CN104600643A - 装配式电缆穿墙固定装置及电缆穿墙敷设施工方法 - Google Patents
装配式电缆穿墙固定装置及电缆穿墙敷设施工方法 Download PDFInfo
- Publication number
- CN104600643A CN104600643A CN201510038062.6A CN201510038062A CN104600643A CN 104600643 A CN104600643 A CN 104600643A CN 201510038062 A CN201510038062 A CN 201510038062A CN 104600643 A CN104600643 A CN 104600643A
- Authority
- CN
- China
- Prior art keywords
- cross
- arm
- cable
- floor
- right support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/06—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/22—Installations of cables or lines through walls, floors or ceilings, e.g. into buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
本发明公开了装配式电缆穿墙固定装置及电缆穿墙敷设施工方法,包括左支架和右支架,其特征在于:在左支架和右支架之间通过螺栓固定设有横担,在两个相邻的横担之间设有组合套管。包括以下步骤完成:先在电缆沟内敷设电缆;再固定左支架和右支架,并在顶端部固定设有横担;在电缆上安装组合套管;把作为一组的四根电缆提升起来,使组合套管上侧的左肋板和右肋板插入顶部的横担的空隙内,在此组电缆的下方固定设置第二根横担,并使组合套管下侧的左肋板和右肋板插入第二根横担的空隙内,第二根横担的两端固定在左支架和右支架上;以此类推;最后浇筑混凝土,施工完成。本发明施工安装简便,提高了电缆敷设效率,确保了变电站和线路的正常运行。
Description
技术领域
本发明涉及一种电缆布设中穿墙施工的改进,具体地说是一种装配式电缆穿墙固定装置及电缆穿墙敷设施工方法,主要应用于变电站主控楼穿墙处、电缆盘井进出口等有电缆穿越的墙体洞口位置。
背景技术
在目前的变电站工程和高压线路配出工程中,都会进行电缆穿墙敷设施工作业,既能避免小动物破坏电缆,又可以起到防火墙的防火作用,还可以作为挡水墙起到防止发生内涝灾害等作用。实际的电缆敷设施工,是进行多期分项的施工工程,电缆无法一次敷设完毕,以致后续电缆敷设难度加大。对于防水、防火、防小动物的问题均难以得到妥善解决,这严重影响到变电站和线路电缆运行安全。比如在电缆沟中的电缆敷设作业,是先在电缆沟中安装预制作带孔穿墙隔板,在隔板孔洞位置处放置套管,然后浇筑混凝土墙,最后才是将电缆依次穿过墙上的通孔,敷设完整条电缆,同时施工中还需对电缆加强临时性支护;再如变电站电缆进线作业时,也是先在墙壁上预留孔洞,再在孔洞内放置套管并浇筑混凝土,待凝固后,做电缆敷设并穿过套管。以上技术的不足之处在于:由于需分期施工,所以施工周期较长,且在后期的电缆穿墙施工中,容易破坏混凝土墙体,修复也比较困难,最终会导致送电时间点被延误。
发明内容
本发明的一个目的在于提供一种结构简单、施工安装简便、成本价格较低,无需穿墙操作的装配式电缆穿墙固定装置。
为了达到以上目的,本发明所采用的技术方案是:该装配式电缆穿墙固定装置,包括左支架和右支架,其特征在于:在左支架和右支架之间通过螺栓固定设有横担,在两个相邻的横担之间设有组合套管。
所述的左支架和右支架的断面都呈“T”型。
所述的横担由前置横担和后置横担平行排列组成,并夹持在左支架和右支架的两侧。
所述的左支架和右支架都是由两个断面呈直角的角钢条组成;所述的前置横担和后置横担也是由断面呈直角的角钢条制成的。
所述的组合套管,由左半圆套管、右半圆套管、左肋板、右肋板和销钉构成,左半圆套管与右半圆套管对称,在左半圆套管的外壁中部的上下两侧都固定设有左肋板,在右半圆套管的外壁中部的上下两侧都固定设有右肋板,左肋板与右肋板的外端部都设有通孔,在通孔内设有销钉,上下两侧的左肋板和右肋板分别插入相对应的上下两侧的前置横担和后置横担之间。
本发明的另一个目的在于提供一种确保在电缆敷设过程中无论工期先后如何,均能高效简便施工,并保证能够100%实现防火、防水、防小动物等功能,确保变电站和电缆线路安全正常运行的电缆穿墙敷设施工方法。
为了达到以上目的,本发明所采用的技术方案是:该电缆穿墙敷设施工方法,其特征在于:它包括以下步骤完成:
(一)、先在电缆沟或变电站墙壁孔内敷设电缆;
