranged on the two ends of adjacent block 2 and calibrated bolck 3, and arrange in pairs at two ends, for longitudinal bolt is installed, as shown in Figure 5, bind between piece 1 and adjacent block 2 and share 12 hoop bolts between adjacent block 2 and calibrated bolck 3 and between calibrated bolck 3 and be connected and fixed, between Lining Ring, with 10 longitudinal bolts, be fixedly connected with, longitudinal bolt respectively distributes 2 in calibrated bolck 3 and the end of adjacent block 2, bind on piece 1 longitudinal bolt is not set, angle between adjacent longitudinal bolt is 36 °.After the piece 1 that binds, adjacent block 2 and calibrated bolck 3 are spliced into ring, longitudinal joint bolt hand hole 5 distance diametrically equates, while connecting between Lining Ring, between the piece of adjacent Lining Ring and piece, the fissure of displacement is connected, as shown in Figure 4.
Described Lining Ring is standard Lining Ring, left-hand bend Lining Ring or right-hand bend Lining Ring, standard Lining Ring width everywhere is the same, the wedge shape amount of left-hand bend Lining Ring and right-hand bend Lining Ring is 41mm, the wedge shape amount is the Breadth Maximum of cambridge ring and minimum widith poor namely, limit cornering ability is 105m, in order to meet the needs of curve simulation and construction correction, generally shield duct piece is connected successively by the standard Lining Ring, when finding that deflection appears in shield duct piece, just can be adjusted with left-hand bend Lining Ring or right-hand bend Lining Ring.
The shield duct piece that the utility model provides, tunnel that can be less for Clearance requirement, as electric power tunnel and various municipal pipeline, and can construct correction or curve simulation.
Finally it should be noted that: these are only preferred embodiment of the present utility model; be not limited to the utility model; although with reference to embodiment, the utility model is had been described in detail; for a person skilled in the art; its technical scheme that still can put down in writing aforementioned each embodiment is modified; perhaps part technical characterictic wherein is equal to replacement; but all within spirit of the present utility model and principle; any modification of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.
Claims (10)
1. a shield duct piece, it is characterized in that: comprise at least one Lining Ring, between described Lining Ring, with at least one longitudinal bolt, connect, described Lining Ring comprises the piece that binds, at least one adjacent block and at least one calibrated bolck, between the described piece that binds, adjacent block and calibrated bolck, with at least one hoop bolt, connects.
2. shield duct piece according to claim 1, it is characterized in that: described Lining Ring is standard Lining Ring, left-hand bend Lining Ring or right-hand bend Lining Ring.
3. shield duct piece according to claim 2, it is characterized in that: the wedge shape amount of described left-hand bend Lining Ring and right-hand bend Lining Ring is 41mm.
4. shield duct piece according to claim 1, it is characterized in that: described longitudinal bolt is arranged on calibrated bolck and adjacent block.
5. shield duct piece according to claim 1, it is characterized in that: the described piece that binds is set to one, and described adjacent block is set to two, and described calibrated bolck is set to three.
6. shield duct piece according to claim 5, it is characterized in that: described calibrated bolck is positioned at the bottom of shield machine, and connects successively, and described adjacent block is positioned at the two ends of calibrated bolck, and the described piece that binds is between adjacent block.
7. shield duct piece according to claim 6, it is characterized in that: the described piece that binds is wedge.
8. shield duct piece according to claim 1, it is characterized in that: described hoop bolt is bent bolt.
9. shield duct piece according to claim 1, it is characterized in that: the internal diameter of described Lining Ring is that 3.6m, thickness are 250mm.