(二)、再在电缆沟或变电站墙壁孔内的两侧壁上固定设有左支架和右支架,并在左支架和右支架的顶端部通过螺栓固定设有横担,电缆位于左支架和右支架之间;
(三)、在每根电缆上都安装固定上组合套管;
(四)、把作为一组的四根电缆提升起来,使组合套管上侧的左肋板和右肋板插入顶部的横担的前置横担和后置横担之间的空隙内,在此组电缆的下方固定设置第二根横担,并使组合套管下侧的左肋板和右肋板插入第二根横担的前置横担和后置横担之间的空隙内,第二根横担的两端固定在左支架和右支架上;以此类推,提起第二组电缆并固定第三根横担,直至全部电缆固定;
(五)、在所有组合套管的外部浇筑混凝土,并使其与电缆沟侧壁或变电站墙体成为一体,施工完成。
本发明的有益效果在于:结构简单、施工安装简便、成本价格较低,在变电站工程和高压线路配出工程中电缆沟(电缆隧道)内部电缆穿墙时,有效的提高了电缆敷设效率,并实现了防火、防水、防小动物等功能,确保了变电站和线路的正常运行,提高了企业的经济效益。
附图说明
图1为本发明的结构前视示意图。
图2为本发明的结构俯视示意图。
图3为本发明的组合套管的结构放大示意图。
图中:1、左支架;2、右支架;3、螺栓;4、横担;5、组合套管;6、角钢条;41、后置横担;42、前置横担;51、左半圆套管;52、右半圆套管;53、左肋板;54、右肋板;55、销钉。
具体实施方式
参照图1、图2、图3制作本发明。该装配式电缆穿墙固定装置,包括左支架1和右支架2,其特征在于:在左支架1和右支架2之间通过螺栓3固定设有横担4,在两个相邻的横担4之间设有组合套管5。
所述的左支架1和右支架2的断面都呈“T”型。
所述的左支架1和右支架2都是由两个断面呈直角的角钢条6组成。
所述的横担4由前置横担42和后置横担41平行排列组成,并夹持在左支架1和右支架2的两侧。
所述的前置横担42和后置横担41也是由断面呈直角的角钢条制成的。
所述的组合套管5,由左半圆套管51、右半圆套管52、左肋板53、右肋板54和销钉55构成,左半圆套管51与右半圆套管52对称,在左半圆套管51的外壁中部的上下两侧都固定设有左肋板53,在右半圆套管52的外壁中部的上下两侧都固定设有右肋板54,左肋板53与右肋板54的外端部都设有通孔,在通孔内设有销钉55,上下两侧的左肋板53和右肋板54分别插入相对应的上下两侧的前置横担42和后置横担41之间,使用时,将左半圆套管51与右半圆套管52从电缆的两侧夹持在电缆上,再把两个销钉55分别穿入上下两侧的左肋板53和右肋板54的通孔内,从而将组合套管5固定在电缆上。
最佳尺寸是:两个角钢条6的壁厚、前置横担42与后置横担41的间距以及左肋板53与右肋板54的厚度都相等。
该电缆穿墙敷设施工方法,其特征在于:它包括以下步骤完成:
(一)、先在电缆沟或变电站墙壁孔内敷设电缆;
(二)、再在电缆沟或变电站墙壁孔内的两侧壁上固定设有左支架1和右支架2,并在左支架1和右支架2的顶端部通过螺栓3固定设有横担4,电缆位于左支架1和右支架2之间;
(三)、在每根电缆上都安装固定上组合套管5;
(四)、把作为一组的四根电缆提升起来,使组合套管5上侧的左肋板53和右肋板54插入顶部的横担4的前置横担42和后置横担41之间的空隙内,在此组电缆的下方固定设置第二根横担4,并使组合套管5下侧的左肋板53和右肋板54插入第二根横担4的前置横担42和后置横担41之间的空隙内,第二根横担4的两端固定在左支架1和右支架2上;以此类推,提起第二组电缆并固定第三根横担,直至全部电缆固定;
(五)、在所有组合套管5的外部浇筑混凝土,并使其与电缆沟侧壁或变电站墙体成为一体,施工完成。
通过这种方法,在电缆沟或变电站墙壁孔内没有障碍物的情况下,先敷设电缆,由于无需穿墙操作,极大的提高了电缆的敷设速度,降低了劳动强度;另外,在前期电缆敷设完成后,后期可以通过此装配式电缆穿墙固定装置使防火防水防小动物封堵操作简便易行,电缆安全运行可靠性大幅提高,可大面积推广。
Claims (6)
1.装配式电缆穿墙固定装置,包括左支架(1)和右支架(2),其特征在于:在左支架(1)和右支架(2)之间通过螺栓(3)固定设有横担(4),在两个相邻的横担(4)之间设有组合套管(5)。
2.根据权利要求1所述的装配式电缆穿墙固定装置,其特征在于:所述的左支架(1)和右支架(2)的断面都呈“T”型。
3.根据权利要求1所述的装配式电缆穿墙固定装置,其特征在于:所述的横担(4)由前置横担(42)和后置横担(41)平行排列组成,并夹持在左支架(1)和右支架(2)的两侧。
4.根据权利要求2或3所述的装配式电缆穿墙固定装置,其特征在于:所述的左支架(1)和右支架(2)都是由两个断面呈直角的角钢条(6)组成;所述的前置横担(42)和后置横担(41)也是由断面呈直角的角钢条制成的。
5.根据权利要求1所述的装配式电缆穿墙固定装置,其特征在于:所述的组合套管(5),由左半圆套管(51)、右半圆套管(52)、左肋板(53)、右肋板(54)和销钉(55)构成,左半圆套管(51)与右半圆套管(52)对称,在左半圆套管(51)的外壁中部的上下两侧都固定设有左肋板(53),在右半圆套管(52)的外壁中部的上下两侧都固定设有右肋板(54),左肋板(53)与右肋板(54)的外端部都设有通孔,在通孔内设有销钉(55),上下两侧的左肋板(53)和右肋板(54)分别插入相对应的上下两侧的前置横担(42)和后置横担(41)之间。
6.电缆穿墙敷设施工方法,其特征在于:它包括以下步骤完成:
(一)、先在电缆沟或变电站墙壁孔内敷设电缆;
(二)、再在电缆沟或变电站墙壁孔内的两侧壁上固定设有左支架(1)和右支架(2),并在左支架(1)和右支架(2)的顶端部通过螺栓(3)固定设有横担(4),电缆位于左支架(1)和右支架(2)之间;
(三)、在每根电缆上都安装固定上组合套管(5);
(四)、把作为一组的四根电缆提升起来,使组合套管(5)上侧的左肋板(53)和右肋板(54)插入顶部的横担(4)的前置横担(42)和后置横担(41)之间的空隙内,在此组电缆的下方固定设置第二根横担(4),并使组合套管(5)下侧的左肋板(53)和右肋板(54)插入第二根横担(4)的前置横担(42)和后置横担(41)之间的空隙内,第二根横担(4)的两端固定在左支架(1)和右支架(2)上;以此类推,提起第二组电缆并固定第三根横担,直至全部电缆固定;
(五)、在所有组合套管(5)的外部浇筑混凝土,并使其与电缆沟侧壁或变电站墙体成为一体,施工完成。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611082438.4A CN106532574B (zh) | 2015-01-27 | 2015-01-27 | 电缆穿墙敷设施工方法 |
CN201510038062.6A CN104600643B (zh) | 2015-01-27 | 2015-01-27 | 装配式电缆穿墙固定装置及电缆穿墙敷设施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510038062.6A CN104600643B (zh) | 2015-01-27 | 2015-01-27 | 装配式电缆穿墙固定装置及电缆穿墙敷设施工方法 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611082438.4A Division CN106532574B (zh) | 2015-01-27 | 2015-01-27 | 电缆穿墙敷设施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104600643A true CN104600643A (zh) | 2015-05-06 |
CN104600643B CN104600643B (zh) | 2017-02-22 |
Family
ID=53126255
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611082438.4A Active CN106532574B (zh) | 2015-01-27 | 2015-01-27 | 电缆穿墙敷设施工方法 |
CN201510038062.6A Active CN104600643B (zh) | 2015-01-27 | 2015-01-27 | 装配式电缆穿墙固定装置及电缆穿墙敷设施工方法 |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611082438.4A Active CN106532574B (zh) | 2015-01-27 | 2015-01-27 | 电缆穿墙敷设施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN106532574B (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104993427A (zh) * | 2015-07-13 | 2015-10-21 | 国网山东阳谷县供电公司 | 一种电缆卡缆器 |
CN105024322A (zh) * | 2015-07-31 | 2015-11-04 | 国网山东省电力公司淄博供电公司 | 穿墙套管专用固定支架 |
CN106505479A (zh) * | 2016-11-29 | 2017-03-15 | 郑州祥和集团电力安装有限公司 | 隧道内高层支架电缆敷设方法及装置 |
CN106549341A (zh) * | 2016-12-10 | 2017-03-29 | 青岛蓝天创先科技服务有限公司 | 一种现浇泡沫混凝土护套的电缆敷设方法 |