10. shield duct piece according to claim 1, it is characterized in that: the width of described Lining Ring is 0.8~1.0m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013204106595U CN203335090U (en) | 2013-07-10 | 2013-07-10 | Shield segment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013204106595U CN203335090U (en) | 2013-07-10 | 2013-07-10 | Shield segment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203335090U true CN203335090U (en) | 2013-12-11 |
Family
ID=49703768
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013204106595U Expired - Lifetime CN203335090U (en) | 2013-07-10 | 2013-07-10 | Shield segment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203335090U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104213928A (en) * | 2014-09-09 | 2014-12-17 | 同济大学 | Horseshoe-shaped shield tunnel lining structure |
CN104612711A (en) * | 2015-02-09 | 2015-05-13 | 浙江省交通规划设计研究院 | Lining segment structure of city subway up-down section overlapping shield tunnels |
CN104947709A (en) * | 2015-04-15 | 2015-09-30 | 上海市政工程设计研究总院(集团)有限公司 | Pre-assembled single-compartment municipal tunnel and construction method thereof |
CN105781576A (en) * | 2016-03-24 | 2016-07-20 | 黄河勘测规划设计有限公司 | Parallelogram segment body structure for shield tunneling machine |
CN106194206A (en) * | 2016-07-18 | 2016-12-07 | 广州地铁设计研究院有限公司 | A kind of duct pieces of shield tunnel information visualization modeling method |
CN106956359A (en) * | 2017-04-24 | 2017-07-18 | 西南交通大学 | A kind of tunnel model test shield duct piece prepares mould |
CN108547634A (en) * | 2018-02-24 | 2018-09-18 | 济南轨道交通集团有限公司 | It is a kind of to be used in the collapsible section of jurisdiction that tunnel internal is removed and construction method |
CN110043281A (en) * | 2019-05-09 | 2019-07-23 | 上海市城市建设设计研究总院(集团)有限公司 | Rectangular shield section of jurisdiction composite structure and method suitable for any transition curve |
-
2013
- 2013-07-10 CN CN2013204106595U patent/CN203335090U/en not_active Expired - Lifetime
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104213928A (en) * | 2014-09-09 | 2014-12-17 | 同济大学 | Horseshoe-shaped shield tunnel lining structure |
CN104213928B (en) * | 2014-09-09 | 2016-04-06 | 同济大学 | A kind of liner structure of shape of a hoof shield tunnel |
CN104612711A (en) * | 2015-02-09 | 2015-05-13 | 浙江省交通规划设计研究院 | Lining segment structure of city subway up-down section overlapping shield tunnels |
CN104947709A (en) * | 2015-04-15 | 2015-09-30 | 上海市政工程设计研究总院(集团)有限公司 | Pre-assembled single-compartment municipal tunnel and construction method thereof |
CN105781576A (en) * | 2016-03-24 | 2016-07-20 | 黄河勘测规划设计有限公司 | Parallelogram segment body structure for shield tunneling machine |
CN106194206A (en) * | 2016-07-18 | 2016-12-07 | 广州地铁设计研究院有限公司 | A kind of duct pieces of shield tunnel information visualization modeling method |
CN106956359A (en) * | 2017-04-24 | 2017-07-18 | 西南交通大学 | A kind of tunnel model test shield duct piece prepares mould |
CN108547634A (en) * | 2018-02-24 | 2018-09-18 | 济南轨道交通集团有限公司 | It is a kind of to be used in the collapsible section of jurisdiction that tunnel internal is removed and construction method |
CN108547634B (en) * | 2018-02-24 | 2019-08-13 | 济南轨道交通集团有限公司 | It is a kind of in the shrinkable section of jurisdiction that tunnel internal is removed and construction method |
CN110043281A (en) * | 2019-05-09 | 2019-07-23 | 上海市城市建设设计研究总院(集团)有限公司 | Rectangular shield section of jurisdiction composite structure and method suitable for any transition curve |
CN110043281B (en) * | 2019-05-09 | 2024-04-09 | 上海市城市建设设计研究总院(集团)有限公司 | Rectangular shield segment combined structure and method suitable for arbitrary turning curve |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203335090U (en) | Shield segment | |
CN104314584A (en) | Assembled type jacking pipe piece structure and assembling method thereof | |
CN204156473U (en) | Frp cable protective pipe pipe is rested the head on | |
CN206346737U (en) | A kind of supporting major diameter curve pipe curtain | |
CN204312088U (en) | A kind of pin-connected panel push pipe tunnel segment structure | |
CN202788868U (en) | Duct piece staggered joint and assembly lining structure for fixing inverted arch positions | |
CN203890981U (en) | Hydraulic tunnel structure | |
CN206268710U (en) | A kind of pipeline patching device | |
CN203950935U (en) | Jacking pipe joints ground structure | |
CN204205524U (en) | A kind of single-wall corrugated pipe | |
CN204371413U (en) | A kind of highstrenghtpiston's pipe for escaping | |
CN208830354U (en) | A kind of underground pipe gallery for municipal integration engineering | |
CN202691420U (en) | Plastic pipe connection structure | |
CN202834386U (en) | Three-dimensional hyperbolic steel pipe jacking axis formed transitional device | |
CN204328203U (en) | A kind of PVC-U overlaps line pipe | |
CN206206851U (en) | A kind of special joint of petroleum pipeline | |
CN206148878U (en) | Can dismantle cable protection tubular construction | |
CN204058540U (en) | Rectangular expansion joint for vertical continuous annealing furnace | |
CN204420311U (en) | A kind of heating direct-buried hot water arc pipe | |
CN205383383U (en) | Automatic spacing compensator of intelligence | |
CN204459543U (en) | One-piece type insulating joint | |
CN204358750U (en) | For the heat pipe seal of flue | |
CN203286169U (en) | Concrete conveying pipeline | |
CN103639669A (en) | Method for manufacturing telescopic expansion joint of steel cylinder | |
CN203307362U (en) | Gravitational dust-removing system in blast furnace system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 510010 No. 204 Huanshi West Road, Guangzhou City, Guangdong Province Patentee after: GUANGZHOU METRO DESIGN & RESEARCH INSTITUTE Co.,Ltd. Address before: 510010 No. 204 Huanshi West Road, Guangzhou City, Guangdong Province Patentee before: GUANGZHOU METRO DESIGN & RESEARCH INSTITUTE Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CX01 | Expiry of patent term |
Granted publication date: 20131211 |
|
CX01 | Expiry of patent term |