CN110295744A (zh) * | 2019-06-19 | 2019-10-01 | 中国一冶集团有限公司 | 套管模板 |
CN110518519A (zh) * | 2019-09-27 | 2019-11-29 | 江苏扬建集团有限公司 | 装配式强弱电槽道及其施工方法 |
CN111395979A (zh) * | 2019-01-02 | 2020-07-10 | 中国石油天然气股份有限公司 | 油管桥固定装置 |
CN112086927A (zh) * | 2020-09-15 | 2020-12-15 | 殷国辉 | 一种防小动物入室的电缆沟 |
CN112103881A (zh) * | 2020-09-15 | 2020-12-18 | 黄敏 | 一种电缆沟用防小动物装置 |
CN112531593A (zh) * | 2020-12-04 | 2021-03-19 | 安徽信息工程学院 | 一种电气工程用线缆支撑架 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070107332A1 (en) * | 2005-11-03 | 2007-05-17 | Lecuyer & Fils Ltee | Modular framing system |
CN101064421A (zh) * | 2006-02-17 | 2007-10-31 | 烙克赛克股份有限公司 | 电缆保持装置 |
CN201448518U (zh) * | 2009-07-23 | 2010-05-05 | 广东省电力设计研究院 | 组合式门型电缆桥架支架系统 |
CN203387134U (zh) * | 2013-06-17 | 2014-01-08 | 田伟 | 一种电缆穿隔密封装置 |
CN203398675U (zh) * | 2013-06-27 | 2014-01-15 | 营口三桂科技有限公司 | 灵活型电缆穿墙板 |
CN204424831U (zh) * | 2015-01-27 | 2015-06-24 | 国家电网公司 | 装配式电缆穿墙固定装置 |
-
2015
- 2015-01-27 CN CN201611082438.4A patent/CN106532574B/zh active Active
- 2015-01-27 CN CN201510038062.6A patent/CN104600643B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070107332A1 (en) * | 2005-11-03 | 2007-05-17 | Lecuyer & Fils Ltee | Modular framing system |
CN101064421A (zh) * | 2006-02-17 | 2007-10-31 | 烙克赛克股份有限公司 | 电缆保持装置 |
CN201448518U (zh) * | 2009-07-23 | 2010-05-05 | 广东省电力设计研究院 | 组合式门型电缆桥架支架系统 |
CN203387134U (zh) * | 2013-06-17 | 2014-01-08 | 田伟 | 一种电缆穿隔密封装置 |
CN203398675U (zh) * | 2013-06-27 | 2014-01-15 | 营口三桂科技有限公司 | 灵活型电缆穿墙板 |
CN204424831U (zh) * | 2015-01-27 | 2015-06-24 | 国家电网公司 | 装配式电缆穿墙固定装置 |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104993427A (zh) * | 2015-07-13 | 2015-10-21 | 国网山东阳谷县供电公司 | 一种电缆卡缆器 |
CN104993427B (zh) * | 2015-07-13 | 2023-09-19 | 国网山东阳谷县供电公司 | 一种电缆卡缆器 |
CN105024322A (zh) * | 2015-07-31 | 2015-11-04 | 国网山东省电力公司淄博供电公司 | 穿墙套管专用固定支架 |
CN106505479A (zh) * | 2016-11-29 | 2017-03-15 | 郑州祥和集团电力安装有限公司 | 隧道内高层支架电缆敷设方法及装置 |
CN106505479B (zh) * | 2016-11-29 | 2017-12-15 | 郑州祥和集团电力安装有限公司 | 隧道内高层支架电缆敷设方法及装置 |
CN106549341A (zh) * | 2016-12-10 | 2017-03-29 | 青岛蓝天创先科技服务有限公司 | 一种现浇泡沫混凝土护套的电缆敷设方法 |
CN106549341B (zh) * | 2016-12-10 | 2017-12-05 | 青岛蓝天创先科技服务有限公司 | 一种现浇泡沫混凝土护套的电缆敷设方法 |
CN111395979A (zh) * | 2019-01-02 | 2020-07-10 | 中国石油天然气股份有限公司 | 油管桥固定装置 |
CN111395979B (zh) * | 2019-01-02 | 2022-02-01 | 中国石油天然气股份有限公司 | 油管桥固定装置 |
CN110295744B (zh) * | 2019-06-19 | 2021-10-01 | 中国一冶集团有限公司 | 套管模板 |
CN110295744A (zh) * | 2019-06-19 | 2019-10-01 | 中国一冶集团有限公司 | 套管模板 |
CN110518519A (zh) * | 2019-09-27 | 2019-11-29 | 江苏扬建集团有限公司 | 装配式强弱电槽道及其施工方法 |
CN112086927A (zh) * | 2020-09-15 | 2020-12-15 | 殷国辉 | 一种防小动物入室的电缆沟 |
CN112103881A (zh) * | 2020-09-15 | 2020-12-18 | 黄敏 | 一种电缆沟用防小动物装置 |
CN112086927B (zh) * | 2020-09-15 | 2022-01-07 | 殷国辉 | 一种防小动物入室的电缆沟 |
CN112531593A (zh) * | 2020-12-04 | 2021-03-19 | 安徽信息工程学院 | 一种电气工程用线缆支撑架 |
CN112531593B (zh) * | 2020-12-04 | 2022-04-08 | 安徽信息工程学院 | 一种电气工程用线缆支撑架 |
Also Published As
Publication number | Publication date |
---|---|
CN106532574B (zh) | 2018-01-26 |
CN106532574A (zh) | 2017-03-22 |
CN104600643B (zh) | 2017-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104600643A (zh) | 装配式电缆穿墙固定装置及电缆穿墙敷设施工方法 | |
CN204424831U (zh) | 装配式电缆穿墙固定装置 | |
CN103259215A (zh) | 一种可伸缩绝缘杆装置 | |
CN204615332U (zh) | 承力式绝缘耐张线夹 | |
JP2002199563A (ja) | 架空送電線の分岐方法 | |
CN206225974U (zh) | 一种快装式电缆转接箱 | |
CN108173186A (zh) | 一种电气配管入户用配电箱安装工艺 | |
CN105137309B (zh) | 一种能快速测试悬式绝缘子耐压的装置及测试方法 | |
KR101043559B1 (ko) | 절연 폴과 완철 홀더를 이용한 전선 가이선이 없는 무정전 전주교체공법 | |
CN212296397U (zh) | 一种盾构隧道结构 | |
CN206195296U (zh) | 中压电缆连接装置 | |
CN106558842A (zh) | 一种630kva变电箱及安装基础 | |
CN207320772U (zh) | 一种浇筑式防水母线槽 | |
KR102626125B1 (ko) | 간접 활선 공법을 위한 건축용 방호관, 이의 설치 방법 및 철거 방법 | |
CN202260336U (zh) | 10千伏带电作业用绝缘限位挡板 | |
CN113659510B (zh) | 一种高层建筑电气永临结合系统 | |
CN209913428U (zh) | 一种防水型电缆快速插拔户外高压转接箱 | |
CN203326494U (zh) | 一种支持绝缘子墙角固定支架 | |
CN203398737U (zh) | 一种低压电缆短接的短接端子 | |
CN203911382U (zh) | 车辆线束转接件固定装置、车辆中央配电盒以及车辆 | |
CN204243622U (zh) | 铁路隧道施工用高压线路进洞架设结构 | |
CN201804617U (zh) | 一种自承式架空绝缘电缆 | |
CN103094872A (zh) | 一种电缆井内电缆固定装置及固定方法 | |
CN203014324U (zh) | 一种电缆井内电缆固定装置 | |
CN114883996A (zh) | 一种插接口可伸缩的插接式母线槽及其连接方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |